Loading...
Att 2 - proposed east elevationI EXIST NEW ROOF ROOF ADDITION TYPICAL EXTERIOR RAILING ASSEMBLY EXiS EXIST F7N S -T- JJ f15 F*3 EX r -> �Xlsj I I I I r- -> V1511 1 111 r- -> pis . . . . . . . . . . . . . . . . . . . . . . . . — - — — — — — — - — — — — — — -EX15T FUUSE NEW — ADDITION NORTH ELEVATION SCALE: 1/4" = l'-O" ADA COMPLIANT WHEELCHAIR LIFT LOCATED ADJACENT TO EX15T PORCH;, DIMS PER MANUFACTURERI 4 ----- INFILL EXIST WINDOW OPENINGS; SIDING TO MATCH EAST CRAWLSPACE VENT; 8"X16" 30YR ARCHITECTURAL ASPHALT COMPOSITE ROOFING, TYP CONTINUOUS RIDGE VENT jjjj� 41 41 4, L L L L NEW NEW EXIST EX GRADE (D ... .. ..... . ... .... ... . .. lNnR-rH WALLOF ARAGE:23515F CRAWLSPACE ACCESS DOOR TYPE 1 SIDING: FIDERCEMENT LAP SIDING WITH 7" EXPOSURE TO MATCH EXIST MAXIMUM HEIGHT = +52.25'+/- +3O'ABOVE AVERAGE GRADE RIDGE EL = 23'-0'+/- (T.O. RIDGE) 12 12 5-1/8 (V) 1 15-1/8 (V) 12 7- 5-1/8 (V 12 --- 15-1/8 (V) NEW�J L_ I EX GRADE MAIN FLOOR PLATE EL = 16'- 0 5/8" (T.O. TOP PLATE) MAIN FLOOR EL = 7'-8 3/4" (T.O. SUDFLOOR) NEW COLUMN TO MATCH INSTALL 36" GUARD �E>L EXIST NEW TYP EXTERIOR METAL RAIL, FASCIA MOUNTED L9 �D RAILING AVERAGE GRAPE = 52.25'+/- U-3 r\ 0 uj < 2: - - — - — - . . . . . . EX GARAGE FLOOR EL = T-31/2" +/- U-1 0. EX SLA13) < LOWER FLOOR EL = 0'-0" +/- (T.O. EX SLAB) EAST ELEVATION SCALE: 1/4" = l'-O" V AREA LIMITED TO 10% OF WALL AREA = 23.515F SED WINDOWS: 11.5 SF + 11.55F = 23 SF MAXIMUM HEIGHT = +82.25'+/- +30'ABOVE AVERAGE GRADE RIDGE EL = 23'-O" (T.O. RIDGE) ELEV = +72.75'+/- +20'-6" +/- ABOVE AVG GRAPE MAIN FLOOR PLATE EL 16'- 0 5/5" (T.O. TOP PLATE) ELEV = +65.75'+/- (T.O. SU13FLOOR) ELEV = +57.45'+/- AVERAGE GRADE = 52.29 +/- EX GARAGE FLR EL = 1'-31/2"+/ r►-Ir '904 l'2� 0=0100 UNAM M I rolyin I m M I- • •miiIiiii (T.19, EX SLAB); ELEV = +49.75'+/ 0 C) N z z C:) 00 < W CY) z 0 � 0 < CY) z Ir- 04 0 100 W 9716 REGISTERED ARCHITECT HEIDI MICHELLE HELGESON STAT E OF WASHINGTON H 2 D A R C H I T E C T U R E D E S I G N 23020 EDMONDS WAY, #113 EDMONDS, WA 98020 P. 206 . 542 . 3 7 34 www.h2darchitects.com DATE: 9/14/2018 PERMIT SET EXTERIOR ELEVATIONS RESUB SEP 14 2018 BUILDING DEPARTMENT CITY OF EDMONDS A2.0 Attachment 2 - BLD20181021 Design Review