Loading...
BLD2022-0296+Application+3.8.2022_4.18.28_PM+2691582CITY OF EDMONDS M BuildingPermit.com Building Application #1091553 - Master and Downstairs Baths Remodel Applicant First Name Last Name Company Name Vance Aqte Number Street Apartment or Suite Number E-mail Address 7923 194TH PL SW vbagte(ab_gmail.com City State Zip Phone Number Extension Edmonds WA 98026 4254223324 Contractor Company Name Owner Number Street Apartment or Suite Number City State Zip Phone Number Extension State License Number License Expiration Date UBI # E-mail Address Project Location Number Street Floor Number Suite or Room Number 7923 194TH PL SW City Zip Code County Parcel Number EDMONDS 98026 00496300000200 Associated Building Permit Number Tenant Name Additional Information (i.e. equipment location or special instructions). Work Location Property Owner First Name Last Name or Company Name Vance B & Lauren Aqte Number Street Apartment or Suite Number 7923 194TH PL SW City State Zip EDMONDS WA 98026-6247 Certification Statement - The applicant states: I certify that I am the owner of this property or the owner's authorized agent. If acting as an authorized agent, I further certify that I have full power and authority to file this application and to perform, on behalf of the owner, all acts required to enable the jurisdiction to process and review such application. I have furnished true and correct information. I will comply with all provisions of law and ordinance governing this type of application. If the scope of work requires a licensed contractor to perform the work, the information will be provided prior to permit issuance. Date Submitted: 3/8/2022 Submitted By: Vance Agte Page 1 of 2 i CITY OF EDMONDS MyBuildingPermit.com Building Application #1091553 - Master and Downstairs Baths Remodel Project Contact Company Name: Name: Vance Agte Email: vbagte@gmail.com Address: 7923 194TH PL SW Phone #: 4254223324 Edmonds WA 98026 Project Type Activity Type Single Family Residential Remodel Project Name: Master and Downstairs Baths Remodel Master Bath remodel: remove old shower and alcove wall and replace with a corner shower, redirect plumbing to the new shower hardware Downstairs Bath remodel: selectively break up Description of concrete to redo a pipe that is currently the sink drain to make it a shower drain, install a sink Work: drain to the existing pipes in the wall, add shower inlet lines from the sink lines, move the sink lines, replace aging piping, and install a shower, and fix the ceiling drywall from the drain pipes for the master bath shower Project Details Mechanical Included? No mechanical work will occur during this project. Plumbing Included? Plumbing work will occur during this project. Work Location Work Description/Location (example: 1st floor, Master Bath, Garage) Valuation Fair Market Value of Remodeling Work Exterior Changes? The work does not involve changes to the exterior Master bath and first floor bath $8,000 Page 2 of 2