APPROVED_PLN_RESUB1 BLD2022-1090+SITE PLAN+9.21.2022_3.43.04_PM+3122387r: ❑,V
APPROVAL STAMP PAGE
PERMITTING & DEVELOPMENT
BUILDING DIVISION
121 5th Avenue N
P: 425.771.0220
www.edmondswa.gov
ENGINEERING DIVISION
APPROVED AS NOTED
V/%�e�10/06/2022
PLEASE KEEP WITH THE PLANS RESUB
Sep 23 2022
City
Of Edmonds DEVE DEPART
Building Department
Work
DEMO
-------------------------
Address
22730 HIGHWAY 99
-------------
Owner
BOO HAN
------------------------------------
Approved Date.
10/6/2022
Building Official
Permit Number'
BLD2022-1090
------------------------------
- PROPERTY OWNER HAS PROVIDED A LETTER THAT
ADJACENT PARCELS ARE UNDER COMMON OWNERSHIP AND
ACCESS ACROSS ADJACENT PARCELS IS PERMITTED DURING
DEMOLITION.
- PROPERTY OWNER HAS INDICATED THAT WATER WILL BE
PROVIDED FROM 22740 HIGHWAY 99. AN AVB IS REQUIRED TO
BE INSTALLED ON THE SPIGOT AT THIS BUILDING TO PROTECT
THE DOMESTIC SERVICE WITHIN THE BUILDING.
- TEMPORARY SEDIMENTATION AND CONTROL MEASURES
SHALL BE IMPLEMENTED THROUGHOUT DEMOLITION,
INCLUDING PLACEMENT OF FILTER SOCKS IN DOWNSTREAM
CATCH BASINS. DUST CONTROL REQUIRED. PERMANENT SITE
STABILIZATION REQUIRED LEAVING NO EXPOSED SURFACES.
APPROVED BY PLANNING
10/06/2022
lb —
ONDS
SERVICES
ENT
NOTE- This Stamp page must remain with the city approved plans at all times. Failure to have this
Stamp page with the City approved plans could result in delay of the inspections including the FINAL
inspection. If lost please contact the city as soon as possible to find a solution. Thank You.
d7rtls ..
e,)i0// ?mD
11'
2,. 6-1oG S4`jfA IY&kr lb
64 APO
L.Idt,-
RESUB
Sep 23 2022
CITY OF EDMONDS
DEVELOPMENT SERVICES
7 DEPARTMENT
Ppu9jt2r Ads_ s
230 tIlemgt%AY -eel
� nrl�yclns, FJ� �gaat�
IS ! .fie:
el
s,le)i9°
�2�
� .mod �I✓�ST RAP
rx.c. cqr4r<^vLlC. .
� Try ,�IS��cI� S��e7UZC.
�kIS�l1�� lA1,AT-' A 66
Rim m 4'1��'1�3.
DRIVEWAY APPROACH f'
TO WEST OF SITE IS TOZ� / S LG : / r8
BE USED FOR
CONSTRUCTION
ACCESS.
BLD2022-1090
CATCH BASIN
BLD2022-1090
GRATE
RESUB
Sep 23 2022
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
FILTER SOCK WITH
OVER FLOW HOLES
(TYP)
CATCH BASIN
NOTE5
1. CONTRACTOR/DEVELOPER SHALL MAINTAIN
THIS APPLICATION AT ALL TIMES DURING
CONSTRUCTION PERIOD.
2. ANY SEDIMENT IN CATCH BASIN INSERT
SHALL BE REMOVED WHEN INSERT IS
ONE—THIRD FULL.
3. CITY INSPECTION REQUIRED ON ALL
EROSION CONTROL METHODS BEFORE
OTHER WORK CAN BEGIN.
REVISION DATE
TEMPORARY JANUARY 2018
CITY OF EDMONDS SEDIMENT TRAP
PUBLIC WORKS[APPROVED
FOR CATCH BASINS STANDARD
DEPARTMENT DETAIL
fs t 1 g O BY: R. ENGLISH E R- 9 02