Building Permit (3)Type: SIGN Subtype: SIGN - WALL OR GENERAL I Status: ISSUED
Parcel No: 27032300404000
Subdivision:
Fire Sprinklers:
Valuation: $0.00
Code Edition: 0
Site Address: 120 5TH AVE S EDMONDS,WA 98020-3499
Lot: 0
Lot Area: Zoning:
Occupancy Type: Construction Type:
No. Stories: 0 # of Dwelling Units: 0
Scope of Work: KOENIG FINANCIAL GROUP- WALL SIGN - INSTALLED W/O A PERMIT
WA State Contractor L & I #: SIGNAL*794LM
Applied: 3/17/2023
Issued: 4/5/2023
Final:
Expiration Date: 10/2/2023
Issued by: NED
CONTACTS
NAME TYPE
NAME
ADDRESS
PHONE
EMAIL
APPLICANT
JEFF JANEWAY
120 5TH AVE S. #B, EDMONDS
(425)775-6131
JEFF@KOENIGFINANCIALGROUP.COM
WA 98020
CONTACT
KOENIG FINANCIAL GROUP
120 5TH AVE S. #B, EDMONDS
(425)775-6131
jeff@koenigfinancialgroup.com
WA 98020
CONTRACTOR
SIGNARAMA LYNNWOOD
4210 196TH ST SW STE D STE D,
(425)679-9109
punita@signarama-lynnwood.com
LYNNWOOD WA 98036
320 DAYTON ST 101, EDMONDS
OWNER
DAYTON PLACE LLC
WA 98020
DESCRIPTION
ACCOUNT
AMOUNT
PAID
PAID DATE
RECEIPT #
BLD - PERMIT BASE FEE
001.000.322.10.000.00
$100.00
$100.00
3/17/23
R27162
CITY TECHNOLOGY FEE - PER
001.000.321.99.100.00
$45.00
$45.00
3/17/23
R27162
PERMIT
SIGN - PER SIGN
001.000.345.83.000.00
$88.00
$88.00
3/17/23
R27162
STATE BUILDING CODE SURCHARGE
001.000.237.150
$25.00
$25.00
3/17/23
R27162
- COM
TOTALS: $258.00
$258.00
CONDITIONS
CONDITION TYPE
STATUS
NOTES
Printed: Wednesday, April 05, 2023 9:47:52 AM 1 of 2
SIGN Permit
City of • • • -
•:� i 1 1
www.edmondswa.gov
1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors
in interests, agrees to indemnify defend and hold harmless the City of Edmonds,
Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance
of this permit shall not be deemed to modify, waive or reduce any requirements of any
City ordinance nor limit in any way the City's ability to enforce any ordinance provision.
2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or
other administrative deviation from adopted codes ordinances or policies must be
specifically requested in writing and be called out and identified. Processing fees for such
requests shall be established by Council and shall be paid upon submittal and are
nonrefundable.
3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a
ALL BUILDING PERMITS
FOR
result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only
INFORMATION
during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on
Saturdays, excluding Sundays and Federal Holidays. At all other times the noise
originating from construction sites/activities must comply with the noise limits of
Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.
4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted
by the Building Official prior to use or occupancy of the building or structure. Check the
job card for all required City inspections including final project approval and final
occupancy inspections.
5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW.
Property owners who hire an unlicensed plumber may assume the risks and potential
monetary liability for work performed by unlicensed plumbing contractors. For more
information contact L&I Department of Licensing at 1-800-647-0982.
It is the owner's responsibility to repair/replace all damage of utilities or frontage
DAMAGE TO FRONTAGE
FOR
improvements in City right of Ways or Easements to City Standards caused by or
IMPROVEMENTS
INFORMATION
occurring during the permitted project.
Installation, use and maintenance of equipment and components shall be per
MANUFACTURER SPECS
FOR
manufacturers specifications, installation instructions, and applicable state codes.
INFORMATION
Provide manufactures installation instructions on site for Building Inspector.
Sound or noise originating from temporary construction sites as a result of construction
activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of
FOR
7:00am to 6:00pm on weekdays and 10:00am and 6:00pm on Saturdays, excluding
SOUND AND NOISE
INFORMATION
Sundays and Federal Holidays. At all other times the noise originating from construction
sites and activities must comply with the noise limits of Chapter 5.30, unless a variance
has been granted pursuant to ECC 5.30.120.
INSPECTIONTYPE INSPECTOR COMPLETED RESULT NOTES
X-3 BUILDING FINAL"
Printed: Wednesday, April 05, 2023 9:47:52 AM 2 of 2