Loading...
Building Permit (3)'S IDENTIAL BLDG Permit PERMIT NUM City of Edmonds www.edmondswa.gov Type: RESIDENTIAL BLDG Owner/ Business: ROGOJAN MAGDELENA & MIREL Status: ISSUED Subtype: NEW SINGLE FAMILY Parcel No: 00373600700802 Site Address: 21705 96TH AVE W EDMONDS,WA 98020-3953 Applied: 11/25/2019 Subdivision: 003736 Lot: Issued: 3/29/2021 Fire Sprinklers: No Lot Area: 0 Zoning: RS-8 Final: Valuation: $471,419.45 Occupancy Type: R3 Construction Type: VB Expiration Date: 3/29/2022 Code Edition: 2015 No. Stories: 2 # of Dwelling Units: 1 Issued by: NED Scope of Work: ROGOJAN NEW SFR, PLUMBING AND MECHANICAL INLCUDED. WA State Contractor L & I #: City of Edmonds Business License #: 602454996-001-0001 CONTACTS NAME TYPE NAME ADDRESS PHONE EMAIL APPLICANT AL ROGOJAN 23828 BRIER RD, BRIER WA (206)992-6916 BIGALROGO@GMAIL.COM 98036 CONTRACTOR AL ROGOJAN 23828 BRIER RD, BRIER WA (206)992-6916 BIGALROGO@GMAIL.COM 98036 ROGOJAN MAGDELENA & 21705 96TH AVE W, EDMONDS OWNER BIGALROGO@GMAIL.COM MIREL WA 98020 FEE INFORMATION DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT# 1 - BASE FEE FOR MECHANICAL 001.000.322.10.000.00 $50.00 $50.00 3/25/21 R11225 PERMITS 1 - BASE FEE FOR PLUMBING 001.000.322.10.000.00 $50.00 $50.00 3/25/21 R11225 PERMITS APPLIANCE VENTS 001.000.322.10.000.00 $15.00 $15.00 3/25/21 R11225 B-BUILDING PERMIT FEE 001.000.322.10.000.00 $3,332.00 $3,332.00 3/25/21 R11225 B-BUILDING PLAN REVIEW FEE 001.000.345.83.000.00 $2,748.00 $2,748.00 11/25/19 REC078047 B-STATE BUILDING CODE 001.000.237.150 $6.50 $6.50 3/25/21 R11225 SURCHARGE EACH PLUMBING FIXTURE ON ONE 001.000.322.10.000.00 $255.00 $255.00 3/25/21 R11225 TRAP EACH VENT OR EXHAUST NOT CONNECTED TO A HEATING OR AC 001.000.322.10.000.00 $75.00 $75.00 3/25/21 R11225 SYTEM ENGINEERING INSPECTION FEE 001.000.341.82.000.00 $880.00 $880.00 3/25/21 R11225 FAN CONNECTED TO SINGLE DUCT 001.000.322.10.000.00 $15.00 $15.00 3/25/21 R11225 FURNACE OR FIREPLACE 001.000.322.10.000.00 $60.00 $60.00 3/25/21 R11225 GAS PIPING - NEW OR LOCATED 001.000.322.10.000.00 $30.00 $30.00 3/25/21 R11225 STORMWATER ENGINEER REVIEW 001.000.341.82.000.00 $910.00 $910.00 3/25/21 R11225 FEE STORMWATER ENGINEER REVIEW 001.000.341.82.000.00 $130.00 $130.00 3/25/21 R11225 FEE Printed: Sunday, March 28, 2021 12:40:48 PM 1 of 4 DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT # WATER HEATER - INCLUDING 001.000.322.10.000.00 $15.00 $15.00 3/25/21 R11225 EXPANSION TANK X-PHOTOCOPIES 001.000.341.81.000.00 $17.10 $17.10 3/25/21 R11225 X-TECHNOLOGY FEE 001.000.321.99.100.00 $35.00 $35.00 3/25/21 R11225 TOTALS: $8,623.60 $8,623.60 CONDITION TYPE STATUS NOTES 48 HRS NOTICE-ENGR FINAL FOR 48 Working hours notice is required when requesting your FINAL engineering inspection. NFORMATION It is the owner's responsibility to repair/replace all damage of utilities or frontage DAMAGE TO FRONTAGE FOR improvements in City right of Ways or Easements to City Standards caused by or IMPROVEMENTS INFORMATION occurring during the permitted project. Damage to Frontage Applicant shall repair/replace all damage to utilities or frontage improvements in City Improvments right-of-way per City standards that is caused by or occurs during the permitted project. Electrical Permit Obtain Electrical Permit from State Department of Labor & Industries. 425-290-1309 FOR Maintain erosion and sedimentation control per City and SWMMW standard ESC REQ INFORMATION requirements. In addition to the required pressure/relief valve, an approved listed expansion tank shall Expansion Tank be installed on all hot water tanks. Per UPC 608. Approval of this foundation design is conditional subject to inspection of existing site soil conditions. Foundation Bearing Retaining Walls must be designed and constructed to resist the lateral pressure of the retained material. Provisions must be made for the control and drainage of surface water around buildings. Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its Hold Harmless officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. Hose Bibbs (exterior faucets) are required to have a permanently affixed anti -siphon Hose Bibbs device installed. INSP PRIOR TO BACKFILL FOR Call for all required inspections. All work shall be inspected prior to backfill. NFORMATION Lot Lines Staked Lot line stakes must be in place at the time of foundation/setback inspection. Maximum Height 25 feet. The agent/contractor shall set up the equipment; establish the datum point and the point of average grade. Call for inspection to verify. These items Maximum Height must be consistent with the approved plan. If the proposed height of a building (as shown on the plans) is within 12 inches of the maximum height permitted for the zone an elevation survey is required. Final approval on a project or final occupancy approval must be granted by the Building Occupancy Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. Printed: Sunday, March 28, 2021 12:40:48 PM 2 of 4 MIDENTIAL BLDG Permit PERMIT NUM City of Edmonds 121 . 98020 1 ' . www.edmondswa.gov • Any request for alternate design, modification, variance or other administrative deviation (hereinafter "variance") from adopted codes, ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such request shall be established by Council and shall be paid upon submittal and are non-refundable. Permit Disclaimer Approval of any plat or plan containing provisions which do not comply with city code and for which a variance has not been specifically identified, requested and considered by the appropriate city official in accordance with the appropriate provision of city code or state law does not approve any items not to code specification. PRV Required Pursuant to UPC 608 a pressure regulator valve (PRV) shall be installed near the water shutoff. Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of Sound/Noise 7:00am to 6:00pm on weekdays and 10:00am and 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. STORM COVENANT FOR A stormwater covenant shall be approved for recording prior to project final approval. NFORMATION All new, extended, re -built or relocated electrical utility and/or service shall be placed Underground Wiring underground. Type B or L vent connectors required on fuel -burning appliances passing through Vent Connectors unheated spaces. Per IMC 803.2 City approved plastic piping may be used in water service piping provided that where metal water service piping is used for electrical grounding purposes, replacement piping Water Service Piping shall be of like materials (UPC 604.8). A state electrical permit and inspection is required if electrical grounding is altered, removed, improved, or added. Contact State Dept. of Labor & Industries Electrical Division at 425-290-1400. Water Service Shutoff Pursuant to UPC 605.2 a water service shutoff shall be installed on the water line as it enters the building. Installer shall provide the manufacturer's installation, operating instructions, and a whole Whole House Fan house ventilation system operation description. A label shall be affixed to the whole house timer control that reads "Whole House Ventilation" (see operating instructions). INSPECTIONS - Schedule Online at: https://Inspection.MyBuildingPermit.com COMPLETED SEQID INSPECTION TYPE INSPECTOR RESULT NOTES DATE B-2 SLAB INSULATION B-7 BUILDING OTHER INSP X-3 BUILDING FINAL" X-2 ENGINEERING FINAL A-1 TESC AND MOBILIZE E-3 STRM MGMT FACILITY A-1 BUILDING PRECON B-2 FOOTINGS B-2 FOUNDATION WALL B-2 SETBACKS B-3 EXT WALL SHEATHING Printed: Sunday, March 28, 2021 12:40:48 PM 3 of 4 BLDG Permit City of • • • PERMITNUM ' 11[ -. •:� i 1 ' . wm . •. B-3 GAS PIPING TEST B-3 MECH ROUGH IN B-3 PLUMB GROUND WK B-3 PLUMB ROUGH IN B-3 ROOF SHEATHING B-3 UNDERFLR FRAMING B-3 WATER SERVICE LINE B-4 DRYWALL FASTENING B-4 FIRESTOPPING B-4 FRAMING B-4 HEIGHT VERIFICATION B-4 INTERIOR SHEAR B-5 INSULATION ENERGY E-3 STRM COVENANT E-3 STRM FOOTING DRAIN E-3 STRM TIGHTLINE E-4 WATER SERVICE LINE E-5 DRIVEWAY SLOPE E-9 COMPOST AMEND Printed: Sunday, March 28, 2021 12:40:48 PM 4 of 4