APPROVED Transportation Impact Analysis WorksheetAPPENDIX A
Page 1 of 2
Transportation Impact Analysis
Worksheet
PERMITTING & DEVELOPMENT
ENGINEERING
DIVISION
121 5th Avenue N
P: 425.771.0220
www.edmondswa.gov
Name of Proposed Project: P I GICE9-1I JG ?I S
Owner/Applicant
CA?-(S PIC
Name
Street/Mailing Address
le- 6H o�,Jb6 wIZO
City State Zip
Telephone: 7 Q (D ' '+Jgot ' IZZ-7-
Applicant Contact Person:
GAN Kuuzk
LF A1JnEV_, :,M AV-C�l eQs
Name
I? pq 6P_155N woob AUS N
street/Mailing Address
SE AST L35 W °I8 to
City 9 State Zip
Telephone: 2-06— Yy 2 —20t I I
Traffic Engineer who prepared the Traffic Impact Analysis (if applicable):
Firm Name
Telephone:
1. PROJECT DESCRIPTION
a. Location - Street address:
Contact Name
E-mail:
I',- AQe
Attach a vicinity map and site plan.)
b. Specify existing land use: awE; f�,M — � - 5 Wekl s7 1W 6
sF2 w/ D51ALREn &A2_ 1NGS
c. Specify proposed type and size of development: ?_ V N W 252D LOT- U) NE s�s
(# of residential units and/or s yuare footage of building)
d. Date construction will begin and be completed:
Define proposed access locations: GU IL & CUT' OW H AP L E ST
APPENDIX A
Page 2 of 2
f. Define proposed sight distance at site egress locations:
2. MITIGATION RECOMMENDATIONS
State recommended measures and fees required to mitigate project specific traffic impacts.
Traffic impact fee shall be calculated from the attached Impact Fee Rate Tables and as identified
in ECDC 18.82.120, except as otherwise provided for independent fee calculations in ECDC
18.82.130.
CHANGE IN USE
Fee for prior use shall be based on fee established at the time the prior use was permitted. If
the previous use was permitted prior to the adoption of Ordinance 3516 (effective date:
09/12/04), the 2004 ECDC 18.82.120 impact fee shall be used.
Units in
ITE Land Use Category Per Unit square feet,
Fee Rate # of dwelling,
of , etc.
New Use $ X
Prior Use $ X
Fee
t
New Use Fee: $ - Prior Use Fee: $ _ $
*N/ NEW DEVELOPMENT
Units in
ITE Land Use Category Per Unit square feet, Fee
Fee Rate # of dwelling,
vf'n. etc.
New Use
2.10 —
5 M
$ (0,249.1 q-
X 2
— $ Az-,�
ppLo?
VSS 15�:?.
oel`{0 t
P Q%LI 0 I W15W
S,'P--. $12,498.28
f 1 OTHER
MITIGATION E RECOMMENDATION
INDEPENDENT FEE CALCULATION: $240.00 + consultant fee $
TOTAL TRANSPORTATION IMPACT FEE $
City of Edmonds, Engineering litviston Approval
8/11 /2021
Date
' No impact fees will be due, nor will a credit be given, for an impact fee calculation resulting in a net negative.