Building Permit (3)'S IDENTIAL
BLDG Permit
PERMIT NUM
City of
Edmonds
www.edmondswa.gov
Type: RESIDENTIAL BLDG
Owner/ Business:
ROGOJAN MAGDELENA & MIREL
Status: ISSUED
Subtype: NEW SINGLE FAMILY
Parcel No: 00373600700802 Site Address: 21705 96TH AVE W EDMONDS,WA 98020-3953
Applied: 11/25/2019
Subdivision: 003736
Lot:
Issued: 3/29/2021
Fire Sprinklers: No Lot
Area: 0
Zoning: RS-8
Final:
Valuation: $471,419.45 Occupancy Type: R3
Construction
Type: VB
Expiration Date: 3/29/2022
Code Edition: 2015 No. Stories: 2
# of Dwelling
Units: 1
Issued by: NED
Scope of Work: ROGOJAN NEW SFR, PLUMBING AND MECHANICAL INLCUDED.
WA State Contractor L & I #: City of Edmonds Business License #: 602454996-001-0001
CONTACTS
NAME TYPE NAME
ADDRESS
PHONE
EMAIL
APPLICANT AL ROGOJAN
23828 BRIER RD, BRIER WA (206)992-6916
BIGALROGO@GMAIL.COM
98036
CONTRACTOR AL ROGOJAN
23828 BRIER RD, BRIER WA (206)992-6916
BIGALROGO@GMAIL.COM
98036
ROGOJAN MAGDELENA & 21705 96TH AVE W, EDMONDS
OWNER
BIGALROGO@GMAIL.COM
MIREL
WA 98020
FEE
INFORMATION
DESCRIPTION
ACCOUNT
AMOUNT
PAID
PAID DATE
RECEIPT#
1 - BASE FEE FOR MECHANICAL
001.000.322.10.000.00
$50.00
$50.00
3/25/21
R11225
PERMITS
1 - BASE FEE FOR PLUMBING
001.000.322.10.000.00
$50.00
$50.00
3/25/21
R11225
PERMITS
APPLIANCE VENTS
001.000.322.10.000.00
$15.00
$15.00
3/25/21
R11225
B-BUILDING PERMIT FEE
001.000.322.10.000.00
$3,332.00
$3,332.00
3/25/21
R11225
B-BUILDING PLAN REVIEW FEE
001.000.345.83.000.00
$2,748.00
$2,748.00
11/25/19
REC078047
B-STATE BUILDING CODE
001.000.237.150
$6.50
$6.50
3/25/21
R11225
SURCHARGE
EACH PLUMBING FIXTURE ON ONE
001.000.322.10.000.00
$255.00
$255.00
3/25/21
R11225
TRAP
EACH VENT OR EXHAUST NOT
CONNECTED TO A HEATING OR AC
001.000.322.10.000.00
$75.00
$75.00
3/25/21
R11225
SYTEM
ENGINEERING INSPECTION FEE
001.000.341.82.000.00
$880.00
$880.00
3/25/21
R11225
FAN CONNECTED TO SINGLE DUCT
001.000.322.10.000.00
$15.00
$15.00
3/25/21
R11225
FURNACE OR FIREPLACE
001.000.322.10.000.00
$60.00
$60.00
3/25/21
R11225
GAS PIPING - NEW OR LOCATED
001.000.322.10.000.00
$30.00
$30.00
3/25/21
R11225
STORMWATER ENGINEER REVIEW
001.000.341.82.000.00
$910.00
$910.00
3/25/21
R11225
FEE
STORMWATER ENGINEER REVIEW
001.000.341.82.000.00
$130.00
$130.00
3/25/21
R11225
FEE
Printed: Sunday, March 28, 2021 12:40:48 PM 1 of 4
DESCRIPTION
ACCOUNT AMOUNT
PAID PAID DATE RECEIPT #
WATER HEATER - INCLUDING
001.000.322.10.000.00
$15.00
$15.00
3/25/21 R11225
EXPANSION TANK
X-PHOTOCOPIES
001.000.341.81.000.00
$17.10
$17.10
3/25/21 R11225
X-TECHNOLOGY FEE
001.000.321.99.100.00
$35.00
$35.00
3/25/21 R11225
TOTALS: $8,623.60 $8,623.60
CONDITION TYPE STATUS NOTES
48 HRS NOTICE-ENGR FINAL
FOR
48 Working hours notice is required when requesting your FINAL engineering inspection.
NFORMATION
It is the owner's responsibility to repair/replace all damage of utilities or frontage
DAMAGE TO FRONTAGE
FOR
improvements in City right of Ways or Easements to City Standards caused by or
IMPROVEMENTS
INFORMATION
occurring during the permitted project.
Damage to Frontage
Applicant shall repair/replace all damage to utilities or frontage improvements in City
Improvments
right-of-way per City standards that is caused by or occurs during the permitted project.
Electrical Permit
Obtain Electrical Permit from State Department of Labor & Industries. 425-290-1309
FOR
Maintain erosion and sedimentation control per City and SWMMW standard
ESC REQ
INFORMATION
requirements.
In addition to the required pressure/relief valve, an approved listed expansion tank shall
Expansion Tank
be installed on all hot water tanks. Per UPC 608.
Approval of this foundation design is conditional subject to inspection of existing site soil
conditions.
Foundation Bearing
Retaining Walls must be designed and constructed to resist the lateral pressure of the
retained material.
Provisions must be made for the control and drainage of surface water around buildings.
Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests,
agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its
Hold Harmless
officials, employees, and agents from any and all claims for damages of whatever nature,
arising directly or indirectly from the issuance for this permit. Issuance of this permit shall
not be deemed to modify, waive or reduce any requirements of any City ordinance nor
limit in any way the City's ability to enforce any ordinance provision.
Hose Bibbs (exterior faucets) are required to have a permanently affixed anti -siphon
Hose Bibbs
device installed.
INSP PRIOR TO BACKFILL
FOR
Call for all required inspections. All work shall be inspected prior to backfill.
NFORMATION
Lot Lines Staked
Lot line stakes must be in place at the time of foundation/setback inspection.
Maximum Height 25 feet. The agent/contractor shall set up the equipment; establish the
datum point and the point of average grade. Call for inspection to verify. These items
Maximum Height
must be consistent with the approved plan. If the proposed height of a building (as
shown on the plans) is within 12 inches of the maximum height permitted for the zone an
elevation survey is required.
Final approval on a project or final occupancy approval must be granted by the Building
Occupancy
Official prior to use or occupancy of the building or structure. Check the job card for all
required City inspections including final project approval and final occupancy inspections.
Printed: Sunday, March 28, 2021 12:40:48 PM 2 of 4
MIDENTIAL BLDG Permit
PERMIT NUM
City of Edmonds
121 . 98020 1 ' .
www.edmondswa.gov •
Any request for alternate design, modification, variance or other administrative deviation
(hereinafter "variance") from adopted codes, ordinances or policies must be specifically
requested in writing and be called out and identified. Processing fees for such request
shall be established by Council and shall be paid upon submittal and are non-refundable.
Permit Disclaimer
Approval of any plat or plan containing provisions which do not comply with city code
and for which a variance has not been specifically identified, requested and considered
by the appropriate city official in accordance with the appropriate provision of city code
or state law does not approve any items not to code specification.
PRV Required
Pursuant to UPC 608 a pressure regulator valve (PRV) shall be installed near the water
shutoff.
Sound/Noise originating from temporary construction sites as a result of construction
activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of
Sound/Noise
7:00am to 6:00pm on weekdays and 10:00am and 6:00pm on Saturdays, excluding
Sundays and Federal Holidays. At all other times the noise originating from construction
sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has
been granted pursuant to ECC 5.30.120.
STORM COVENANT
FOR
A stormwater covenant shall be approved for recording prior to project final approval.
NFORMATION
All new, extended, re -built or relocated electrical utility and/or service shall be placed
Underground Wiring
underground.
Type B or L vent connectors required on fuel -burning appliances passing through
Vent Connectors
unheated spaces. Per IMC 803.2
City approved plastic piping may be used in water service piping provided that where
metal water service piping is used for electrical grounding purposes, replacement piping
Water Service Piping
shall be of like materials (UPC 604.8). A state electrical permit and inspection is required
if electrical grounding is altered, removed, improved, or added. Contact State Dept. of
Labor & Industries Electrical Division at 425-290-1400.
Water Service Shutoff
Pursuant to UPC 605.2 a water service shutoff shall be installed on the water line as it
enters the building.
Installer shall provide the manufacturer's installation, operating instructions, and a whole
Whole House Fan
house ventilation system operation description. A label shall be affixed to the whole
house timer control that reads "Whole House Ventilation" (see operating instructions).
INSPECTIONS
- Schedule Online
at: https://Inspection.MyBuildingPermit.com
COMPLETED
SEQID
INSPECTION TYPE
INSPECTOR
RESULT NOTES
DATE
B-2 SLAB INSULATION
B-7 BUILDING OTHER INSP
X-3 BUILDING FINAL"
X-2 ENGINEERING FINAL
A-1 TESC AND MOBILIZE
E-3 STRM MGMT FACILITY
A-1 BUILDING PRECON
B-2 FOOTINGS
B-2 FOUNDATION WALL
B-2 SETBACKS
B-3 EXT WALL SHEATHING
Printed: Sunday, March 28, 2021 12:40:48 PM 3 of 4
BLDG Permit
City of • • • PERMITNUM
' 11[
-. •:� i 1 ' .
wm . •.
B-3 GAS PIPING TEST
B-3 MECH ROUGH IN
B-3 PLUMB GROUND WK
B-3 PLUMB ROUGH IN
B-3 ROOF SHEATHING
B-3 UNDERFLR FRAMING
B-3 WATER SERVICE LINE
B-4 DRYWALL FASTENING
B-4 FIRESTOPPING
B-4 FRAMING
B-4 HEIGHT VERIFICATION
B-4 INTERIOR SHEAR
B-5 INSULATION ENERGY
E-3 STRM COVENANT
E-3 STRM FOOTING DRAIN
E-3 STRM TIGHTLINE
E-4 WATER SERVICE LINE
E-5 DRIVEWAY SLOPE
E-9 COMPOST AMEND
Printed: Sunday, March 28, 2021 12:40:48 PM 4 of 4