Building Permit (3)Type: RESIDENTIAL BLDG Subtype: NEW SINGLE FAMILY I Status: ISSUED
Parcel No: 00452000400800 Site Address: 7901 240TH ST SW EDMONDS,WA 98026
Subdivision: 005486, 004520, SIR S-30-88 Lot: 0
Fire Sprinklers: Yes Lot Area: Zoning:
Valuation: $701,725.78 Occupancy Type: R3/U Construction Type: VN
Code Edition: 2018 No. Stories: 2 # of Dwelling Units: 1
Scope of Work: QUANTUM HOMES- LOT 1, NEW SFR P&M INCL
WA State Contractor L & I #: QUANTHL806BW
Applied: 10/21/2021
Issued:3/27/2023
Final:
Expiration Date: 3/21/2024
Issued by: NED
CONTACTS
NAME TYPE
NAME
ADDRESS
PHONE
EMAIL
APPLICANT
DANTE PALMAFFY
12925 47TH DR SE, EVERETT WA
(425)345-2530
DPALMAFFY@AOL.COM
98208
CONTACT
D. PALMAFFY DESIGN
12925 47TH DR SE, EVERETT WA
(425)345-2530
dpalmaffy@aol.com
98208
CONTRACTOR
QUANTUM HOMES, LLC
1226 169TH PL SW, LYNNWOOD
(206)899-8893
DPALMAFFY@AOL.COM
WA 98037
OWNER
TWIN PIER LLC
PO BOX 55545, SHORELINE WA
(206)571-7777
balwantaulck@gmail.com
98155
PREVIOUS
FM ENTERPRISE LLC
10321 30TH ST NE, LAKE
(425)322 8549
SANDRA.GASPAR1045@GMAIL.COM
CONTRACTOR
STEVENS WA 98258
•' IVA F11 I Is]
DESCRIPTION
ACCO U 11AMOUNT
PAID
PAID DATE RECEIPT#
1 - BASE FEE FOR MECHANICAL
001.000.322.10.000.00
$50.00
$50.00
3/27/23
R27368
PERMITS
1 - BASE FEE FOR PLUMBING
001.000.322.10.000.00
$50.00
$50.00
3/27/23
R27368
PERMITS
2020 TRANSPORTATION IMPACT
112.502.345.86.000.00
$6,249.14
$6,249.14
3/27/23
R27368
FEE
AIR CONITIONING SYSTEM OR HEAT
001.000.322.10.000.00
$50.00
$50.00
3/27/23
R27368
PUMP - 1.75 BTU OR LESS
AIR HANDLERS - 10,000 CFM OR
001.000.322.10.000.00
$30.00
$30.00
3/27/23
R27368
LESS
APPLIANCE VENTS
001.000.322.10.000.00
$30.00
$30.00
3/27/23
R27368
CITY TECHNOLOGY FEE CHARGED
001.000.321.99.100.00
$40.00
$40.00
9/24/21
R14967
PER PERMIT
EACH PLUMBING FIXTURE ON ONE
001.000.322.10.000.00
$360.00
$360.00
3/27/23
R27368
TRAP
ENGINEERING INSPECTION FEE
001.000.341.82.000.00
$770.00
$770.00
3/27/23
R27368
ENGINEERING PEER REVIEW
001.000.245.963
$715.00
$715.00
3/27/23
R27375
FAN CONNECTED TO SINGLE DUCT
001.000.322.10.000.00
$135.00
$135.00
3/27/23
R27368
FURNACE OR FIREPLACE
001.000.322.10.000.00
$30.00
$30.00
3/27/23
R27368
Printed: Tuesday, March 28, 2023 9:44:29 AM 1 of 5
-RESIDENTIAL
BLDG PermitCity
• • • •
98020 1 1: 1
www.edmondswa.gov
DESCRIPTION
ACCOUNT AMOUNT
PAID
PAID DATE RECEIPT #
GAS PIPING - NEW OR LOCATED
001.000.322.10.000.00
$30.00
$30.00
3/27/23
R27368
PARK IMPACT - ADMIN FEE RES
001.000.322.10.000.00
$50.00
$50.00
3/27/23
R27368
PARK IMPACT FEE - SINGLE FAMILY
332.100.345.85.000.00
$2,734.05
$2,734.05
3/27/23
R27368
PERMIT FEE - RESIDENTIAL
001.000.322.10.000.00
$4,510.00
$4,510.00
3/27/23
R27368
PLAN REVIEW FEE - RESIDENTIAL
001.000.345.83.000.00
$3,833.50
$3,833.50
9/24/21
R14967
RESIDENTIAL STATE SURCHARGE
001.000.237.150
$6.50
$6.50
3/27/23
R27368
STORMWATER ENGINEER REVIEW
001.000.341.82.000.00
$65.00
$65.00
3/27/23
R27368
FEE
STORMWATER GENERAL FACILITY
422.000.379.00.000.00
$799.00
$799.00
3/27/23
R27368
CHARGE SFR UNDER 5000
TRANSPORTATION IMPACT ADMIN
001.000.341.82.000.00
$50.00
$50.00
3/27/23
R27368
FEE - SFR
WATER HEATER - TANKLESS
001.000.322.10.000.00
$15.00
$15.00
3/27/23
R27368
TOTALS: $20,602.19 $20,602.19
CONDITIONS
CONDITION TYPE
STATUS
NOTES
48 HRS NOTICE-ENGR FINAL
FOR
48 Working hours notice is required when requesting your FINAL engineering inspection.
NFORMATION
1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors
in interests, agrees to indemnify defend and hold harmless the City of Edmonds,
Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance
of this permit shall not be deemed to modify, waive or reduce any requirements of any
City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2
- PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other
administrative deviation from adopted codes ordinances or policies must be specifically
requested in writing and be called out and identified. Processing fees for such requests
shall be established by Council and shall be paid upon submittal and are nonrefundable.
3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a
ALL BUILDING PERMITS
FOR
result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only
INFORMATION
during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on
Saturdays, excluding Sundays and Federal Holidays. At all other times the noise
originating from construction sites/activities must comply with the noise limits of
Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 -
OCCUPANCY - Final approval on a project or final occupancy approval must be granted by
the Building Official prior to use or occupancy of the building or structure. Check the job
card for all required City inspections including final project approval and final occupancy
inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter
18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and
potential monetary liability for work performed by unlicensed plumbing contractors. For
more information contact L&I Department of Licensing at 1-800-647-0982.
FOR
CARBON MONOXIDE SYSTEMS
CARBON MONOXIDE SYSTEMS
NFORMATION
It is the owner's responsibility to repair/replace all damage of utilities or frontage
DAMAGE TO FRONTAGE
FOR
improvements in City right of Ways or Easements to City Standards caused by or
IMPROVEMENTS
INFORMATION
occurring during the permitted project.
ELECTRICAL PERMIT
FOR
Obtain Electrical Permit from State Department of Labor and Industries 425-290-1309.
NFORMATION
Printed: Tuesday, March 28, 2023 9:44:29 AM 2 of 5
'RESIDENTIAL BLDG Permit
PERMIT NUM
City of Edmonds
www.edmondswa.gov•
FOR
MAINTAIN EROSION AND SEDIMENTATION CONTROL PER CITY AND SWMMW STANDARD
ESC REQUIREMENTS
INFORMATION
REQUIREMENTS.
FIRE FINAL INSPECTION
FOR
Request final Fire Department Inspection 425-775-7720.
NFORMATION
Approval of this foundation design is conditional subject to inspection of existing site soil
FOR
conditions. Retaining walls must be designed and constructed to resist the lateral
FOUNDATION BEARING
INFORMATION
pressure of the retained material. Provisions must be made for the control and drainage
of surface water around buildings.
GAS PIPE TEST
FOR
Gas pipe test must be observed by City Building Inspector, affidavits shall not be accepted
NFORMATION
Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests,
agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its
FOR
officials, employees, and agents from any and all claims for damages of whatever nature,
HOLD HARMLESS
INFORMATION
arising directly or indirectly from the issuance for this permit. Issuance of this permit shall
not be deemed to modify, waive or reduce any requirements of any City ordinance nor
limit in any way the City's ability to enforce any ordinance provision.
HOSE BIBBS
FOR
Hose Bibbs are required to have a permanently affixed anti -siphon device installed.
NFORMATION
INSP PRIOR TO BACKFILL
FOR
Call for all required inspections. All work shall be inspected prior to backfill.
NFORMATION
FOR
SCHEDULE REQUIRED INSPECTIONS AS NOTED THROUGH MY BUILDING PERMIT.
INSPECTIONS
INFORMATION
www.mybuildingpermit.com
Installation, use and maintenance of equipment and components shall be per
MANUFACTURER SPECS
FOR
manufacturers specifications, installation instructions, and applicable state codes.
INFORMATION
Provide manufactures installation instructions on site for Building Inspector.
Maximum Height 25 feet. The agent or contractor shall set up the equipment; establish
the datum point and the point of average grade. Call for inspections to verify. These
MAXIMUM HEIGHT
FOR
items must be consistent with the approved plan. If the proposed height of a building is
INFORMATION
within 12 inches of the maximum height permitted for the zone an elevation survey is
required.
Final approval on a project or final occupancy approval must be granted by the Building
OCCUPANCY
FOR
Official prior to use or occupancy of the building or structure. Check the job card for all
INFORMATION
required City inspections including final project approval and final occupancy inspections.
New and existing buildings shall have approved address numbers, building numbers or
approved building identification placed in a position that is plainly visible from the street
POST ADDRESS
FOR
or road fronting the property. Address numbers shall be Arabic numerals or alphabet
INFORMATION
letters Numbers shall be legible from the public way, at least 4 inches high with a half
inch min stroke width on a contrasting background.
FOR
Electronic civil asbuilt shall be submitted to the City prior to final project acceptance.
PROJECT CIVIL ASBUILT
INFORMATION
Asbuilt shall be submitted to Engineeringpermits@edmondswa.gov.
The issuance of this permit in no way constitutes approval from any other agencies
REGULATING AGENCIES
FOR
having regulatory authority over the facility and this construction activity. It is the
INFORMATION
responsibility of the property owner to obtain any and all such required approvals.
FOR
Heat pumps, AC units and similar equipment greater than 36 inches in height are not
SIDE YARD EQUIPMENT
INFORMATION
allowed within required building setbacks.
Sound or noise originating from temporary construction sites as a result of construction
activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of
FOR
7:OOam to 6:OOpm on weekdays and 10:OOam and 6:OOpm on Saturdays, excluding
SOUND AND NOISE
INFORMATION
Sundays and Federal Holidays. At all other times the noise originating from construction
sites and activities must comply with the noise limits of Chapter 5.30, unless a variance
has been granted pursuant to ECC 5.30.120.
Printed: Tuesday, March 28, 2023 9:44:29 AM 3 of 5
'RESIDENTIAL
BLDG Permit
PERMIT NUM
City of Edmonds
-0810
. •. •
Sound/Noise originating from temporary construction sites as a result of construction
activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of
FOR
7:00am to 6:00pm on weekdays and 10:00am and 6:00pm on Saturdays, excluding
SOUND OR NOISE
INFORMATION
Sundays and Federal Holidays. At all other times the noise originating from construction
sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has
been granted pursuant to ECC 5.30.120.
Special inspections have been called for on this project and are noted on the approved
SPECIAL INSPECTION BUILDING
FOR
construction plans. It is the owner and or contractors responsibility to ensure that reports
DIVISION
INFORMATION
are provided to the City on a weekly basis.
FOR
All utilities shall be located prior to any excavation. New locates shall be called for if at
UTILITY LOCATES
INFORMATION
time of excavation, original locates are no longer identifiable.
City approved plastic piping may be used in water service piping provided that where
FOR
metal water service piping is used for electrical grounding purposes, replacement piping
WATER SERVICE PIPING
INFORMATION
shall be of like materials (UPC 604.8) a state electrical permit and inspection is required if
electrical grounding is altered or removed.
Installer shall provide the manufacturer installation, operating instructions, and a whole
FOR
WHOLE HOUSE FAN
house ventilation system operation description. A label shall be affixed to the whole
INFORMATION
house timer control that reads "Whole house ventilation, see operating instructions".
4 INSPECTIONTYPE INSPECTOR
COMPLETED
RESULT
NOTES
A-1 BUILDING PRECON
B-2 FND DAMPPROOFING
B-2 FOOTINGS
B-2 FOUNDATION WALL
B-2 SLAB INSULATION
B-3 EXT WALL SHEATHING
B-3 GAS PIPING TEST
B-3 MECH ROUGH IN
B-3 PLUMB ROUGH IN
B-3 ROOF SHEATHING
B-3 UNDERFLR FRAMING
B-3 WATER SERVICE LINE
B-4 DRYWALL FASTENING
B-4 FRAMING
B-4 INTERIOR SHEAR
B-4 SHOWER PAN
B-5 BLDG SPECIAL
INSPECTION
B-5 INSULATION ENERGY
B-7 BUILDING OTHER INSP
X-3 BUILDING FINAL"
Printed: Tuesday, March 28, 2023 9:44:29 AM 4 of 5
AL BLDG Permit
-
City •Edmonds
it:
www.edmondswa.gov
B-4 HEIGHT VERIFICATION
A-1 ENGINEERING PRECON
A-1 TESC AND MOBILIZE
E-3 STRM FOOTING DRAIN
E-3 STRM TIGHTLINE
E-4 STRM STUB CONNECT
E-4 WATER SERVICE LINE
E-5 DRIVEWAY SLOPE
E-9 COMPOST AMEND
E-9 PROJECT ASBUILTS
X-2 ENGINEERING FINAL
E-3 STRM MGMT FACILITY
Note to Inspector: This inspection is for the
vegetated filter strip for the surface water runoff
from the driveway.
Printed: Tuesday, March 28, 2023 9:44:29 AM 5 of 5