Loading...
Building Permit (3)Type: COMMERCIAL BLDG Subtype: NEW TENANT IMPROVEMENT I Status: ISSUED Parcel No: 00434212001500 Site Address: 550 MAIN ST #102 EDMONDS,WA 98020-3183 Applied: 9/11/2021 Subdivision: 004342 Lot: 0 Issued: 11/5/2021 Fire Sprinklers: Yes Lot Area: Zoning: BD1 Final: Valuation: $75,000.00 Occupancy Type: M Construction Type: VB Expiration Date: 2/28/2024 Code Edition: 2018 No. Stories: 0 # of Dwelling Units: 0 Issued by: JOK Scope of Work: COPPER POT BAKERY (MAIN ST COMMONS) NEW TENANT, P&M NOT INCL WA State Contractor L & I #: WILCOC*194Q0 CONTACTS NAME TYPE NAME ADDRESS PHONE EMAIL APPLICANT KEITH SMITH 603 STEWART STREET SUITE (206)713-4076 KSMITH@SMITHCO.ORG 610, SEATTLE WA 98101 CONTACT SMITH CO LLC 603 STEWART STREET SUITE (206)713-4076 ksmith@smithco.org 610, SEATTLE WA 98101 234 5TH AVE S, EDMONDS WA MMCISAAC@WILCOXCONSTRUCTION. CONTRACTOR WILCOX CONSTRUCTION (425)774-4185 98020- COM SEATTLE-SNOHOMISH MILL 9525 AIRPORT WAY, OWNER COMPANY INC SNOHOMISH WA 98296 7DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT # BUILDING PERMIT FEE 001.000.322.10.000.00 $272.50 $272.50 2/27/23 R26745 CITY TECHNOLOGY FEE CHARGED 001.000.321.99.100.00 $40.00 $40.00 9/14/21 R14770 PER PERMIT COMMERCIAL STATE SURCHARGE 001.000.237.150 $25.00 $25.00 11/5/21 R15799 PERMIT FEE - COMMERCIAL 001.000.322.10.000.00 $1,090.00 $1,090.00 11/5/21 R15799 PLAN REVIEW FEE - COMMERCIAL 001.000.345.83.000.00 $926.50 $926.50 9/14/21 R14770 TOTALS: $2,354.00 $2,354.00 CONDITION TYPE STATUS NOTES Printed: Monday, March 27, 2023 4:13:44 PM 1 of 2 •M MERCIAL BLDG Permit of Edmonds PERMIT NUM IF EdmondsCity 121 5th Ave N, 980201 .. www.edmondswa.gov• 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests shall be established by Council and shall be paid upon submittal and are nonrefundable. 3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a ALL BUILDING PERMITS FOR result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only INFORMATION during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and potential monetary liability for work performed by unlicensed plumbing contractors. For more information contact L&I Department of Licensing at 1-800-647-0982. ELECTRICAL PERMIT FOR Obtain Electrical Permit from State Department of Labor and Industries 425-290-1309. NFORMATION Installation, use and maintenance of equipment and components shall be per MANUFACTURER SPECS FOR manufacturers specifications, installation instructions, and applicable state codes. INFORMATION provide manufactures installation instructions on site for Building Inspector. The issuance of this permit in no way constitutes approval from any other agencies REGULATING AGENCIES FOR having regulatory authority over the facility and this construction activity. It is the INFORMATION responsibility of the property owner to obtain any and all such required approvals. 'P[" 16101 V-• • • •- • • • •.- • 7INSPECTIO7NTYPE INSPECTOR COMPLETED RESULTING FINAL" REC'D HEALTH DEPT APPROVAL DOCS- IN ADDRESS FILES B-4 FRAMING 11/30/2022 CORRECTION Corrections 1. Seal all penetrations at plate IineOk to 12:00:00 AM REQUIRED insulate South wall. Verify if R21 is required. B-4 FRAMING B-7 BUILDING OTHER INSP 12/16/2022 PARTIAL Insulation for TI space only. Ok 12:00:00 AM APPROVAL B-7 BUILDING OTHER INSP Printed: Monday, March 27, 2023 4:13:44 PM 2 of 2