Loading...
BLD2021-0668+Structural_Calculations+5.13.2021_2.15.32_PM+2195735Category Equipment QTY Notes Solar Equipment �- Modules LG-37CN1K-A6 38 A&RSOLAR Optimizers P370 Sol arEdge Dptirnizer 36 3211 Martin Luther King Jr Way S. Inverters Solar Edge SE114WH 1 Seattle, WA 98144(206)707-9937 Monitoring Solal-Ed�e Consumption Monitoring {2p20A breaker 1 Electrical Equipment )box J b o x 4 THIS DRAWING CONSTITUTES THE CONFIDENTIAL INFORMATION OF A&R SOLAR AND ITS RECEPTOR. POSSESSION DOES NOT J� r } ` s i �7 C 5 E J� �,� f�+ r5 Vletel-Base Meteriiase-125A4Jaw w/3_5"AYYi�AP I CONFER ANY RIGHT IN OR LICENSE TO USE IT OR THE INFORMATION DISCLOSED HEREIN NOR ANY RIGHT TO REPRODUCE THIS `,� C y �y �y���y�,-yy �y �y �} �y �} �y� r Meter Landfs Gyr EA 11G000-OP29 240Y 1 DRAWING OR ANY PART HEREIN WITHOUT THE WRITTEN CONSENT OF A&R SOLAR. Usconnect 60A 24GV 2 Pole i Heavy Duty, Fuse, Lockable 1 DH222N€ K UsconnectFuse FLNR- 60A Fuses for Disconnect (qty 1/pole) 1 ElectricalWork EV Cha rge r o utl et nerna 14-50) 1 U a M� Ln�0 `n 00 (U < V p ��00 T vi C�N-0 Solar Racking 'O fu c) O IronRldge Racking BOM L NON '--� E Des-cript on QTY 0 a o co w XR1D0B1ackr17' 4 X R100 BI a ck r 14' 17 Kit, XFUDC Bonded SpIi-ce BOSS 6 Universal Module CIamp, Black 98 Stopper Sleeve 40mm 44 Grounding Lug, LOIN Profhie 11 REVISIONS Square -Bolt Bond[ ngAttach ment.Hardware 74 Rev. #: Date: 1 May 07, 2021 1/4 x 314 Microlnverter Bonding Hardware, T-Boll 3S End Caps, 10 sets(package� XR100 3 IronRidge Flash Foot2, Black (Spacing: 72"i 74 Fastener- 5}16 x 4_75" Lag(lncluded) � 1 f rnount� Designed by: Thomas N Project Manager: System Welghts Nathan Bennett (805) 350-1823 Racking Weight(lbs) 336 Current Date:May 07, 2021 Total IrSfolght(lbs) 1591 ti We 26 G5 Equipment DeadLoad(PSF) 2.55 BOM