Loading...
APPROVED Transportation Impact Analysis WorksheetAPPENDIX A Page 1 of 2 Transportation Impact Analysis Worksheet PERMITTING & DEVELOPMENT ENGINEERING DIVISION 121 5th Avenue N P: 425.771.0220 www.edmondswa.gov Name of Proposed Project: P I GICE9-1I JG ?I S Owner/Applicant CA?-(S PIC Name Street/Mailing Address le- 6H o�,Jb6 wIZO City State Zip Telephone: 7 Q (D ' '+Jgot ' IZZ-7- Applicant Contact Person: GAN Kuuzk LF A1JnEV_, :,M AV-C�l eQs Name I? pq 6P_155N woob AUS N street/Mailing Address SE AST L35 W °I8 to City 9 State Zip Telephone: 2-06— Yy 2 —20t I I Traffic Engineer who prepared the Traffic Impact Analysis (if applicable): Firm Name Telephone: 1. PROJECT DESCRIPTION a. Location - Street address: Contact Name E-mail: I',- AQe Attach a vicinity map and site plan.) b. Specify existing land use: awE; f�,M — � - 5 Wekl s7 1W 6 sF2 w/ D51ALREn &A2_ 1NGS c. Specify proposed type and size of development: ?_ V N W 252D LOT- U) NE s�s (# of residential units and/or s yuare footage of building) d. Date construction will begin and be completed: Define proposed access locations: GU IL & CUT' OW H AP L E ST APPENDIX A Page 2 of 2 f. Define proposed sight distance at site egress locations: 2. MITIGATION RECOMMENDATIONS State recommended measures and fees required to mitigate project specific traffic impacts. Traffic impact fee shall be calculated from the attached Impact Fee Rate Tables and as identified in ECDC 18.82.120, except as otherwise provided for independent fee calculations in ECDC 18.82.130. CHANGE IN USE Fee for prior use shall be based on fee established at the time the prior use was permitted. If the previous use was permitted prior to the adoption of Ordinance 3516 (effective date: 09/12/04), the 2004 ECDC 18.82.120 impact fee shall be used. Units in ITE Land Use Category Per Unit square feet, Fee Rate # of dwelling, of , etc. New Use $ X Prior Use $ X Fee t New Use Fee: $ - Prior Use Fee: $ _ $ *N/ NEW DEVELOPMENT Units in ITE Land Use Category Per Unit square feet, Fee Fee Rate # of dwelling, vf'n. etc. New Use 2.10 — 5 M $ (0,249.1 q- X 2 — $ Az-,� ppLo? VSS 15�:?. oel`{0 t P Q%LI 0 I W15W S,'P--. $12,498.28 f 1 OTHER MITIGATION E RECOMMENDATION INDEPENDENT FEE CALCULATION: $240.00 + consultant fee $ TOTAL TRANSPORTATION IMPACT FEE $ City of Edmonds, Engineering litviston Approval 8/11 /2021 Date ' No impact fees will be due, nor will a credit be given, for an impact fee calculation resulting in a net negative.