Loading...
PalmerGeo - RRC FIELD REPORT 9-24-2021Rose Ridge Condominiums Field Report Observations P* PALMER C/Geotechnical Consultants, Inc. FIELD REPORT Project Name: Rose Ridge Condominiums PGC Representative: Meghan Hallam Time Onsite: 9:45 am Project Number: Daily Task: Observe Drainage Section Behind Wall Date: 09.24.2021 19011 09.24.2021 Weather: Sunny Comments Palmer Geotechnical Consultants (PGC) onsite as requested to observe the drainage section behind the new bluff crest wall. Since the last site visit on Monday, September 20, 2021, PGC observed that the boards and waler had been attached. Additionally, the drainage section behind the wall was in the process of being installed. PGC observed that separation fabric had been placed in all directions behind the wall. Drain rock had been placed in the base of the section and a 4-inch drain pipe had been installed approximately 3.5 feet below the top of the wall. The drain was closed at both ends and tied into the existing storm drain with sufficient fall. Photo 1: Looking south along the drainage section. Photo shows the separation fabric, drain rock, and drain pipe. Photo 2: Photo shows connection of wall drainage to the existing storm drain. The work observed today was in general conformance with the project documents and specifications. PGC site Representative: Qeghan Hallam