Loading...
APPROVED_PLN_RESUB1 BLD2022-1090+SITE PLAN+9.21.2022_3.43.04_PM+3122387r: ❑,V APPROVAL STAMP PAGE PERMITTING & DEVELOPMENT BUILDING DIVISION 121 5th Avenue N P: 425.771.0220 www.edmondswa.gov ENGINEERING DIVISION APPROVED AS NOTED V/%�e�10/06/2022 PLEASE KEEP WITH THE PLANS RESUB Sep 23 2022 City Of Edmonds DEVE DEPART Building Department Work DEMO ------------------------- Address 22730 HIGHWAY 99 ------------- Owner BOO HAN ------------------------------------ Approved Date. 10/6/2022 Building Official Permit Number' BLD2022-1090 ------------------------------ - PROPERTY OWNER HAS PROVIDED A LETTER THAT ADJACENT PARCELS ARE UNDER COMMON OWNERSHIP AND ACCESS ACROSS ADJACENT PARCELS IS PERMITTED DURING DEMOLITION. - PROPERTY OWNER HAS INDICATED THAT WATER WILL BE PROVIDED FROM 22740 HIGHWAY 99. AN AVB IS REQUIRED TO BE INSTALLED ON THE SPIGOT AT THIS BUILDING TO PROTECT THE DOMESTIC SERVICE WITHIN THE BUILDING. - TEMPORARY SEDIMENTATION AND CONTROL MEASURES SHALL BE IMPLEMENTED THROUGHOUT DEMOLITION, INCLUDING PLACEMENT OF FILTER SOCKS IN DOWNSTREAM CATCH BASINS. DUST CONTROL REQUIRED. PERMANENT SITE STABILIZATION REQUIRED LEAVING NO EXPOSED SURFACES. APPROVED BY PLANNING 10/06/2022 lb — ONDS SERVICES ENT NOTE- This Stamp page must remain with the city approved plans at all times. Failure to have this Stamp page with the City approved plans could result in delay of the inspections including the FINAL inspection. If lost please contact the city as soon as possible to find a solution. Thank You. d7rtls .. e,)i0// ?mD 11' 2,. 6-1oG S4`jfA IY&kr lb 64 APO L.Idt,- RESUB Sep 23 2022 CITY OF EDMONDS DEVELOPMENT SERVICES 7 DEPARTMENT Ppu9jt2r Ads_ s 230 tIlemgt%AY -eel � nrl�yclns, FJ� �gaat� IS ! .fie: el s,le)i9° �2� � .mod �I✓�ST RAP rx.c. cqr4r<^vLlC. . � Try ,�IS��cI� S��e7UZC. �kIS�l1�� lA1,AT-' A 66 Rim m 4'1��'1�3. DRIVEWAY APPROACH f' TO WEST OF SITE IS TOZ� / S LG : / r8 BE USED FOR CONSTRUCTION ACCESS. BLD2022-1090 CATCH BASIN BLD2022-1090 GRATE RESUB Sep 23 2022 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT FILTER SOCK WITH OVER FLOW HOLES (TYP) CATCH BASIN NOTE5 1. CONTRACTOR/DEVELOPER SHALL MAINTAIN THIS APPLICATION AT ALL TIMES DURING CONSTRUCTION PERIOD. 2. ANY SEDIMENT IN CATCH BASIN INSERT SHALL BE REMOVED WHEN INSERT IS ONE—THIRD FULL. 3. CITY INSPECTION REQUIRED ON ALL EROSION CONTROL METHODS BEFORE OTHER WORK CAN BEGIN. REVISION DATE TEMPORARY JANUARY 2018 CITY OF EDMONDS SEDIMENT TRAP PUBLIC WORKS[APPROVED FOR CATCH BASINS STANDARD DEPARTMENT DETAIL fs t 1 g O BY: R. ENGLISH E R- 9 02