ENG2022-0045+Application_Instructions+2.4.2022_9.49.40_AM+26617780 Application Instructions Application Type: Right -of -Way Project Type: Single Family Residential Activity Type: New Scope of Work: Excavation and Utility Work Based on your selections, the following information and requirements apply to your application. Submittal Information A RIGHT-OF-WAY CONSTRUCTION PERMIT IS REQUIRED prior to entry into the City right-of-way (ROW) by any person for the purpose of excavation, construction, maintenance, or repair. Only a licensed, bonded contractor can sign an application for a ROW permit. CITY RIGHTS -OF -WAY: All public easements, licenses or other rights of entry owned by the City. CODE: Edmonds Community Development Code (ECDC) Chapter 18.60 FEES: Permit Fee + Technology Fee Inspection fee (each) Additional fees may apply: Overlay penalty cut fee, sidewalk/parking/alley disruption/closure fees Refer to Fee Schedule for a complete list of fees. Traffic Control Plan: Vehicular & Pedestrian (as applicable): a. The Traffic Control Plan must comply with the Manual on Uniform Traffic Control Devices (MUTCD) requirements. b. When applicable, one or more of the approve plans provided in the City Traffic Control Handout may be utilized. c. All flaggers must be certified. d. Signage is required to safely direct pedestrians to cross the street at the nearest intersection prior to the sidewalk closure. e. Lighted barricades required for nighttime sidewalk closures. f. Lighted arrow boards are required on Edmonds Way and Highway 99. Tree Removal: If tree removal is proposed, include the following on the site plan, and download any additional documentation as required in code section ECDC 23.10; a. Tree(s) for proposed removal shall be identified clearly on the site plan b.Tree(s) to be retained shall be shown with tree protection measures. c. Replacement trees if required shall also be shown on the site plan. Required Documents • Traffic Control Plan Please review the Requirements for Electronic Plans prior to uploading documents. Required Supplementals • Authorization and Acknowledgment - Right of Way • Right of Way - Construction Terms and Conditions View Supplementals General Process Info Application and Electronic Plans Submission Process Once the application and plans are received, the engineering division will screen the submittal within two business days of receipt. There are two possible outcomes for your application: 1. The submittal will be accepted, and an invoice will be sent to the applicant via email. Payment of submittal fees are due upon receipt of the invoice. 2. The submittal will not be accepted, and an email will be sent to the applicant outlining what is required to complete the application. The applicant will have 30 days to submit the requested documents through the MyBuildingPermit.com Plan Review Dashboard. Re -submittals • Include a response letter addressing each of the comments. • Submit the revisions to Permit Processing, not the reviewer, through your MyBuildingPermit.com Dashboard by clicking Submit Additional Files. • If the permit has not been issued, submit a full plan set. Please direct any questions regarding application submittal to engineeringpermits@edmondswa.gov or contact the Engineering Division at (425) 771-0220. Please Note: The property owner bears the responsibility for the accuracy and completeness of all information provided with or affecting the application submittal. If the property contains or is adjacent to critical areas (streams and stream buffers, wetlands, floodplains, and geological hazard areas), additional information may be required.