Loading...
ENG2022-0430 ROW PERMITOF WAY PERMIT PERMIT ER City •EdmondsRIGHT Edmonds98020 ENG2022-0430 www.edmondswa.gov i Description: REMOVE 2 ROW TREES DUE TO SEWER DAMAGE- REPLANTING REQUIRED ISSUED: 04/06/2023 Address: 18709 92ND AVE W EDMONDS WA 98020-2315 EXPIRES: 03/31/2024 Permit Type: RIGHT OF WAY Permit Subtype: RESIDENTIAL Parcel Number: 00434600003707 NAME TYPE NAME ADDRESS PHONE APPLICANT ALLAN GOURLIE 18709 92ND AVE W, EDMONDS WA 98020 (206)484-8110 CONTACT ALLAN GOURLIE 18709 92ND AVE W, EDMONDS WA 98020 (206)484-8110 CONTRACTOR The Davey Tree Expert Company PO Box 27605, Seattle WA 98165 (206)829-8500 OWNER ALLAN GOURLIE 18709 92ND AVE W, EDMONDS WA 98020 (206)484-8110 FEE INFORMATION DESCRIPTION AMOUNT PAID CITY TECHNOLOGY FEE CHARGED PER PERMIT $40.00 $40.00 ENGINEERING INSPECTION FEE $220.00 $220.00 RIGHT OF WAY STANDARD PERMIT FEE $330.00 $330.00 REQUIREMENTS REQUIREMENT TYPE NOTES TRAFFIC CONTROL Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification verifying completion of the required training in their posession. RESTORATION Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with asphalt or City approved material prior to the end of the workday - No Exceptions WARRANTY The contractor is responsible for workmanship and materials for a period of one year following the final inspection and acceptance of the work. INSPECTION SCHEDULING: WWW.MYBUILDING PERMIT.COM 24 HR NOTICE REQUIRED The Applicant has signed an application which states he/she holds the City of Edmonds harmless from injuries, damages or claims of any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its departments or employees, including but not limited to the defense of any legal proceedings including defense costs and attorney fees by reason of granting this permit. RELEASED BY: GRN DATE: 04/06/2023 Printed: Thursday, April 06, 2023 1:49:30 PM 1 of 2 RESUB Lti�y of EDdf04O� ANC. 1 g90 SECTION A RIGHT OF WAY CONSTRUCTION PERMIT APPLICATION Complete and submit this Application in accordance with the Submittal Requirements outlined in Right -of -Way permit Handout E63. Apr 06 2023 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT If any field is not applicable to your project, write "N/A" instead of leaving blank. All fields required. Incomplete Applications will be denied. General• Project Name Site Address or if no site address use Property Address at NW corner of project area: Associated Permits: BLD PLN ENG • • • .• .• - Name of Company Franchise Ordinance No: Point of Contact Title Address City State Zip Phone Email Contractor and Authorized Agent of Owner (see note below) Name of company The Davey Tree Expert Company Contractor Contacts During Construction Primary Name Jay Maize Agent Name Title District Manager Title Mobile 206-730-8596 Address PO Box 27605 Email jason.maize@davey.com City Seattle State WA Zip 98165 Secondary Name Phone 206-829-8500 Title Email Mobile City of Edmonds Business License No: 602000069 Email State License No: DAVEYTE952LO &q Contractor verifies it is currently bonded Contractor verifies it currently has general liability insurance NOTE: ECDC 18.6o.02o requires that the Application be signed by a licensed and bonded contractor unless otherwise approved by the city engineer. ❑ Multifamily residential ❑ Commercial ❑ City project ❑ Single family residential subdivision ❑ Single family -other ❑ Industrial ❑ Demo and rebuild or from vacant land? ❑ Other, please specify: ❑ Utility Franchise Work associated with development (check one of the above boxes as well) ❑ Traffic Control Only (no associated development) City of Edmonds ROW construction permit Application --Page 1 of 3 Updated 3/25/2021 ❑ Utility Franchise Work (no associated development) Project Description Include an overall narrative description of the proposed work. Be specific and detailed: Describe infrastructure to be impacted, such as, poles, wires, conduit, utility mains, etc. Include whether this is construction, maintenance, or repair. Include description of proposed construction methods, (e.g., bores, trenches, overhead wires proposed, depth for underground utilities, etc.) Removal of 2 redwoods in right of way along the west perimeter of the property. RIGHT-OF-WAY CLOSURE AREA TOTAL DURATION (Number of Months) Sidewalk 72 hours + LF JxJ LF SF Alley 72 hours + LF JxJ F SF Parking 72 hours + LF JxJ LF SF SECTION B - If you are not a utility company performing work in the City ROW, skip to SECTION C. 1. The work in the right of way is on or for the following type of facilities: ❑ telecommunications ❑ cable ❑ power ❑ gas ❑ water ❑ sewer ❑ storm 1. CompletedDetails of Work to be Does the utility owner have existin overhead infrastructure in the area of work? • 2. Will any equipment be added underground or above ground (e.g. pedestals, vaults, etc.)? If yes, describe: 3. Does the proposed work connect a lot or commercial development with utilities that serve more than one lot or commercial development? 4. Does the work involve rebuilding or relocating an existing aboveground utility system which connects a lot or commercial development to an existing underground common utility system? 5. Does the work involve proposed additions to an aboveground utility system? If es: Are the additions for the purpose of serving new commercial development? Are the additions for the purpose of serving a single-family residential subdivision? Details of • to be Completed ®i 6. Does your project involve rebuilding or replacing utility equipment which currently serves more than one lot or commercial development? City of Edmonds ROW construction permit Application --Page 2 of 3 Updated 3/25/2021 If yes, answer the following questions related to project area, i.e. the actual area in which the project is proposed: 6a. Does your project involve wires/cables/lines? If yes: How many are existing? I I How many are to be added? 6b. Does your project involve poles? If yes: How many poles are existing in the project area? What is the height of the existing poles? How many poles are to be removed? Are additional poles to be laced? How many? I I What is the height of the additionalpoles? 6c. Are any poles to be modified/rebuilt/replaced? If yes: How many? What is the height of the poles after? Describe the modification rebuild: SECTION C Traffic Control and Public Safety. Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification verifying completion of the required training in their possession. Restoration. Restoration shall be in accordance with City codes and Standards. All street cut trench work shall be patched with asphalt or City approved material prior to the end of the workday -NO EXCEPTIONS. Insurance. The City may require the owner or contractor to provide proof of insurance acceptable to the City prior to any permit approval. Indemnification. The Applicant agrees to defend, indemnify, and hold harmless the City of Edmonds, its officials, officers, employees, and agents against any injuries, damages, or claims of any kind or description whatsoever, foreseen or unforeseen, including defense costs and attorney fees, resulting directly or indirectly from any act or omission of the Applicant, its subcontractors, anyone directly or indirectly employed by them, and anyone for whose acts or omissions they may be liable, arising out of, related to, or by reason of the granting of this permit; and specifically including but not limited to all loss by the failure of the Applicant to fully or adequately perform, in any respect, all authorizations or obligations under the permit. These indemnification requirements shall survive the expiration, revocation, or termination of any resulting permit approval. Acceptance of terms, conditions, and requirements. Applicant accepts the terms, conditions, and requirements set forth in this Application and agrees they apply to any resulting permit and shall comply with them to the satisfaction of the City Engineer. Applicant further agrees to comply with the conditions listed on the Submittal Requirements; with all applicable city ordinances, including but not limited to ECDC Title 18; and with all applicable requirements of state and federal law. Statement of Applicant. I declare under penalty of perjury under the laws of the State of Washington that: I am a licensed and bonded contractor; the information provided herein is correct and complete; and I am authorized by owner to act on its behalf and have authority to bind the owner to this application. Fees. The Applicant is responsible for all permit fees. APPLICANT SIGNATURE: �` " q, DATE: 04/05/23 APPLICANT PRINTED NAME: Jason Maize APPLICANT TITLE: District Manager NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE City of Edmonds ROW construction permit Application --Page 3 of 3 Updated 3/25/2021 APPROXIMATE EDGE SCHEDULE ALL INSPECTIONS THROUGH MYBUILDINGPERMIT.COM OF PAVEMENT shed shed 11ft E Tree TREES 1 AND 2 ONLY 1 APPROVED FOR REMOVAL aft BASED ON PROXIMITY TO 18 ft to clog Appx sewer SIDE SEWER LINE. Man clog hole �,b ENGINEERING DIVISION 9ft �, b-k . ���... ,�� "" "7TED 1/22/2022 TREES BEING Sft ° REMOVED SHALL BE FELL ONTO P R I VAT E Applicant shall repair/replace all Tree PROPERTY AND NOT IN damage to utilities or frontage improvements in City right-of-way per city standards that is caused or 2 ASPHALT ROAD occurs during the permitted project. 11ft E manhole OWNER/CONTRACTOR IS RESPONSIBLE FOR EROSION CONTROL AND DRAINAGE OWNER/CONTRACTOR RESPONSIBLE FOR LOCATING ALL ON SITE UTILITIES. RELOCATION/REVISION TO ANY UTILITIES MAY REQUIRE A SEPERATE PERMIT. Tree 3 Existing House 18709 92ND AVE W TREE 3 SHALL BE PRESERVED - TREE 3 IS NOT FREPLANTED OTAL OF 4 TREES SHALL BE APPROVED FOR FOR REMOVAL OF TREES REMOVAL. D 2 (2 TREES FOR EACH TREEOVED). SEE ARBORIST LIST OFROVED TREES BELOW. CONSISTENT WITH CITY POLICY ON TREE REMOVAL OR TRIMMING WITH CITY RIGHTS -OF -WAY, IT HAS BEEN DETERMINED THAT TREES 1 AND 2 MEET THE CRITERIA FOR APPROVAL BASED ON THE TREE ROOT SYSTEM(S) CAUSING BLOCKAGE OF UNDERGROUND UTILITY SYSTEMS (SANITARY SEWER LINE ON PRIVATE PROPERTY). SELECT 4 OF THE FOLLOWING TREES FOR REPLANTING: - City Sprite Zelkova (Zelkova serrata'JFS-KW1') - Height 24', Width 18' - Parrotia persica varieties such as 'Persian Spire' 25' by 10' or Golden Bell Tower 28' by 12' - Lindsey's Skyward Ball cypress (Taxodium distichum 'Skyward') 25' by 10' �L! 1 n AQ . A ' •. BUFFER DATA LONGITUDINAL BUFFER SPACE = B SPEED (MPH) 25 30 35 40 45 50 55 60 65 70 LENGTH (feet) 155 200 250 305 360 425 495 570 645 730 TRANSPORTABLE ATTENUATOR ROLL AHEAD DISTANCE = R HOST VEHICLE WEIGHT 9,900 TO 22,000 lbs. HOST VEHICLE WEIGHT > 22,000 lbs. < 45 MPH 45-55 MPH > 55 MPH < 45 MPH 45-55 MPH > 55 MPH 100, 123' 172' 74' 100, 150, PROTECTIVE VEHICLE (WORK VEHICLE) = R NO SPECIFIED DISTANCE REQUIRED 4 ZIE— SIGN SPACING = X (1) RURAL HIGHWAYS 60 165 MPH 800't RURAL ROADS 45/55 MPH 500'i RURAL ROADS & URBAN ARTERIALS 35/40 MPH 350't RURAL ROADS, URBAN ARTERIALS, 25 / 30 MPH RESIDENTIAL & BUSINESS DISTRICTS 200't (2) URBAN STREETS 25 MPH OR LESS 100'i (2) (1) ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERSECTIONS AND DRIVEWAYS. (2) THIS SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS. 50' TO 100' 59TO 100' 6 DEVICE 6 DEVICE R B MI MIN. I AREA ////// O oo _ I c 13 r I x x x x 50' TO 300' 48" 48" • ONE LANE . I ROAD al AHEAD of 48" 48" zl 46" W20-4 48N W20-7A ROAD BE w WORK PREPARED AHEAD TO STOP 48" 48" W20.1 W20-7B I W20.7B (OPTIONAL IF I 40 MPH OR LESS W20.7B (OPTIONAL IF 40 MPH OR LESS) 48" 48' BE ROAD PREPARED WORK TO STOP AHEAD 48" 46" 48" 48' . W20.7B ONE LANE W20.1 ROAD AHEAD 48" 48" W20-7A W20-4 G x 48" Q x 48" 48' 4 W20-7A BE P 48' _ NE LANE ROAD AHEAD x 48' W20-4 ROAD I 4 WORK NOTES T I 48' 1. ALL SIGNS ARE BLACK ON ORANGE. a W20.1 2. EXTENDING THE CHANNELIZING DEVICE TAPER ACROSS LEGEND SHOULDER IS RECOMMENDED. FLAGGING STATION 3. NIGHT WORK REQUIRES ADDITIONAL ROADWAY LIGHTING AT b TEMPORARY SIGN LOCATION FLAGGING STATIONS. SEE THE STANDARD SPECIFICATIONS D CHANNELIZING DEVICES WITH FLAGGERS T ® 4. SEE SPECIAL PROVISIONS FOR WORK HOUR RESTRICTIONS. ° PROTECTIVE VEHICLE NOT TO SCALE FILE NAME S:\Desi n R P& SW-Standardsl2-Plan Sheet Libra \01-Published PSL\ TC Work Zone Traffic Control\ TC-1 One Lane, Two WayTraffic Control with Flaggers\TC-l.dgn Plot 1 TIME 3,05,14 PM —E FED.AID PROJ.NO.Amok —N Nsr DATE 1/212018 � PLOTTED BY Ilddslf WAS �I/ TC7� DESIGNED BY Joe N...EN ENTERED BY Washington State sire. CHECKED BY coxTNnm x"wn"N N". Department of Transportation or PROJ. ENGR. re —E TRAFFIC CONTROL PLAN REGIONAL ADM. REVISION DATE BV PREPARED W2o-76 (OPTIONAL IF 40 MPH OR LESS) TO STOP 48' W20-7B 48' CHANNELIZATION DEVICE SPACING (FEET) MPH TAPER TANGENT 50/65 10 TO 20 80 35/45 10 TO 20 60 25/30 10 TO 20 40