Fallon Walls 6 (2)Daily Field Report
• ,Corporate ce
Project No:
2021-177-1
17522 Bothell'Way Northeast
Bothell, Washington 98011
Report No:
6
RILEYGROUp 425.415.0551
RGI rep:
Kristina Weller
www.riley-group.com
Date:
Sept 13, 2021 Day Monday
Permit No: BLD2021-0886
Page No.
1 of 1
Project: Fallon Walls
Subject:
Wall Construction
Location: 1116 Vista Place, Edmonds
Contractor:
FM Enterprise LLC
Client Name: Eddie Fallon
Superintendent
Felix Mata 425-322-8250
& Address: 1116 Vista Place
Visitors:
Edmonds, Washington 98020
Weather:
Sunny
OBSERVATIONS
RGI was onsite to observe the wall construction progress.
Contractor has finished the wall construction and backfill. The front and back of the wall have been
backfilled with native materials. The surface is still loose but the underlying material was compacted based
on probing with a % inch diameter probe. The material below the wall was observed to be compacted as
well.
The loose material on the surface was being
moisture conditioned with a sprinkler prior
to compaction. , ;`
v!<' s
_��;
No tracking was observed and a silt
r'
fence is installed on the downslope
portion of the project below the wall @ ;
y,
location.°
i
RGI Rep sign: KrWUYLCEIWeV" Copies To: