Loading...
Building Permit (3)Type: RESIDENTIAL BLDG Subtype: ALTERATION OR REMODEL I Status: ISSUED Parcel No: 00451200000305 Subdivision: 005729, 004512 Fire Sprinklers: Valuation: $66,731.60 Code Edition: 0 Site Address: 19015 80TH AVE W EDMONDS,WA 98026-6010 Lot: 0 Lot Area: Zoning: Occupancy Type: Construction Type: No. Stories: 0 # of Dwelling Units: 0 Scope of Work: SULLY- GARAGE CONVERSION INCL MECH, P SEP WA State Contractor L & I #: GREENBN861QE Applied: 11/14/2022 Issued: 4/3/2023 Final: Expiration Date: 3/28/2024 Issued by: NED do CONTACTS NAME TYPE NAME ADDRESS PHONE EMAIL APPLICANT OWEN KEEPER 400 NW GILMAN BLVD #171, (425)414-4264 OFFICE@KBPRODESIGN.COM ISSAQUAH WA 98027 CONTACT KB PRO DESIGN 400 NW GILMAN BLVD #171, (425)414-4264 office@kbprodesign.com ISSAQUAH WA 98027 CONTRACTOR GREEN BUILT NORTHWEST 18604 76TH AVE W UNIT B, (206)274-9226 fabian@greenbuiltnw.com LLC EDMONDS WA 98026 OWNER COLIN TREVOR SULLY 19015 80TH AVE W, EDMONDS (425)583-5807 WA 98026 DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT # 1 -BASE FEE FOR MECHANICAL 001.000.322.10.000.00 $50.00 $50.00 4/3/23 R27525 PERMITS CITY TECHNOLOGY FEE CHARGED 001.000.321.99.100.00 $40.00 $40.00 11/15/22 R24464 PER PERMIT EACH VENT OR EXHAUST NOT CONNECTED TO A HEATING OR AC 001.000.322.10.000.00 $15.00 $15.00 4/3/23 R27525 SYTEM PERMIT FEE - RESIDENTIAL 001.000.322.10.000.00 $869.00 $869.00 4/3/23 R27525 PLAN REVIEW FEE - RESIDENTIAL 001.000.345.83.000.00 $738.65 $738.65 11/15/22 R24464 RESIDENTIAL STATE SURCHARGE 001.000.237.150 $6.50 $6.50 4/3/23 R27525 TOTALS: $1,719.15 $1,719.15 CONDITION TYPE STATUS NOTES Printed: Monday, April 03, 2023 11:22:58 AM 1 of 2 'RESIDENTIAL BLDG PermitCity • • • • - EL 98020 1 • www.edmondswa.gov• 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests shall be established by Council and shall be paid upon submittal and are nonrefundable. 3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a ALL BUILDING PERMITS FOR result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only INFORMATION during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and potential monetary liability for work performed by unlicensed plumbing contractors. For more information contact L&I Department of Licensing at 1-800-647-0982. ELECTRICAL PERMIT FOR Obtain Electrical Permit from State Department of Labor and Industries 425-290-1309. NFORMATION Installation, use and maintenance of equipment and components shall be per MANUFACTURER SPECS FOR manufacturers specifications, installation instructions, and applicable state codes. INFORMATION Provide manufactures installation instructions on site for Building Inspector. The issuance of this permit in no way constitutes approval from any other agencies REGULATING AGENCIES FOR having regulatory authority over the facility and this construction activity. It is the INFORMATION responsibility of the property owner to obtain any and all such required approvals. 7INSPECTIONTYPE INSPECTOR COMPLETED RESULT S7 A-1 BUILDING PRECON B-2 SLAB INSULATION B-3 MECH ROUGH IN B-3 UNDERFLR FRAMING B-4 FRAMING B-5 INSULATION ENERGY B-7 BUILDING OTHER INSP X-3 BUILDING FINAL" B-3 EXTERIOR INSULATION Printed: Monday, April 03, 2023 11:22:58 AM 2 of 2