BLD2022-0296+Application+3.8.2022_4.18.28_PM+2691582CITY OF EDMONDS M BuildingPermit.com
Building Application #1091553 - Master and Downstairs Baths Remodel
Applicant
First Name Last Name Company Name
Vance Aqte
Number Street Apartment or Suite Number E-mail Address
7923 194TH PL SW vbagte(ab_gmail.com
City State Zip Phone Number Extension
Edmonds WA 98026 4254223324
Contractor
Company Name
Owner
Number Street Apartment or Suite Number
City State Zip Phone Number Extension
State License Number License Expiration Date UBI # E-mail Address
Project Location
Number Street Floor Number Suite or Room Number
7923 194TH PL SW
City Zip Code County Parcel Number
EDMONDS 98026 00496300000200
Associated Building Permit Number Tenant Name
Additional Information (i.e. equipment location or special instructions).
Work Location
Property Owner
First Name Last Name or Company Name
Vance B & Lauren Aqte
Number Street Apartment or Suite Number
7923 194TH PL SW
City State Zip
EDMONDS WA 98026-6247
Certification Statement - The applicant states:
I certify that I am the owner of this property or the owner's authorized agent. If acting as an authorized agent, I further certify that I have full power and
authority to file this application and to perform, on behalf of the owner, all acts required to enable the jurisdiction to process and review such application. I
have furnished true and correct information. I will comply with all provisions of law and ordinance governing this type of application. If the scope of work
requires a licensed contractor to perform the work, the information will be provided prior to permit issuance.
Date Submitted: 3/8/2022 Submitted By: Vance Agte
Page 1 of 2
i
CITY OF EDMONDS MyBuildingPermit.com
Building Application #1091553 - Master and Downstairs Baths Remodel
Project Contact
Company Name:
Name: Vance Agte Email: vbagte@gmail.com
Address: 7923 194TH PL SW Phone #: 4254223324
Edmonds WA 98026
Project Type Activity Type
Single Family Residential Remodel
Project Name: Master and Downstairs Baths Remodel
Master Bath remodel: remove old shower and alcove wall and replace with a corner shower,
redirect plumbing to the new shower hardware Downstairs Bath remodel: selectively break up
Description of concrete to redo a pipe that is currently the sink drain to make it a shower drain, install a sink
Work: drain to the existing pipes in the wall, add shower inlet lines from the sink lines, move the sink
lines, replace aging piping, and install a shower, and fix the ceiling drywall from the drain pipes
for the master bath shower
Project Details
Mechanical Included?
No mechanical work will occur during this project.
Plumbing Included?
Plumbing work will occur during this project.
Work Location
Work Description/Location (example: 1st floor,
Master Bath, Garage)
Valuation
Fair Market Value of Remodeling Work
Exterior Changes?
The work does not involve changes to the exterior
Master bath and first floor bath
$8,000
Page 2 of 2