Loading...
Fallon Walls 2 (2)Daily Field Report ate O ffice • , Project No: 2021-177-1 17522CorporBot ll Way Northeast Bothell, Washington 98011 Report No: 2 RILEYGROUp 425.415.0551 RGI rep: Kristina Weller www.riley-group.com Date: Sept 2, 2021 Day Thursday Permit No: BLD2021-0886 Page No. 1 of 1 Project: Fallon Walls Subject: Wall Subgrade and plan Location: 1116 Vista Place, Edmonds Contractor: FM Enterprise LLC Client Name: Eddie Fallon Superintendent Felix Mata 425-322-8250 & Address: 1116 Vista Place Visitors: Edmonds, Washington 98020 Weather: Sunny OBSERVATIONS RGI was onsite to observe the excavation for the wall and provide confirmation of wall details. The contractor has completed the excavation and exposed the subgrade for the wall alignment. The subgrade was probed with a % inch diameter steel probe and suitable conditions for support of the wall were observed. Overexcavation of the soils from 6 to 10 inches was necessary at the south end to provide suitable support. This will be brought back to grade with compacted 5/8 inch minus crushed rock that is also used for the base leveling pad. The cuts appear stable but raveling of the soils should be expected. Special care should be taken when setting blocks as the excavator is located on top of the cut. The contractor expects the base block and the drain pipe will be complete by Tuesday afternoon or Wednesday morning. RGI will return to conform drainage and block placement. Blocks were being delivered to the site for the base. No tracking was observed and a silt fence is installed on the downslope portion of the project below the wall location. RGI Rep sign: Kv'6WuVLC11WP.t1P-v' Copies To: The Riley Group, Inc.