Loading...
Fallon Walls 3 (2)Daily Field Report ce • , lWay Project No: 2021-177-1 17522CorporBothOellate Northeast ILW Bothell, Washington 98011 Report No: 3 RILEYGROUp 425.415.0551 RGI rep: Lizzie Wratten www.riley-group.com Date: Sept 7, 2021 Day Tuesday Permit No: BLD2021-0886 Page No. 1 of 1 Project: Fallon Walls Subject: Wall Subgrade and plan Location: 1116 Vista Place, Edmonds Contractor: FM Enterprise LLC Client Name: Eddie Fallon Superintendent Felix Mata 425-322-8250 & Address: 1116 Vista Place Visitors: Edmonds, Washington 98020 Weather: Sunny OBSERVATIONS RGI was onsite to observe the excavation for the wall and construction progress. The contractor has completed the over excavation at the southern end of the excavation. Contractor has brought the pad back to grade with 5/8 inch minus and compacted it in lifts with hoe-pac. When probed with a %" diameter steel tipped T-probe suitable conditions for support of the wall were observed. Contractor has started placing the first layer of blocks and installed drainage behind the wall. Perorated drain pipe has been surrounded by drain rock to the depth of the first blocks, and surrounded all the rock with filter fabric. More blocks are arriving on site tomorrow, and the second row will be started then. The cuts appear stable but raveling of the soils should be expected. Special care should be taken when setting blocks as the excavator is located on top of the cut. No tracking was observed and a silt fence is installed on the downslope portion of the project below the wall location. RGI Rep sign: Lik3ie1Wra+ tP4,i1 Copies To: Reviewed by Krwo 'alweuew The Riley Group, Inc.