Loading...
APPROVED BLD2021-0235+Transportation_Impact_Form+8.6.2021_5.13.08_PM+2344716RES U B z:, Z 1. 6 s� BLD2021-0235 Aug 09 2021 �: t}, CITY OF EDMONDS OY �7 EVELOPMENTSERVJ<yE ORMATION FOR RE�' E D ' Transportation Requirements CITY OF EDMONDS PERMITTING & DEVELOPMENT DIVISION 121 5th Avenue N P: 425.771.0220 www.edmondswa.gov TRANSPORTATION IMPACT FEES SHALL BE COLLECTED from any applicant seeking development approval from the city as provided in ECC Chapter 3.36. This shall include, but is not limited to, the development of residential, commercial, retail, office space, and includes the expansion or change of existing uses that create a demand for additional public facilities. PAYMENT OF FEES Impact fees shall be paid at the time of issuance of the building permit or city business license. EXEMPTIONS ECC 3.36.040 identifies particular development activities in which exemptions may apply. Please refer to this code section for additional information. The director shall make the final determination as to whether the exemption is applicable. TRANSPORTATION IMPACT ANALYSIS TIA WORKSHEET or TRAFFIC STUDY A TIA worksheet (Appendix A) shall be submitted in conjunction with a building permit application or a traffic study (Appendix B) shall be prepared by a qualified professional in the field of transportation engineering and submitted at the time of land use application and/or building permit application. For projects that generate less than 25 peak -hour .,trips, please complete the worksheet found ir6ppendix VFor projects that generate more than 25 pea c�-hour trips, a traffic study shall be provided to the City that complies with and addresses Appendix B. f /�Z� -Pik i Form #E82 Impact Analysis TIMING AND CALCULATION OF FEES Impact fees shall be assessed based upon the impact fee rates in effect at the time of issuance of the building permit, including but not limited to, change of use permit or remodel permit. In the event the development activity does not require a building permit, impact fees will be assessed at the time of issuance of the business license. The 2017- 2019 Impact Fee Rate Table incorporated herein shall be used to determine the applicable ITE Land Use Category and associated per unit impact fee rate.' • CHANGE IN USE Impact Fee _ for NEW use — Impact . fee . for PREVIOUS use = Impact feet When calculating impact fees for a change in use of an existing building or dwelling unit, including any alteration, expansion, replacement or new accessory building, the impact fee shall be the applicable impact fee for the ITE land use of the new use, less an amount equal to the applicable impact fee for the ITE land use of the prior use, established at the time the prior use was permitted. Refer to Fee Rate Tables, incorporated herein. If the previous use was permitted prior to 9/12/04 (adoption of Ordinance 3516), the 2004 Impact Fee Rate Table shall be used. INDEPENDENT FEE CALCULATION An Independent Fee Calculation may be submitted in accordance with ECC 3.36.130 if none of the fee categories or fee amounts set forth in the 2017-2019 Impact Fee Rate Table describe or capture the impacts of a new development.' Updated on 313,Q017 Page I qf'2 Form #E82 TYPES OF PROJECTS THAT DO NOT TRIGGER IMPACT FEES The following list is intended to provide examples of projects that are exempted from the payment of street impact fees as identified in ECC 3.36.040. The examples provided do not involve a change in use and do not expand the usable space or add any residential units and therefore, do not create additional demand on the roadway system. Traffic impact fees will not be required as a condition of development approval for these types of projects. ❑ A project that involves demolition of one single family residential unit and replacement with one new single family residential unit on the same lot and within 12 months of demolition. ❑ A residential remodel that does not increase the number of residential units. ❑ A residential addition (e.g. garage, etc.) that does not increase the number of residential units. ❑ Decks, fences, retaining walls, etc. ❑ Accessory dwelling unit (ADU). (Approval of an ADU is regulated by the Edmonds Community Development Code, which limits the total number of individuals living at the property to one "family" as defined in the code) TYPES OF PROJECTS THAT DO TRIGGER IMPACT FEES The following project examples do increase the number of residential units or involve commercial or other activity using the roadway system and therefore, do create additional demand on the roadway system. Street impact fees shall be required as a condition of development approval for these types of projects. Construction of a single family residence on a previously undeveloped, vacant or subdivided lot. ❑ Demolition of a single family residence and construction of a commercial, mixed -use or multi- family facility or duplex on the same property. ❑ A tenant improvement that changes the use from general office to medical office. ❑ Remodel of an existing multi -family building that increases the number of residential units. Note: This information should not be used as a substitute for City codes and regulations. Edmonds City Code may be viewed at l-ittp://www.codepublisiiilig.cony/WAI"Edmonds.%. The applicant is responsible for ensuring compliance with the fees and regulations that are applicable at the time of submittal. If you have a specific question about a certain aspect of your project, please contact the Engineering Division at 121 5th Ave N or (425) 771-0220. Please note that other local, state, and/or federal permits or approvals may be required. Impact fee rates can also be referenced in ECC 3.36.125. No impact fees will be due, nor will a credit be given, for an impact fee calculation resulting in a net negative. 3 Additional fee for Independent Fee Calculation: $240 review fee plus actual cost of outside consultant review if required by City. Updated on 31312017 Page 2 of 2 APPENDIX A Page 1 of 2 Transportation Impact Analysis Worksheet PERMITTING & DEVELOPMENT ENGINEERING DIVIS10N 121 5th Avenue N P: 425.771.0220 www.edmondswa.gov Name of Proposed Project: 0.7 / *7- r Owner/Applicant Phuong Vo Name 14534 27th Ave Ne Street/Mailing Address Shoreline Wa 98155 City State Zip Telephone: 425-344-0688 Applicant Contact Person: Name zb l Y 2 � �-_ /4-v2-- S'( .� Street/Mailing Address City State Zip Telephone: ZoK- 742. 19 ?k 26'6,,7;'9. S'ts1__ e Traffic Engineer who Prepared the Traffic Impact Analysis (if applicable): Firm Name S �?LP Contact Name Telephone. Z o € . 195.5_6 $ 7 E-mail: _'_! d A e "��- c f �r , C PROJECT DESCRIPTION a. Location - Street address: 7 Attach a vicinity map and site plan.) b. Specify existing land use: Z v 'f 7--o r V JO Q c. Specify proposed type and size of development: n — f -s is4 '` (# of residential units and/or square footage of building) d. Date construction will begin and be completed: ��'' l ^ �" < '� / Z Z i< e. Define proposed access locations: V- y ' APPENDIX A Page 2 of 2 f. Define proposed sight distance at site egress locations: p -e, i+'� �, �X �j o�.j�,2� �rj� -tea i/r 2, MITIGATION RECOMMADATIONS State recommended measures and fees required to mitigate project specific traffic impacts. Traffic impact fee shall be calculated from the attached Impact Fee Rate Tables and as identified in ECDC 18.82.120, except as otherwise provided for independent fee calculations in ECDC 18.82.130. ❑ CHANGE IN USE Fee for prior use shall be based on fee established at the time the prior use was permitted. If the previous use was permitted prior to the adoption of Ordinance 3516 (effective date: 09/12/04), the 2004 ECDC 18,82.120 impact fee shall be used. Units in ITE Land Use Category Per Unit square feet, Fee Rate # of dwelling, VJ2, etc. New Use $ X Prior Use $ X Fee 1 Now Use Fee: $ - Prior Use Fee: $ 1 = $ g NEW DEVELOPMENT ITE Land Use Category Per Unit Fee Rate New Use Z 1 0 $ 6jzy� ❑ OTHER Units in square feet, # of dwelling, vfn. etc. XI / 1- INDEPENDENT FEE CALCULATION: $240.00 {+ consultant fee TOTAL TRANSPORTATION IMPACT FEE 1 $ '.� 9/14/2021 City of Edmonds, Engineering Division Approval Date 1 No impact fees will be due, nor will a credit be given, for an impact fee calculation resulting in a net negative. 2017-2019 - Impact Fee Rate Table Fee 2017 2018 (w/ 4,036.61 2019 and beyond ITE Land Use Code - Description Calculation {w/ $2 543.01 costper (w/ $5,530.21 cost per trip) cost per trip) 110 - Light Industrial per sq. foot $3.64 $5.77 $7.91 140 - Manufacturing per sq. foot $2.72 $4.32 $5.92 151 - Mini -warehouse per sq. foot $0.97 $1.54 $2.10 210 - Single-family house per dwwetlling $2,873 60 $4,561.37 $6,249.14 220 - Apartment per dwelling $1,881.83 $2,987.09 $4,092.36 unit 230 - Condominium per ling $1,525.81 $2,421.97 $3,318.13 unit 240 - Mobile home per dwelling ling $1,627.53 $2,583.43 $3,539.33 251 - Senior Housing per dwelling $584.89 $928.42 $1,271.95 unit 320 - Motel per room $1,525.81 $2,421.97 $3,318.13 420 - Marina per boat berth $457,74 $726.59 $995.44 444 - Movie theater per screens $31,905.90 $50,645.37 $69,384.85 492 - Health/fitness club per sq. foot $6.74 $10.98 $14.66 530 - High school per sq. foot $1.98 $3.15 $4.31 560 - Church per sq. foot $1.68 $2.67 $3.65 565 - Day care center per sq. foot $15.77 .02 $34.29 620 - Nursing home per bed $483.17 E$25 766.96 $1,050.74 710 - General office per sq. foot $5.01 $7.95 $10.89 720 - Medical office per sq. foot $9.54 $15.14 $20.74 820 - Shopping center per sq. foot $3.26 $5.17 $7.09 826 - Specialty retail per sq. foot $2.06 $3.27 $4.48 850 - Supermarket per sq. foot $10.50 $16.84 $22.84 850 - Convenience market 15-16hrs per sq. foot $14.07 $22.38 $30.58 912 - Drive-in bank per sq. foot $15.97 $25.41 $34.73 932 - Restaurant: sit-down per sq. foot $10.04 $15.95 $21.84 933 - Fast food, no drive -up per sq. foot $22.28 $35.36 $48.44 934 - Fast food with drive -up per sq. foot $26.24 $41.66 $57.07 936 - Coffee/donut shop, no drive- per sq. foot $13.88 $22.04 $30.19 UP 938 - Coffee/donut shop, drive -up, per sq. foot $25.56 $40.37 $55.58 no indoor seating per vehicle 945 - Gas station with convenience fueling $6,916.99 $I0,979.58 $15,042.18 position EFFECTIVE EFFECTIVE EFFECTIVE 1/1/2017 1/1/2018 1/1/2019 2009 - Impact Fee Rate Table e­Jr:-. Sfreofs ord'Roods Impcef Poe Rcts3 SttadV TABLE .q IMPAG'T FE6. tiA1l'ES _ (1) (3) (4) (5? 6t 1 ri1] ITE ITE Land We F %low Length Net New Trips per ltnp4ct Pee Per Unit @ cde tyat Trips' Factor' Unlit of Measure $1 049.41 r Trip 1 10 bight trbdusl rial 100% 1.47 1,43 1,000 sq ft 1.50 per square Pant 140 Manufacturing 013 100% 1,47 1.07 1.000 sq ft 1.12 per aQuare root 151 Mani -warehouse 0:26 100% 1.47 0,38 1,000 sq ft 0_40 r square foot T 10 Single family House 1,01 100% 1.13 1.14 dwelling 1.1 96.33 per dwelling unit 220 Apartrrwnt U2 100% 1.2tf 0.74 dwelling 776.56 per dwelling unit 230 Coiidowiniurn 0.52 100% 1,15 0.60 dwelling 629.65 per dwellinq unit 240 Mobile Hume 0.59 100% 1.09 0.64 dwelling 671.62 per dwelling unit 251 Senior Housing 13.116 100% 0.93 015 0-A% ling 157.41 per dwelling unit 320 Motel 0.47 100% 1.27 0,60 morn G29.65 Per MGM 420 Marina 0.1 S 100% 0.97 0,18 berth 188.89 per boat berth 4�14 Ma0e Theater 3.80 85% 01 73 2.36 1,000 sq ft 2.48 per square foot 492 Health/Fitnvs Club 3.53 7596. 1,+00 2.65 1,000 Sq ft 2,78 persquare foot 530 High School 0.97 80% 1.00 0,78 1,DOO sq ft : 0.82 per square Flynt 560 Church 0.55 100% 1120 0.66 1,000 s;q ft. ; 0.69 per square foot 565 Day Care Contor 12.4 6 15% 0,67 6.26 1,009 Sq ft. 6.57 per square foot 620 Nursing Hmme 0.22 100% 0,87 0.19 deli 19939 per bed 710 Ger+eral iOffsrtJe 1.49 90% 1.47 1.97 1,000 cl ft 2.07 per squaro foot 720 Medical Office 3.46 75% 1.40 3.f]3 1,r)(10 ft 3,81 pers are fooL $14 Specialty Potail 2.71 5596 O.w) 0,89 1,000 sq ft 0.93 per square fc�t >320 Shopping Center 3.73 65% 053 1 ,?8 1,000 s,q ft 1.34 per square fENIL 850 Supermarket 10.50 850X,0,67 4,$7 1,000 s ft 4.80 eer square foal _ 852. Convenience mkt 34-57 443°i6 (J AO 5.53 1,000 sq ft 5.80 per squares font 15-16 flours 9-12 Chive -in back 2S..82 SS% 0.+17 6.67 1,000 sq *t 7.OU per square taut 932 Restaurant: s.t- 11.15 55% 013 4.48 1,000 sq ft 4.70 per square foot dowel 26A 50% O167 T:} per square farm 933 Fast food, no 8.76 1,000 sq ft drive -up 934 Fast food, w/ 33,84 st% 0,62 10.70 1,0 sq ft 11.23 per square foot drive -up 956 Coffee/DonuE 40.75 20% 0.67 5.46 1,000 sq ft 5.73 per square foot Shop, no drive -up 938 Coffee/Donut 75.00 2046 0.67 10,05 1,000 sq ft i 10.55 por square foot Shop, drive-rlp, no indoor seating 94S Gas station 13-38 45,% 0.53 3.19 vi[3 3,347_(12 per Op' w/convenience ITE Trip Gencratiori (8th Edition): 4-6 PM Peck HourTrlp Ends 3 Excludes pass -key trips: see "Trip Generatlon F oodbook: An 47E F40posed Recommended Prcrcfice' (1989) Rollo to avorag4 trip length, V1`P, veNdo €uoirlg Position Honciorson, C#VA;afEdmonds. WashIngian. Younp tic October 29, 2t109 Company EFFECTIVE 5/1/2010 Doge 21 2004 - Impact Fee Rate E(In-wilds Rood Impor-1 P ,0 Rafe TABLE 4 IMPACT FEE mns �11 (gy) (1) (4) {s} f6} Trip ITE ITE Land I.]sc Trigs % New length Net New Tilps per Impact Fee Per kJnit P $ Coda Cate ory Ratp' Tri 5' ractor" unit of Measure 70i 66 per Trip 110 Llglit industrial 0_98 1009fi 1.59 1,56 1,000 sn ft 1.19 per square foot 140 Manufacturing 0-74 . 1 GM6 1.59 1,18 1,000 sq ft 0.90 lx'r square fact 151 Mini -warehouse 026 10€F°,5 1.59 0.41 1 000 s ft rl.3Z par square foot 210 5injle. family U)1 1010% 1.0!) 1.16 dwetling B40.72 per dwelling unit House 220 Apwtpient 0.62 100% 1.15 0,71 dwelling 5,14.4a Per dwelling unit 230 Condominium 0.54 100% 1-15 0.62 dwelling 474.24 er dwelling unit 240 MoNe Home 0.56 100% 1.09 0.61 dwelling 466.14 per dwelling unit 310 Motel 0.61 100% 1.25 0.76 room 562.79 per room 320 riotel 0.47 100% 1.25 0-59 room .11 .65 er room ~- 420 Marina 0.13 10()% 0.97 0.16 berth 140.74 per boat hcnii 430 atslf course 0.3) 1001Y6 1.00 03U acre 22110 l_er acre 444 Movie Theater 3XD 100% 0,72 2,74 1,000 scl It 1.36 .car square foot 49;? racquet club 1.83 100% 0,97 1 -79 1,000 sq ft 3-58 (x!r square fo)at 530 High School 1.02 100% 0.62 0.63 1,000 sq ft 0.48 per square foot 560 Church 0.66 100% _ 1.1 S 0.7€ 1,000 sq ft C1.58 der stLuaae fact 610 Hospital 0 ' 9.21 100% 1.56f 1.44 1,000 sq ft 1.10 per Square fool GZO Hursing liorne O-ZU 100% 0.87 0.17 %d 132.88 pLr bed 710 General Office 1,49 100% 1.59 2.37 1,000 sg ft 1,81 ,er sc roan: toot 720 Macica.l affic_e 3.66 100% 1.50 5.49 1,000 scl ft 4,19 per square foot 820 Shoaping Center 3.?4 ail % O qO 1.21 1'gOO sq ft 0.93 per square font 83Z RQutaurant: sit 1().aG 5C"NO 1.06 15.45 1.300 cl ft 4.92 per square toot down 83:1 Fast fend, no 26-15 5?R'p O.G? F3.43 1,.000 sil ft 6-44 per square foot driae-aup Wel Fast fwc1, ve! 33,48 51 % 4.C)2 10.59 1,00D sel ft 8,0B per square foot drivo-up 844 Gas station 14.56 60% 0.53 4.63_ .pump 3 535-l32 per of 1945 Gas station 13.38 4796 0.53 3.33 pump 2,S45.26 per vfp5 w/ccnvenience 850 Supermarket 11,51 35% O'GS 4.11 1,000 sq, ft 3.14 per ;quare foot 851 Convenience 53.73 39% OAO 8.38 1,000 sq ft 6.40 per sgoare foot miarket-Z4 Fir 91? Drive-in Bank 54.77 51DA 0.47 13,13 1,000 5q ft, 10.03 per square font ITE Trip Cenerrjtron (6th EdJion): 4-6 PM. Pook Mesta Trip Ends ' Excludes puss -by irips. see "ftlp Genefntion l-larrci%ookl An HE I'lioiosed Re-ccarrmendc"d Pldctica" (1988) Rohe, to average trip length, vfp: vehlcle fueling pcmillon Hendeison, City of Edm-)rt ls, w'asttingyorl YuUrt� & April 15, 2003 company EFFECTIVE 9/12/2004 Pogo, 18