Loading...
REVIEWED REV1 BLD2021-1436 REVISION LETTERREVISION BLD2021-1436 Dec 18 2022 CITY OF EDMONDS From: G REG. BLU NT@CO MCAST. N ET <G REG. BLU NT@ COM CAST. N ET> DEVELOPMENT SERVICES DEPARTMENT Sent: Friday, December 16, 2022 8:38 AM To: Nelson, Denise <Denise.Nelson@edmondswa.gov> REVIEWED = BY I, for Subject: Re: revision for BLD2021-1436 OF EDMONDS BUILDING DEPARTMENT; Denise, The original plan and engineering had the beam resting on a nine inch wall on the North side of the room. It said on the plan for the contractor to verify bearing below that nine inch wall. As the contractor, we opened up the floor and there was no bearing under where the wall as to be built. We contacted the architect and engineer and they come up with the revision you now have. The difference is that now the beam goes all the way to the exterior wall and for extra support they have required a 6x12 block in the floor joists and a 4x6 column inside of the exterior wall. If you have further questions you can contact the Architect: Ki Nam kinamarchitect(o)-yahoo.com 253-219-5943 or the Engineer: Terry Nettles 253-858-7777. We have the customer's (Scott Amy) condo torn apart and we are ready to install the beam and finish the renovation. We were planning on being done with the renovation before Christmas. We have already been waiting almost a month for the Architect and Engineer to do the revision and we hope that we can get going again on the project, so we can complete it as soon as possible. Please let me know if there is anything else I can do to help with this. We appreciate your help, Greg and Mark Greg Blunt Kobe One, LLC Cell Phone: 425-422-2994 Fax Number: 425-743-8795 E-mail: area.blunt@comcast.net