Building Permit (3)Type: COMMERCIAL BLDG Subtype: NEW TENANT IMPROVEMENT I Status: ISSUED
Parcel No: 00434212001500 Site Address: 550 MAIN ST #102 EDMONDS,WA 98020-3183 Applied: 9/11/2021
Subdivision: 004342 Lot: 0 Issued: 11/5/2021
Fire Sprinklers: Yes Lot Area: Zoning: BD1 Final:
Valuation: $75,000.00 Occupancy Type: M Construction Type: VB Expiration Date: 2/28/2024
Code Edition: 2018 No. Stories: 0 # of Dwelling Units: 0 Issued by: JOK
Scope of Work: COPPER POT BAKERY (MAIN ST COMMONS) NEW TENANT, P&M NOT INCL
WA State Contractor L & I #: WILCOC*194Q0
CONTACTS
NAME TYPE
NAME
ADDRESS
PHONE
EMAIL
APPLICANT
KEITH SMITH
603 STEWART STREET SUITE
(206)713-4076
KSMITH@SMITHCO.ORG
610, SEATTLE WA 98101
CONTACT
SMITH CO LLC
603 STEWART STREET SUITE
(206)713-4076
ksmith@smithco.org
610, SEATTLE WA 98101
234 5TH AVE S, EDMONDS WA
MMCISAAC@WILCOXCONSTRUCTION.
CONTRACTOR
WILCOX CONSTRUCTION
(425)774-4185
98020-
COM
SEATTLE-SNOHOMISH
MILL
9525 AIRPORT WAY,
OWNER
COMPANY INC
SNOHOMISH WA 98296
7DESCRIPTION
ACCOUNT
AMOUNT
PAID
PAID DATE
RECEIPT #
BUILDING PERMIT FEE
001.000.322.10.000.00
$272.50
$272.50
2/27/23
R26745
CITY TECHNOLOGY FEE CHARGED
001.000.321.99.100.00
$40.00
$40.00
9/14/21
R14770
PER PERMIT
COMMERCIAL STATE SURCHARGE
001.000.237.150
$25.00
$25.00
11/5/21
R15799
PERMIT FEE - COMMERCIAL
001.000.322.10.000.00
$1,090.00
$1,090.00
11/5/21
R15799
PLAN REVIEW FEE - COMMERCIAL
001.000.345.83.000.00
$926.50
$926.50
9/14/21
R14770
TOTALS: $2,354.00
$2,354.00
CONDITION TYPE
STATUS
NOTES
Printed: Monday, March 27, 2023 4:13:44 PM 1 of 2
•M MERCIAL BLDG Permit
of Edmonds PERMIT NUM
IF
EdmondsCity
121 5th Ave N, 980201 ..
www.edmondswa.gov•
1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors
in interests, agrees to indemnify defend and hold harmless the City of Edmonds,
Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance
of this permit shall not be deemed to modify, waive or reduce any requirements of any
City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2
- PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other
administrative deviation from adopted codes ordinances or policies must be specifically
requested in writing and be called out and identified. Processing fees for such requests
shall be established by Council and shall be paid upon submittal and are nonrefundable.
3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a
ALL BUILDING PERMITS
FOR
result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only
INFORMATION
during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on
Saturdays, excluding Sundays and Federal Holidays. At all other times the noise
originating from construction sites/activities must comply with the noise limits of
Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 -
OCCUPANCY - Final approval on a project or final occupancy approval must be granted by
the Building Official prior to use or occupancy of the building or structure. Check the job
card for all required City inspections including final project approval and final occupancy
inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter
18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and
potential monetary liability for work performed by unlicensed plumbing contractors. For
more information contact L&I Department of Licensing at 1-800-647-0982.
ELECTRICAL PERMIT
FOR
Obtain Electrical Permit from State Department of Labor and Industries 425-290-1309.
NFORMATION
Installation, use and maintenance of equipment and components shall be per
MANUFACTURER SPECS
FOR
manufacturers specifications, installation instructions, and applicable state codes.
INFORMATION
provide manufactures installation instructions on site for Building Inspector.
The issuance of this permit in no way constitutes approval from any other agencies
REGULATING AGENCIES
FOR
having regulatory authority over the facility and this construction activity. It is the
INFORMATION
responsibility of the property owner to obtain any and all such required approvals.
'P[" 16101 V-• •
• •-
• • • •.- •
7INSPECTIO7NTYPE INSPECTOR COMPLETED
RESULTING
FINAL"
REC'D HEALTH DEPT APPROVAL DOCS- IN ADDRESS
FILES
B-4 FRAMING
11/30/2022
CORRECTION
Corrections 1. Seal all penetrations at plate IineOk to
12:00:00 AM
REQUIRED
insulate South wall. Verify if R21 is required.
B-4 FRAMING
B-7 BUILDING OTHER INSP
12/16/2022
PARTIAL
Insulation for TI space only. Ok
12:00:00 AM
APPROVAL
B-7 BUILDING OTHER INSP
Printed: Monday, March 27, 2023 4:13:44 PM 2 of 2