Building Permit (3)Type: COMMERCIAL BLDG Subtype: NEW TENANT IMPROVEMENT I Status: ISSUED
Parcel No: 00434212001500 Site Address: 558 MAIN ST #104 EDMONDS,WA 98020-3183 Applied: 10/28/2022
Subdivision: 004342 Lot: 0 Issued: 3/27/2023
Fire Sprinklers: Yes Lot Area: Zoning: Final:
Valuation: $150,000.00 Occupancy Type: B Construction Type: VB Expiration Date: 3/21/2024
Code Edition: 2018 No. Stories: 0 # of Dwelling Units: 0 Issued by: NED
Scope of Work: VIRTUE WINES- TENANT IMPROVEMENT (AT THE COMMONS) P/M SEP
WA State Contractor L & I #: WILCOCL791RC
CONTACTS
NAME TYPE
NAME
ADDRESS T
PHONE
EMAIL
APPLICANT
LAUREN KEENE
1507 BELMONT, SEATTLE WA
(518)744-0210
LAURENK@GRAHAMBABA.COM
98122
CONTACT
GRAHAMBABA ARCHITECTS
1507 BELMONT, SEATTLE WA
(518)744-0210
Laurenk@grahambaba.com
98122
234 5TH AVE S, EDMONDS WA
MHART@WILCOXCONSTRUCTION.CO
CONTRACTOR
WILCOX CONSTRUCTION
(425)744-4185
98020-
M
SEATTLE-SNOHOMISH
MILL
9525 AIRPORT WAY,
OWNER
COMPANY INC
SNOHOMISH WA 98296
•' ' •
DESCRIPTION
ACCOUNT
AMOUNT
PAID
PAID DATE
RECEIPT #
CITY TECHNOLOGY FEE CHARGED
001.000.321.99.100.00
$40.00
$40.00
10/31/22
R24086
PER PERMIT
COMMERCIAL STATE SURCHARGE
001.000.237.150
$25.00
$25.00
3/27/23
R27365
PERMIT FEE - COMMERCIAL
001.000.322.10.000.00
$1,660.00
$1,660.00
3/27/23
R27365
PLAN REVIEW FEE - COMMERCIAL
001.000.345.83.000.00
$1,411.00
$1,411.00
10/31/22
R24086
TOTALS: $3,136.00
$3,136.00
CONDITION TYPE
STATUS
NOTES
Printed: Monday, March 27, 2023 3:00:02 PM 1 of 2
•MERCIAL BLDG PermitCity
• • • • -
•:0iBLD2022-1484
www.edmondswa.gov
1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors
in interests, agrees to indemnify defend and hold harmless the City of Edmonds,
Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance
of this permit shall not be deemed to modify, waive or reduce any requirements of any
City ordinance nor limit in any way the City's ability to enforce any ordinance provision.
2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or
other administrative deviation from adopted codes ordinances or policies must be
specifically requested in writing and be called out and identified. Processing fees for such
requests shall be established by Council and shall be paid upon submittal and are
nonrefundable.
3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a
ALL BUILDING PERMITS
FOR
result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only
INFORMATION
during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on
Saturdays, excluding Sundays and Federal Holidays. At all other times the noise
originating from construction sites/activities must comply with the noise limits of
Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.
4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted
by the Building Official prior to use or occupancy of the building or structure. Check the
job card for all required City inspections including final project approval and final
occupancy inspections.
5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW.
Property owners who hire an unlicensed plumber may assume the risks and potential
monetary liability for work performed by unlicensed plumbing contractors. For more
information contact L&I Department of Licensing at 1-800-647-0982.
ELECTRICAL PERMIT
FOR
Obtain Electrical Permit from State Department of Labor and Industries 425-290-1309.
NFORMATION
Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests,
agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its
FOR
officials, employees, and agents from any and all claims for damages of whatever nature,
HOLD HARMLESS
INFORMATION
arising directly or indirectly from the issuance for this permit. Issuance of this permit shall
not be deemed to modify, waive or reduce any requirements of any City ordinance nor
limit in any way the City's ability to enforce any ordinance provision.
Installation, use and maintenance of equipment and components shall be per
MANUFACTURER SPECS
FOR
manufacturers specifications, installation instructions, and applicable state codes.
INFORMATION
Provide manufactures installation instructions on site for Building Inspector.
The issuance of this permit in no way constitutes approval from any other agencies
REGULATING AGENCIES
FOR
having regulatory authority over the facility and this construction activity. It is the
INFORMATION
responsibility of the property owner to obtain any and all such required approvals.
INSPECTIONS - Schedule Online
at https://inspection.mybuildingpermit.com
INSPECTIONTYPE INSPECTOR COMPLETED
RESULT
NOTES
X-1 FIRE FINAL
X-3 BUILDING FINAL"
B-4 CEILING GRID
B-4 FRAMING
B-5 INSULATION ENERGY
Printed: Monday, March 27, 2023 3:00:02 PM 2 of 2