BLD2022-1170+EOR Letter+10.4.2022_7.07.01_PM+3146226STRUCTURAL MEMO 1
MALSAM
TSANG
TO Matt Petersen
STRUCTURAL
ENGINEERING
230 3rd Ave S
APT 201-E
Edmonds WA, 98020
RE Sawn Lumber Material
DATE October 3, 2022
FROM Russ Foisy
PROJECT 1110 5th Ave S — Unit 8
5449-2022-01-01
It is our understanding that SPF sawn lumber material was used in lieu of DF sawn
lumber specified on the approved plans. We have reviewed the photos received on
September 30, 2022 along with the information you have provided. The bottom
plate material is existing and per the as -built plans is DF material. New SPF bearing
studs installed below the new beam bear on the existing bottom plates. This is
structurally acceptable.
Please let us know if you haveg any further questions. Thank you
Russ Foisy PE
Associate Principal