BLD2021-0668+Structural_Calculations+5.13.2021_2.15.32_PM+2195735Category Equipment QTY Notes
Solar Equipment �-
Modules LG-37CN1K-A6 38 A&RSOLAR
Optimizers P370 Sol arEdge Dptirnizer 36
3211 Martin Luther King Jr Way S.
Inverters Solar Edge SE114WH 1 Seattle, WA 98144(206)707-9937
Monitoring Solal-Ed�e Consumption Monitoring {2p20A breaker 1
Electrical Equipment
)box J b o x 4
THIS DRAWING CONSTITUTES THE
CONFIDENTIAL INFORMATION OF A&R SOLAR
AND ITS RECEPTOR. POSSESSION DOES NOT
J� r } ` s i �7 C 5 E J� �,� f�+ r5
Vletel-Base Meteriiase-125A4Jaw w/3_5"AYYi�AP I
CONFER ANY RIGHT IN OR LICENSE TO USE IT
OR THE INFORMATION DISCLOSED HEREIN
NOR ANY RIGHT TO REPRODUCE THIS
`,� C y �y �y���y�,-yy �y �y �} �y �} �y� r
Meter Landfs Gyr EA 11G000-OP29 240Y 1
DRAWING OR ANY PART HEREIN WITHOUT
THE WRITTEN CONSENT OF A&R SOLAR.
Usconnect 60A 24GV 2 Pole i Heavy Duty, Fuse, Lockable 1 DH222N€ K
UsconnectFuse FLNR- 60A Fuses for Disconnect (qty 1/pole) 1
ElectricalWork EV Cha rge r o utl et nerna 14-50) 1
U
a
M�
Ln�0
`n 00
(U <
V p
��00
T
vi
C�N-0
Solar Racking
'O
fu c) O
IronRldge Racking BOM
L
NON
'--� E
Des-cript on QTY
0
a o
co w
XR1D0B1ackr17' 4
X R100 BI a ck r 14' 17
Kit, XFUDC Bonded SpIi-ce BOSS 6
Universal Module CIamp, Black 98
Stopper Sleeve 40mm 44
Grounding Lug, LOIN Profhie 11
REVISIONS
Square -Bolt Bond[ ngAttach ment.Hardware 74
Rev. #:
Date:
1
May 07, 2021
1/4 x 314 Microlnverter Bonding Hardware, T-Boll 3S
End Caps, 10 sets(package� XR100 3
IronRidge Flash Foot2, Black (Spacing: 72"i 74
Fastener- 5}16 x 4_75" Lag(lncluded) � 1 f rnount�
Designed by: Thomas N
Project Manager:
System Welghts
Nathan Bennett
(805) 350-1823
Racking Weight(lbs) 336
Current Date:May 07, 2021
Total IrSfolght(lbs) 1591
ti
We 26
G5 Equipment
DeadLoad(PSF) 2.55
BOM