Loading...
ENG2022-0144 REVISION 1 ROW PERMITRIGHT OF WAY EUC PERMIT PERMIT NUMBER City of Edmonds - N, Edmonds WA •:0i i www.edmondswa.govi Description: PUD - REPLACE BO POLE ISSUED: 04/03/2023 Address: 7407 212TH ST SW EDMONDS WA 98026-7635 EXPIRES: 09/30/2023 Permit Type: RIGHT OF WAY EUC Permit Subtype: STANDARD Parcel Number: 00566900400303 NAME TYPE NAME ADDRESS PHONE APPLICANT MOE NAVE PO BOX 1107, EVERETT WA 98206 (425)783-5681 CONTACT SNOHOMISH COUNTY PUD PO BOX 1107, EVERETT WA 98206 (425)783-5681 CONTRACTOR SNOHOMISH COUNTY PUD P.O. BOX 1107, EVERETT WA 98206 (425)670-3216 OWNER SOUND TOWNHOUSE APARTMENTS 16419 SE 24TH ST, BELLEVUE WA 98008 LLC FEE INFORMATION DESCRIPTION AMOUNT PAID CITY TECHNOLOGY FEE CHARGED PER PERMIT $40.00 $40.00 ENGINEERING INSPECTION FEE $110.00 $110.00 ENGINEERING REVISION REVIEW FEE $220.00 $220.00 RIGHT OF WAY STANDARD - EUC PERMIT FEE $330.00 $330.00 REQUIREMENTS REQUIREMENT TYPE NOTES TRAFFIC CONTROL Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification verifying completion of the required training in their posession. RESTORATION Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with asphalt or City approved material prior to the end of the workday - No Exceptions WARRANTY The contractor is responsible for workmanship and materials for a period of one year following the final inspection and acceptance of the work. INSPECTION SCHEDULING: WWW.MYBUILDING PERMIT.COM 24 HR NOTICE REQUIRED The Applicant has signed an application which states he/she holds the City of Edmonds harmless from injuries, damages or claims of any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its departments or employees, including but not limited to the defense of any legal proceedings including defense costs and attorney fees by reason of granting this permit. RELEASED BY: GRN DATE: 04/03/2023 Printed: Monday, April 03, 2023 2:26:52 PM 1 of 2 RIGHT OF WAY EUC PERMIT PERMIT NUM11BE City of Edmonds www.edmondswa.gov • • CONDITIONS CONDITION TYPE ALERT RESIDENTS ALERT AFFECTED RESIDENTS AND OR BUSINESSES PRIOR TO WORK START. It is the owner's responsibility to repair/replace all damage of utilities or frontage improvements in DAMAGE TO FRONTAGE City right of Ways or Easements to City Standards caused by or occurring during the permitted IMPROVEMENTS project. TRANSFER OF UTILITIES, REMOVAL OF POLE, AND FINAL RESTORATION TO BE CONSISTENT WITH POLE ENGINEERING OTHER ATTACHMENT AGREEMENT. MAINTAIN EROSION AND SEDIMENTATION CONTROL PER CITY AND SWMMW STANDARD ESC REQUIREMENTS REQUIREMENTS. Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the HOLD HARMLESS issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. SCHEDULE REQUIRED INSPECTIONS AS NOTED THROUGH MY BUILDING PERMIT. INSPECTIONS www.mybuildingpermit.com POTHOLING VERIFY CLEAR BORE CROSSINGS. RESTORE LANDSCAPE Restore landscape to like or better conditions Sound or noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:00am to 6:00pm on SOUND AND NOISE weekdays and 10:00am and 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites and activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. All utilities shall be located prior to any excavation. New locates shall be called for if at time of UTILITY LOCATES excavation, original locates are no longer identifiable. INSPECTIONS INSPECTION TYPE DATE RESULT COMPLETE A-1 JOB START X-2 ENGINEERING FINAL" E-7 TRAFFIC CTRL Printed: Monday, April 03, 2023 2:26:52 PM 2 of 2 Lti�y of ED%�O� ANC. 1 g90 SECTION A RIGHT OF WAY CONSTRUCTION PERMIT APPLICATION Complete and submit this Application in accordance with the Submittal Requirements outlined in Right -of -Way permit Handout E63. RECEIVED Apr 06 2022 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT If any field is not applicable to your project, write "N/A" instead of leaving blank. All fields required. Incomplete Applications will be denied. General• Project Name Replace pole PLI #10147 Site Address or if no site address use Property Address at NW corner of project area: 7407 212th St SW, Edmonds, WA 98026 Associated Permits: BLD PLN ENG Owner and Entity Holding Franchise (if applicable) Name of Company Snohomish County PUD Franchise Ordinance No: N/A Point of Contact Daniel Luu Title Address PO Box 1107 City Everett State WA zip 98206 Phone (425) 783-4174 Email dcluu@snopud.com Contractor and Authorized Agent of • Name of Company Same info as above • - below) C• • • During Construction Primary Name Same info as above Agent Name Title Title Mobile Address Email City State Zip Secondary Name Phone Title Email Mobile City of Edmonds Business License No: Email State License No: 313-005-741 ® Contractor verifies it is currently bonded ® Contractor verifies it currently has general liability insurance NOTE: ECDC 18.6o.02o requires that the Application be signed by a licensed and bonded contractor unless otherwise approved by the city engineer. ❑ Multifamily residential ❑ Commercial ❑ City project ❑ Single family residential subdivision ❑ Single family -other ❑ Industrial ❑ Demo and rebuild or from vacant land? * Other, please specify: Utility pole replacement ❑ Utility Franchise Work associated with development (check one of the above boxes as well) ❑ Traffic Control Only (no associated development) City of Edmonds ROW construction permit Application --Page 1 of 3 Updated 3/25/2021 ❑ Utility Franchise Work (no associated development) Project Description Include an overall narrative description of the proposed work. Be specific and detailed: Describe infrastructure to be impacted, such as, poles, wires, conduit, utility mains, etc. Include whether this is construction, maintenance, or repair. Include description of proposed construction methods, (e.g., bores, trenches, overhead wires proposed, depth for underground utilities, etc.) The PUD needs to replace BO pole PLI #10147. Work is expected to take 1-2 business days. Lane closure along westbound lane at 212th St SW & 74th Ave W is needed to complete this work. Tree trimming will be needed for this project. RIGHT-OF-WAY CLOSURE AREA TOTAL DURATION (Number of Months) Sidewalk 72 hours + LF JxJ LF SF Alley 72 hours + LF JxJ F SF Parking 72 hours + LF JxJ LF SF SECTION B - If you are not a utility company performing work in the City ROW, skip to SECTION C. 1. The work in the right of way is on or for the following type of facilities: ❑ telecommunications ❑ cable ® power ❑ gas ❑ water ❑ sewer ❑ storm 1. CompletedDetails of Work to be Does the utility owner have existin overhead infrastructure in the area of work? x • 2. Will any equipment be added underground or above ground (e.g. pedestals, vaults, etc.)? x If yes, describe: 3. Does the proposed work connect a lot or commercial development with utilities that serve more than one lot or commercial development? X 4. Does the work involve rebuilding or relocating an existing aboveground utility system which connects a lot or commercial development to an existing underground common utility system? x 5. Does the work involve proposed additions to an aboveground utility system? If es: X Are the additions for the purpose of serving new commercial development? Are the additions for the purpose of serving a single-family residential subdivision? Details of • to be Completed Me 6. Does your project involve rebuilding or replacing utility equipment which currently serves more X than one lot or commercial development? City of Edmonds ROW construction permit Application --Page 2 of 3 Updated 3/25/2021 If yes, answer the following questions related to project area, i.e. the actual area in which the project is proposed: 6a. Does your project involve wires/cables/lines? If yes: X How many are existing? 1 4 How many are to be added? 0 6b. Does your project involve poles? If yes: X How many poles are existing in the project area? 1 What is the height of the existing poles? 43' How many poles are to be removed? 0 Are additional poles to be laced? 0 How many? I I What is the height of the additionalpoles? 6c. Are any poles to be modified/rebuilt/replaced? If yes: X How many? 1 1 1 What is the height of the poles after? 43' Describe the modification rebuild: Replace BO distribution pole. SECTION C Traffic Control and Public Safety. Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification verifying completion of the required training in their possession. Restoration. Restoration shall be in accordance with City codes and Standards. All street cut trench work shall be patched with asphalt or City approved material prior to the end of the workday -NO EXCEPTIONS. Insurance. The City may require the owner or contractor to provide proof of insurance acceptable to the City prior to any permit approval. Indemnification. The Applicant agrees to defend, indemnify, and hold harmless the City of Edmonds, its officials, officers, employees, and agents against any injuries, damages, or claims of any kind or description whatsoever, foreseen or unforeseen, including defense costs and attorney fees, resulting directly or indirectly from any act or omission of the Applicant, its subcontractors, anyone directly or indirectly employed by them, and anyone for whose acts or omissions they may be liable, arising out of, related to, or by reason of the granting of this permit; and specifically including but not limited to all loss by the failure of the Applicant to fully or adequately perform, in any respect, all authorizations or obligations under the permit. These indemnification requirements shall survive the expiration, revocation, or termination of any resulting permit approval. Acceptance of terms, conditions, and requirements. Applicant accepts the terms, conditions, and requirements set forth in this Application and agrees they apply to any resulting permit and shall comply with them to the satisfaction of the City Engineer. Applicant further agrees to comply with the conditions listed on the Submittal Requirements; with all applicable city ordinances, including but not limited to ECDC Title 18; and with all applicable requirements of state and federal law. Statement of Applicant. I declare under penalty of perjury under the laws of the State of Washington that: I am a licensed and bonded contractor; the information provided herein is correct and complete; and I am authorized by owner to act on its behalf and have authority to bind the owner to this application. Fees. The Applicant is responsible for all permit fees. APPLICANT SIGNATURE: D�' Z-441VI APPLICANT PRINTED NAME: Daniel Luu APPLICANT TITLE: Distribution Engineer NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE 4/5/2022 City of Edmonds ROW construction permit Application --Page 3 of 3 Updated 3/25/2021 OPUBLIC UTILITY DISTRICT NO.1 OF SNOHOMISH COUNTY REVISION 2 LOCATION 7407 212TH ST SW, EDMONDS, WA 98026 LYNNWOODAREA POLE NO. PLI 10147 SW1/4S 20 T 27 R 04 DATE 4/3/2023 ORDER 100088201 REASON FOR WORK REPLACE BO POLE PLI 10147 ENGINEER DANIEL LUU OPERATION 0030 DRAFTER U.G. NO. SCALE 111 = 100' DATE WORK COMPLETED FOREMAN FEES REQID ❑ YES ■ NO PRIMARY OVERHEAD ❑ RESIDENTIAL ❑ COMMERCIAL LEO NO. @$ -$ SECONDARY OVERHEAD BASIC FEE 3 METER/CONV. POLE $ PRIMARY UNDERGROUND ❑ RESIDENTIAL ❑ COMMERCIAL BASIC FEE 3 LEU NO. SECONDARY UNDERGROUND BASIC FEE 3 UNDERGROUND PLAT BASIC FEE 3 cL FT.0 _$ STREET LIGHTING AFT.@$ '_$ WORK IN RIGHT OF WAY ❑ PRIMARY ❑ SECONDARY (� FT.0 =$ MISCELLANEOUS FEES VAULT 3 PERMIT 3 3 3 3 TOTAL DUE 3 DATE PAID RECEIPT NO. SERVICE ORDER NO. LEGEND: NESC VIOLATIONS ■ NO ❑ YES (SEE NOTES) PERMITS (DATE GRANTED) ❑ TREE TRIM ❑ STATE ❑ COUNTY ■ CITY EASEMENTS ❑ REQUIRED ■ NOT REQUIRED DATE RELEASED FOREIGN CONTACTS ■ JPN# ❑ JOINT TRENCH ZIPLY & CATV ❑ JOINT BORE ZIPLY & CATV POLE STENCILING FROM TO TAKE OFF POLE PRE-CONST. REQUIRMENTS ■ TREE TRIM ❑ PUD LOCATOR ■ BACKHOE ■ FLAGGING ■ ONE CALL DATE No. STREET LIGHTING ■ YES ❑ NO M&R AS -BUILT GIs GIs QC M&R GIS Ph JOINT USE LOCATION MAP PAGE 455 A6 O EXISTING POLE X EXISTING POLE -TO BE REMOVED NEW POLE )10 NEW POLE TO REPLACE EXISTING POLE APPROVED & DATE PRINTED DATE SUBSTATION ESPERANCE CIRCUIT NO. 12-688 PHASE 1, 2, 3 ENGR'S TEL. # (425) 783-4174 ENGR'S CELL # (425) 315-3529 Applicant shall repair/replace all damage to utilities or frontage improvements in City right-of-way per city standards that is caused or Noccurs during the permitted project. CONSTRUCTION NOTES OA POLE PLI 10147: SET 50 CL1 POLE 7' DEEP, TIGHT EAST OF EXISTING (PW1050, N0110) INSTALL 30 10' SINGLE ARM TANGENT ASSEMBLY (12F303) INSTALL 30 BUCK ARM ASSEMBLY (12F318) INSTALL (3) LOADBREAK CUTOUTS & FUSE 100T (E0202, E1100) INSTALL 121 STREET LIGHT MAST ARM (10505), TRANSFER LUMINAIRE SL-112800 TRANSFER EXISTING PRIMARY, NEUTRAL, AND SECONDARY CONDUCTORS TRANSFER OF UTILITIES, REMOVAL OF POLE, AND FINAL RESTORATION TO BE CONSISTENT WITH POLE ATTACHMENT AGREEMENT. OWNER/CONTRACTOR RESPONSIBLE FOR LOCATING ALL ON SITE UTILITIES. RELOCATION/REVISION TO ANY UTILITIES MAY REQUIRE A SEPERATE PERMIT. OWNER/CONTRACTOR IS RESPONSIBLE FOR EROSION CONTROL AND DRAINAGE SCHEMATIC NTS 150 BEFORE � gC AFTER 25 50 25 F40�, F40 F100 -----------❑ ---L-� -Q L L- F65 I I I I I I I I I M ♦ ' � 0 N 150 1 *300 00 ENGINEERING DIVISION ...,7TED 0)w 14/03/2023 PLAN VIEW 11' = 100' SL 128931 H 6 0 50-457 57 = 7315 25-390160 �8 A-4349 1/ 407 M = 50-7332 25-21277 7415-M N 30 -245 - 8 274445 FU40 1-129277-H i6404 SL-112800-H ^ SL-112788-H A-2168 10147 10146 Cc FU4 A 0 N � ESP �E 12 f j ��J jj Ij 212TH ST S ,�, FU65 _ 122092 A 9233 - — - _ � � 150456938 13945 REVISION 12657 p 150-456936 Apr 03 2023 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT SHEET 1 OF LANE SHIFT ON A THREE -LANE, TWO-WAY ROAD ROAD W20-1 WORK AHEAD CENTER LANE W20-5MOD CLOSED _0 AHEAD p O N ENGINEERING DIVISION 0 00 A " "7TED = O 14/03/2023 N O O 0 48" x 24" WORK HOURS BETWEEN 9 AM AND 3 PM WHEN SCHOOL IS IN SESSION (V O O O 0 s ROADNWORK 20-2 x (OPTIONAL) O O 00 W20-1 00 O O z� 3 O ROAD W20-7A WORK z OAHEAD ❑ (OPTIONAL) J 2� O 1n1 V) O 200' 200' TRANSFER OF UTILITIES, REMOVAL OF POLE, AND FINAL O o o STOP O RESTORATION TO BE CONSISTENT WITH POLE ATTACHMENT AGREEMENT. 74TH AVE W Applicant shall repair/replace all damage to utilities or frontage improvements in City right-of-way O RIGHT LANE per city standards that is caused or occurs during the permitted project. CLOSED AHEAD O O C) 00 N • 0 ET W20-7A OWNER/CONTRACTOR IS RESPONSIBLE FOR O 0 "po (OPTIONAL) O EROSION CONTROL AND DRAINAGE 0 0 N 0 W1-4L O 0 0 CREWS TO ROUTE O N CENTER PEDESTRIANS THROUGH WORK AREA, AS NEEDED 00 0 s LAN 20-SHOD RESUB ED O ROAD Jun 21 2022 OWNER/CONTRACTOR RESPONSIBLE FOR LOCATING ALL ON SITE UTILITIES. RELOCATION/REVISION TO ANY WORK W20-1 AHEAD CITY OF EDMONDS UTILITIES MAY REQUIRE A SEPERATE PERMIT. DEVELOPMENT SERVICES DEPARTMENT SNOHOMISH COUNTY pRflF_M TRAFFIC CONTROL PLAN - REVISION 1 PUBLIC UTILITY DISTRICT NO 1 PROJECT REPLACE BO POLE PLI 10147 LOCATION 7407 212TH ST SW, EDMONDS, WA 98026 ENGINEER DANIEL LUU DATE 6/21/2022 ORDER 100088201 PHONE (425) 783-4174 CELLULAR (425) 315-3529