ENG2023-0154 WATER AVAILABILITY CERTIFICATEU
SECTION A
RECEIVED
WATER AVAILABILITY APPLICATION
MAR 24 2023
Complete and submit this form through www.MyBuildingPermit.com.
CITY OF EDMONDS
DEVELOPMENT
SERVICES DEPARTMENT
Applicant Information
Contact/Applicant Name Glenn Safadago
Phone Number 360.321.7090
Email GlennHCI@msn.com
Address PO Box 1389
City Edmonds
state WA
Zip 98020
Property Information
Project Name 627 Dayton Apartments
Associated Permit Number N/A
Address 627 Dayton Street
City Edmonds
State WA
Zip 98020
Parcel No. 00434209703100
Does the property currently have water service? x Yes (City of Edmonds water) ❑ No
Describe project (number of buildings, number of units, number of stories per building):
-3-story, 18-unit apartment building with 18 parking stalls
In what phase is the project?
U Design Review N Building Permit
❑ Preliminary Plat ❑ Rezone or Other
Associated permit application number(s), if applicable: PLN2022-0089 & BLD2022-1540
SECTION B
❑ Applicant certifies that this project is a single-family residence, multi -family project of four units or
less with combo water/fire lines, or short plat subdivision (four single-family lots or less), in which case
completion of a full utility availability study shall not be required. Please sign below and submit this form
through www.WBuildingPermit.com.
I x I For all other permit types, a utility availability study is required and associated fees will be due. Please
submit the complete application through www.MyBuildingPermit.com.
APPLICANT SIGNATURE. 57&" 5404*0 DATE: 03/1 3/23
APPLICANT PRINTED NAME: Glenn SafaCiagO
Form Updated 12/9/2021
SECTION C
1. a. Water will be provided by service only to an existing 12" ductile iron
(size) water main that is 15. (feet) from the site.
OR
❑ b. Water servicewill require an improvement to the water system of:
❑ (1). ______________ feet of water main to reach thesite; and/or
❑ (2). Theconstruction of adistribution system on thesite; and/or
❑ (3). Other (describe)_
2. a. The water system is in conformance with a City approved water comprehensive plan.
OR
❑ b. Thewater system improvement will require awater comprehensive plan amendment.
(This will cause adelay in permit issuance and approval.)
3. V a. The proposed project is within the corporate limits of the City, or has been granted
Boundary Review board approval for extension of service outside the City, or is within the City approved
service area of a private water purveyor.
OR
❑ b. Annexation or Boundary Review Board approval will be necessary to provide service.
4. V a. Water is/or will be available at the rate of flow and duration indicated below at no lessthan
20 psi -Measured at the nearest fire hydrant_ 60 __feet from the buiIding/ property (or as marked on
attached map)
Rate of Flow
❑ Lessthan 500 gpm. (approximately_
❑ 500 to 999 gpm
❑ 1500 gpm or more
❑ Flow test of
❑ Calculation of 4898
OR
Duration
____ _gpm) ❑ Less than one (1) hour
❑ One (1) to two (2) hours
❑ Two (2) hours or more
__gpm ❑ Other
gpm (Commercial building permits requireflow test or
calculation)
❑ b. Water system is not capable of providing fireflow.
A. -
Per model, static pressure is 86 psi and residual pressure is 84 psi.
At available flow of 4898 gpm, pressure is 20 psi
Connection shall be made onto Durbin Drive 12" DI.
12" DI on Dayton Street was installed in 2020.
1 hereby certify that the above information istrue. This certification shall be valid for one year from the date of signature.
City of Edmonds - Engineering
Russell Lynch
(Agency Name
(Signatory Printed Name
Associate Engineer
/2 2�3
Title
(i rtBfG'�e/Date)
Form Updated 12/9(2021