BLD2023-0340_Site_Plan_3.17.2023_2.13.23_PM_3428488Equipment Summary
Modules:
(29) REC 405W AA
Inverter(s):
(1) SolarEdge 1000OH-US
Racking:
Ironridge XR100
Table of Contents:
Cover Page
Al Site Overview
A2 Roof Layout
E1 Single Line
E2 Electrical Calculations
G1 Roof As Built
G2 Electrician As -Built
G3 Micro/optimizer map
G4 Placards
G5 Equipment BOM
General Notes:
Additional Electrical Work:
- Install Clipper Creek EV Charger
.._:_ jr�.16_ _01f
!i
Net Meter
x
Site
0
N
A&RSOLAR
3211 Martin Luther King Jr Way S.
Seattle, WA 98144 (206)707-9937
THIS DRAWING CONSTITUTES THE
CONFIDENTIAL INFORMATION OF A&R SOLAR
AND ITS RECEPTOR. POSSESSION DOES NOT
CONFER ANY RIGHT IN OR LICENSE TO USE IT
OR THE INFORMATION DISCLOSED HEREIN
NOR ANY RIGHT TO REPRODUCE THIS
DRAWING OR ANY PART HEREIN WITHOUT
THE WRITTEN CONSENT OF A&R SOLAR.
U
0O
o
O
L.0
=
N
�
O
O
O
ZM
UO)
Q
�
U
C
C
C)
,-.
"D
p
Cy)
vi
,Q
J
NO
E
L
IN
U
a
,w
�
w
REVISIONS
Rev. #: IDate:
Designed by: Wes K.
Project Manager:
Will MacArthur
(206)307-1741
Current Date:Mar 16, 2023
Cover Page
o F-1
MSP
OO
O
EV Charger
N
O
Net Meter, Inverter,
AC Disconnect,
Customer -Owned
Production Meter
Attachment Detail
Side View (Portrait)
FLASHING AS REQUIRED
TO SEAL ROOF
MINIMUM (1) 5/16 X 4.75 LAC
BOLT EMBEDDED 2" MINIMUM
CENTER ON ROOF FRAMINC
PV MODULE,
BY OTHERS
IRONRIDGE
RAIL
(E) COMPOSITION
SHINGLE ROOF
IRONRIDGE
FLASHFOOT2
(E) ROOF FRAMING
Modules not to exceed height of existing ridge
-------i--------
'611
(sample) Attachment point layout for array.
72" OC Max.
&M-1IPi.
A&RSOLAR
3211 Martin Luther King Jr Way S.
Seattle, WA 98144 (206)707-9937
THIS DRAWING CONSTITUTES THE
CONFIDENTIAL INFORMATION OF A&R SOLAR
AND ITS RECEPTOR. POSSESSION DOES NOT
CONFER ANY RIGHT IN OR LICENSE TO USE IT
OR THE INFORMATION DISCLOSED HEREIN
NOR ANY RIGHT TO REPRODUCE THIS
DRAWING OR ANY PART HEREIN WITHOUT
THE WRITTEN CONSENT OF A&R SOLAR.
Q
p
L
O
N
_�
OL()
OCO
O
O
M
U
O)
Q
�
U
C
C
C)
�-.
O
p
0)
vi
.O�
J
06
0�
E
L
I�
U
_0
a
w
w
REVISIONS
Rev. #: I Date:
Designed by: Wes K.
Project Manager:
Will MacArthur
(206) 307-1741
Current Date:Mar 16, 2023
Al Site
Overview
Required Setbacks from Ridge: 18.,
Maximum Mount Spacing: 72^ `„I''
Roof Type: Comp
Roof Slope: A&RSO BAR
Array Tilt : Flush
Array Azimuth(s): 2700 3211 Martin Luther King Jr Way S.
Roof Area: 1789 ft2 Seattle, WA 98144 (206)707-9937
Array Area 578 ft2
Array to Roof Coverage 32%
* * *Roof Attachments/ Fastners: see pg. G5 Equip. BOM*
rV THIS DRAWING CONSTITUTES THE
\ CONFIDENTIAL INFORMATION OF A&R SOLAR
'r1 AND ITS RECEPTOR. POSSESSION DOES NOT
CONFER ANY RIGHT IN OR LICENSE TO USE IT
OR THE INFORMATION DISCLOSED HEREIN
Q NOR ANY RIGHT TO REPRODUCE THIS
DRAWING ANY PART HEREIN WITHOUT
"A" THEWRITTEN
N CONSENT OF A&R SOLAR.
npn
U
- O�
_ OLNn �000
O U M
O ,—I N fu Q
U c O a
C) 0 p vi
Module and Rail Selection Guide ,�_ Om o
V - M c
O U
T ❑ a w w
00 I rl
� 00
M
NRev. #: Date:
Designed by: Wes K.
Project Manager:
Will MacArthur
(206)307-1741
Net Meter
Current Date:Mar 16, 2023
A2 Roof Layout
REC405AA Pure
40 x 71.7
Clamp Zone "A"
7.9-11.8"
Clamp Zone "B"
14.8-19.9"
Mods per Row
Rail typel+ rail type2
(7)Portrait, (2)rows
(2)14', (2)14'
(5)Portrait, (2)rows
(2)14', (2)split 14'
(5)Landscape, (1)row
(2)17', (2)14'
I
I
I
I
I
I I
String 1
z
10 modules + o
V_ _ _ _ _ _
String 2
� o
10 modules +
String 3
AA AB
9 modules +
0 Equipment Schedule
I
Line
C O
Load �-------�
I Located less than 10'
I from net meter and
I
I
I
�t---------
5
Customer Owned
Production Meter
0
Ref.
Category
Equipment
QTY
1
Modules
REC405AA Pure
29
2
Optimizers
S440 SolarEdge Optimizer
29
3
Jbox
Soladeck
2
4
Inverters
Solar Edge SE10000H
1
5
MeterBase
MeterBase-125A 4 Jaw
1
Meter
Landis Gyr EA110000-OP29 240V
1
6
Disconnect
60A 240V 2 Pole I Heavy Duty, Fuse, Lockable
1
DisconnectFuse
FLNR - 60 A Fuses for Disconnect (qty 1 /pole)
2
Monitoring
SolarEdge PV Inverter Monitoring
1
ElectricalWork
Clipper Creek EV Charger Install (wired to 50A breaker)
1
less than 10' from tap
a
Supply Side Connection
705.11
(Existing)
Main Service Panel
(1ph 240V Service)
Main Breaker: 200A
Bus Rating: 200A
I
I
I
L---.4
#6 GEC 1
■=A&RScope `,'I'
_ I
= Existing or A&RSOLAR
Others Scope
3211 Martin Luther King Jr Way S.
Seattle, WA 98144 (206)707-9937
THIS DRAWING CONSTITUTES THE
CONFIDENTIAL INFORMATION OF A&R SOLAR
AND ITS RECEPTOR. POSSESSION DOES NOT
O CONFER ANY RIGHT IN OR LICENSE TO USE IT
OR THE INFORMATION DISCLOSED HEREIN
M NOR ANY RIGHT TO REPRODUCE THIS
DRAWING OR ANY PART HEREIN WITHOUT
THE WRITTEN CONSENT OF A&R SOLAR.
Service entrance conductors
Neutral Bar 4/0 XHHW-2
w/ bonding jumper (L1 & L2)
2/0 XHHW-2
(N)
nverter Specs
Watts
�
Output
AC
Voltage
# of
Inverters
OCPD
ll
SolarEdge SE10000H
10000
42
240
1
60
****N/A****
0
0
0
0
0
****N/A****
0
0
0
0
0
Module Specs
Watts w
Imp
Vmp
Voc
Isc
REC405AA Pure
405
9.56
42.4
48.9
10.14
Temp. Adjusted
0
0
38.7
52.7
0
General Notes:
0 Conductor Schedule
Utility: SnoPUD
1. EGC Where exposed to physical damage will be #6AWG
Bare CU
Summary
Distance (ft)
Current
Operating
Voltage
Volt. Drop
@125%
Voltage
Drop
(total)
2. If installing conduit on the roof, maintain greater than 7/8"
above the surface
3. NEC 690.12: Rapid Shutdown initiated by loss of Grid or AC
Disconnect
4. For supply side taps, a #6 GEC (min.) will be run separately
from the disconnect and connected to the grounding electrode
with an irreversible crimp
A
(2)#10 CU, (1)#6 EGC, PV Wire 600V, AIR
50
18.75A
400V
0.31%
0.97%
B
(6)#10 CU, (1)#10 EGC, THWN-2, 0.75"EMT(min)
50
18.75A
400V
0.31%
C
(2)#6 CU, (1)#8 N, (1)#10 EGC, THWN-2, 0.75"EMT(min)
10
52.5A
240V
0.17%
D
(2)#6 CU, (1)#6 N, THWN-2, 1"PVC(min)
10
52.5A
240V
0.17%
U
O
j
O
O
O
In
N
CO
O
O
�
M
U
M
,-I
�
c
IN fu
a
U
O
n
0
p
vi
�_�
JOM
,-.
O
L
n
U
a
A
ww
REVISIONS
Rev. #: Date:
Designed by: Wes K.
Project Manager:
Will MacArthur
(206) 307-1741
Current Date:Mar 16. 2023
E1 Single Line
PV Electrical Calculations
Inverter
ppt Input
Amperage (Imp)
Voltage (Vmp)
Itag e(DC)
Amps (DC)
&A'AI P
A&RSOLAR
3211 Martin Luther King Jr Way S.
Seattle, WA 98144(206)707-9937
THIS DRAWING CONSTITUTES THE
CONFIDENTIAL INFORMATION OF A&R SOLAR
AND ITS RECEPTOR. POSSESSION DOES NOT
CONFER ANY RIGHT IN OR LICENSE TO USE IT
OR THE INFORMATION DISCLOSED HEREIN
NOR ANY RIGHT TO REPRODUCE THIS
DRAWING OR ANY PART HEREIN WITHOUT
THE WRITTEN CONSENT OF AIR SOLAR.
U
�<
_�
O
o ,�
U
�+
�_ �
�O�
L I�
o �O
oNn �000
Z M UM
Q) � Q
c o a
L- M p vi
.-�
-J C:
dSN� E
U
a ,�
,-�
w w
REVISIONS
Rev. #:
Date:
Total Voltage Drop:
0.97%
Designed by: Wes K.
Project Manager:
Will MacArthur
(206) 307-1741
Current Date:Mar 16, 2023
E2 Electrical
Calculations
Inverter Specs
M
Watts
�
Output
AC
Voltage
# of
Inverters
OCPD
Total AC
Comb.
EGC
AC
ll
out. A
OCPD
Solar Edge SE10000H
10000
42.00
240
1
60
42.0
60
#10
Ampe
****N/A****
0
0.00
0
0
0
****N/A****
0
0.00
0
0
0
Module Specs
Watts
LW-1
Imp
Vmp
Voc
Isc
Temp. Coef V(oc)
EGC
DC
Volt
REC405AA Pure
405
9.56
42.4
48.9
10.14
Max
Array
Specs (Adjusted for Temperature)
Solar Edge SE10000H
****N/A****
****N/A****
1
2
3
1
2
3
1
2
3
10.13
9.11
0.00
0.00
0.00
0.00
0.00
0.00
0.00
400.0
400.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
480.0
480.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
15.00
15.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Max Array Power(STC):
11.745 kW DC
Max Continuous AC Power: 10kW AC
Interconnection Calcs
Main Breaker
200
Bus Bar
200
Max PV OCD AI lowed
40
PV OCPD Device Used
60
Tap or Breaker?
Tap
Site Conditions
ASHRAE Site:
Seattle
Low Temp (°F)
19
High 2%Temp (°F)
84
High 0.4% Temp (°F)
91
Ref.
Conductor Description
Distance
AL CU
Wire
Gauge
�_
(4TY) Phase
Neutral
Neutral
EGC
AwG
( )
Wire Type
Conduit
Min.
Conduit
90°C
Rating
Temp
Correct.
Fill
Derate
De rated
75°C
Rating
Current
Operating_
Voltaire
ft
�
Conductors
Awe
��.
Ty
(Q )
T ype
Ampacity
@125%
Voltage
Drop
A
String to Jbox
50
Cu
#10
2
N/A
N/A
#6
PV wire 600v
AIR
N/A
40
1
100%
40.00
35
18.8
400
0.31%
B
Jbox to Inverter
50
CU
#10
6
N/A
N/A
#10
THWN-2
EMT
0.75"
40
1
80%
32.00
35
18.8
400
0.31%
C
I nverter to Disconnect
10
CU
#6
2
#8
1
#10
THWN-2
EMT
0.75"
75
1
100%
75.00
65
52.5
240
0.17%
D
Disco. to Interconnect
10
CU
#6
2
#6
1
#6
THWN-2
PVC
1"
75
1
100%
75.00
65
52.5
240
0.17%
E
F
G
H
Typical Placards
A) NEC 2020 690.13 & 691.15
B) NEC 2020 705.12 (13)(3)(2)
C) Utility Requirement
D) Utility Requirement (Utility -Owned)
D) A&R Solar Requirement (Customer -
Owned)
E) A&R Solar Requirement * if combiner used
F) NEC 2020 690.13 (B)
I) NEC 2020 690.31 (D)(2)
K) NEC 2020 690.13 (B)
SOLAR PV SYSTEM EQUIPPED
WITH RAPID SHUTDOWN
TURN RAPID SHUTDOWN
SWITCH TO THE
"OFF" POSITION TO
SOLAR ELECTRIC
PV PANELS
SHUTDOWN PV SYSTEM
AND REDUCE
SHOCK HAZARD IN THE
ARRAY
L) NEC 2020 690.56 (C)
Located on or no more than 3' from the
service disconnecting means to which the PV
system is connected
O) A&R Solar Requirement * if
multiple inverters
IAWARNING DUAL POWER SOURCE
SECOND SOURCE IS PHOTOVOLTAIC SYSTEM
P) NEC 2020 705.12(C) & 690.59
` • D• NOT INSTALL
ADDITIONAL LOADS IN THIS PANEL
R) AHJ Requirement * if combiner used
S) NEC 2020 230.85(1)
T) NEC 2020 230.85(3)
Custom Placards
PLACARD SPECS QT`
G) NEC 690.54
MAX AC OUTPUT CURRENT: 42.0 A AC Letter Height: 1/8"
Maintain border
OPERATING AC VOLTAGE: 240 V AC Red / White
MAX AC OUTPUT CURRENT: 42.0 A AC
OPERATING AC VOLTAGE: 240 V AC
Inverter
Interconnection Point
Letter Height: 1/8"
Maintain 1/4" border 1 Solar Edge SE10000H
Red / White
Letter Height: 1/8" (1) for each
Maintain 1/4" border 1 Disconnect or upstream
Red / White loadcenters.
&MIPi.
A&RSOLAR
3211 Martin Luther King Jr Way S.
Seattle, WA 98144 (206)707-9937
THIS DRAWING CONSTITUTES THE
CONFIDENTIAL INFORMATION OF A&R SOLAR
AND ITS RECEPTOR. POSSESSION DOES NOT
CONFER ANY RIGHT IN OR LICENSE TO USE IT
OR THE INFORMATION DISCLOSED HEREIN
NOR ANY RIGHT TO REPRODUCE THIS
DRAWING OR ANY PART HEREIN WITHOUT
THE WRITTEN CONSENT OF A&R SOLAR.
U
0O
o
O
L
=
N
L0
O
O
O
�
M
U
0 )
a
�
U
C
C
C)
�-.
�
p
Cy)
vi
.OLn
J
o'6N�
E
L
rN
U
a
LU
w
REVISIONS
Rev. #: I Date:
IDesioned bv: Wes K. I
Project Manager:
Will MacArthur
(206)307-1741
Current Date:Mar 16, 2023
G4 Placards
J) NEC 2020 690.56 (C)(2)
A&RSOLAR
3211 Martin Luther King Jr Way S.
Seattle, WA 98144 (206)707-9937
THIS DRAWING CONSTITUTES THE
CONFIDENTIAL INFORMATION OF A&R SOLAR
AND ITS RECEPTOR. POSSESSION DOES NOT
CONFER ANY RIGHT IN OR LICENSE TO USE IT
OR THE INFORMATION DISCLOSED HEREIN
NOR ANY RIGHT TO REPRODUCE THIS
DRAWING OR ANY PART HEREIN WITHOUT
THE WRITTEN CONSENT OF A&R SOLAR.
Q
p
O
L 0
_
O
O Ln� N 66
z M UM
O,�
a��fQ
� U
C C)
�+
L- � p vi
�
J O O C
.O�
°6N� E
U
L I�
a
w w
,-�
REVISIONS
Rev. #:
Date:
Designed by: Wes K.
Project Manager:
Will MacArthur
(206)307-1741
Current Date:Mar 16, 2023
G5 Equipment
BOM
Category
Equipment
QTY
Notes
Modules
REC405AA Pure
29
Optimizers
5440 SolarEdge Optimizer
29
Jbox
Soladeck
2
Inverters
Solar Edge SE10000H
1
MeterBase
MeterBase-125A 4 Jaw
1
Meter
Landis Gyr EA110000-OP29 240V
1
Misc.
3.5" AWCAP (Meter Base Accessory)
1
Disconnect
60A 240V 2 Pole � Heavy Duty, Fuse, Lockable
1
DH222NRK
DisconnectFuse
FLNR - 60 A Fuses for Disconnect (qty 1 /pole)
2
Misc.
Tap connectors IPCS4002
2
HCS-50
ElectricalWork
Clipper Creek EV Charger (wired to 50A breaker)
1
IronRldge Racking BOM
XR100 Black,l7'
2
XR100 Black,l4'
16
Kit, XR100 Bonded Splice BOSS
10
Universal Module Clamp, Black
68
Stopper Sleeve 30mm
20
Grounding Lug, Low Profile
5
Square -Bolt Bonding Attachment Hardware
51
1/4 x 3/4 Microinverter Bonding Hardware, T-Bolt
29
End Caps, 10 sets(package) XR100
1
IronRidge Flash Foot2, Black (Spacing: 72")
51
System Weights
Racking Weight: 269.1(Ibs)
Total Weight: 1574.1(Ibs)
Weight/Attachment: 30.86(Ibs)
Dead Load: 2.73(PSF)