Loading...
BLD2019-0817_Storm Report_3-12-20STORMWATER SITE PLAN REPORT FOR Killin Residence 543 31d Avenue South Edmonds, WA 98020 Parcel #00409600-100-900 September 20, 2019 Revised March 12, 2020 Prepared For: Jon & Selena Killin 543 3rd Avenue South Edmonds, WA 98020 Prepared By: Site CIV/1 JISEngineering PLLC JLS Engineering PLLC 19125 North Creek Parkway, Suite 123B Bothell, WA 98011 Contact: Jeremy Sather, P.E. Phone: (206) 849-5489 Killin Residence Stormwater Site Plan Report March 12, 2020 Table of Contents Site Civil Engineering JISPLLC 1. PROJECT OVERVIEW .............................................................................................................................. 3 ProjectLocation ........................................................................................................................................................... 3 ExistingConditions Summary ................................................................................................................................. 3 DevelopedSite Hydrology ....................................................................................................................................... 3 2. MINIMUM REQUIREMENTS SUMMARY .............................................................................................. 6 3. OFFSITE ANALYSIS DESCRIPTION ........................................................................................................ 8 UpstreamA na�vsis ..................................................................................................................................................... 'q DownstreamA na�vsis .............................................................................................................................................. 8 PotentialDrainage Impacts ................................................................................................................................... 9 4. STORMWATER CONTROL PLAN ....................................................................................................... 10 FlowControl BMFs .................................................................................................................................................. 10 FlowControl HMP SIzIng ........................................................................................................................................ I I Conveyan ce Design ................................................................................................................................................ 12 5. CONSTRUCTION STORMWATER POLLUTION PREVENTION (CSWPP) .................................... 13 CSW17 NVrdl/Ve ...................................................................................................................................................... 13 Construction Site Planning and Sequencing ................................................................................................... 16 Activities During Constructlon .............................................................................................................................. 17 Infiltratlonand DIsoerslon Facillty Constructlon Techniques ..................................................................... /8 6. SPECIAL REPORTS AND STUDIES, OTHER PERMITS ...................................................................... 19 Speci3lReportsand Studies .................................................................................................................................. /9 OtherPermits ............................................................................................................................................................ 19 7. OPERATIONS & MAINTENANCE ....................................................................................................... 19 Appendices A. Project Site Plans B. Calculations 0 WWHM - Infiltration Sizing C. Geotechnical Investigation Page ii Killin Residence Stormwater Site Plan Report March 12, 2020 1. PROJECT OVERVIEW Project Location site civil Erigirteering JISPLLC The project site is located at 543 31d Avenue South, Edmonds, Washington. The project has Snohomish County parcel identification number 00409600-100-900. See Figure 1, Site Vicinity Map. Existing Conditions Summary The existing 8,124-square foot (0. 187-acre) parcel is zoned RS-6 Single Family Residential. The project site is bounded by • single-family residential of similar zoning to the east, north and south, • by 3rd Avenue South to the west, and * by an alley to the east. The site contains an existing single-family residence. Access is provided via a private asphalt driveway that directly accesses 3,d Avenue South to the west, and via a private gravel driveway that directly accesses the alley to the east. All utilities are served underground, except for power which is above ground. The total existing hard surface area on the existing parcel is 4,899 square feet. See Figure 2, Site Aerial Map. Historically the project site was forested. The project site generally slopes down to both the northwest and northeast property corners from the high point located on the southern property line. The average slope of approximately 2% to 4% across the site. Stormwater discharges the property at the northwest and northeast property corners as sheetflow. There are no known critical areas located on or near the project site. A Geotechnical Investigation was prepared by Cobalt Geosciences, dated December 19, 2019, that assessed the existing site soils and the feasibility of infiltration of stormwater runoff. One test pit was excavated onsite to a depth of 10 feet. The test pit encountered several inches of gravel overlying about 1.25 feet of topsoil (Fill). This layer was underlain by approximately 1.5 feet of medium dense, silty -fine to medium grained sand with gravel (Fill). This layer was underlain by medium dense to dense, silty -fine to medium grained sand trace gravel (Whidbey Formation), which continued to the termination depth of the test pit. Groundwater was not encountered during the investigation. An in -situ infiltration test was completed at a depth of 6 feet below grade. The adjusted design infiltration rate was determined to be 0.6 inches per hour. Infiltration of runoff from impervious surface is feasible within the weathered Whidbey Formation that underlies the site. Groundwater is estimated to be 7 to 10 feet below existing grade. Developed Site Hydrology The proposed project will demolish a portion of the existing single-family residence and construct a new single-family residence in its place. The total proposed onsite new and replaced hard surfaces is 4,036 square feet. See Section 4 for a detailed review of project areas. Page 3 Killin Residence Stormwater Site Plan Report March 12, 2020 Site Civil Erighiecring JISPLLC The new residence will access 31d Avenue South via existing private driveway and to the west to using the existing gravel driveway to the alley. Utilities will be reconnected and upsized as necessary. Onsite stormwater runoff will be collected and conveyed to a new stormwater infiltration trench located in the southeastern portion of the site. Runoff that overflows the infiltration trench will outlet into the existing eastern concrete gutter in the 3,d Avenue South right-of-way. Best Management Practices (BMPs) will be implemented for the project site to the maximum extent feasible, which pprimarily includes the infiltration trench for the roof area. See Section 4 for a more detailed discussion of the onsite BMPs to used. See Figure 3 for Proposed Development Plan. Figul-e I., SIte Vlclnity Map. 91n-G M-7p Fun Chinese Edmor,ds BoM Ace Hardware 104 Ln Hm%elF Way Hamburg.— Harrys i i T1 QJ Edmonds City Park EdFr)Dnds Cfty Pairk �* Erhen a, Pine 5t Pine st Bark.ada-IT.11 SITE Hoil-� - 0 Hc)molul)d DF LUXUrY t Metals LA Hemlock Way 8mlock Way M M Seemont Ln Seamont Ln pinast pine�t Page 4 Killin Residence Stormwater Site Plan Report March 12, 2020 Site Civil Erigincering JISPLLC -IgUrC J.- I-TOPOSCU LJCVe1OPMC1_7t I-Idt-7 D051ING CRAVE [WkWAY TO ENE POISE). !E T REII&DE TO MATD­1 PROPOSED OARAEE SLAG. PROIDE "TNE DRAINME AWAT FKM GARAGE F.; 66.8 SEE PRQJETT NUTE 5 IE 65,� 15 �51L 6" -7 - - - - - - - - - - - 44 i —BUILDING FCCnNG CRAINS V AND TTE- EL IE PERIF(WEDEPTH OS Tj DRAINAGE WITH ARCHITECTLRALI�3 -RUCTLIRAL PLANS 11,3 LF Re S-1 1051, WIN. STEEL SEE PRCL-E-r NCTE 5 LF - ".7 UIN 11.�'H�.;-_E F�R T El. H CfJ AN 'Fr F3CTVC CRAINS 94 LF - 4- RD BE -ECT ­TE S�_O% WIN. 32 SEE PROECT WGTE 5 -------------------------------------- R� N. .............. .7 - ---------- ....... 'LLL�_ T R M', LL %; ELE T'I 1', T E H E TUT, -E, T_ fMq 51 A I "POL IE �M 8FILTRA TIM TRENCH T E -H PFL_ LF - CB -TYPE 1 IE RNA f�" 2 TRENEHES 01 35� LONG IN LF TCT-'L. 5. WDE � S HEIGHT CrI 'D (4' OYERFLDW OVO �LE 'I' 670-61L FINISHED MAGE I (I- RI M IE 64.5 (A TRENCH GILM = 6 6 0 = TU: TRENCH 64.5 - IE C Pff � 6 0 EWCH RG-Rom Ti Page 5 Killin Residence Stormwater Site Plan Report March 12, 2020 2. MINIMUM REQUIREMENTS SUMMARY Site Civil Erighiecring JISPLLC The project will meet the requirements and guidelines for the following standards: City of Edmonds Community Development Code (ECDC) Chapter 18.30, Stormwater Management. Department of Ecology Stormwater Management Manual for Western Washington, Ver- sion 2012 with 2014 edits (SWMMWW) City of Edmonds Stormwater Addendum, Version June 2017 The project site is redevelopment. See Figure 5 for Flow Chart for Determining Requirements for Development. Per the guidelines listed above and Figure 4, Minimum Requirements I through 5 will apply to the project site. Flgul-e 4 - Flo w Chart- fol- DetermInIng 1?equll-ements for De velopment EDMONDS $TORUWATER ADDE-'4L)U-A JUNC XIL Do -as &e pyajectrasultin2:1000square feet: or Water: ofnewplusnplacedbardsuthee =7 OR D�62 hnldis=bingi��itytot-all,Wl quaz2 Bee, wgmaree minlInuln Req U='—k No. I 11trough 5 apply I hlb� EArraimicnant No- 2 applies Does the pr,�ecl 2dI I,0W ��E leer or � ofniew plus replaced hard 2,rI=,c2,7 OR C—t 075 -- or-- f—E.Uti— to 1— - lan&-aped —1 OR Conv,etl 2.5 acres or rnore of natiw vegetation to pasture? yat No N. rog I-� tbi5 a mad related prqj�t? Doe� the project �W 5,000 sq� feet or KDOTE ofnem hard —fa—' ALIMili= RAEqUilelUeBM Y" apply to the � and reph�ed Do new hard surf�s add 50% ar hard and ---t-d 4 xnew tG tb� emstng b3id mtrface� vegetation Ah- the p-j—t li—t�7 `-"— 1, N. adAiti-1 apply to the new h;ard aurfices req--nt, 1A —"IM and commrted vegetation areas. AID Figurv1l. Flow Ckm-t for Doeraiinhag Requirements for De,% elopment. Page 6 Killin Residence Stormwater Site Plan Report March 12, 2020 site civil Erigirteering JISPLLC The following are the applicable Minimum Requirements and how they apply to the proposed development. MI? I - ftporc7tIon of Storm wc7ter SIte Plcms This Stormwater Site Plan Report and Civil Improvement Plan, Sheet C3 provided in Appendix A, has been prepared to analyze stormwater control measures for disturbed onsite and offsite areas in accordance with: Chapter 3 of Volume I of the SWMMWW, and City of Edmonds Stormwater Addendum, Appendix C, Checklists I through 3 MR 2 - ConstrIctlon Storm woter Follutlon Pre ventlon P1,7n 4CS A temporary erosion and sediment control (TESC) plan and a CSWPPP has been prepared for the project and is included as Section 7 of this Report to provide direction for Construction Stormwater Pollution Prevention requirements. These will include silt fence, construction entrance, storm drain inlet protection and cover measures as typical for single-family residential construction. MY? 3 - Sout-ce Control of Pollution Water pollution source control will be provided per Volume IV of the SWMM for non- commercial activities at residential properties. During construction the source control will be provided by the TESC measures and implemented per the CSWPPP. See Section 5 of this Report for the CSWPPP. After construction the project site will be operated as a typical single-family residence. Some of the source control items will include: Prevention of prohibited discharges and connections. This may include contaminated materials entering the storm conveyance system. 0 Materials storage, containment and cleanup. Materials may include paint, oil and gas for personal vehicles, etc. An easy and cost-effective solution is to keep materials covered and in garage or shed. MR 4 - Freservotlon of Natural Qrc7lnage Systems,3nd Qutfc7lls The natural downstream flowpath will be maintained by discharging to the same location as precleveloped conditions: at the northwest and northeast property corners as sheetflow. Developed onsite stormwater runoff will be collected and conveyed to a new stormwater infiltration trench; the infiltration trench overflow will outlet into the existing eastern concrete gutter in the 3 rd Avenue South right-of-way. See Section 3 - Offsite Analysis Description for assessment of the potential offsite impacts of stormwater discharges. MR 5 - Qn-slte Storm water Mana ement Q_ On -site stormwater management will be applied per the City of Edmonds Stormwater Page 7 Killin Residence Stormwater Site Plan Report March 12, 2020 site civil Erigirteering JISPLLC Addendum and Chapter 5, Volume V of the SWMMWW. On -site stormwater management incorporates implementation of BMPs to reduce stormwater runoff and pollution from developed sites. Per SWMMWW - Volume I - Chapter 2.5.5, Table 2.5. 1, new development inside the UGA, the project is a Category 1, and will comply with List # 1. On -site Stormwater Management, or BMPs (Best Management Practices) are required for the project to the maximum extent feasible which includes the following BMPs: Proposed/rep laced lawn and landscape surfaces will apply Post Construction Soil Quality and Depth. 0 Full infiltration will be used for the new and replaced roof area for the residence. Sheetflow dispersion will be used for the front walkway. A d tailed review for BMP feasibility is provided in Section 4 of this Drainage Report. 3. OFFSITE ANALYSIS DESCRIPTION A Category I offsite analysis was completed to identify potential problems prior to and after the proposed development. This includes reviewing the upstream and downstream areas tributary to the project site and assessing the potential off -site impacts of stormwater discharges. Since the project will fully infiltrate the proposed roof surface and discharges up to and exceeding the 100- year peak flow event will be very low or negligible, a detailed field review has not been completed. The following offsite analysis is a cursory review of the offsite drainage systems. Upstream Analysis: The upstream area is rather limited. The upstream areas is to the east of the project site. Surface runoff from uphill areas are intercepted by the existing alley and drain to the north. Downstream Anab� �Js. The downstream flowpath begins at the northwestern corner of the project site where onsite surface water enters the eastern street gutter of 3rd Avenue South. At this point the downstream flowpath is described below and is based on City of Edmonds stormwater maps. See Figure 5 for the Downstream Analysis Map. 0 Stormwater runoff follows the street gutter toward the north and enters an existing catch basin approximately 500 feet to the north. The Catch basin is located at the southeast corner of the intersection of 3 rd Ave S & Howell Way. Stormwater crosses the intersection in the City piped stormwater system and continues north. Stormwater runoff enters Shallabarger Creek and flows west across Edmonds Way and through Edmonds Marsh. 0 Runoff outlets to the Puget Sound at the Port of Edmonds. Page 8 Killin Residence Site Civil Stormwater Site Plan Report Engineering March 12, 2020 JISPLLC Potential Drainage Impacts: The existing project site currently does not contain Flow Control BMPs. The project will provide Flow Control BMPs to mitigate for surface runoff and reduce impacts to downstream properties. The proposed roof area will be directed to a full infiltration trench. An overflow is provided for the infiltration trench as a protective measure. Based on the inclusion of the proposed BMPs, it is anticipated the proposed project will not adversely impact the downstream drainage conditions. There are no proposed offsite mitigation measures proposed by the project. FIgure 5: Downstream An,76VSIS M,7P eXTVVOVII��__l 1 -11 ., I I NF, TR_1 TV- -71 F11 77 too outlet to Puget Sound at Part of Edmonds Downstream Flowpath 1/7 -AP Edmonds 'k, W 221 21b 21S 2to 224 � 1 229 2M 221 no 2a 220 233 2A2 314 260 W47 - 114 Shelbb,rger Cree 2%7 2@7 U2 420 1 2 A 6 An 346 . . . 41T 423 4� 550 Marsh - I 2 400 510 Map clip of Edmonds Watersheds I i Gutter Flow Along 527 531 W I 7 534 East Side 3rd A veS s" 5" 541 554 Z Ed­� - ­ Edmonds �5 ;��O Shellabarger 7, Project Site is . 1 71 Puget T 110 Project Site tM IMO IQIJ Iola Z % 1011 lw� 02 102 Ion Page 9 Killin Residence Stormwater Site Plan Report March 12, 2020 4. STORMWATER CONTROL PLAN site civil Erigirteering JISPLLC This section addresses the impacts of the Project target surfaces (new and replaced pervious and impervious areas) created by the proposed improvements and how Flow Control BMPs will be applied to the project. Existing Site HjLcLrolog The existing site generally slopes toward the northwest to 3rd Ave S. The driveway and yard areas sheetflow to the east gutter line of 3,d Ave S. The existing roof downspouts are piped underground. There is no surface connection or outlet point for the roof downspouts, thus it is assumed the roof area is managed in a subsurface system, i.e. drywells. Qej�,"o edSiteHjLc&-o1o6Z Onsite stormwater runoff generated by the new roof will be collected and conveyed to a new infiltration trench. The proposed walkway will sheetflow across the front yard. The existing asphalt and gravel driveways will remain, no BMP's are proposed for those surfaces. SLoLectAreas The summary of project areas is as follows: TOTAL SITE AREA 8,124 SF APPROX. DISTURBED AREA 8,000 SF EXISTING IMPERVIOUS AREA 4,899 SF EXISTING IMP. TO REMAIN 504 SF NEW/REPLACED IMPERVIOUS AREAS ROOF 3,062 SF DRIVEWAY 734 SF PATIO/WALKWAYS 240 SF TOTAL 4,036 SF TOTAL IMPERVIOUS AREA 4,540 SF (55.9%) CONVERTED LAWN/LANDSCAPE 3,460± SF Flow Control BMPs Flow Control BMPs will be applied to the new and replaced impervious areas and converted vegetation areas to the maximum extent feasible. Table 2 on the next page provides an assessment of the feasibility for the Flow Control BMPs per List #1 of the SWMMWW and Edmonds Stormwater Addendum. Page 10 Killin Residence Stormwater Site Plan Report March 12, 2020 Table 2: List #2 Feasibility Summary site civil Erigirpeering JISPLLC BMP Pro - F BMP Standard Feasible? vided? Feasibility Comment Post Construction Soil BMP T5.13 YES YES This BMP can be used for new, replaced, Quality and Depth and created pervious landscaped areas. Infeasible. Not enough flowpath length Full Dispersion BMP T5.30 NO NO and separations available for full disper- sion. FEASIBLE. Infiltration testing yielded Full Infiltration BMP T5. I OA YES YES long-term adjusted rates of 0.6 inches per hour. Infiltration will be used for the roof surface. Biofiltration Facility BMP T7.30 N/A NO Not applicable. Roof area is managed BMP T5.14A with full infiltration system. Downspout Dispersion BMP T5. I OB N/A NO Not applicable. Roof area is managed System with full infiltration system. Perforated Stub -out Con- BMP T5. I OC N/A NO Not applicable. Roof area is managed nection with full infiltration system. Infeasible. Not enough flowpath length Full Dispersion BIVIP T5.30 NO NO and separations available for full disper- sion. Permeable Pavements BMP T5.15 YES YES FEASIBLE. Paver unit system will be used for new and replaced surfaces. Biofiltration BMPs BMP T7.30 NO NO N/A — Sheet flow dispersion will be used. BMP T5.14A Sheet Flow Dispersion BMP T5.12 NO NO Not applicable. Permeable pavements will be used for non -roof surfaces. Flow Control BMP Sizing BMPs will be designed per the SWMMWW - Volume V - Chapter 5. SMP T5 13 — Post-Constructlon Soll Qydllt e j�,7nd" Soil amendment meeting BMP T5. 13 To be applied to all converted vegetated areas, totaling 3,460 square feet. The minimum requirement is to provide 8-inches of topsoil and scarify sub -soils 4-inches below the topsoil. The topsoil can be a combination of retained native topsoil to be reapplied and imported topsoil. BMF T5 / OA — Full Infiltra u6n The roof area to the proposed infiltration trench is 3,062 square feet (0.070 Acres). The Page I I Killin Residence Stormwater Site Plan Report March 12, 2020 site civil Erigirteering JISPLLC infiltration trench is located near the southeastern corner of the site. The Geotechnical Report provides an infiltration test and adjusted design infiltration rate that was used ot size the infiltration trench. The adjusted design infiltration rate was determined to be 0.6 inches per hour. The trench is sized for 100% infiltration up to the I 00-year peak storm event using the Western Washington Hydrology Model (WWHM). Calculations are provided in Appendix B. The trench is a total of 78 feet long, 5 feet wide, and 3'depth. The trench is divided into two parallel trenches at 39 feet long and will maintain the required setbacks from the proposed building and property lines. A rock void ratio of 0.35 (35% void space) was used for the rock porosity, which is on the conservative side for most clean storage rock. The groundwater was determined to be 7 to 10 feet below existing grade. The groundwater is estimated to be at elevation 60.0 feet. The bottom of the trench is placed at 63.0 feet which will provide over 3 feet of separation from groundwater. BMI-I T5 15 — Permeable Pavements Permeable pavements will be used for new and replaced impervious surfaces. Typical Unit Paver Systems will be installed per City standard detail SD-623. Approximately 25% of the existing driveway on the west side of the site will be replaced with the paver unit system to comply with the City retrofit requirement of ECDC 18.30.060.D.5.b.i. Conve.yance Design Sizing has been based on a quantitative analysis of existing storm system and tributary areas. The onsite storm system will be comprised of 4" diameter roof drain tightlines to collect downspouts and convey to the infiltration trench. An overflow is provided to the street gutter in V Ave South. Page 12 Killin Residence Stormwater Site Plan Report March 12, 2020 site civil Erigirteering JISPLLC S. CONSTRUCTION STORMWATER POLLUTION PREVENTION (CSWPPI A CSWPP Narrative is provided below describing the 13 applicable elements for erosion control during construction. A temporary erosion and sediment control (TESC) plan is included in Appendix A. CSWPP Narrative 13 elements are as follows: 1. Preserve VCqetcglon /Mark Cle.3rin-q Llmlts' Orange construction fence or silt fence will be used along the clearing and grading limits which are defined on the TESC Plan. This is listed as one of the first steps in the construction sequence. The following BMPs will be used: • BMP C 103: High -Visibility Fence • BMP C233: Silt Fence 2. Est,7blish Construction Access. - The existing asphalt driveway will be used as the construction access. The following BMPs will be used: 0 BMP C 105: Stabilized Construction Access 3 ControlFlowR,3tes- Sediment controls will provide adequate erosion control measures for this site during the dry season. The following BMPs will be used: • BMP C233: Silt Fence • BMP C235: Wattles 4 1nst,711Sed1mentContro1s- Sediment controls will be installed prior to any grading activities. Installation of the sediment controls shall be per the construction sequence shown on the TESC Plans. Silt fence will be the primary method of sediment control. The following BMPs will be used: • BMP C233: Silt Fence • BMP C235: Wattles 5 Stc7bilize Soils. - Temporary ground cover will include plastic sheeting or mulch. Any soils that will be exposed long-term, over 30 days, will be sprayed with hydroseed and allowed to grow prior to the wet season. The following BMPs will be used: 0 BMP C 120: Temporary and Permanent Seeding • BMP C 12 1: Mulching • BMP C 123: Plastic Covering Page 13 Killin Residence Stormwater Site Plan Report March 12, 2020 • BMP C 124: Sodding • BMP C 140: Dust Control 6. Frotect"o es. - site civil Erigirteering JISPLLC The project site is near flat, approximately 2% grade. The project will stabilize slopes using plastic sheeting until the time that the slopes can be stabilized. Any cuts will be for utilities where sediment will be trapped in the trench. The following BMPs will be used: • BMP C 120: Temporary and Permanent Seeding • BMP C 12 1: Mulching • BMP C 123: Plastic Covering • BMP C 124: Sodding 7 I-1rotectQr,7Jn1n1ets- Storm drain inlet protection will be installed in the vicinity of the property. Drain inlets will have filter socks and catch basin protection installed to prevent sediment from directly entering the storm system. The following BMPs will be used: 0 BMP C220: Inlet Protection 8 St,7blllze Channels.3nd Outlets - The project site is near flat, approximately 2% grade. The project does not propose any channels and the proposed storm system outlets into the existing eastern concrete gutter in the 3rd Avenue South right-of-way. The following BMPs will be used: 0 BMP C235: Wattles 9. Control loollutc7nts.- Construction equipment will be kept in good working order to prevent oil drippings. The following BMPs will be used: 0 BMP C 15 1: Concrete Handling • BMP C 152: Sawcutting and Surfacing Pollution Prevention • BMP C 153: Material Delivery, Storage, and Containment • BMP C 154: Concrete Washout Area • S407 BMPs for Dust Control at Disturbed Land Areas and Unpaved Roadways and Parking Lots • S41 I BMPs for Landscaping and Lawn / Vegetation Management • S435 BMPs for Pesticides and an Integrated Pest Management Program • S444 BMPs for the Storage of Dry Pesticides and Fertilizers • S419 BMPs for Mobile Fueling of Vehicles and Heavy Equipment • S438 BMPs for Construction Demolition • S442 BMPs for Labeling Storm Drain Inlets On Your Property • S443 BMPs for Fertilizer Application Page 14 Killin Residence Stormwater Site Plan Report March 12, 2020 site civil Erigirteering JISPLLC S451 BMPs for Building, Repair, Remodeling, Painting, and Construction 10 ControlDe-W,3tering Per the Geotechnical Investigation included in Appendix C: "Groundwater was not encountered during our investigation. There is a chance that perched groundwater (as interflow) may be present seasonally below the site. Based on our observations in the test pit, groundwater could be present at or near 7 to 10 feet below grade." Any cle-watering activities will discharge as sheetflow over the grass yard to retain sediment onsite. The following BMPs will be used: BMP C236: Vegetative Filtration 11. M.3int.3in BMI-Is.- The CESCL or Monitoring Personnel shall be responsible for keeping track of construction BMPs. The following BMPs will be used: BMP C 150: Materials on Hand BMP C 160: Certified Erosion and Sediment Control Lead 12. M,7n,7ge the 8�jo ect. L The contractor, CESCL, and parties involved shall be mindful of construction activities, the time of year, and to maintain TESC facilities to function as designed. The following BMPs will be used: BMP C 150: Materials on Hand BMP C 160: Certified Erosion and Sediment Control Lead BMP C 162: Scheduling 13. Protect L o w L12Zoact De k�2�ment BMPs Low Impact Development (LID) BMPs shall be protected during construction to prevent sedimentation or compaction of existing soils that would inhibit the operation of the proposed LID BMPs. The following BMPs will be used: • BMP C 103: High -Visibility Fence • BMP C208: Triangular Silt Dike (TSD) (G eotextile-En cased Check Dam) • BMP C233: Silt Fence 0 BMP C234: Vegetated Strip Protecting native soil and vegetation, minimizing soil compaction, and retaining the hydrologic function of LID BMPs during the site preparation and construction phases are some of the most important practices during the development process. Section 6.1.2 of the City of Edmonds Stormwater Addendum provides Additional Construction Techniques for LID BMPs. Page 15 Killin Residence Stormwater Site Plan Report March 12, 2020 Construction Site Planning and Sequencing: Site Civil Erigincering JISPLLC Construction Site Planning and Sequencing Requirements Construdion Site Planningand SequendnrgTerhniques Limit dBaFing and grading activities 9 Keep g rading to a minimum by incorporating natu ra I tCIPC3gFaphic depressions into the developmerifL * Shape final lot grades and topographic features early {i.e-, at the site development stage) where feasible. * Limit the amount of cut and fill in a reas wiWh permea ble soils. * Limit clearing to road, utility, building pad, lawn arear, and the minimurn amourrt. of Extra land necmaFy to manELUVEr mach inery (e.g, a 10-foot perimeter around a building). Limit construction acdvity in areas 9 Clearly clacurneryt—and plan to meet and walk throug h the designated for UD site with equipment operatDFS priorto constructiork--� clarify construction boundaries, limits of disturbance, and constmcticin activities in the vicinity of UD BMPs. * CenEFal/primary contractor mu s-t inform other su b-cDntFaL-tDFS of applicable LID BIVI P protection req uirements. This is particularly important when working around permeable pavement. Limit deaFing and grading during heavy * Ti rfle con=uction activities to= rt d Lffing the SUMM2F (lowest rairrFall seasuns precipitation) and End in the fail (when cunditions are fayoFable for the esub lishment of Yygetation), if feasible. M ini mize the a mount and ti me dhat g raded * Complete construction and Eros ion c*ntrol actiAiES in one areas are left exposed section of thesite before beginning activity in anciftheFSeCtiOn. Utilize p-ermeable anrd n utrient rich soils * P reserve any portion of the site with permeable soils to promote infiltration of stormwater ru noff. * Leawe areas of rich topsoil in place, or if excavated, utilize elsewhere on the site to amend areas with sparse or nutrient deficient topsoil. Reduce impact of consuuction access roads 9 Reduce the number and size (widthilEngth) of construction access roads. * Locate construction access roads in areas where furwre Foadr. and uti Rty corridors wil I be placed �Lmless utilizing perrnL-a ble pavement). PFOMOtL' sheet flow and mini m Lze * Avoid grading that results in steep, continuous slopes, COnCEntrated runoff especially in a reas contributing runoff to LID BM Ps. LID BIVIP activation 9 LID BIVI ft shall rmyt bE4g in operation until all erosion -causing p rofrect improvements (including use of access rciads that may ,�ntr but- sedirrhent) are complEted and all exposed ground surfacer. are sub ilized by revegetaticin or landscaping in upland areas portentially contributing ru noff to the BMP. Page 16 Killin Residence Stormwater Site Plan Report March 12, 2020 Activities During Construction: Site Civil Erigincering JISPLLC Erosion Control Requirements Er-Dsio n Control Te-chniques P�otect native topsoil during the * WherepFacticable, protect areasoct' rich topsoil. If excavation is construction phase, and reuse on site necessary, stockpile native suils that can The used on the site after construction. * Stoc kpile materials in areas designated fCIF C lea ring a nd g rad ing (such as paFki ng a reas and 1fUtUF2 im perviou s roadways) and arway from infiltration and other stormwater facilities- 0 COVeF Small stockpiles with weed baFriL-F material thart sheds moistu re yet a llows air tra rismission. La rge stockpiles may need IG be seeded a ncl/or mu lche-d. * Do not relocate wpsoil OF otheF material to areas where they can cover critical Foot zones, suffocate vegetation, OF Erode into adjacent streams. Use effectiye reyegetatiGn methods * Use native plant species adapted to the local environment * P laiyt dUFing late fait winter, ci r Ea dy spring months WhE n VegEtatiCin is likely to establish quickly and suFvivL-- * Utilize proper seedbed preparatiDrL * Fertilize and muk h tG protect germin ating p larfts. Apply 1 inch cvF com post topped with 2 inch Ps of mu�c h. * P rotect areas d 2signated fOF reveg2tatiOn from soil corn paction by Festricting heavy equi pment. * P rovide proper Soil arnEndrnEntE where necessary (FEfer to SWMMWW, Volume V, Clhapt2F S, BM P T5.13 Post - Construction Soil Quality and Depth). * Amend soil toward the end of construction- Once established, protect from compaction and erosion. * During EWFage, plants should be protected by solar screens when possible to prevent oveFeXPOSUFE and excessive drying. Perform precon=ucticin, FoLrtinE, and * Conduct a pFeconstruction inspection to vety that adequate posixonstruction inspections barriers have been placed around vegetation Fetention areas, infiltration facilities (as needed), and stFuctu ra I controls are iMplernEnted property. 9 Conduct routine inspections to verify that structural mntrcils are bAng maintained and effectively protecting LID BMPs throughout construction. * Conduct a final inspection to verify that Fevegetartion areas are stabilized and that permanent LID BMPs are in place and functioning property. Page 17 Killin Residence Stormwater Site Plan Report March 12, 2020 Infiltration and Dispersion Facility Construction Techniques: Site Civil Erigincering JISPLLC CenFtr-udion Stage Techniques for PFGt&ding Infiltration and Dispersion Facilities PFiGF 10 construction 9 The infiftration/d ispersion area shall be clearly identified (e.g., using flagging or high visibility fencing) and protected prior to construction U31 prevent compaction of underlying soils by Ye hic le traffic. * Deyelop a soil and vegetation ma nagernent plan Showing areas to be protected and resto ration method s for d isturbed areas befc3FL- land c lea ri ng sta rts. * The Construction SWPPP sheets mu st outline con=uctio n 31equEncing that will protect the infiltrationidispersicin area during construction- * Constru ction SWP P P 8 M Ps and prot ecti cin tm h n iq Lees. identified in t he previous se ct ions sh al I be im plernented as app licabi e. In part ic ul ar, be s uFe to sta bilize u pslope cortmuction areas (e.g., us ing si It fiences, berms, mu Ich, or other Corkstruction 5WPP P BM Ps) a nd min imize overland flow d is:tancEs. Excavation * Excavation of rfi tration1dispersion areas shal I be perfOFmL-d by machinery operating aqjacent to the BIVI P. No heavy equipment with narrow tracks, na nrow tires, or la rge lu gged hig h pressure tires shall be allowed on the infittration1dispersion area footprirrL 9 WhEFE feasible, EXCaVabE infiltration/d ispersion areas to final g rade on ly after all d ism rbed areas in the u pgradient project dra inage area have been permanerrilly stabilized- (If infiltration areas must be excavated before permanent s ibe stabilization, in itial excavation m ust be condu cted to rw3. less than 6 i nches of the final elevation cvF the fac il ity floor.) * Excavation cif infiltration aMaSshal I not be a IIOWEd dUFing wet or satu rated conditions. * The use of d raglines and tFackhoes should be considered for consuucti ng infiltration and dispL-Fsion areas- * The bottom (and sid L-walls if feasi b12) of an infiltration faci lity excavation mu st be ra Iced or scarified to a minimu rn depth of 3 inches after final eo�cavatio n to reStON infiltration ratEs. * Scarify soil a Icing the di5persicin flow path if disturbed during construction. SL-d iment: control 9 8 ioretention, rain garden, and pL-FmL-ablE pavement BM Ps shall not be used as. sedirneryt control facilities� and all drainage shall be directed away from ldhe BIVI P location after initial rough grading. * Direct construction site flow away from the infiltratiork�dispersion area using applicable Construction SWPP P BM Ps (e.g., temporary diversion swa ILLs). Page 18 Killin Residence Stormwater Site Plan Report March 12, 2020 site civil Erigirteering JISPLLC 6. SPECIAL REPORTS AND STUDIES, OTHER PERMITS Special Reports and Studies The following Reports have been prepared for the Project under separate cover. Geotechnical Investigation by Cobalt Geosciences, Inc. dated December 19, 2019 Other Permits The following permits may be required for the development: • Building Permits, Edmonds • Right of Way Permit, Edmonds 7. OPERATIONS & MAINTENANCE The Property Owner will be responsible for Operations and Maintenance of the private storm system on private property. The property owner shall inspect the stormwater system at a minimum yearly for proper operation. The items that will need inspection and/or maintenance include the following: Roof gutters and downspouts: o Connected to the storm tightlines. Signs of erosion at downspout connections. Gutters and downspouts are free of debris and clean. 0 Catch basin and yard drains: Clean of debris and sediment around the structure. o Sediment free inside the structure. o Inlet and outlet pipes are clean and open. Vegetation is cleared around the inlet. 0 Infiltration Trench: Clean of debris and sediment around the inlet structure. o Clean of debris and sediment in and around the screen. o Overflow pipes are clear and operational. Observation wells are accessible and assess the following. Water level in the trench recedes after a rain event. Trench is dry in summer months Tee is properly installed on inlet catch basin Inlet catch basin is free from debris and sediment Page 19 Killin Residence Stormwater Site Plan Report March 12, 2020 APPENDICES A Project Site Plans B. Calculations 0 WWHM - Infiltration Sizing C. Geotechnical Investigation Under separate cover site civil Erigirteering JISPLLC Appendix 3 C RZT64A APPROXIMATE LOCATION EXISTING CURB & GUTTER_� SEE PROJ T T. ON WEST SIDE STREE I NOTE 2 EXIS�NG 6" PVC SIDE SEWER LOCATION CONNECT TO EX SIDE SEWER. SEE - DETAIL SS-200 & PROJECT NOTE 5 IE 61.0 MIN. (VER 10, STREET RESTORA71ON 210 sf - Walkway TE SEE PROJECT NOTE 3. <ej Permeable Pavers UTILITY CONFLICT NOTE - CAUTION: 11 [ "27 , 1" COPPER STREET SERVICE 'W SEE PROJECT NOTE 4 FOR A R METER C W �RC 11 1E E, xU u U j Pul CV) EARTHWORK ESTIMATE CUT 50 CU. YD. FILL 25 CU. YD. (STOCKPILE) NET 25 CU. YD. (EXPORT) THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATION, DIMENSION, AND DEPTH OF ALL EXISTING UTILITIES WHETHER SHOWN ON THESE PLANS OR NOT BY POTHOUNG THE UTILITIES AND SURVE)1NG THE HORIZONTAL AN VERTICAL LOCATION PRIOR TO CONSTRUCTION. THIS SHALL INCLUDE CAUJING UTILITY LOCATE 0 1-800-424-5555 AND THEN POTHOUNG ALL OF THE EXISTING UTILITIES AT LOCATIONS OF NEW UTILITY CROSSINGS TO PHYSICALLY VERIFY WHETHER OR NOT CONFLICTS EXIST. IF CONFLICTS SHOULD OCCUR, THE CONTRACTOR SHALL CONSULT THE ENGINEER TO RESOLVE ALL PROBLEMS PRIOR TO PROCEEDING WITH CONSTRUCTION. 90 sf - Driveway Permeable Pavers 25% of existing driveway for retrofit 350 sf - Ex Driveway SEE 1701ECT NOTE 12 F 690 sf - Driveway Permeable Pavers EXISTING GRAVEL DRIVEWAY TO BE REMOVED INSTALL NEW PERMEABLE UNIT PAVER SYSTEM PER CITY ST) DETAIL SD-623 � 88,55,11" . I 1� ­ �659 MITI �'6 ,;WPVIC SIDEs, ER J S=2.0% MIN. BUILDING FOOTING DRAINS VERIFY DEPTH AND POSITIVE DRAINAGE NTH 5' n ARCHITECTURAL/STRUCTURAL Ss PLANS SSCO IE 66.0± 118 LF - 4 RD S=1.0% MIN DAYUGHT FOOTING SEE PROJE6T NOTE 7 DRAINS IE 66.0± 1 PROPOSED SFR I MAIN �.K W­lb - - - - 68 WALKWAY PERMEABLE UNIT PAVER SYSTEM PER CITY STD DETAIL SD-623 94 LF - 4" RD S=1.0% MIN. SEE PROJECT NOTE 7 3' MIN. SEPARATION -A WATER SERVICE AND DRY UTUTIES �­ GAS AND ELECTRIC IN TRENCH UTILITY PURVEYOR STANDARDS IE 65.6 AREA SUMMARY GARAGE1 SLAB 66.20 =7 - 7=RC_4 YARD DIRWOR SD RIM 68.7 3,062 sf - Roof I -TYPE 1 To Trench A 68.0 66.0 (4" OVERFLOW OUT) SDCO 64.5 (C RD IN) IE 64.5 (e TRENCH OUT) TRENCH OVERFLOW7 INSTALL REMOVABLE PUSH -ON 100 LF - 4" SID TEE PER CITY DETAIL S=0.80% TOTAL SITE AREA 8,124 SF APPROX. DISTURBED AREA 8,000 SIF EXISTING IMPERAOUS AREA 4,899 SIF EXISTING IMP. TO REMAIN 350 SIF NEW/REPLACED HARD SURFACE AREAS ROOF 1,062 SIF DRIVEWAY (PERMEABLE) 780 SIF WALKWAYS (PERMEABLE) 210 SIF TOTAL 4,052 SIF TOTAL HARD SURFACE AREA 4,402 SIF (54.2%) CONVERTED LAWNAANDSCAPE 3,600± SIF STANDARD DETAILS LIST 30, �2 67 1 2 TYPI 0 5 10 20 1 inch = 10 feet PORTS �-BLENI 10 MATCH EX GRAVEL ALLEY 5.0, H, 2 TRENCHES 0 39' LONG (78 LIF 5' WIDE x 3' HEIGHT ELEVATIONS, 67.0-68.0 = FINISHED GRADE 66.0 = TOP TRENCH 64.5 = IE 4" PERF 63.0 = BOTTOM TRENCH SEE PROJECT NOTE 11 FOR ROCK BACKFILL SPECIFICATIONS. THE APPLICABLE CITY OF EDMONDS STANDARD DETAILS ARE AS FOLLOWS AND PROVIDED ON SHEETS C4, C5, AND C6: STID DET BMP NAME WA-130 r-l" WATER SERVICE INSTALLATION WA-140 RESIDENTIAL DOUBLE CHECK VALVE ASSEMBLY SS-200 SEWER CLEANOUT DETAILS SS-201 SIDE SEWER RELOCATION/REPAIR GIJ-400 TYPICAL TRENCH SECTION GU-410 TYPICAL HMA UTIUTY PATCH TR-520 CONCRETE CURB AND CUTTER TR-531 CONCRETE SIDEWALK SD-303 CATCH BASIN TYPE 1 SD-619 STORM DRAINAGE CLEANOUT SD-623 TYPICAL PERMEABLE UNIT PAVER SYSTEM SD-636 TYPICAL DOWNSPOUT INFILTRATION TRENCH SD-642 POST CONSTRUCTION SOIL QUALITY AND DEPTH TR-541 DRIVEWAY APPROACH TYPE I LEGEND CLEANAJS (TYP) 68 9 ASPH. DRIVE69 0 PROPERTY LINE - - - 100- CONTOUR - MAJOR CONTOUR - MINOR 2.0% ANNO SLOPE ARROW - SLOPE ARROW 100.00 SPOT ELIEVATON FLOW LINE -SD-SD- STORM DRAIN LINE - ED - - FOUNDATION DRAIN UNE -RD- - ROOF DRAIN LINE STORM CLEAN OUT 101 STORM YARD/AREA DRAIN STORM DRAIN CATCH BASIN INFILTRATION TRENCH (j) PROJECT NOTES 1. ALL FINISHED GRADES AROUND RESIDENCES SHALL BE SLOPED AWAY FROM THE FOUNDAMN, MINIMUM 5% SLOPE FOR SOFT SURFACES AND 2% FOR HARD SURFACES. 2. REPLACE EXISTING DRIVEWAY RAMP WITH NEW 12 FOOT WIDE TYPE 1 DRIVEWAY APPROACH. 3. PAVEMENT RESTORATION SHALL BE PROVIDED FOR ALL WORK WTHIN THE RIGHT-OF-WAY WHICH MAY INCLUDE PAVEMENT PATCHING, PAINT STRIPING REPLACEMENT, SIDEWALK REPLACEMENT, AND PAVEMENT OVERLAY. ADDITIONAL RESTORATION MAY BE REQUIRED IF THE SANITARY SEWER LATERAL IS REPLACED (SEE NOTE 5 BELOW). ALL STREET CUTS TO BE PATCHED PER CITY OF EDMONDS STANDARD DETAILS. UTILITY PATCHES SHALL BE COMBINED AND FULL WIDTH OR HALF WIDTH OVERLAY WILL BE REQUIRED DEPENDING ON THE EXTENT OF DISTURBANCE. WHERE UTILITY PATCHES FALL ENTIRELY WITHIN ON TRAVEL LANE, THE OVERLAY SHALL EXTEND TO THE CENTERLINE OF ROADWAY. WHERE UTIUTY PATCHES EXTEND INTO BOTH TRAVEL LANES THEN A FULL WIDTH OVERLAY IS REQUIRED. FINAL DETERMINATION OF OVERLAY EXTENTS TO BE MADE IN FIELD BY CITY INSPECTOR. ALL FINAL RESTORATION SHALL BE COMPLETED BY THE CONTRACTOR. 4. NEW WATER METER AND SERVICE. CITY WILL PERFORM THE TAP ON THE CITY WATER MAIN AND EXTEND SERMCE TO THE PROPERTY AND SET THE METER. FIRE SPRINKLERS TO BE PROVIDED IN NEW RESIDENCE PER NFPA 13D FIRE SYSTEEM. MINIMUM 1" METER AND 1-1/2" WATER SERVICE LINE SHALL BE INSTALLED. TRACER WIRE REQUIRED FOR NON-METAWC WATER SERVICE LINES PER CITY DETAIL WA-130. 5. EXISTING SANITARY SIDE SEWER TO BE REUSED. CONTRACTOR SHALL TV EXISTING SIDE SEWER (THAT PORflON ON PRIVATE PROPERTY) AND SUBMIT VIDEO TO CITY FOR REVIEW AND APPROVAL TO RE -USE. CONTACT EDMONDS PUBUC WORKS SEWER DIVISION, 425-771-0235, TO SCHEDULE INSPECTION OF THE SANITARY SEWER LATERAL NOTE THAT A GOOD TIME TO ADDRESS THIS IS MEN THE SEWER IS CAPPED FOR DEIAOUTION. IF IT IS DETERMINED THAT THE SEWER LATERAL IS NOT ACCEPTABLE TO REUSE, THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPLACING (OR LINING IF THE LINE CONDITION ALLOWS FOR) FROM THE CITY SEWER MAIN TO THE PROPERTY UNE. DEPTH OF EXISTING SIDE SEWER CURRENTLY UNKNOWN. FOR DESIGN PURPOSES A 4-FOOT DEPTH HAS BEEN ASSUMED. CONTRACTOR SHALL FIELD VERIFY SIDE SEWER DEPTH PRIOR TO CONSTRUCTION. 6. ROOKERY WALL SHALL BE REMOVED/RIELOCATED TO DROP GRADES IN THE VICINITY OF THE POP-UP EMITTER SO THAT SURFACE WATER OVERFLOW FROM THE POP-UP EMITTER DOES NOT FLOW OVER THE ROCKERY WALL 7. CONNECT ROOF DRAIN DOWNSPOUTS TO ROOF DRAIN TIGHTLINE. FOUNDATIONS DRAINS SHALL BE SEPARATE FROM ROOF DRAIN TIGHTUNE AND DAYLIGHT DISCHARGE, AS SHOWN ON PLAN. & UTIUTES SHALL MAINTAIN THE FOLLOWING SEPARATION& 3 FEET DRY UTIUTY TO WATER, SEWER, STORM 5 FEET DRY UTIUTY TO CITY PUBUC MAIN 10 FEET WATER TO SEWER 9. DRIVEWAY SLOPES SHALL NOT EXCEED 14X PER EDMONDS COMMUNITY DEVELOPMENT CODE 18.80.060. 10. EXISTING FAILING, DAMAGED, OR NON-ADA COMPUANT FRONTAGE IMPROVEMENTS SHALL BE REMOVED AND REPLACED AS DETERMINED BY THE CITY ENGINEERING INSPECTOR. 11. GRAVEL BACKFILL SHALL BE CLEAN PERMEABLE BALLAST F­ ­1 STANDARD SPECIFICATION 9-03.9(3). 12. EAST PORTION OF EXISTING DRIVEWAY TO BE REGRADED AS SHOWN PER PLAN TO ACCOMMODATE REVISED DRIVEWAY APRON AND SIDEWALK TO MEET ADA REQUIREMENTS. ANY PAVEMENT REMOVED FOR REGRADING SHALL BE A PERMEABLE UNIT PAVER SYSTEM PER CITY ST) DETAIL SD-623. APPROXIMATELY 30% OF THE EXISTING DRIVEWAY LENGTH TO BE REPLACED/MITIGATED TO COMPLY WTH 25% RETROFIT REQUIREMENT OF ECDC 18,30.060.10.5.b.i. _SS_SS_ SIDE SEWER SERIACE SEWER CLEAN OUT W W - WATER SERIACE LINE IN WATER METER CONCRETE PAVEMENT/SIDEWALK ASPHALT PAVEMENT PERMEABLE PAVER UNIT SYSTEM PER CITY DETAIL SD-623 SCALE DATE AS SHOKIV 311212020 DESIINED 1Y C"ECIED11 JLS JLS LS JOB# 19-135 It z Me, _C4 Q, BE z Z 2e o w _j 0; z 0 n.Q LU U z LU Q 0-0 L�) 0 LU E; C14 _j _j C0 M %a W < .j 0 L6 Call before you Dig SHEET 1-800-424-5555 C3 UNDERMUND SEWCE Ol�) I SHEET NO. 3 OF 6 WWH? PROJECT General Model Information Project Name: Killin-Trench Site Name: Killin Res Site Address: 543 3rd Ave S City: Edmonds Report Date: 3/13/2020 Gage: Everett Data Start: 1948/10/01 Data End: 2009/09/30 Timestep: 15 Minute Precip Scale: 0.800 Version Date: 2018/03/02 Version: 4.2.14 POC Thresholds Low Flow Threshold for POC1: 50 Percent of the 2 Year High Flow Threshold for POCII: 50 Year Killin-Trench 3/13/2020 5:56:16 AM Page 2 Landuse Basin Data Predeveloped Land Use Basin 1 Bypass: No GroundWater: No Pervious Land Use acre A B, Forest, Flat 0.0703 Pervious Total 0.0703 Impervious Land Use acre Impervious Total 0 Basin Total 0.0703 Element Flows To: Surface Interflow Groundwater Killin-Trench 3/13/2020 5:56:16 AM Page 3 Mitigated Land Use Basin 1 Bypass: No GroundWater: No Pervious Land Use acre Pervious Total 0 Impervious Land Use acre ROOF TOPS FLAT 0.0702 Impervious Total 0.0702 Basin Total 0.0702 Element Flows To: Surface Interflow Groundwater Gravel Trench Bed 1 Gravel Trench Bed 1 Killin-Trench 3/13/2020 5:56:16 AM Page 4 Routing Elements Predeveloped Routing Killin-Trench 3/13/2020 5:56:16 AM Page 5 Mitigated Routing Gravel Trench Bed 1 Bottom Length: Bottom Width: Trench bottom slope 1: Trench Left side slope 0: Trench right side slope 2: Material thickness of first layer: Pour Space of material for first layer: Material thickness of second layer: Pour Space of material for second layer Material thickness of third layer: Pour Space of material for third layer: Infiltration On Infiltration rate: Infiltration safety factor: Total Volume Infiltrated (ac-ft.): Total Volume Through Riser (ac-ft.): Total Volume Through Facility (ac-ft.): Percent Infiltrated: Total Precip Applied to Facility: Total Evap From Facility: Discharge Structure Riser Height: 3 ft. Riser Diameter: 8 in. Element Flows To: Outlet 1 Outlet 2 78.00 ft. 5.00 ft. 0 To 1 0 To 1 0 To 1 3 0.35 0 0 0 0 0.6 1 8.26 0 8.26 100 0 0 Gravel Trench Bed Hydraulic Table Stage(feet) Area(ac.) Volume(ac-%) Discharge(cfs) Infilt(cfs) 0.0000 0.009 0.000 0.000 0.000 0.0444 0.009 0.000 0.000 0.005 0.0889 0.009 0.000 0.000 0.005 0.1333 0.009 0.000 0.000 0.005 0.1778 0.009 0.000 0.000 0.005 0.2222 0.009 0.000 0.000 0.005 0.2667 0.009 0.000 0.000 0.005 0.3111 0.009 0.001 0.000 0.005 0.3556 0.009 0.001 0.000 0.005 0.4000 0.009 0.001 0.000 0.005 0.4444 0.009 0.001 0.000 0.005 0.4889 0.009 0.001 0.000 0.005 0.5333 0.009 0.001 0.000 0.005 0.5778 0.009 0.001 0.000 0.005 0.6222 0.009 0.001 0.000 0.005 0.6667 0.009 0.002 0.000 0.005 0.7111 0.009 0.002 0.000 0.005 0.7556 0.009 0.002 0.000 0.005 0.8000 0.009 0.002 0.000 0.005 0.8444 0.009 0.002 0.000 0.005 0.8889 0.009 0.002 0.000 0.005 0.9333 0.009 0.002 0.000 0.005 0.9778 0.009 0.003 0.000 0.005 1.0222 0.009 0.003 0.000 0.005 Killin-Trench 3/13/2020 5:56:16 AM Page 6 1.0667 0.009 0.003 0.000 0.005 1.1111 0.009 0.003 0.000 0.005 1.1556 0.009 0.003 0.000 0.005 1.2000 0.009 0.003 0.000 0.005 1.2444 0.009 0.003 0.000 0.005 1.2889 0.009 0.004 0.000 0.005 1.3333 0.009 0.004 0.000 0.005 1.3778 0.009 0.004 0.000 0.005 1.4222 0.009 0.004 0.000 0.005 1.4667 0.009 0.004 0.000 0.005 1.5111 0.009 0.004 0.000 0.005 1.5556 0.009 0.004 0.000 0.005 1.6000 0.009 0.005 0.000 0.005 1.6444 0.009 0.005 0.000 0.005 1.6889 0.009 0.005 0.000 0.005 1.7333 0.009 0.005 0.000 0.005 1.7778 0.009 0.005 0.000 0.005 1.8222 0.009 0.005 0.000 0.005 1.8667 0.009 0.005 0.000 0.005 1.9111 0.009 0.006 0.000 0.005 1.9556 0.009 0.006 0.000 0.005 2.0000 0.009 0.006 0.000 0.005 2.0444 0.009 0.006 0.000 0.005 2.0889 0.009 0.006 0.000 0.005 2.1333 0.009 0.006 0.000 0.005 2.1778 0.009 0.006 0.000 0.005 2.2222 0.009 0.007 0.000 0.005 2.2667 0.009 0.007 0.000 0.005 2.3111 0.009 0.007 0.000 0.005 2.3556 0.009 0.007 0.000 0.005 2.4000 0.009 0.007 0.000 0.005 2.4444 0.009 0.007 0.000 0.005 2.4889 0.009 0.007 0.000 0.005 2.5333 0.009 0.007 0.000 0.005 2.5778 0.009 0.008 0.000 0.005 2.6222 0.009 0.008 0.000 0.005 2.6667 0.009 0.008 0.000 0.005 2.7111 0.009 0.008 0.000 0.005 2.7556 0.009 0.008 0.000 0.005 2.8000 0.009 0.008 0.000 0.005 2.8444 0.009 0.008 0.000 0.005 2.8889 0.009 0.009 0.000 0.005 2.9333 0.009 0.009 0.000 0.005 2.9778 0.009 0.009 0.000 0.005 3.0222 0.009 0.009 0.023 0.005 3.0667 0.009 0.010 0.121 0.005 3.1111 0.009 0.010 0.255 0.005 3.1556 0.009 0.010 0.404 0.005 3.2000 0.009 0.011 0.547 0.005 3.2444 0.009 0.011 0.665 0.005 3.2889 0.009 0.012 0.747 0.005 3.3333 0.009 0.012 0.799 0.005 3.3778 0.009 0.012 0.860 0.005 3.4222 0.009 0.013 0.909 0.005 3.4667 0.009 0.013 0.956 0.005 3.5111 0.009 0.014 1.000 0.005 3.5556 0.009 0.014 1.043 0.005 3.6000 0.009 0.014 1.084 0.005 Killin-Trench 3/13/2020 5:56:16 AM Page 7 3.6444 0.009 0.015 1.123 0.005 3.6889 0.009 0.015 1.161 0.005 3.7333 0.009 0.016 1.198 0.005 3.7778 0.009 0.016 1.234 0.005 3.8222 0.009 0.016 1.269 0.005 3.8667 0.009 0.017 1.303 0.005 3.9111 0.009 0.017 1.336 0.005 3.9556 0.009 0.018 1.368 0.005 4.0000 0.009 0.018 1.399 0.005 Killin-Trench 3/13/2020 5:56:16 AM Page 8 Analysis Results POC I + Predeveloped Predeveloped Landuse Totals for POC #1 Total Pervious Area: 0.0703 Total Impervious Area: 0 Mitigated Landuse Totals for POC #1 Total Pervious Area: 0 Total Impervious Area: 0.0702 anal 05 t 2 5 10 20 30 50 79 to 0 $6 W W $05 x Mitigated Flow Frequency Method: Log Pearson Type III 17B Flow Frequency Return Periods for Predeveloped. POC #1 Return Period Flow(cfs) 2 year 0.00005 5 year 0.000057 10 year 0.000061 25 year 0.000064 50 year 0.000066 100 year 0.000067 Flow Frequency Return Periods for Mitigated. POC #1 Return Period Flow(cfs) 2 year 0 5 year 0 10 year 0 25 year 0 50 year 0 100 year 0 AnnualPeaks Annual Peaks for Predeveloped and Mitigated. POC #1 Year Predeveloped Mitigated 1949 0.000 0.000 1950 0.000 0.000 1951 0.000 0.000 1952 0.000 0.000 1953 0.000 0.000 1954 0.000 0.000 1955 0.000 0.000 1956 0.000 0.000 1957 0.000 0.000 1958 0.000 0.000 Killin-Trench 3/13/2020 5:56:16 AM Page 9 1959 0.000 0.000 1960 0.000 0.000 1961 0.000 0.000 1962 0.000 0.000 1963 0.000 0.000 1964 0.000 0.000 1965 0.000 0.000 1966 0.000 0.000 1967 0.000 0.000 1968 0.000 0.000 1969 0.000 0.000 1970 0.000 0.000 1971 0.000 0.000 1972 0.000 0.000 1973 0.000 0.000 1974 0.000 0.000 1975 0.000 0.000 1976 0.000 0.000 1977 0.000 0.000 1978 0.000 0.000 1979 0.000 0.000 1980 0.000 0.000 1981 0.000 0.000 1982 0.000 0.000 1983 0.000 0.000 1984 0.000 0.000 1985 0.000 0.000 1986 0.000 0.000 1987 0.000 0.000 1988 0.000 0.000 1989 0.000 0.000 1990 0.000 0.000 1991 0.000 0.000 1992 0.000 0.000 1993 0.000 0.000 1994 0.000 0.000 1995 0.000 0.000 1996 0.000 0.000 1997 0.000 0.000 1998 0.000 0.000 1999 0.000 0.000 2000 0.000 0.000 2001 0.000 0.000 2002 0.000 0.000 2003 0.000 0.000 2004 0.000 0.000 2005 0.000 0.000 2006 0.000 0.000 2007 0.000 0.000 2008 0.000 0.000 2009 0.000 0.000 Ranked Annual Peaks Ranked Annual Peaks for Precleveloped and Mitigated. POC #1 Rank Predeveloped Mitigated 1 0.0001 0.0000 2 0.0001 0.0000 3 0.0001 0.0000 Killin-Trench 3/13/2020 6:03:37 AM Page 10 4 0.0001 0.0000 5 0.0001 0.0000 6 0.0001 0.0000 7 0.0001 0.0000 8 0.0001 0.0000 9 0.0001 0.0000 10 0.0001 0.0000 11 0.0001 0.0000 12 0.0001 0.0000 13 0.0001 0.0000 14 0.0001 0.0000 15 0.0001 0.0000 16 0.0001 0.0000 17 0.0001 0.0000 18 0.0001 0.0000 19 0.0001 0.0000 20 0.0001 0.0000 21 0.0001 0.0000 22 0.0001 0.0000 23 0.0001 0.0000 24 0.0001 0.0000 25 0.0001 0.0000 26 0.0001 0.0000 27 0.0001 0.0000 28 0.0001 0.0000 29 0.0001 0.0000 30 0.0001 0.0000 31 0.0001 0.0000 32 0.0001 0.0000 33 0.0001 0.0000 34 0.0001 0.0000 35 0.0001 0.0000 36 0.0000 0.0000 37 0.0000 0.0000 38 0.0000 0.0000 39 0.0000 0.0000 40 0.0000 0.0000 41 0.0000 0.0000 42 0.0000 0.0000 43 0.0000 0.0000 44 0.0000 0.0000 45 0.0000 0.0000 46 0.0000 0.0000 47 0.0000 0.0000 48 0.0000 0.0000 49 0.0000 0.0000 50 0.0000 0.0000 51 0.0000 0.0000 52 0.0000 0.0000 53 0.0000 0.0000 54 0.0000 0.0000 55 0.0000 0.0000 56 0.0000 0.0000 57 0.0000 0.0000 58 0.0000 0.0000 59 0.0000 0.0000 60 0.0000 0.0000 61 0.0000 0.0000 Killin-Trench 3/13/2020 6:03:38 AM Page 11 Killin-Trench 3/13/2020 6:03:38 AM Page 12 Duration Flows The Facility PASSED Flow(cfs) Predev mit Percentage Pass/Fail 0.0000 873 0 0 Pass 0.0000 848 0 0 Pass 0.0000 820 0 0 Pass 0.0000 787 0 0 Pass 0.0000 769 0 0 Pass 0.0000 747 0 0 Pass 0.0000 721 0 0 Pass 0.0000 687 0 0 Pass 0.0000 668 0 0 Pass 0.0000 638 0 0 Pass 0.0000 618 0 0 Pass 0.0000 593 0 0 Pass 0.0000 576 0 0 Pass 0.0000 559 0 0 Pass 0.0000 534 0 0 Pass 0.0000 513 0 0 Pass 0.0000 492 0 0 Pass 0.0000 470 0 0 Pass 0.0000 454 0 0 Pass 0.0000 437 0 0 Pass 0.0000 419 0 0 Pass 0.0000 398 0 0 Pass 0.0000 383 0 0 Pass 0.0000 368 0 0 Pass 0.0000 358 0 0 Pass 0.0000 348 0 0 Pass 0.0000 342 0 0 Pass 0.0000 322 0 0 Pass 0.0000 312 0 0 Pass 0.0000 302 0 0 Pass 0.0000 286 0 0 Pass 0.0000 279 0 0 Pass 0.0000 267 0 0 Pass 0.0000 253 0 0 Pass 0.0000 244 0 0 Pass 0.0000 237 0 0 Pass 0.0000 227 0 0 Pass 0.0000 217 0 0 Pass 0.0000 211 0 0 Pass 0.0000 203 0 0 Pass 0.0000 197 0 0 Pass 0.0000 187 0 0 Pass 0.0000 184 0 0 Pass 0.0000 178 0 0 Pass 0.0000 172 0 0 Pass 0.0000 166 0 0 Pass 0.0000 157 0 0 Pass 0.0000 152 0 0 Pass 0.0000 147 0 0 Pass 0.0000 141 0 0 Pass 0.0000 136 0 0 Pass 0.0000 127 0 0 Pass 0.0000 121 0 0 Pass Killin-Trench 3/13/2020 6:03:38 AM Page 13 0.0000 113 0 0 Pass 0.0000 109 0 0 Pass 0.0000 102 0 0 Pass 0.0000 99 0 0 Pass 0.0000 89 0 0 Pass 0.0000 88 0 0 Pass 0.0000 81 0 0 Pass 0.0000 73 0 0 Pass 0.0001 67 0 0 Pass 0.0001 64 0 0 Pass 0.0001 59 0 0 Pass 0.0001 55 0 0 Pass 0.0001 51 0 0 Pass 0.0001 44 0 0 Pass 0.0001 39 0 0 Pass 0.0001 36 0 0 Pass 0.0001 34 0 0 Pass 0.0001 30 0 0 Pass 0.0001 24 0 0 Pass 0.0001 16 0 0 Pass 0.0001 14 0 0 Pass 0.0001 11 0 0 Pass 0.0001 6 0 0 Pass 0.0001 1 0 0 Pass 0.0001 0 0 0 Pass 0.0001 0 0 0 Pass 0.0001 0 0 0 Pass 0.0001 0 0 0 Pass 0.0001 0 0 0 Pass 0.0001 0 0 0 Pass 0.0001 0 0 0 Pass 0.0001 0 0 0 Pass 0.0001 0 0 0 Pass 0.0001 0 0 0 Pass 0.0001 0 0 0 Pass 0.0001 0 0 0 Pass 0.0001 0 0 0 Pass 0.0001 0 0 0 Pass 0.0001 0 0 0 Pass 0.0001 0 0 0 Pass 0.0001 0 0 0 Pass 0.0001 0 0 0 Pass 0.0001 0 0 0 Pass 0.0001 0 0 0 Pass 0.0001 0 0 0 Pass 0.0001 0 0 0 Pass 0.0001 0 0 0 Pass Killin-Trench 3/13/2020 6:03:38 AM Page 14 Water Quality Water Quality BMP Flow and Volume for POC #1 On-line facility volume: 0 acre-feet On-line facility target flow: 0 cfs. Adjusted for 15 min: 0 cfs. Off-line facility target flow: 0 cfs. Adjusted for 15 min: 0 cfs. Killin-Trench 3/13/2020 6:03:38 AM Page 15 LID Report LID Technique Usedfor Total Volume Volume Infiltration Cumulabve Percent Wateriauality Percent Comment Treatment ? Needs Through Volume Volume Volume Water Quality Treatment Facility (ac-ft) Infiltration Infiltrated Treated (ac-ft) (ac-ft) C�redit Gravel Trench Bed I POC 13 7.52 13 100.00 Total Volume Infiltrated 7.52 0.00 0.00 100.00 0.00 0% No Treat. Credit [Duration Compliance with LID Analysis Standard B% of2-yr to 50% of Result r 2-yr Passed Killin-Trench 3/13/2020 6:03:38 AM Page 16 Model Default Modifications Total of 0 changes have been made. PERLND Changes No PERLND changes have been made. IMPLND Changes No IMPLND changes have been made. Killin-Trench 3/13/2020 6:03:57 AM Page 17 Appendix Predeveloped Schematic ELlBasin 1 0.07ac Killin-Trench 3/13/2020 6:03:57 AM Page 18 Mitigated Schematic L_,j Basin 1 Aw *-M" 6012 lGravel Trench Bed 1 Killin-Trench 3/13/2020 6:03:58 AM Page 19 Predeveloped UCI File Killin-Trench 3/13/2020 6:03:58 AM Page 20 Mitigated UCI File RUN GLOBAL WWHM4 model simulation START 1948 10 01 END RUN INTERP OUTPUT LEVEL 3 0 RESUME 0 RUN 1 END GLOBAL FILES <File> <Un#> < ----------- File Name <-ID-> WDM 26 Killin-Trench.wdm MESSU 25 MitKillin-Trench.MES 27 MitKillin-Trench.L61 28 MitKillin-Trench.L62 30 POCKillin-Trenchl.dat 2009 09 30 END FILES OPN SEQUENCE UNIT SYSTEM 1 ------------------------------ Killin-Trench 3/13/2020 6:03:58 AM Page 21 INGRP INDELT 00:15 IMPLND 4 RCHRES 1 COPY 1 COPY 501 DISPLY 1 END INGRP END OPN SEQUENCE DISPLY DISPLY-INFOl # - #< ---------- Title ----------- >***TPAN PIVL DIG1 FIL1 1 Gravel Trench Bed 1 MAX END DISPLY-INFOl END DISPLY COPY TIMESERIES # - # NPT NMN 1 1 1 501 1 1 END TIMESERIES END COPY GENER OPCODE # # OPCD END OPCODE PARM # # K END PARM END GENER PERLND GEN-INFO <PLS >< ------- Name ------- >NBLKS Unit -systems Printer # - # User t-series Engl Metr in out END GEN-INFO *** Section PWATER*** PYR DIG2 FIL2 YRND 1 2 30 9 ACTIVITY <PLS > Active Sections # - # ATMP SNOW PWAT SED PST PWG PQAL MSTL PEST NITR PHOS TRAC END ACTIVITY PRINT -INFO <PLS > Print -flags PIVL PYR # - # ATMP SNOW PWAT SED PST PWG PQAL MSTL PEST NITR PHOS TRAC END PRINT -INFO PWAT-PARMl <PLS > PWATER variable monthly parameter value flags *** # - # CSNO RTOP UZFG VCS VUZ VNN VIFW VIRC VLE INFC HWT END PWAT-PARMl PWAT-PARM2 <PLS > PWATER input info: Part 2 # - # ***FOREST LZSN INFILT LSUR SLSUR KVARY END PWAT-PARM2 PWAT-PARM3 <PLS > PWATER input info: Part 3 # - # ***PETMAX PETMIN INFEXP END PWAT-PARM3 PWAT-PARM4 <PLS > PWATER input info: Part 4 # - # CEPSC UZSN NSUR END PWAT-PARM4 AGWRC INFILD DEEPFR BASETP AGWETP INTFW IRC LZETP PWAT-STATE1 <PLS > Initial conditions at start of simulation ran from 1990 to end of 1992 (pat 1-11-95) RUN 21 # - # CEPS SURS UzS IFWS LZS AGWS END PWAT-STATEl END PERLND IMPLND GEN-INFO <PLS >< ------- Name ------- > 4 ROOF TOPS/FLAT END GEN-INFO *** Section IWATER*** Unit -systems Printer User t-series Engl Metr in out 1 1 1 27 0 ACTIVITY <PLS > Active Sections # - # ATMP SNOW IWAT SLD IWG IQAL 4 0 0 1 0 0 0 END ACTIVITY PRINT -INFO <ILS > ******** Print -flags ******** PIVL PYR # - # ATMP SNOW IWAT SLD IWG IQAL 4 0 0 4 0 0 0 1 9 END PRINT -INFO IWAT-PARMl <PLS > IWATER variable monthly parameter value flags # - # CSNO RTOP VRS VNN RTLI 4 0 0 0 0 0 END IWAT-PARMl IWAT-PARM2 <PLS > IWATER input info: Part 2 # - # *** LSUR SLSUR NSUR RETSC 4 400 0.01 0.1 0.1 END IWAT-PARM2 IWAT-PARM3 <PLS > IWATER input info: Part 3 # - # ***PETMAX PETMIN 4 0 0 END IWAT-PARM3 IWAT-STATEl <PLS > Initial conditions at start of simulation # - # RETS SURS 4 0 0 END IWAT-STATEl GWVS Killin-Trench 3/13/2020 6:03:58 AM Page 22 END IMPLND SCHEMATIC <-Source-> <Name> # Basin 1*** IMPLND 4 ******Routing****** IMPLND 4 RCHRES 1 END SCHEMATIC <--Area--> <-Target-> MBLK <-factor-> <Name> # Tbl# 0.0702 RCHRES 1 5 0.0702 COPY 1 15 1 COPY 501 17 NETWORK <-Volume-> <-Grp> <-Member-><--Mult-->Tran <-Target vols> <-Grp> <-Member-> <Name> # <Name> # #<-factor->strg <Name> # # <Name> # # COPY 501 OUTPUT MEAN 1 1 48.4 DISPLY 1 INPUT TIMSER 1 <-Volume-> <-Grp> <-Member-><--Mult-->Tran <-Target vols> <-Grp> <-Member-> <Name> # <Name> # #<-factor->strg <Name> # # <Name> # # END NETWORK RCHRES GEN-INFO RCHRES Name Nexits Unit Systems # - #< ------------------ >< --- > User T-series in out 1 Gravel Trench Be-005 2 1 1 1 END GEN-INFO *** Section RCHRES*** Printer Engl Metr LKFG 28 0 1 ACTIVITY <PLS > Active Sections # - # HYFG ADFG CNFG HTFG SDFG GQFG OXFG NUFG PKFG PHFG 1 1 0 0 0 0 0 0 0 0 0 END ACTIVITY PRINT -INFO <PLS > Print -flags PIVL PYR # - # HYDR ADCA CONS HEAT SED GQL OXRX NUTR PLNK PHCB PIVL PYR 1 4 0 0 0 0 0 0 0 0 0 1 9 END PRINT -INFO HYDR-PARM1 RCHRES Flags for each HYDR Section # - # VC Al A2 A3 ODFVFG for each ODGTFG for each FUNCT for each FG FG FG FG possible exit possible exit possible exit 1 0 1 0 0 4 5 0 0 0 0 0 0 0 0 2 2 2 2 2 END HYDR-PARM1 HYDR-PARM2 # - # FTABNO LEN DELTH STCOR KS DB50 < ------ >< >< -------- >< -------- >< -------- >< -------- >< -------- > 1 1 0.01 0.0 0.0 0.5 0.0 END HYDR-PARM2 HYDR-INIT RCHRES Initial conditions for each HYDR section # - # VOL Initial value of COLIND Initial value of OUTDGT *** ac-ft for each possible exit for each possible exit < >< -------- > < --- >< --- >< --- >< --- >< > < --- >< --- >< --- >< --- >< > 1 0 4.0 5.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 END HYDR-INIT END RCHRES SPEC -ACTIONS END SPEC -ACTIONS Killin-Trench 3/13/2020 6:03:58 AM Page 23 FTABLES FTABLE 1 92 5 Depth Area Volume Outflowl Outflow2 (ft) (acres) (acre-ft) (cfs) (cfs) 0.000000 0.008953 0.000000 0.000000 0.000000 0.044444 0.008953 0.000139 0.000000 0.005417 0.088889 0.008953 0.000279 0.000000 0.005417 0.133333 0.008953 0.000418 0.000000 0.005417 0.177778 0.008953 0.000557 0.000000 0.005417 0.222222 0.008953 0.000696 0.000000 0.005417 0.266667 0.008953 0.000836 0.000000 0.005417 0.311111 0.008953 0.000975 0.000000 0.005417 0.355556 0.008953 0.001114 0.000000 0.005417 0.400000 0.008953 0.001253 0.000000 0.005417 0.444444 0.008953 0.001393 0.000000 0.005417 0.488889 0.008953 0.001532 0.000000 0.005417 0.533333 0.008953 0.001671 0.000000 0.005417 0.577778 0.008953 0.001811 0.000000 0.005417 0.622222 0.008953 0.001950 0.000000 0.005417 0.666667 0.008953 0.002089 0.000000 0.005417 0.711111 0.008953 0.002228 0.000000 0.005417 0.755556 0.008953 0.002368 0.000000 0.005417 0.800000 0.008953 0.002507 0.000000 0.005417 0.844444 0.008953 0.002646 0.000000 0.005417 0.888889 0.008953 0.002785 0.000000 0.005417 0.933333 0.008953 0.002925 0.000000 0.005417 0.977778 0.008953 0.003064 0.000000 0.005417 1.022222 0.008953 0.003203 0.000000 0.005417 1.066667 0.008953 0.003343 0.000000 0.005417 1.111111 0.008953 0.003482 0.000000 0.005417 1.155556 0.008953 0.003621 0.000000 0.005417 1.200000 0.008953 0.003760 0.000000 0.005417 1.244444 0.008953 0.003900 0.000000 0.005417 1.288889 0.008953 0.004039 0.000000 0.005417 1.333333 0.008953 0.004178 0.000000 0.005417 1.377778 0.008953 0.004317 0.000000 0.005417 1.422222 0.008953 0.004457 0.000000 0.005417 1.466667 0.008953 0.004596 0.000000 0.005417 1.511111 0.008953 0.004735 0.000000 0.005417 1.555556 0.008953 0.004875 0.000000 0.005417 1.600000 0.008953 0.005014 0.000000 0.005417 1.644444 0.008953 0.005153 0.000000 0.005417 1.688889 0.008953 0.005292 0.000000 0.005417 1.733333 0.008953 0.005432 0.000000 0.005417 1.777778 0.008953 0.005571 0.000000 0.005417 1.822222 0.008953 0.005710 0.000000 0.005417 1.866667 0.008953 0.005849 0.000000 0.005417 1.911111 0.008953 0.005989 0.000000 0.005417 1.955556 0.008953 0.006128 0.000000 0.005417 2.000000 0.008953 0.006267 0.000000 0.005417 2.044444 0.008953 0.006406 0.000000 0.005417 2.088889 0.008953 0.006546 0.000000 0.005417 2.133333 0.008953 0.006685 0.000000 0.005417 2.177778 0.008953 0.006824 0.000000 0.005417 2.222222 0.008953 0.006964 0.000000 0.005417 2.266667 0.008953 0.007103 0.000000 0.005417 2.311111 0.008953 0.007242 0.000000 0.005417 2.355556 0.008953 0.007381 0.000000 0.005417 2.400000 0.008953 0.007521 0.000000 0.005417 2.444444 0.008953 0.007660 0.000000 0.005417 2.488889 0.008953 0.007799 0.000000 0.005417 2.533333 0.008953 0.007938 0.000000 0.005417 2.577778 0.008953 0.008078 0.000000 0.005417 2.622222 0.008953 0.008217 0.000000 0.005417 2.666667 0.008953 0.008356 0.000000 0.005417 2.711111 0.008953 0.008496 0.000000 0.005417 2.755556 0.008953 0.008635 0.000000 0.005417 2.800000 0.008953 0.008774 0.000000 0.005417 2.844444 0.008953 0.008913 0.000000 0.005417 Velocity Travel Time*** (ft/sec) (Minutes)*** Killin-Trench 3/13/2020 6:03:58 AM Page 24 2.888889 0.008953 0.009053 0.000000 0.005417 2.933333 0.008953 0.009192 0.000000 0.005417 2.977778 0.008953 0.009331 0.000000 0.005417 3.022222 0.008953 0.009729 0.023421 0.005417 3.066667 0.008953 0.010127 0.121030 0.005417 3.111111 0.008953 0.010525 0.255267 0.005417 3.155556 0.008953 0.010923 0.404632 0.005417 3.200000 0.008953 0.011321 0.547841 0.005417 3.244444 0.008953 0.011719 0.665728 0.005417 3.288889 0.008953 0.012117 0.747561 0.005417 3.333333 0.008953 0.012515 0.799562 0.005417 3.377778 0.008953 0.012912 0.860390 0.005417 3.422222 0.008953 0.013310 0.909594 0.005417 3.466667 0.008953 0.013708 0.956270 0.005417 3.511111 0.008953 0.014106 1.000771 0.005417 3.555556 0.008953 0.014504 1.043376 0.005417 3.600000 0.008953 0.014902 1.084308 0.005417 3.644444 0.008953 0.015300 1.123750 0.005417 3.688889 0.008953 0.015698 1.161854 0.005417 3.733333 0.008953 0.016096 1.198748 0.005417 3.777778 0.008953 0.016494 1.234539 0.005417 3.822222 0.008953 0.016892 1.269321 0.005417 3.866667 0.008953 0.017290 1.303176 0.005417 3.911111 0.008953 0.017687 1.336173 0.005417 3.955556 0.008953 0.018085 1.368375 0.005417 4.000000 0.008953 0.018483 1.399836 0.005417 4.044444 0.008953 0.018881 1.430605 0.005417 END FTABLE 1 END FTABLES EXT SOURCES <-Volume-> <Member> SsysSgap<--Mult-->Tran <-Target vols> <-Grp> <-Member-> <Name> # <Name> # tem strg<-factor->strg <Name> # # <Name> # # WDM 2 PREC ENGL 0.8 PERLND 1 999 EXTNL PREC WDM 2 PREC ENGL 0.8 IMPLND 1 999 EXTNL PREC WDM 1 EVAP ENGL 0.76 PERLND 1 999 EXTNL PETINP WDM 1 EVAP ENGL 0.76 IMPLND 1 999 EXTNL PETINP END EXT SOURCES EXT TARGETS <-Volume-> <-Grp> <-Member-><--Mult-->Tran <-Volume-> <Member> Tsys Tgap Amd <Name> # <Name> # #<-factor->strg <Name> # <Name> tem strg strg*** RCHRES 1 HYDR RO 1 1 1 WDM 1000 FLOW ENGL REPL RCHRES 1 HYDR 0 1 1 1 WDM 1001 FLOW ENGL REPL RCHRES 1 HYDR 0 2 1 1 WDM 1002 FLOW ENGL REPL RCHRES 1 HYDR STAGE 1 1 1 WDM 1003 STAG ENGL REPL COPY 1 OUTPUT MEAN 1 1 48.4 WDM 701 FLOW ENGL REPL COPY 501 OUTPUT MEAN 1 1 48.4 WDM 801 FLOW ENGL REPL END EXT TARGETS MASS -LINK <Volume> <-Grp> <Name> MASS -LINK IMPLND IWATER END MASS -LINK <-Member-><--Mult--> <Name> # #<-factor-> 5 SURO 0.083333 5 MASS -LINK 15 IMPLND IWATER SURO END MASS -LINK 15 MASS -LINK 17 RCHRES OFLOW OVOL END MASS -LINK 17 END MASS -LINK END RUN <Target> <Name> RCHRES 0.083333 COPY COPY <-Grp> <-Member->*** <Name> # #*** INFLOW IVOL INPUT MEAN INPUT MEAN Killin-Trench 3/13/2020 6:03:58 AM Page 25 Killin-Trench 3/13/2020 6:03:58 AM Page 26 Predeveloped HSPF Message File Killin-Trench 3/13/2020 6:03:58 AM Page 27 Mitigated HSPF Message File Killin-Trench 3/13/2020 6:03:58 AM Page 28 Disclaimer Legal Notice This program and accompanying documentation are provided 'as-is'without warranty of any kind. The entire risk regarding the performance and results of this program is assumed by End User. Clear Creek Solutions Inc. and the governmental licensee or sublicensees disclaim all warranties, either expressed or implied, including but not limited to implied warranties of program and accompanying documentation. In no event shall Clear Creek Solutions Inc. be liable for any damages whatsoever (including without limitation to damages for loss of business profits, loss of business information, business interruption, and the like) arising out of the use of, or inability to use this program even if Clear Creek Solutions Inc. or their authorized representatives have been advised of the possibility of such damages. Software Copyright @ by: Clear Creek Solutions, Inc. 2005-2020; All Rights Reserved. Clear Creek Solutions, Inc. 6200 Capitol Blvd. Ste F Olympia, WA. 98501 Toll Free 1(866)943-0304 Local (360)943-0304 www.clearcreeksolutions.com Killin-Trench 3/13/2020 6:03:58 AM Page 29