Loading...
APPROVED ENG PLN STM RESUB1 BLD2021-0259+Civil_Plan+7.6.2021_6.07.05_PM+2285951SEC. 19, TWAT. 27N, RNG. 04E, 114 NE TEMPORARY STOCKPILE FOR TOPSOIL AND DUFF COVER WITHIN 24 HOURS PROPOSED ASPHAL T 23 SF OWNER/CONTRACTOR IS RESPONSIBLE FOR EROSION CONTROL AND DRAINAGE And downstream from 20' INGRESS, the construction site. EGRESS, & INSTALL CATCH BASIN U TILI TIES SOCKS PER ER- 902 EA SEMEN T TO 401 �,' 10 ,; 10 " 10'; 8 "C BENEFIT L 0 T 2 � J9 8 8/C 8 C )) 99 99 4 F / _ / 9 -0111- 55", 152. 0 / x / 43 10 "C / J0, x x - \-x x / _ X x-x-7L-x-x-x x � � 8 "D T/ C � ; _ I F // , 99 99 CIS / 30 BROW -- - - - - -/---I^ --- - _ _ I _ _ _ EXISTING FOOTING I DRAIN _ - - -� 6 " 0 VER L 0 WISK XISTIN' ASPHAI� 00+5o RIS 00+00 I of op 1 01+ „ 1 E S j TOPT 385. 53 G l So /li l I I o1+50 01 EX �° P V C Sd I �� - � ''\/ G ASPHALT SD / I of L 0 T 2- 721 SF I // INSTALLED GAS LICE I W I� NSTALL CA TCH BASIN SOCK PER ER-902 , „ ` G INSTALLED 1.5 " WATE R LINE =/00 37 - 1.5 W_ �I ------ WATER LINE A2 411. x I I I r I x I I 1 I EL EC TRI CIA TO DETERMINE TERMINA TEMPORARY STOCKPILE I I I I TION OF CONDUI T FOR HARDPAN. x 1 I I I GARAGE = 401 COVER WI THIN 24 HOURS I I ___________________ PROPOSED I o IoW � Fi -� I SFR FF = 402 �I C x i 1 i LOT 2 x m I LOT AREA - 91 342 I I 1 / I C ACCEPTABLE TIGHTLINE x 1 I AVERAGE EX / MATERIAL. GRADE= 402.9 SCH 40 x 1 i BACK DECK ' I N-12 I N I _ 401.9 F810 HANCOR x 1 / L------_-__ = I W D2 O' EXISTING SITE FEATURES, UTILITIES, BOUNDARY, AND TOPOGRAPHY WERE OBTAINED FROM SURVEY BY AXIS SURVEY & MAPPING 1181 IN11ork11,441%ei / ------------ Ensure that debris from t ALL DISTURBED AREAS TO BE COMPOST AMENDED PER 2014 construction does not discharge SWMMWW 2014 BMP T5.13 onto driveway and into the onsite stormwater management system. INSTALL AND MAINTAIN ALL TESC MEASURES ACCORDING TO APPROVED PLANS. CITY OF EDMONDS STANDARD DETAILS, AND ALL OTHER MEASURES THAT MAY BE REQUIRED DURING CONSTRUCTION MINIMUM OF 3' HORIZONTAL SEPARATION AND 1' VERTICAL SEPARATION IS REQUIRED BETWEEN DRY UTILITIES (POWER, GAS, PHONE, CABLE, ETC.) AND SEWER, WATER AND STORM AND 5' FROM ANY CITY MAIN LINES. A MINIMUM OF 2' OF COVER UNDER DRIVEABLE SURFACES AND V OF COVER UNDER LANDSCAPE AREAS FOR STORM PIPE IS REQUIRED. S° WA TER ` w SER yl C7 LIN, E W LE 1 W T IR ' I MEITER 0 P ID I SER VICE L T h 2' -0CID CK) I EXIS 7NG ROCA ERY 410 410 f8' TALL L L 400 5 27% I 400 o J Q) o � J 390 0C cz� 390 o W to I `� EXISTING CB 380 380 ± STA-1+1 .38 Q VANED G ATE 370 RIM=396. 4 370 IE=392.9 (E) 360 360 350 350 1+80 1+60 1+40 1+20 1+00 ACCESS DRIVEWAY CENTERLINE PROFILE LOT 2 _ 1" = 20' VERTICAL @R YWEL L SSCO 1 1" = 20' HORIZONTAL 1 FbO FOOTING RIM= 400 S C2 II I l IE=395 4 S �, 391.9 DRY 1 / W A Applicant shall repair/replace all damage to utilities or frontage improvements in City right-of-way per city standards that is caused or occurs during the permitted project. l _400--_ �' ' - I - 7 -7 EX. SAS � \ P V I 2 SS _ 6 „ PVC / / / l 99 / I �� / 1 / I / 1 S � 387.32 l - - - -' 1 � \` � x 8 F 1 I I I, I' / /' 1 SSCO // / i / I Dcv✓ / Co - - - - i - _ -�- - - - l / Ito I ---- � - -� o - I - J -- -- �_i� °' / I / Rll�-374.32 7.5 B,SB� 3 , / /' 3 ;R�sR_ , 3 T - = 3- = - ,It= 368.57 N8973'11"W 152.15'_80.50' " 26 F / / / 0HP- 10"DL BMP C103 HIGH- VIS FENCE FILTER FABRIC ' _ � _ /� �'`°k - NP / �1° AROUND DR YWELL FENCE ER- 900 / / , ORIGINATING BENCHMARK. • SNOHOMISH COUNTY DESIGNATION: 2704PO5 A 2" BRASS DISK SET IN CONC. 0.2' DN IN CASE ® INTX OF 76TH AVE W & 204TH ST SW ELEVATION: 435.28 (NAVD 88) TEMPORARY BENCHMARK: TBM A' SET R.R. SPIKE IN SOUTH FACE OF U77LITY POLE ELEVATION: 369.57' XISTING SITE FEATURES AND BOUNDARY NOTE =XISTING SITE FEATURES, UTILITIES, BOUNDARY, AND TOPOGRAPH SERE OBTAINED FROM SURVEY BY AXIS SURVEY & MAPPING UTILITY CONFLICT NOTE THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATION, DIMENSION AND DEPTH OF ALL EXISTING UTILITIES WHETHER SHOWN ON THESE PLANS OR NOT, BY POTHOLING THE UTILITIES AND SURVEYING THE HORIZONTAL AND VERTICAL LOCATIONS PRIOR TO CONSTRUCTION. THIS SHALL INCLUDE CALLING UTILITY LOCATE AT 1-800-424-5555 AND THEN POTHOLING ALL OF THE EXISTING UTILITIES AT THEIR LOCATIONS OF NEW UTILITY CROSSINGS TO PHYSICALLY VERIFY WHETHER OR NOT CONFLICTS EXIST. LOCATION OF SAID UTILITIES AS SHOWN ON THESE PLANS ARE BASED UPON THE UNVERIFIED PUBLIC INFORMAT70N AND ARE SUBJECT TO VARIATION. Know what's below. Call 811 two business days before you dig. HEIGHT CALCULATIONS LOT 2 A2 =411.4 B2 =401.3 C2=391.94 D2 =407.0 AVERAGE EX GRADE =402.9 MAXIMUM HEIGHT =427.9 PROPOSED HEIGHT=425.71 AVERAGE EXISTING GRADE AND HENCE THE POINT ELEVATIONS AT THE FOUR CORNERS ARE THE HISTORICAL GRADE OF THE SITE PRIOR TO GRADING LOT COVERAGE CALCS (357 MAX, LOT 2 AREA =9,342 SF LOT 2 STRUCTURAL LOT COVERAGE =2,243 SF (249) PROPERTY BOUNDARY -EASEMENT/GARAGE PARKING -- - - - - - - - - - - - - - -- BUILDING SETBACK LINE BUILDING FOOTPRINT ROOFLINE EDGE OF PAVEMENT/CONC. FIRE LANE SD - STORM SEWER w WATER E POWER/CABLE/PHONE G GAS OVERHEAD POWER SAWCUT CABLE/TELEPHONE Zone ' ----------- ------ RS--- Corner ....... ' Flag i X _ Setbacks: Required Proposed Side N 7.5 38 Side W -----------, ' --- 7-5 ---; 24 Side S ----------- 7.5 ____ 30 7.5 7.5 Side E ---------- --- 25 - 22.8 Height :------ APPROVED BY PLANNING Jul 27 2021 LOT 2 TO BIORETENTION AREA = 745 SF VICINITY MAP N. T. S. LEGEND: UTILITIES INSTALLED UNDER EXISTING: SHORT PLAT PLN2018-0050 CONCRETE MONUMENT ■ EXISTING TYPE 1 CATCH BASIN • EXISTING SANITARY SEWER MANHOLE ® EXISTING WATER METER O POWER POLE OEXISTING STORMDRAIN MANHOLE \ EXISTING SANITARY SEWER CLEANOUT So EXISTING STORMDRAIN CONVEYANCE PIPE PROPOSED N PROPOSED WATER METER ------ SILT FENCING CLEARING LIMITS TYPE 1 CATCH BASIN FLOW ARROW LOT 2 ROOFTOP AREA = 2,673 SF / / I I COMPLIES WITH APPLICABLE LOT 2 CRUSHED LANDSCAPING I CITY STORMWATER CODE GRAVEL AREA = 172 SF ALLOWED IMPERVIOUS AREA FOR LOT 1 PER 2-LOT SHORT PLAT APPROVED BIORETENTION SIZE PROJECT CONTACT LIST: APPLICANT: CIVIL ENGINEER: RYKER YOUNG DONNA L. BRESKE, P.E. REAL PROPERTY ASSOCIATES 21 AVE. A PHONE. (206) 930-0377 SNOHOMISH, WA 98290 EMAIL:rAerlsl-pore.com PHONE. 206-715-9582 EMAIL: donnabreske@comcast.net OWNER: REAL PROPERTY FUNDING GROUP, LLC SURVEYOR: 7500 ROOSEVEL T WAY NE MI TCH EVANS SEATTLE, WA 98115 AXIS SURVEY & MAPPING 15241 NE 90TH ST. REDMOND, WA 98052 PHONE. (425) 823-5700 EMAIL: mitch@oxismaps.com N. T. S. SHEET INDEX: 1. SITE PLAN Z NOTES & DETAILS RECEIVED Jul 07 2021 BLD2021-0259 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT APPROVED FOR CONSTRUCTION CITY OF EDMONDS 8/10/2021 r CI. GENERAL NOTES: 1. ALL MATERIALS AND WORK SHOWN ON THESE PLANS SHALL CONFORM TO THE CITY OF EDMONDS STANDARD PLANS AND DETAILS, THE FOLLOWING SPECIFICATIONS AND CODES, AND ALL OTHER APPLICABLE LOCAL MUNICIPAL, STATE, AND FEDERAL CODES, RULES AND REGULATIONS• 2021 CURRENT INTERNATIONAL BUILDING CODE (IBC) -3Btfr WSDOT/APWA STANDARD SPECIFICATIONS FOR ROAD, BRIDGE AND MUNICIPAL CONSTRUCTION - WASHINGTON STATE DEPARTMENT OF ECOLOGY STORMWATER MANAGEMENT MANUAL FOR THE PUGET SOUND BASIN (CURRENT EDITION) 2. STANDARD PLAN AND TYPE NUMBERS INDICATED ON THESE DRAWINGS REFER TO CITY OF EDMONDS STANDARD DETAILS, UNLESS NOTED OTHERWISE J. A COPY OF THESE APPROVED PLANS MUST BE ON THE JOBSI7E WHENEVER CONSTRUCTION IS IN PROGRESS. 4. DEVIATIONS FROM THESE PLANS MUST BE APPROVED BY THE ENGINEER OF RECORD AND THE LOCAL GOVERNING AUTHORITY. 5. CONTRACTOR SHALL RECORD ALL APPROVED DEVIATIONS FROM THESE PLANS ON A SET OF 'AS -BUILT" DRAWINGS AND SHALL SUMMARIZE ALL ASBUILT COND177ONS ON ONE SET OF REPRODUCIBLE DRAWINGS FOR SUBMITTAL TO THE OWNER PRIOR PROJECT COMPLETION AND ACCEPTANCE. A SET OF AS -BUILT DRAWINGS SHALL BE SUBMITTED TO THE CITY OF EDMONDS PRIOR TO FINAL APPROVAL OF THE BUILDING OCCUPANCY/FINAL PROJECT APPROVAL. 6. ELEVATIONS SHOWN ARE IN FEET. SEE SURVEY FOR BENCHMARK INFORMATION. 7. THE LOCATIONS OF EXISTING UTILITIES AND SITE FEATURES SHOWN HEREON HAVE BEEN FURNISHED BY OTHERS BY FIELD SURVEY OR OBTAINED FROM AVAILABLE RECORDS AND SHOULD THEREFORE BE CONSIDERED APPROXIMATE ONLY AND NOT NECESSARILY COMPLETE. IT IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO INDEPENDENTLY VERIFY THE ACCURACY OF ALL UTILITY LOCATIONS SHOWN AND TO FURTHER DISCOVER AND PROTECT ANY OTHER UTILITIES NOT SHOWN HEREON WHICH MAY BE AFFECTED BY THE IMPLEMENTATION OF THIS PLAN. CONTRACTOR SHALL VERIFY LOCATION, DEPTH, SIZE, TYPE AND CONDITION OF EXISTING UTILITY LINES AT CONNECTION OR CROSSING POINTS BEFORE TRENCHING FOR NEW UTILITIES. ENGINEER ASSUMES NO RESPONSIBILITY FOR THE COMPLETENESS OR ACCURACY OF THE EXISTING UTILITIES AND SITE FEATURES PRESENTED ON THESE DRAWINGS. ENGINEER SHALL BE NOTIFIED IMMEDIATELY OF CONFLICTS THAT ARISE. & CONTRACTOR SHALL LOCATE AND PROTECT ALL UTILITIES DURING CONSTRUCTION AND SHALL CONTACT THE UNDERGROUND UTILITIES REVISED 05.15.2017 LOCATION SERVICE (1-800-424-5555) AT LEAST 48 HOURS PRIOR TO CONSTRUCTION. 9. CONTRACTOR SHALL VERIFY ALL CONDITIONS AND DIMENSIONS AT THE PROJECT SITE BEFORE STARTING WORK AND SHALL NOTIFY OWNERS REPRESENTATIVE OF ANY DISCREPANCIES. 10. PIPE LENGTHS WHERE SHOWN ARE APPROXIMATE AND MAY CHANGE DUE TO FIELD CONDITIONS. 11. CONTRACTOR SHALL OBTAIN A COPY OF THE GE07ECHNICAL REPORT (WHERE APPLICABLE) AND SHALL THOROUGHLY FAMILIARIZE HIMSELF WITH THE CONTENTS THEREOF. ALL SITE WORK SHALL BE PERFORMED IN STRICT COMPLIANCE WITH THE RECOMMENDATIONS OF THIS REPORT. 12. STRUCTURAL FILL MATERIAL AND PLACEMENT SHALL CONFORM TO THE RECOMMENDATIONS OF THE PROJECT GEOTECHNICAL REPORT. 13. SUBGRADE SOILS IN ALL AREAS WHERE RAIN GARDENS, INFILTRATION OR PERVIOUS PAVEMENT IS TO BE PLACED SHALL BE DELINEATED AND PROTECTED AT ALL TIMES FROM COMPAC77VE ACTIVITIES (I.E. HEAVY EQUIPMENT, STOCKPILING). 14. MANHOLES, CATCH BASINS, UTILITIES AND PAVEMENT SHALL BEAR ON MEDIUM DENSE TO VERY DENSE NA ITVE SOIL OR COMPACTED S7RUCTURAL FILL. IF SOIL IS DISTURBED, SOFT, LOOSE, WET OR IF ORGANIC MATERIAL IS PRESENT AT SUBGRADE ELEVATION, REMOVE AND REPLACE WITH COMPACTED STRUCTURAL FILL PER GE07ECHNICAL REPORT. 15. SEE SURVEY AND ARCH17EC77JRAL DRAWINGS FOR DIMENSIONS AND LOCA7ONS OF BUILDINGS, LANDSCAPED AREAS AND OTHER PROPOSED OR EXISTING SITE FEATURES 16. SEE ARCH17ECTURAL DRAWINGS FOR PERIMETER FOUNDATION DRAINS. FOUNDATON DRAINS SHALL BE INDEPENDENT OF OTHER SITE DRAIN LINES AND SHALL BE TIGHTLINED TO THE STORM DRAIN SYSTEM WHERE INDICATED ON THE PLANS. 17. ALL REQUIRED STORMWATER FACILITIES MUST BE CONSTRUCTED AND IN CONSTRUCTION SEO UENCE NOTES: 1. SCHEDULE A PRE -CONSTRUCTION MEETING WITH CITY ENGINEERING DIVISION AT 425-771-0220, EXT. 1326. TWO DAY (48 HR) N077CE IS REQUIRED. 2. REVIEW TEMPORARY EROSION AND SEDIMENT CONTROL NOTES. J. CALL FOR U77LITY LOCATES. 4. INSTALL TESC MEASURES AND MAINTAIN DUST CONTROL WHILE PREVENTING DISTURBANCE OF ANY AREAS OF VEGETATON OUTSIDE THE CONSTRUCTION ZONE. 5. HAVE EROSION CONTROL MEASURES INSPECTED BY CITY OF EDMONDS ENGINEERING INSPECTOR. ALL 7EMPORARY SEDIMENTATION AND EROSION CONTROL MEASURES MUST BE IN PLACE AND INSPECTED PRIOR TO ANY CONSTRUCTION OR SITE CLEARING. EROSION AND SEDIMENTATION CONTROL PRAC77CES AND/OR DEVICES SHALL BE MAINTAINED UNTIL PERMANENT VEGETA7ON IS ESTABLISHED. 6. DEMOLISH EXIS77NG STRUCTURES 7. ROUGH GRADE S17E AS REQUIRED TO INSTALL DRAINAGE FEATURES. 8. CLEAR, GRUB & ROUGH GRADE SITE. COMPOST AMEND AND REVEGETATE DISTURBED AREAS NOT SUBJECT TO ADDITIONAL SURFACE DISTURBANCE IMMEDIATELY AFTER ROUGH GRADING. OTHER EXPOSED AREAS SHALL BE STABILIZED PER EROSION CONTROL N07ES BELOW 9. INSTALL UTILITIES AND OTHER SITE IMPROVEMENTS, INCLUDING FRONTAGE IMPROVEMENTS. 10. STABILIZE AND COMPOST AMEND ALL EXPOSED SOILS PRIOR TO REVEGETATION OF EN77RE SITE. 11. ESTABLISH LANDSCAPING AND PERMANENT VEGETATION. ALL TEMPORARY EROSION CONTROL MEASURES SHALL BE REMOVED UPON FINAL S17E STABILIZATION AND APPROVAL BY CITY INSPECTOR. 12. INSTALL INFILTRATION TRENCH. EXCAVA77ON OF INFILTRATION AREAS SHALL NOT BE ALLOWED DURING WET OR SATURATED CONDITIONS. THE BMP SHALL NOT BE MADE OPERATIONAL UNTIL ALL EROSION -CAUSING PROJECT IMPROVEMENTS ARE COMPLETED AND ALL EXPOSED GROUND SURFACES ARE STABILIZED. OPERATION PRIOR TO INSTALLATION OF ANY PAVEMENT UNLESS OTHERWISE APPROVED BY THE ENGINEER. 1& ALL ROOF DRAINS, PERIMETER FOUNDATION DRAINS, CATCH BASINS AND OTHER EXTERNAL DRAINS SHALL BE CONNECTED TO THE STORM DRAINAGE SYSTEM, UNLESS NOTED OTHERWISE. 19. ALL FOOTING DRAINS SERVING BUILDINGS, WALLS, ROCKERIES, ETC. SHALL CONNECT TO THE DRAINAGE SYSTEM DOWNSTREAM OF THE SITE STORMWATER ^EIENRON Y-SIR4 STORMWATER MANAGEMENT SYSTEM OR DISCHARGE REVISED 05.15.2017 TO A SEPARATE SYSTEM. 20. CONTRACTOR SHALL OBTAIN AND PAY FOR ALL PERMITS REQUIRED FOR INSTALLATION OF ALL S17E IMPROVEMENTS INDICATED ON THESE DRAWINGS 21. A SEPARATE IRRIGATION PERMIT MUST BE OBTAINED FROM THE CITY PUBLIC WORKS DEPARTMENT. PRIOR TO FINAL CONSTRUCTION ACCEPTANCE, PROVIDE TO THE CITY WATER QUALITY TECHNICIAN, A COPY OF THE BACKFLOW TEST REPORT. TEST REPORTS CAN BE FAXED TO 425-744-6057 OR EMAILED TO JEFF.KOBLYK@EDMONDSWA.GOV.. BACKFLOW TESTING SHALL BE COMPLETED BY THE OWNER ANNUALLY THEREAFTER. 22. AS A MINIMUM REQUIREMENT, ALL DISTURBED AREAS ON AND OFF SITE SHALL BE RETURNED TO THE EQUIVALENT OF THEIR PRECONSTRUCTION CONDITION IN ACCORDANCE WITH APPROPRIATE REQUIREMENTS AND STANDARDS 23. ALL DISTURBED SOIL AREAS SHALL BE COMPOST AMENDED AND SEEDED OR STABILIZED BY OTHER ACCEPTABLE METHODS FOR THE PREVENTION OF ONS17E EROSION AFTER THE COMPLETION OF CONSTRUCTION. SEE EROSION CONTROL PLANS FOR SPECIFIC GRADING AND EROSION CONTROL REQUIREMENTS. 24. THE CONTRACTOR SHALL KEEP OFF -SITE STREETS CLEAN AT ALL TIMES BY SWEEPING. WASHING OF THESE STREETS WILL NOT BE ALLOWED WITHOUT PRIOR APPROVAL. 25. THIS PROJECT IS NOT A BALANCED EARTHWORK PROJECT. BOTH EXPORT AND IMPORT OF SOIL AND ROCK MATERIALS ARE REQUIRED. 26. SLOPE OF FINISHED GRADE SHALL BE CONSTANT BETWEEN FINISHED CONTOURS OR SPOT ELEVATIONS SHOWN. 27. FINISHED GRADE SHALL SLOPE AWAY FROM BUILDING WALLS AT MINIMUM 59 SLOPE FOR A MINIMUM DISTANCE OF 10 FEET. 28. CONTRACTOR SHALL BE RESPONSIBLE FOR AND SHALL INSTALL AND MAINTAIN SHORING AND BRACING AS NECESSARY TO PROTECT WORKERS, EXISTING BUILDINGS, STREETS, WALKWAYS, UTILITIES AND OTHER EXISTING AND PROPOSED IMPROVEMENTS AND EXCAVATIONS AGAINST LOSS OF GROUND OR CAVING EMBANKMENTS. CONTRACTOR SHALL ALSO BE RESPONSIBLE FOR REMOVAL OF SHORING AND BRACING, AS REQUIRED. 29. CONTRACTOR SHALL OBTAIN APPROVAL FROM THE CITY AND FOLLOW CITY PROCEDURES FOR ALL WATER SERVICE INTERRUPTIONS, HYDRANT SHUTOFFS, STREET CLOSURES OR OTHER ACCESS RESTRICTIONS CONTRACTOR SHALL NOT RELOCATE OR ELIMINATE ANY HYDRANTS WITHOUT FIRST OBTAINING WRITTEN APPROVAL FROM THE FIRE MARSHAL. 30. COORDINATE AND ARRANGE FOR ALL UTILITY CONNECTIONS, UTILITY RELOCATIONS AND/OR SERVICE INTERRUPTIONS WITH THE AFFECTED OWNERS AND APPROPRIATE UTILITY COMPANIES. CONNECTIONS TO REVISED 05.15.2017 EXISTING UTILITIES SHALL BE MADE ONLY WITH ADVANCE WRITTEN APPROVAL OF THE AUTHORITIES GOVERNING SAID UTILITIES 31. ALL UTILITIES SHALL BE PLACED UNDERGROUND. 32. EXISTING UTILITY LINES IN SERVICE WHICH ARE DAMAGED DUE TO CONSTRUCTION WORK SHALL BE REPAIRED AT CONTRACTOR'S EXPENSE AND INSPECTED AND ACCEPTED BY CITY OF EDMONDS AND OWNERS REPRESENTATIVE PRIOR TO BACKFILLING. 33. NEW UTILITY LOCATIONS ARE GENERALLY SHOWN BY DIMENSION, WHERE NO DIMENSIONS ARE INDICATED, LOCATIONS MAY BE SCALED FROM DRAWINGS FIELD ADJUSTMENTS SHALL BE APPROVED BY OWNER'S REPRESENTATIVE AND CITY. 34. FIELD STAKE ALL UTILITY STUBS AT THE PROPERTY LINE. 35. TRENCH BACKFILL OF UTILITIES LOCATED WITHIN THE CITY RIGHT-OF-WAY SHALL BE COMPACTED TO 957. COMPAC77ON TEST REPORTS SHALL BE PROVIDED TO THE CITY PRIOR TO PAVING. 36. WHERE NEW PIPE CLEARS AN EXISTING OR NEW UTILITY BY 6" OR LESS, PLACE POLYETHYLENE PLASTIC FOAM AS A CUSHION BETWEEN THE UTILITIES. 37. SEE MECHANICAL DRAWINGS (WHERE APPLICABLE) FOR CONTINUAT70N OF SITE U77LI TIES WITHIN THE BUILDING. 38. SEE ELECTRICAL DRAWINGS (WHERE APPLICABLE) FOR EXTERIOR ELECTRICAL WORK. 39. SEE LANDSCAPE DRAWINGS (WHERE APPLICABLE) FOR SITE IRRIGATION SYSTEM. 40. PIPE MATERIAL AND SIGNAGE SUBMITTALS SHALL BE PROVIDED TO CITY ENGINEERING DIVISION FOR APPROVAL PRIOR TO INSTALLATION. 1 4 I - S . FILTERI SOCK WITH OVER IFLOW HOLES (NP) c. -a 4'- GRATE FILTER SOCK WITH OVER FLOW HOLES (TYP) CATCH BASIN NOTES: CATCH BASIN 1. CONTRACTOR/DEVELOPER SHALL MAINTAIN THIS APPLICATION AT ALL TIMES DURING CONSTRUCTION PERIOD. 2. ANY SEDIMENT IN CATCH BASIN INSERT SHALL BE REMOVED WHEN INSERT IS ONE-THIRD FULL. 3. CITY INSPECTION REQUIRED ON ALL EROSION CONTROL METHODS BEFORE OTHER WORK CAN BEGIN. REVISION DATE CITY OF EDMONDS TEMPORARY JANUARY 2018 SEDIMENT TRAP PUBLIC WORKS FOR CATCH BASINS STANDARD DEPARTMENT DETAIL APPROVED BY: R. ENGLISH E R- 9 0 2 2" x 2" WOOD/STEEL FILTER FABRIC SECURED TO 2" x 2" 14 GA WIRE FABRIC EQUAL NATIVE BACKFILL MATERIAL 0 I CA NOTES: 8 FILTER FABRIC MATERIAL IN CONTINOUS ROLLS USE STAPLES OR WIRE RINGS TO ATTACH FABRIC TO WIRE 2" x 2" WOOD/STEEL POSTS WIRE MESH FENCE TO SUPPORT FILTER FABRIC BURY BOTTOM OF FILTER MATERIAL 8" TO 12" 1. CONTRACTOR/DEVELOPER SHALL MAINTAIN AND ENSURE PROPER EROSION CONTROL THROUGHOUT PROJECT. 2. SILT FENCE TO BE PLACED DOWNSLOPE OF CONSTRUCTION ACTIVITY. CITY OF EDMONDS PUBLIC WORKS DEPARTMENT CITY INSPECTION REQUIRED ON ALL EROSION CONTROL METHODS BEFORE OTHER WORK CAN BEGIN FILTER FABRIC FENCE FILTRATION SYSTEMS REVISION DATE JANUARY 2018 STANDARD DETAIL ER-900 ENGINEERING DIVISION APPROVED AS NOTED 08/10/2021 RECEIVED Jul 07 2021 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT