Loading...
PalmerGeo - Rose Ridge Condos FIELD REPORT 09-15-21Rose Ridge Condominiums *** Field Report Observations pG APALMER CGeotechnical Consultants, Inc. FIELD REPORT Project Name: Rose Ridge Condominiums Project Number: PGC Representative: Meghan Hallam Date: Time Onsite: 8:45 am Weather: 09.15.2021 19011 09.15.2021 Overcast becoming sunny Daily Task: Observe pin piles Comments Palmer Geotechnical Consultants (PGC) onsite as requested to observe the installation of pin piles at project location. Eleven piles were driven along the east side of the project area with two piles driven at the north and south end for the return by Pile King (contractor). Piles were 2-in round schedule 80 steel in 10.5-foot lengths. Piles were driven with a 400-pound hammer on a rubber track excavator. Refusal criteria is 1-inch at 10 seconds. Table 1 shows the pile number and driven length. Pile Driven Length 1 12.0 2 14.0 3 14.5 4 13.5 5 13.5 6 16.0 7 15.0 8 14.5 9 15.0 10 13.0 11 13.5 Photo 1: Looking north at pile 3 location with Photo 2: Looking north at driven piles 8-11. pile 2 location in the foreground. Rose Ridge Condominiums Field Report Observations 09.15.2021 The work observed today was in general conformance with the project documents and specifications. PGC site Representative: ghan Hallam