Loading...
APPROVED BLD2021-0259 Traffic Impact Form.RECEIVED Apr 12 2021 CITY OF EDMONDS DEVELOPMENT SERVICES TransEportation Worksheet PtRi+IITCING & U`F.VEI., ENGINEERIN.: DIVISION 121 51h Avenue N P; 425.771.0220 vjvv .edmondswa.gov I'I C I of'? Impact Analysis Name of Proposed Project: Z011 S "3"t *e, 6,) WA-Q1i0'?+ Owner/Applicant Applicant Contact Person: 1 r0 -U' FuAZt . G'ru-up U-C f2-,-A Name I Name 1 Street/Mailing Address &-P � WA- q (b i 15— city State Zip Telephone: 2.,o6 IF3a 5-P v �U Street/Mailing Address City State Zip Telephone: Z..`Db Traffic Engineer who prepared the Traffic Impact Analysis (if applicable): Firm Name Telephone: l . PROJECT DESCRIPTION Contact Name E-mai I: a. Location - Street address: 2 v i 1 9 ` 3 r-IL AVe b. Specify existing land use: 4.F (Attach a vicinity map and site plan.) c. Specify rproposed type and size of development: 2-k6l"-05 L L�4` s� AqA _ (# of residential units} and/or square footage of building) d. Date construction will begin and be completed: ! Zy z e. Define proposed access locations:�- Page 2 of 2 f. Define proposed sight distance at site egress locations: 2. MITIGATION RECOMMENDATIONS State recommended measures and fees required to mitigate project specific traffic impacts. Traffic impact fee shall be calculated from the attached Impact Fee Rate Tables and as identified in ECDC 18.82.120, except as otherwise provided for independent fee calculations in ECDC 18.82.130. CHANGE IN USE Fee for prior use shall be based on fee established at the time the prior use was permitted. If the previous use was permitted prior to the adoption of Ordinance 3516 (effective date: 09/12/04), the 2004 ECDC 18.82.120 impact fee shall be used. Per Unit ITE Land Use Category Fee Rate New Use $ Prior Use $ X V.i Units in square feet, # of dwelling, vfn. etc. Fee New Use Fee: $ - Prior Use Fee: $ $ r NEW DEVELOPMENT ITE Land Use Category Per Unit Fee Rate New Use 1 �� $ ❑ OTHER Units in square feet, # of dwelling, of , etc. X I I [)U Fee OTAL TRANSPORTATION IMPACT FEE $ � Z 1 8/ 10/2021 City of Ed s, Eng�eering Division Approval Date No impact fees will be due, nor will a credit be given, for an impact fee calculation resulting in a net negative.