Loading...
8515 242nd St SW - Rannow -Structural Calculations PackageLONGITUDE ONE TWENTY° ENGINEERING & DESIGN calculation Package for Foundation Stabilization/Lift 8519 242nd St SW Edmonds, WA 98026 Project no: S200220-1 March 19, 2020 Prepared for: R&R Foundation Specialist 3409 McDougall Ave, Suite 204 STRUCTURAL ENGINEER Everett, WA 98201 L120 ENGINEERING & DESIGN P: 425.760.5077 13150 91ST PL NE KIRKLAND, WA 98034 CONTACT: MANS THURFJELL, PE PHONE: (206) 790-9502 EMAIL: MTHURFJELL@L120ENGINEERING.COM 48.5 -1/8 -5/8 -5/8 Access jA N -3/8 -3/8 -5/8 O _71 3-_ R L_1l -1 _1 5/8 00 3 in. Helical Pile 1 /8 -1112 J3.5' 4 3.5' w L� 0 1 8 O _ mNf 0 24' 23.5' R&R Level Survey See Structural Calculations Package for Additional Requirements N.T.S. - IMTHA10TESBYL120 SITE PLAN LEGEND i i •\ 1 '\ __________________________ 1 __ i i i ❑ EXISTING RESIDENCE STRUCTURE EXISTING ADJACENT STRUCTURE STEEP SLOPE AREA (> 33%) 1 AREA OF PROPOSED WORK — - — - - PROPERTY LINE XXX CONTOUR LINE & ELEVATION - - - - UTILITY APPROXIMATE DIMENSION �A� URGA REBECCA 8 ANTHONY J 8515 242ND ST SW UNIT 701C, EDMONDS, WA 98026-9077 BURGGRAFF PAULR 22419149TH ST SE, MONROE, WA 98272-9015 MAKUTA KEVIN 8519 242ND ST SW #801C, EDMONDS, WA 98026 KLOSTER LINDA M 8519 242ND ST SW #802C, EDMONDS, WA 98026 SPENCER BRAD 808 NW 193RD ST, SHORELINE, WA 98177 i -- i LU Z J Of o , 1 Of 48'-6„ i APPROXIMATE 1 10'4" 15'•0" LOCAT10 OF CRAWL i MAX MAX SPACE ENTRY 3 , w1 REA OF i = WORK 1-1-17 I I ' - I I 1 3'- " i I I is I I :' • I t ALL - '?'` 1. -- I . ,........ .. .. .. A� -8'-6" • (E) CONCRETE \ FOUNDATION, TYP '\ 31 ,\ \ MAX y \ I T\ (E) CONCRETE FOUNDATION,4\ ,\ FIELD VERIFY MINIMUM ,\ STEM WALL AND FOOTING ,\ 3'-6" 'DIMENSIONS PER NOTE 5 '\ I '\ MULTI -FAMILY 3-STORY DWELLING \ 8519 242ND ST SW \ (ALT. 8515 242ND ST SW, BLDG C) APPROXIM E - EDMONDS, WA 98026 LOCATION F •WALL OPE NG ' I (E) CONC PARKING LOT •q'•�•: 8610 OTH ST SW I EDMON , WA 98026 , I , 430 Q I �w � oa \�2 I NOTE: THE PROJECT WILL NOT RESULT IN CHANGING OF SITE TOPOGRAPHY OR EXISTING DEVELOPED AREAS. Ell A AI KIATGQ 1. VERIFY EXISTING STRUCTURES AND ALL DIMENSIONS ON SITE. 2. FOUNDATION DIMENSIONS ARE TO OUTSIDE FACE OF CONCRETE STEM WALL PER R&R FOUNDATION SPECIALIST (R&R) LEVEL SURVEY. 3. REFER TO STRUCTURAL CALCULATIONS PACKAGE BY L120 DATED MARCH 19, 2020, FOR ADDITIONAL INFORMATION, SPECIFICATIONS, AND REQUIREMENTS. 4. LEVEL SURVEY PER R&R PROPOSAL DATED FEBRUARY 7, 2020, PROVIDED BY R&R TO L120 ON FEBRUARY 20, 2020. REFER TO STRUCTURAL CALCULATIONS PACKAGE FOR MODIFICATIONS AND ADDITIONAL REQUIREMENTS FOR LEVEL SURVEY. 5. CONTRACTOR TO FIELD VERIFY MINIMUM DIMENSIONS OF EXISTING FOUNDATION ELEMENTS. CONCRETE STEM WALLS SHALL BE CONTINUOUS AND AT LEAST 12" THICK AND 3'-0" TALL. CONCRETE FOOTINGS SHALL BE CONTINUOUS AND AT LEAST 12" DEEP AND 2'-0" WIDE. ENGINEER TO BE NOTIFIED PRIOR TO INSTALLATION IF MINIMUMS ARE NOT MET. 6. PARCEL DIMENSIONS APPROXIMATED BY COUNTY/ JURISDICTIONAL GIS MAPPING TOOLS FOR THE SELECTED PARCEL. NOT TO SCALE. NOT TO BE USED FOR LEGAL PURPOSES OR IN PLACE OF A FIELD SURVEY. 7. SOME SITE FEATURES AND EXISTING STRUCTURES ON ADJACENT PARCELS NOT SHOWN FOR CLARITY. 8. LOCATIONS OF THE EXISTING UTILITIES (SEWER, WATER, ETC.) INDICATED ON PLAN ARE APPROXIMATED BASED ON o JURISDICTIONAL RECORDS FOR REPRESENTATIVE PURPOSES ONLY. PRESENCE OF THESE ELEMENTS ARE TO BE FIELD VERIFIED AS NECESSARY TO PREVENT DAMAGE TO EXISTING ELEMENTS. 9. ALL STRUCTURES AND SITE FEATURES ARE EXISTING. 10. PROPOSED WORK DOES NOT INVOLVE NEW OR REPLACED HARD SURFACES. CONTRACTOR TO VERIFY. 11. PROPOSED WORK DOES NOT INVOLVE SOILS BEING EXPOSED FOR LONGER THAN 24 HOURS. CONTRACTOR TO VERIFY. 12. PER JURISDICTIONAL GIS MAPPING, THE SITE DOES NOT CONTAIN ANY CRITICAL AREA SITE PLANS AND SUBSEQUENTLY NO NATIVE GROWTH PROTECTION AREAS (NGPA). 240TH ST SW 2 I \ , 2� I I. -.06e LU �I Q SITE PLAN s i; 2 LJ_I I 242ND ST SW - - - OVERALL PARCEL PLAN N.T.S. SITE PLAN Q0 z W �zo w� z ow z W ZLi z z 0 O O z z _j oRmFrT NIAMF 8519 242ND ST SW EDMONDS, WA 98026 PROJECT NUMBER S200220-1 DRAWN BY- TAK CHECKED BY- MRT SHEETDATE- 03/19/2020 1" = 20'-0" o w� N az� S. 0 �ouio =o 0 Qo rn o w w O C W y Z W ��..W � " a W � 0 o a 0 N V LONGITUDE ONE TWENTY ENGINEERING & DESIGN PROJECT NO. SHEET NO. 11 1 PROJECT 8519 242nd St SW SUBJECT Foundation Stabilization/Jacking - Scope & Summary m TAK DATE 3/19/2020 Scope/Objective: To determine the required pile spacing and geometry to stabilize and lift the existing structural foundation. These findings are based on the calculated strength of the existing foundation system and the current vertical loading from the existing structure above (based on as -built assessments). The R&R Foundation Specialist (R&R) proposed pile layout can be found in the following pages with structural recommendations based upon the findings of L120 Engineering & Design. These recommendations are limited to the scope of the stabilization as proposed by R&R. Note that cosmetic damages to rigid wall coverings/members and siding are expected during a foundation lift. Such cosmetic damages/cracks are to be repaired by others following the completion of the foundation stabilization and lifting and are not included in the structural scope presented here. It should be further noted that L120's scope is limited to the existing continuous concrete footings. The interior crawl -space support system (wood) for the 1st floor will be stabilized with the use of some or all of the following: longer support posts, adjustable post -base hardware, and/or the addition of taller wood support members. Settlement in these interior support areas shall be monitored and further adjustments shall be made if necessary. To the knowledge of L120, a geotechnical investigation was not performed on this site at the time this package was published. Any findings revealed from past or future geotechnical investigations not provided to L120 prior to the publishing of this package that differ from the assumptions in this package and/or necessitate the structural package to be revised may require additional fee. Structural Summary: - The foundation of the building consists of continuous cast -in -place concrete stem walls and footings assumed to be minimum 12" thick and minimum 4'-8" tall [measured from b/ftg to t/conc]. Based on the photographs, the superstructure is assumed to be wood framing over a crawl space. The building is understood to be a 3-story condominium building with (6) total units. Below the continuous cast -in -place concrete footings, piles are to be spaced at a maximum distance as indicated on the attached Level Survey (unless noted otherwise). End piles are to be placed as close to corners as possible and shall not be placed immediately below existing openings/penetrations in the concrete stem wall at the locations indicated on the attached Level Survey. - The following load values represent the maximum expected pile loads for the indicated spacing. R&R to provide pile and equipment assemblies with capacities equal to or greater than the indicated load values with applicable factors of safety per the General Notes. Allowable Load Capacity Requirement: Interior Piles [#1-4] @ 8'-0" o.c. max .......................... 30 kip minimum vertical capacity (allowable) Note: Refer to the attached General Notes for additional requirements. - A maximum allowable loading of 4,000 plf was determined through assessment of the provided building geometry and conservative span/tributary loading assumptions based on standard construction practices. - Structural recommendations contained in this package are based on site photographs provided by R&R on March 20, 2020. These photographs are included with the attached Level Survey. Contractor to verify minimum assumptions when on -site, which includes the dimensions of existing foundation elements for pile attachment and the presence of foundation elements in a layout matching those shown on the Level Survey. Any observed discrepancy that exceeds the minimum/maximum listed should be brought to the attention of the engineer prior to pile installation. - Per jurisdictional records, the multi -family 3-story residence was constructed in 1979. Consequently, the existing foundation is assumed to be reinforced. The attached calculations include a concrete foundation with the minimum dimensions observed with minimal reinforcement. - With the absence of a geotechnical report, all structural recommendations assume adequate soil conditions to obtain the required pile capacities. It is recommended that piles are to penetrate into relatively dense native soils a minimum of 5 feet before applying the refusal criteria. - As determined by R&R, the site appears to have no lateral (horizontal) displacements or concerns. As such, the analysis and recommendations presented in this report have been strictly limited to vertical (gravity) stabilization. If lateral movement is observed or expected, additional structural analysis will be required. * Please inform L120 of site -specific conditions that were not explicitly identified, contradict, or otherwise compromise the recommendations contained within this package, including, but not limited to, water drainage, slope stability, existing structural damage, or existing subsurface obstructions. In this instance, the structural assumptions, recommendations, and scope for this project will need to be revisited to consider and address the new findings. L120 ENGINEERING & DESIGN 3 of 27 GENERAL NOTES CONCENTRIC/DRIVEN PILES 1. "CONCENTRIC" OR DRIVEN PILES SHALL BE DESIGNED AND MANUFACTURED IN ACCORDANCE WITH THE 2015 INTERNATIONAL BUILDING CODE (IBC). 2. IT IS RECOGNIZED THAT THE SEATTLE BUILDING CODE (SBC) REQUIRES 8 INCH MINIMUM DIAMETER PIPE FOR PIPE PILE INSTALLATION. THE APPROPRIATE ANALYSIS/EVALUATION AND TESTING REQUIREMENTS IN ACCORDANCE WITH SEATTLE DEPARTMENT OF CONSTRUCTION & INSPECTIONS (SDCI) DIRECTOR'S RULE 10-2009 ARE PROVIDED TO ALLOW FOR USE OF PILES LESS THAN 8 INCHES IN DIAMETER AS REQUIRED BY SECTION 104.5 OF THE SBC. 3. DRIVEN PILES SHALL BE DESIGNED AND MANUFACTURED BY STABIL-LOC SYSTEMS, LLC, AND SHALL BE IN ACCORDANCE WITH ESR-4121. 4. ALL MATERIAL PROPERTIES OF DRIVEN PILE COMPONENTS SHALL COMPLY WITH ESR-4121. 5. CORROSION PROTECTION OF ALL PILE COMPONENTS SHALL COMPLY WITH THE ICC-ES ACCEPTANCE CRITERIA FOR CORROSION PROTECTION OF STEEL FOUNDATION SYSTEMS USING POLYMER (EAA) COATINGS (AC228). 6. ALL PILE COMPONENTS SHALL BE GALVANICALLY ISOLATED FROM CONCRETE REINFORCING STEEL, BUILDING STRUCTURAL STEEL, OR ANY OTHER METAL BUILDING COMPONENTS. 7. THE SHAFT SHALL BE DESIGNED AND FABRICATED TO SUPPORT THE SPECIFIED DESIGN LOADS. 8. ONLY MANUFACTURER -APPROVED CONNECTORS, ADAPTORS, AND ACCESSORIES MAY BE USED. 9. DRIVEN PILES SHALL BE INSTALLED VERTICALLY INTO THE GROUND WITH AN ALLOWABLE ANGLE OF INCLINATION OF 1 DEGREE FROM VERTICAL PER SECTION 5.7 OF ESR-4121. 10. DRIVEN PILES SHALL BE INSTALLED TO THE MINIMUM FORCE REQUIRED TO PROVIDE THE MINIMUM REQUIRED LOAD CAPACITIES INDICATED ON PLAN INCLUDING A FACTOR OF SAFETY NO LESS THAN TWO (2). THE MAXIMUM INSTALLATION FORCE SHALL NOT EXCEED THE ALLOWABLE CAPACITY OF ANY INDIVIDUAL COMPONENT OF THE ASSEMBLY. 11. ALL BRACKETS AND PILE ASSEMBLY COMPONENTS SHALL HAVE ADEQUATE CAPACITY TO ACHIEVE THE MINIMUM REQUIRED BEARING CAPACITY INCLUDING A FACTOR OF SAFETY NO LESS THAN TWO (2). 12. THE PILE QUANTITY, LAYOUT, AND SPACING INDICATED ON PLAN SHALL NOT BE CHANGED WITHOUT WRITTEN APPROVAL FROM THE ENGINEER -OF -RECORD PRIOR TO INSTALLATION. 13. SPECIAL INSPECTION IN ACCORDANCE WITH IBC SECTION 1705.7 IS REQUIRED FOR INSTALLATION OF THE STABIL- LOC FOUNDATION PIERING SYSTEM. A GEOTECHNICAL SPECIAL INSPECTOR MUST VERIFY AND RECORD THE FOLLOWING: A. VERIFICATION OF MANUFACTURER PRODUCT MODEL NUMBERS B. TYPES, CONFIGURATIONS, AND IDENTIFICATIONS OF HYDRAULICALLY DRIVEN STEEL PIER SEGMENT AND ADJUSTABLE HEAD ASSEMBLY AS SPECIFIED IN ESR-4121 AND THE CONSTRUCTION DOCUMENTS. C. INSTALLATION PROCEDURES, ANTICIPATED AND ACTUAL PILING DEPTH D. TIP ELEVATIONS, THE INSTALLATION PRESSURE AND FINAL DEPTH OF THE DRIVEN FOUNDATION SYSTEM E. INCLINATION AND POSITION/LOCATION OF HYDRAULICALLY DRIVEN PIER SEGMENTS F. COMPLIANCE OF THE INSTALLATION WITH THE APPROVED CONSTRUCTION DOCUMENTS AND THIS EVALUATION REPORT. 14. PILES IMPROPERLY INSTALLED BECAUSE OF MISLOCATION, MISALIGNMENT, OR FAILURE TO MEET OTHER SPECIFIED DESIGN/INSTALLATION CRITERIA ARE NOT ACCEPTABLE. ABANDON REJECTED PILES AND INSTALL ADDITIONAL PILES AS REQUIRED. DRIVEN PILE PROOF TESTING THE CAPACITY OF THE INSTALLED PILES SHALL BE VERIFIED BY FIELD TESTING OF A MINIMUM THREE (3) PERCENT OF PILES UP TO FIVE (5) PILES MAXIMUM (ONE (1) MINIMUM) IN ACCORDANCE WITH THE PROCEDURE OUTLINED IN ASTM D1143 AND/OR THE 2015 SEATTLE BUILDING CODE (SBC). THE MAXIMUM TEST LOAD SHALL BE TWO -HUNDRED (200) PERCENT OF THE SPECIFIED DESIGN LOAD. 4 of 27 GENERAL NOTES CONT'D STRUCTURAL STEEL 1. REFERENCE STANDARDS: DESIGN, FABRICATION AND ERECTION ARE TO BE IN ACCORDANCE WITH THE LATEST EDITION OF THE AISC "CODE OF STANDARD PRACTICE FOR STEEL BUILDINGS AND BRIDGES". 2. MATERIALS: BOLTS - ASTM A307, UNLESS OTHERWISE NOTED ALL OTHER STEEL - ASTM A36 (Fy = 36,000 PSI) 3. ALL WELDING SHALL BE PERFORMED BY CERTIFIED WELDERS AND CONFORM TO AWS CODES D1.1 AND D1.3. WELDS NOT SPECIFIED ARE TO BE 1/4" CONTINUOUS FILLET MINIMUM. USE DRY E70 ELECTRODES. WHERE ON -SITE WELDING IS REQUIRED, SPECIAL INSPECTION IN ACCORDANCE WITH 2O15 AND 2012 IBC SECTION 1705.2 IS ALSO REQUIRED. CONCRETE 1. REFERENCE STANDARDS: ACI 301, ACI 318, IBC. 2. MINIMUM CONCRETE STRENGTH (28 DAYS): FOOTINGS AND STEM WALLS..................................................3,000 PSI - 5 SACK MIX BASEMENT FOUNDATION RETAINING WALLS .......................3,000 PSI - 5 SACK MIX SLAB-ON-GRADE........................................................................2,500 PSI - 5 SACK MIX SLAB -ON -GRADE... EXPOSED WEATHERING SURFACES ...... 3,000 PSI AIR -ENTRAINMENT 2.5% TO 5.5% FOR EXPOSED CONCRETE 3. MIXING: COMPLY WITH ACI 301. DO NOT EXCEED THE AMOUNT OF WATER SPECIFIED IN THE APPROVED MIX. PROPORTIONS OF AGGREGATE TO CEMENT SHALL BE SUCH AS TO PRODUCE A DENSE, WORKABLE MIX WHICH CAN BE PLACED WITHOUT SEGREGATION OR EXCESS FREE SURFACE WATER. 4. PLACING: COMPLY WITH ACI 301. PROVIDE A 3/4 INCH CHAMFER AT ALL EXPOSED CONCRETE EDGES, UNLESS INDICATED OTHERWISE ON ARCHITECTURAL DRAWINGS. 5. SLUMP: 4 INCHES PLUS OR MINUS 1 INCH. DO NOT ADD WATER TO MIX TO INCREASE SLUMP. GREATER SLUMP, ACCELERATED SET, OR HIGH EARLY STRENGTH MAY BE ACHIEVED BY USING APPROVED ADMIXTURES. 6. CURING: COMPLY WITH ACI 301. KEEP CONCRETE MOIST FOR SEVEN DAYS MINIMUM. 7. JOINTING: PROVIDE ADEQUATE JOINTING TO MINIMIZE EFFECTS OF VOLUME CHANGE. JOINTS SHOWN MAY BE ADJUSTED AT CONTRACTOR'S OPTION WITH PRIOR APPROVAL FROM ENGINEER. 8. WEATHER EXTREMES: COMPLY WITH ACI 305R FOR HOT WEATHER. COMPLY WITH ACI-306R FOR COLD WEATHER. 9. WATER/CEMENT RATIO SHALL NOT EXCEED 0.50 (BY WEIGHT), TYPICAL. 10. ALL SPECIFIED CONCRETE ANCHORS SHALL BE SIMPSON STRONG -TIE, HILTI, OR EQUIVALENT. SPECIAL INSPECTIONS REQUIRED. ANCHORS SHALL BE INSTALLED IN ACCORDANCE WITH MINIMUM EMBEDMENT, SPACING, EDGE DISTANCE, AND REQUIREMENTS PER MANUFACTURER. 5of27 Friday, February 7, 2020 SCOPE OF WORK FOUNDATION 1 I SPECIALIST Crew will install Concentric Piers and lift house to maximum practical recovery. Crew will drive Piers to a maximum depth of 25', after there will be a $20 per foot charge per pile. Homeowner is responsible for permit. Survey and details provided by R&R per 2120120 email. LEVEL SURVEY Acce 3.5' 0 48.5' 1/8 w -5/8 -5/8 0�� !E— o Z � Q' LU2Ei = CD 0 CN U J cv Q 2!E -3/8� a -3/8 0 -5/8 - — - -7/8 3 1 1 -1 -1 5/8 U =6 M o -112 -1 /8 o X w oE 11/24_ CnQ BO 0 o o — Cz 8' Q .o cz U J _o N U2 24' .7 L120 is in agreement with the Level Survey by R&R with pile spacing requirements as indicated on plan. Note: It is acceptable o install piles at the spacing shown ance to allow for unexpected obstructions en ountered during pile installation provided that n two adjacent spans exceed the maximum on-CE nter spacing requirement. -L 120 Approximate foundation wall opening per photographs. Contractor to verify. -L120 Concentric/Stabil-loc L', piers per R&R -L120 = 3 in. Pile 3.5' N i Foundation of adjacent unit assumed to match that of the proposed work area. Contractor to verify. If layout varies, this has implications for the load values -L120 # = pile designation 6of27 Friday, February 7, 2020 JOB PHOTOS Interior West wall, Piers 1 & 2 will be installed here cI FOUNDATION I I SPECIALIST Interior East wall, Piers 3 & 4 will be installed here. Crew will adjust post bases with beams here during Interior wall. lift. 7 of 27 ESR-4121 I Most Widely Accepted and Trusted Page 6 of 6 [EXCERPT FROM ESR-4121] m I ERI1 s i gar se � uio3a4s or Peru k GUM Nss U Ir 9VLM MV4 0.59E km FNER a am PE3 SME117S ,--AFir= ce MIR WrFO 6 SWA PIER ASSEMBLY STABIL- L% S75"S, ue oar a—�s—�s FIGURE 1—STABIL-LOC° FOUNDATION PIERING SYSTEM I � I I OUTLINE OF I£ PLAY MEW V0xlhA8 BETWEEN e ARING 3RG It & FOOTING PATE :. —.FOOTING 2-WO x 3.5" MIN. ' a (2%") EMBEDMENT I ESR 1396 WEDGE '. ANCHORS BEARING PLATE I —SIiI, BLOCK I HEAD ROUND PLATE 1552.3754.188 ASSFM13LFD INNFR CUT TO FIT & & OUTER PIER I INSTALL AFTER SEGMENTS COMPLETED PIER INSTALLATION HEAD ASSEMBLY sAK-LOC SYMr, U.0 FIGURE 2—STABIL-L000 FOUNDATION PIERING SYSTEM ADJUSTABLE HEAD ASSEMBLY LONGITUDE ONE TWENTYO ENGINEERING & DESIGN 8of27 PROJECT NO. NO. S200220-1 SSK-001 m PROJECT 8519 242nd St SW SUBJECT Installation Detail - Stabil-Loc Concentric Pile BY TAK (E) WOOD FRAMED FLOOR SYSTEM, FIELD VERIFY 12" MIN THICKNESS, CONTRACTOR TO VERI _U- cU ww x 0 (E) CRAWL _ SPACE O 0 ti Q z o' � z '=IIII=IIII=IIII=IIII=IIII=IIII=11 'Il—IIII—_IIII—IIII—_IIII—I i�lI=IIII=IIII=IIII=IIII ° -IIII=IIII=1 � " • d -IIII—IIII . II_ — lill IIII=III (E) CONTINUOUS CONIC FOOTING NOTES: 1. CONTRACTOR TO VERIFY NOTED MINIMUM EXISTING FOUNDATION DIMENSIONS PRIOR TO INSTALLATION. ENGINEER -OF -RECORD TO BE NOTIFIED PRIOR TO INSTALLATION IF MINIMUMS NOT MET. 2. EXPOSED STEEL COMPONENTS TO HAVE CORROSION PROTECTION PER ASTM All 23/A153. J J Q II I� Lu W_ F- 0- 07 tpItp DATE 3/19/2020 T/STEM WALL = FIELD VERIFY (E) CONC STEM WALL T/FIN GRADE IIII=IIII=IIII=IIII VARIES T/CONC FTG = ° -I IIII=IIII FIELD VERIFY d "III II II II II II II WEDGE ANCHORS PER STABIL-LOC =IIII —1 REQUIREMENTS - IIII_1111=iii STABIL-LOC CONCENTRIC PIER ASSEMBLY PER R&R FOUNDATION SPECIALIST TO CONFORM TO ESR-4121 L120 ENGINEERING & DESIGN LONGITUDE ONE TWENTYO ENGINEERING & DESIGN GENERAL NOTES - PILE INSTALLATION 1. VERIFY ALL DIMENSIONS ON SITE. PROJECT NO. SHEET NO. 11 1 PROJECT 8519 242nd St SW SUBJECT General Notes - Pile Installation 2. MINIMUM PILE DIAMETER SHALL BE 2-7/8". TAK DATE 3/17/2020 3. ALL EXISTING CONCRETE STEM WALLS AT AND BETWEEN PILE ATTACHMENT LOCATIONS SHALL BEAT LEAST 12" THICK AND 3'.0" TALL. ALL EXISTING CONCRETE FOOTINGS AT AND BETWEEN PILE ATTACHMENT LOCATIONS SHALL BE AT LEAST 12" DEEP AND 2'-0" WIDE. TOTAL CONCRETE HEIGHT (INCLUDING FOOTING AND STEM WALL) MEASURED FROM BOTTOM OF FOOTING TO TOP OF CONCRETE STEM WALL SHALL BE AT LEAST 4'-0" AND AT MOST 6'-0". FIELD VERIFY. ENGINEER TO BE NOTIFIED PRIOR TO INSTALLATION IF MINIMUMS AS LISTED ARE NOT MET. 4. IT IS ACCEPTABLE TO INSTALL PILES AT THE SPACING SHOWN WITH ± 0'-6" TOLERANCE TO ALLOW FOR UNEXPECTED OBSTRUCTIONS ENCOUNTERED DURING PILE INSTALLATION PROVIDED THAT NO TWO ADJACENT SPANS EXCEED THE MAXIMUM ON -CENTER INDICATED ON PLAN UNLESS NOTED OTHERWISE. 5. WHERE OCCURS, ALL SUPPLEMENTAL CHANNELS SHALL SPAN FROM PILE -TO -PILE AND EXTEND 6" MINIMUM PAST SUPPORTING PILE EACH END. CHANNEL TO BE INSTALLED PRIOR TO STABILIZATION AND ATTEMPTED LIFT. 6. WHERE OCCURS, ALL SUPPLEMENTAL CHANNELS SHALL BE ANCHORED TO THE FOUNDATION WITH 5/8" DIA. x 6" SIMPSON STRONG -TIE TITEN HD SCREW ANCHORS (OR APPROVED EQUIVALENT) AT A MAXIMUM SPACING 18"OC WITH 4" MINIMUM EMBEDMENT INTO CONCRETE. ANCHORS SHALL BE INSTALLED ALONG THE CENTER LINE OF THE CHANNEL AT A DISTANCE NO GREATER THAN 6" ABOVE THE TOP OF FOOTING. 7. PILES ARE TO PENETRATE INTO RELATIVELY DENSE NATIVE SOIL A MINIMUM OF 5-0" BEFORE APPLYING THE REFUSAL CRITERIA. 8. INTERIOR DRIVEN PILES SHALL BE INSTALLED SUCH THAT THERE IS NO ECCENTRICITY IMPOSED ON THE EXISTING FOUNDATION WALL ABOVE. THE CENTERLINE OF THE PILE SHALL ALIGN WITH THE CENTERLINE OF THE FOUNDATION WALL ABOVE. 9. CONTRACTOR TO PROVIDE MEASURES TO PREVENT FUTURE CORROSION FOR ANY EXISTING CONCRETE REINFORCEMENT EXPOSED AS A RESULT OF THE PILE INSTALLATION WORK. 10. CONTRACTOR TO MAINTAIN EXISTING VAPOR BARRIER. ANY DAMAGE AS A RESULT OF THE WORK INVOLVED IN THE SCOPE OF THIS PROJECT SHOULD BE SUFFICIENTLY REPAIRED TO ITS ORIGINAL STATE OR BETTER. L120 ENGINEERING & DESIGN LONGITUDE ONE TWENTYO ENGINEERING & DESIGN ROOF +�-' D FLOOR �'r 2ND FLOOR ++6'---6'r 1ST FLOOR "I PROJECT NO. SHEET NO. 11 1 PROJECT 8519 242nd St SW SUBJECT Foundation Stabilization - Key Plan TAK Ilk 50' MAX +0'-01, 1 J. LEVEL KEY *Elevations approximated by Google Earth. DATE 3 / 19 / 2020 10' MAX � 5' MAX 15' M ff �L 10' MAX � _ I 1 3 � VrV DI A AI 8519 242nd St SW Edmonds, WA * Concrete segments and piles shown as referenced in the following calculations L120 ENGINEERING & DESIGN LONGITUDE ONE TWENTY ENGINEERING & DESIGN Gravity Loads *Per IBC 2015 Dead Loads PROJECT NO. SHEET NO. 11 1 PROJECT 8519 242nd St SW SUBJECT Foundation Stabilization - Loading Analysis m TAK DATE 3 / 19 / 2020 *Note: All framing assumptions are based on photographs of as -built conditions and conventional construction practices. (A) Wood framed Roof =15psf (B) Wood framed Interior Wall =12psf (C) Wood framed Floor =15psf Live Loads (A) Snow = 25psf (C) Residential -Single Family = 40psf Tributary Area . Interior Wall (A) Roof Trib = 0.5*48.5' = 24.5' (B) 3rd Floor to Roof Wall Ht = 10' (C) 3rd Floor Trib = 0.5*15' + 0.5*15' =15' (B) 2nd Floor to 3rd Floor Wall Ht =10' (C) 2nd Floor Trib = 0.5*15' + 0.5*15' =15' (B) 1 st Floor to 2nd Floor Wall Ht = 10' (C) 1st Floor Trib = 0.5*15' + 0.5*15' =15' Loading Summary @ continuous foundation DL=1410plf LL=1800pif SL = 625plf Foundation self -weight, DL = 750/1200plf (min/max ROOF +30 00 3RD FLOOR +20 2ND FLOOR +101-011 1 ST FLOOR +0'-0" LEVEL KEY L120 ENGINEERING & DESIGN LONGITUDE ONE TWENTY ENGINEERING & DESIGN PROJECT NO. SHEET NO. 11 1 PROJECT 8519 242nd St SW SUBJECT Foundation Stabilization - Calculation Summa m TAK DATE 3/16/2020 nterior 3-sto Maximum loading on grade beam determined based on building geometry, and through conservative assumptions regarding span lengths and support walls/foundation. Basically, Case 1: Point Load all concrete walls assumed full tributary span of floor members and roof members. 8'-0" Span: Design code: IBC 2015 DL = 11.3k » Use 12.Ok VRoof LL (snow ground): 25 psf LL=14.4k»Use 15k---- --------------------------------------- - - - - -- Floor ILL 40psf + SL = 5.Ok Floor/Roof DL: 15psf TL = 32.Ok L/2 L/2 Wall DL: 12psf Refer to attached calculations for Roof Trib = 0.5'50' max span = 25' analysis. 1st Floor Trib = 0.5*30' max span = 15' Estim. Typ Flr Ht = 10' Estim. Crawl Space Ht = 6' Case 2: Uniform Load 8'-0" Span: DL = 1410plf » Use 1500 plf ILL = 1800plf + SL = 625DIf >> Use 700 Dlf TL = 4,000 plf Refer to attached calculations for analysis. Conclusion: 4'-0" total height = 12" (min) dp ftg 36" (min) tall stem wall Based on the loading and geometry of the structure, L120 concludes that the foundation may be stabilized through the use of piles and connections per R&R. These are to be attached to the foundation footing and stem -wall (grade -beam) at an on -center (o.c.) spacing no greater than 8'-0" to the existing foundation (connections per R&R), spanning pile -to -pile. Per jurisdictional records, the existing structure was built in 1979. Concrete beam strengths are based on minimal reinforcement at a 40ksi yield stress. This assumption is based on conventional construction practice without scanning for reinforcement or other exploratory techniques of this particular existing condition. Consequently, the existing foundation has been checked including (3) #5 bars (Fy=40ksi) in the ftg and #4 bars @ 16"OC (Fy=40ksi) minimum distributed in the stem wall. If cracking is experienced due to the stabilization and lift, engineer of record should be notified prior to continuing the installation. Measures to reinforce the existing foundation may be recommended, including, but not limited to, installation of an supplemental steel member anchored to the concrete. L120 ENGINEERING & DESIGN 13of27 Case 1. Point Load 8'-0"OC spacing Concrete Beam Interior 3-story DESCRIPTIO 8519 242nd St SW - 8ft Concrete Beam - Pt Load (3-story Loading) CODE REFERENCES Calculations per ACI 318-14, IBC 2015, CBC 2016, ASCE 7-10 Load Combination Set: ASCE 7-10 Material Properties f'c = 2.50 ksi fr = fc2 7.50 = 375.0 psi yr Density = 145.0 pcf LtWt Facto = 1.0 Elastic Modulu= 3,122.0 ksi Phi Values Flexure: 0.90 Shear: 0.750 R = 0.850 Fy - Stirrups 40.0 ksi E St' = 29 000 0 k ; fy - Main Reba= 40.0 ksi - irrups , . si E - Main Reba= 29,000.0 ksi Stirrup Bar Size # 3 Number of Resisting Legs Per Stirrup = 2 D(12) L(15) S(5) III=IIII=IIII=IIII=IIII=IIII=IIII�8'-0„ PIE Cross Section & Reinforcing Details �� M 0 12 24"� N II-IIII-IIII-IIII-IIII-IIII-IIII PILE Inverted Tee Section, Stem Width = 12.0 in, Total Height = 48.0 in, Top Flange Width = 24.0 in, Flange Thickness = 12.0 it Span #1 Reinforcing.... 345 at 3.0 in from Bottom, from 0.0 to 8.0 ft in this span 144 at 14.0 in from Bottom, from 0.0 to 8.0 ft in this sp, 144 at 18.0 in from Top, from 0.0 to 8.0 ft in this span 144 at 3.0 in from Top, from 0.0 to 8.0 ft in this span Beam self weight calculated and added to loads Point Load : D = 12.0, L = 15.0, S = 5.0 k @ 4.0 ft, (Loading from above (3-story) - Pt load) DESIGN SUMMARY Maximum Bending Stress Ratio = 0.580 : 1 Maximum Deflection Section used for this span Typical Section Max Downward Transient Deflection 0.000 in Ratio = 0 <360. Mu : Applied 88.611 k-ft Max Upward Transient Deflection 0.000 in Ratio = 0 <360. MnPhi : Allowable 152.768 k-ft Max Downward Total Deflection 0.001 in Ratio = 79485>=241 Max Upward Total Deflection 0.000 in Ratio = 0 <240. Location of maximum on span 3.993 ft Span # where maximum occurs Span # 1 Cross Section Strength & Inertia Top & Bottom references are for tension side of sect Phi'Mn ( k-ft ) Moment of Inertia ( in14 ) Cross Section Bar Layout Description Bottom Top I gross Icr - Bottom Icr - Top Section 1 3- #5 @ d=45",1- #4 @ d=34",1- #4 @ d=18",1- #4 @ d=: 152.77 59.02 149644.80 15,357.15 5,053.68 Vertical Reactions Support notation : Far left is #1 Load Combination Support 1 Support 2 Overall MAXimum 16.400 16.400 Overall MINimum 2.500 2.500 +D+H 8.900 8.900 +D+L+H 16.400 16.400 +D+Lr+H 8.900 8.900 +D+S+H 11.400 11.400 +D+0.750Lr+0.750L+H 14.525 14.525 +D+0.750L+0.750S+H 16.400 16.400 14of27 Concrete Beam Lic. #: KW-06011993 L120 Engineering and Desigr DESCRIPTIO 8519 242nd St SW - 8ft Concrete Beam - Pt Load (3-story Loading) Vertical Reactions Support notation : Far left is #1 Load Combination Support 1 Support 2 +D+0.60W+H 8.900 8.900 +D+0.70E+H 8.900 8.900 +D+0.750Lr+0.750L+0.450W+H 14.525 14.525 +D+0.750L+0.750S+0.450W+H 16.400 16.400 +D+0.750L+0.750S+0.5250E+H 16.400 16.400 +0.60D+0.60W+0.60H 5.340 5.340 +0.60D+0.70E+0.60H 5.340 5.340 D Only 8.900 8.900 Lr Only L Only 7.500 7.500 S Only 2.500 2.500 W Only E Only H Only Maximum Forces & Stresses for Load Combinations Load Combination Segment MAXimum BENDING Envelope Span # 1 +1.40D+1.60H Span # 1 + 1.2 0 D +0.50 L r+ 1.60 L+ 1.60 H Span # 1 + 1. 2 0 D + 1. 60 L+0. 50 S + 1. 60 H Span # 1 + 1.2 0 D+ 1.60 L r+0.50 L+ 1.60 H Span # 1 +1.20D+1.60Lr+0.50W+1.60H Span # 1 + 1.2 0 D +0.50 L+ 1.60 S + 1.60 H Span # 1 +1.20D+1.60S+0.50W+1.60H Span # 1 + 1.20 D+0.50 L r+0.50 L+W + 1.60 H Span # 1 + 1.20 D+0.50 L+0.50 S+W + 1.60 H Span # 1 + 1.20 D+0.50 L+0.20 S+E+ 1.60 H Span # 1 +0.90D+W+0.90H Span # 1 +0.90D+E+0.90H Span # 1 Location (ft) Span # alona Beam Bending Stress Results ( k-ft ) Mu: Max Phi'Mnx Stress Ratio 1 8.000 88.61 152.77 0.58 1 8.000 41.66 152.77 0.27 1 8.000 83.62 152.77 0.55 1 8.000 88.61 152.77 0.58 1 8.000 50.68 152.77 0.33 1 8.000 35.71 152.77 0.23 1 8.000 66.65 152.77 0.44 1 8.000 51.68 152.77 0.34 1 8.000 50.68 152.77 0.33 1 8.000 55.67 152.77 0.36 1 8.000 52.68 152.77 0.34 1 8.000 26.78 152.77 0.18 1 8.000 26.78 152.77 0.18 15 of 27 ■ Concrete Lic. # : KW-06011993 L120 Engineering and Design DESCRIPTIO 8519 242nd St SW - 8ft Concrete Beam - Pt Load (3-story Loading) MEMBER L C 0 0179 1.59 2139 3.19 3199 4.79 5160 6,40 7120 8100 Distance (R) 1 +1.4DD+ EH 1 +1,2DD+D,SD1i+1,6D1+1,6DH 1 +1,2DD+1.6D1+D,SD9+1,6DH 1 +1,2D6+1,6D1 +D, D1+1,6DH 1 +1.2DD+1,6D1i+D,SDW+1,6DH 1 +1,2DD+D,SD1+1,6D9+1,6DH 1 +1.2DD+I,6D9+D.SDW+1.6DH 1 +1,2DD+D,SD1l+D,SD1+W+I,6DH 1 +1,2DD+D,SD1+D,SD9+W+I,6DH 1 +1,2DD+D.SD1+D,2D9+E+I,6DH 1 +D,9DD+W+D.9DH 1 +D.9DD+E+D.9DH 1 pa;Me MEMBER L Z N •24 1 1 1 1 1 1 1 1 1 1 1 1 1 0179 1.59 239 3.19 3199 4.79 8160 6,40 7120 8100 Distance (R) 1 +1ADD+11 H 1 1 +1,2DD+1.6D1+D,SD9+I,6DH 1 +1,2DD+I,6D1l+D,SD1+I,6DH 1 +1.2DD+I,6D1,+D,SDW+I,6DH 1 +1,2DD+D,SD1+I,6D9+I,6DH 1 +1.2DD+i,6D9+D.5DW+1.6DH 1 +1,2DD+D.SDil+D.SD[+W+i,6DH 1 +1,2DD+D,SD1+D.SD9+W+1,6DH 1 +1,2DD+D.5D1+D,2D9+E+1,6DH 1 +D,9DD+W+D.9DH 1 +D.9DD+E+D.9DH 16 of 27 Concrete Lic. # : KW-06011993 L120 Engineering and Design DESCRIPTIO 8519 242nd St SW - 8ft Concrete Beam - Pt Load (3-story Loading) MEMBER •0,0003 � •0000b ti m a •00009 •00012 009 1 +D+H 1 +D+I+H 1 +D+D,6DW+H 1 +D+D,TDE+H 1 +D,6DD+D.7DE+D,6DH 1 D4nly 1 EOnly 1 Holy Distance (R) 1 +D+li+H 1 +D+S+H 1 +D+D.7Sl3b+D.7SDl.+H 1 +D+D.TSDI+D.TSDS+H 1 +�+D7SD��+D,TSDl+D,4SDW+H 1 +D+D.TSD�+D,TSD�+D,4SDW+H 1 +D+D,TSDI+D,TSD�+D,S2SDE+H 1 +D.6DD+D,6DW+D.6DH 1 Uonly [only 1 Sonly IWonly 17of27 Case 2. Uniform Load 8'-0"OC spacing Concrete Beam Interior 3-story DESCRIPTIO 8519 242nd St SW - 8ft Concrete Beam - Uniform Load (3-story Loading) CODE REFERENCES Calculations per ACI 318-14, IBC 2015, CBC 2016, ASCE 7-10 Load Combination Set: ASCE 7-10 Material Properties f'c = 2.50 ksi fr = fc2 7.50 = 375.0 psi yr Density = 145.0 pcf LtWt Facto = 1.0 Elastic Modulu= 3,122.0 ksi Phi Values Flexure: 0.90 Shear: 0.750 R = 0.850 Fy - Stirrups 40.0 ksi E St' = 29 000 0 k ; fy - Main Reba= 40.0 ksi - irrups , . si E - Main Reba= 29,000.0 ksi Stirrup Bar Size # 3 Number of Resisting Legs Per Stirrup = 2 �� M 0 12 24"� N - IIII-IIII-IIII-IIII-IIII-IIII-III�8,_0„-IIII-IIII-IIII-IIII-IIII-1111: PIE PILE Cross Section & Reinforcing Details Inverted Tee Section, Stem Width = 12.0 in, Total Height = 48.0 in, Top Flange Width = 24.0 in, Flange Thickness = 12.0 it Span #1 Reinforcing.... 345 at 3.0 in from Bottom, from 0.0 to 8.0 ft in this span 144 at 14.0 in from Bottom, from 0.0 to 8.0 ft in this sp, 144 at 18.0 in from Top, from 0.0 to 8.0 ft in this span 144 at 2.0 in from Top, from 0.0 to 8.0 ft in this span Beam self weight calculated and added to loads Load for Span Number 1 Uniform Load : D = 1.50, L = 1.80, S = 0.70 k/ft, Tributary Width = 1.0 ft, (Loading from above (3-story) - Uniform load) DESIGN SUMMARY Maximum Bending Stress Ratio = Section used for this span Mu : Applied Mn * Phi : Allowable Location of maximum on span Span # where maximum occurs 0.309 : 1 Typical Section 47.20 k-ft 152.595 k-ft 3.993 ft Span # 1 Maximum Deflection Max Downward Transient Deflection Max Upward Transient Deflection Max Downward Total Deflection Max Upward Total Deflection 0.000 in Ratio = 0 <360. 0.000 in Ratio = 0 <360. 0.000 in Ratio = 0 <240. 0.000 in Ratio = 0 <240. Cross Section Strength & Inertia Top & Bottom references are for tension side of sect Phi*Mn ( k-ft ) Moment of Inertia ( inA4 ) Cross Section Bar Layout Description Bottom Top I gross Icr - Bottom Icr - Top Section 1 3- #5 @ d=45",1- #4 @ d=34",1- #4 @ d=18",1- #4 @ d=: 152.59 59.62 149644.80 15,375.19 5,209.89 Vertical Reactions Support notation : Far left is #1 Load Combination Support 1 Support 2 Overall MAXimum 16.400 16.400 Overall MINimum 2.800 2.800 +D+H 8.900 8.900 +D+L+H 16.100 16.100 +D+Lr+H 8.900 8.900 +D+S+H 11.700 11.700 18of27 Concrete Beam Lic. #: KW-06011993 L120 Engineering and Desigr DESCRIPTIO 8519 242nd St SW - 8ft Concrete Beam - Uniform Load (3-story Loading) Vertical Reactions Support notation : Far left is #1 Load Combination Support 1 Support 2 +D+0.750Lr+0.750L+H 14.300 14.300 +D+0.750L+0.750S+H 16.400 16.400 +D+0.60W+H 8.900 8.900 +D+0.70E+H 8.900 8.900 +D+0.750Lr+0.750L+0.450W+H 14.300 14.300 +D+0.750L+0.750S+0.450W+H 16.400 16.400 +D+0.750L+0.750S+0.5250E+H 16.400 16.400 +0.60D+0.60W+0.60H 5.340 5.340 +0.60D+0.70E+0.60H 5.340 5.340 D Only 8.900 8.900 Lr Only L Only 7.200 7.200 S Only 2.800 2.800 W Only E Only H Only Maximum Forces & Stresses for Load Combinations Load Combination Location (ft) Bending Stress Results ( k-ft ) Segment Span # along Beam Mu: Max Phi'Mnx Stress Ratio MAXimum BENDING Envelope Span # 1 1 8.000 47.20 152.59 0.31 +1.40D+1.60H Span # 1 1 8.000 24.92 152.59 0.16 + 1.2 0 D +0.50 L r+ 1.60 L+ 1.60 H Span # 1 1 8.000 44.40 152.59 0.29 + 1. 2 0 D + 1. 60 L+0. 50 S + 1. 60 H Span # 1 1 8.000 47.20 152.59 0.31 + 1.2 0 D+ 1.60 L r+0.50 L+ 1.60 H Span # 1 1 8.000 28.56 152.59 0.19 +1.20D+1.60Lr+0.50W+1.60H Span # 1 1 8.000 21.36 152.59 0.14 + 1.2 0 D +0.50 L+ 1.60 S + 1.60 H Span # 1 1 8.000 37.52 152.59 0.25 +1.20D+1.60S+0.50W+1.60H Span # 1 1 8.000 30.32 152.59 0.20 + 1.20 D+0.50 L r+0.50 L+W + 1.60 H Span # 1 1 8.000 28.56 152.59 0.19 + 1.20 D+0.50 L+0.50 S+W + 1.60 H Span # 1 1 8.000 31.36 152.59 0.21 + 1.20 D+0.50 L+0.20 S+E+ 1.60 H Span # 1 1 8.000 29.68 152.59 0.19 +0.90D+W+0.90H Span # 1 1 8.000 16.02 152.59 0.10 +0.90D+E+0.90H Span # 1 1 8.000 16.02 152.59 0.10 19of27 ■ Concrete Lic. # : KW-06011993 L120 Engineering and Design DESCRIPTIO 8519 242nd St SW - 8ft Concrete Beam - Uniform Load (3-story Loading) MEMBER L C 0 0179 1.59 2139 3.19 3199 4.79 5160 6,40 7120 8100 Distance (R) 1 +1.4DD+ EH 1 +1,2DD+D,SD1i+1,6D1+1,6DH 1 +1,2DD+1.6D1+D,SD9+1,6DH 1 +1,2D6+1,6D1 +D, D1+1,6DH 1 +1.2DD+1,6D1i+D,SDW+1,6DH 1 +1,2DD+D,SD1+1,6D9+1,6DH 1 +1.2DD+I,6D9+D.SDW+1.6DH 1 +1,2DD+D,SD1l+D,SD1+W+I,6DH 1 +1,2DD+D,SD1+D,SD9+W+I,6DH 1 +1,2DD+D.SD1+D,2D9+E+I,6DH 1 +D,9DD+W+D.9DH 1 +D.9DD+E+D.9DH 1 pa;Me MEMBER L Z N •24 1 1 1 1 1 1 1 1 1 1 1 1 1 1 —1 0179 1.59 239 3.19 3199 4.79 8160 6,40 7120 8100 Distance (R) 1 +1.6+1,6DH +1,2DD+1.6D1+D,SD9+I,6DH 1 +1,2DD+I,6D1l+D,SD1+I,6DH 1 +1.2DD+I,6D1 +D,�DW+I,6DN 1 +1,2DD+D,�D1+I,6D9+I,6DN 1 +1.2DD+i,6D9+D.5DW+1.6DH 1 +1,2DD+D.SDil+D.SD[+W+i,6DH 1 +1,2DD+D,SD1+D.SD9+W+1,6DH 1 +1,2DD+D.5D1+D,2D9+E+1,6DH 1 +D,9DD+W+D.9DH 1 +D.9DD+E+D.9DH 20 of 27 i Concrete Lic. # : KW-06011993 L120 Engineering and Design DESCRIPTIO 8519 242nd St SW - 8ft Concrete Beam - Uniform Load (3-story Loading) MEMBER •0100021 7 •0,00041 ti m a •0000fi2 •0,00082 089 1 +D+H 1 +D+I+H 1 +D+D,6DW+H 1 +D+D,TDE+H 1 +D,6DD+D.7DE+D,6DH 1 DOnly 1 EOnly 1 H4nly Distance (R) 1 +D+li+H 1 +D+S+H 1 +D+D.7SDb+D.7SDI+H 1 +D+D.TSDI+D.7SDS+H 1 +D+D7SD1i+D,7SDl.+DASDW+H 1 +D+D.7SDI+D,7SDS+D,4SDW+H 1 +D+D,7SDl.+D,TSDS+D,SZSDE+H 1 +D.6DD+D,6DW+D.6DH 1 U4nly [Only 1 S4nly IWonly 21 of 27 Appendix Parcel Details & Photographs 2/24/2020 22 of 27 Snohomish Onlins Government Information & Services County 1�1 1 Washington UNIT 701C SELECTED FOR REPRESENTATIVE PURPOSES, SIM. AT 702C, 801C, 802C, 901C, 902C Property Account Summary 2/24/2020 Parcel Number 100669500370100 jProperty Address 18515 242ND ST SW UNIT 701C , EDMONDS, WA 98026-9077 General Information Property Description GALLEON, A CONDOMINIUM BLK 003 D-00 APT 701 BLDG C TGW AN UND 2.69% INT IN COM AREAS & FACS DESC IN ART 3 OF DECL REC AFN 7804240368 & AMEND PER AFN'S 7806060289, 7808100175, 7901050207, 7901090287,7902210310, 7903120268, 8304130130, 8608130297, 200611210732, 200701090125 Property Category Land and Improvements Status Active, Locally Assessed Tax Code Area 00227 Property Characteristics Use Code Unit of Measure Size (gross) 143 Single Family Residence Condominium Multiple Acre(s) 0.00 Related Properties No Related Properties Found Parties Role Percent Name Address URGA REBECCA & 8515 242ND ST SW UNIT 701C, EDMONDS, WA Taxpayer 100 ANTHONY J 98026-9077 United States URGA REBECCA & 8515 242ND ST SW UNIT 701C, EDMONDS, WA Owner 100 ANTHONY J 98026-9077 United States FProperty Values Value Type Tax Year 2020 Tax Year 2019 Tax Year 2018 Tax Year 2017 Tax Year 2016 Taxable Value Regular $217,000 $217,000 $182,500 $152,000 $139,500 Exemption Amount Regular Market Total $217,000 $217,000 $182,500 $152,000 $139,500 Assessed Value $217,000 $217,000 $182,500 $152,000 $139,500 Market Land $90,000 $127,000 $87,000 $130,000 $63,500 $119,000 $58,500 $93,500 $58,500 $81,000 Market Improvement Personal Property Active Exemptions No Exemptions Found Events Effective Date Entry Date -Time Type Remarks 02/09/2017 03/23/2017 12:16:00 Owner Terminated Property Transfer Filing No.: 1126118 02/09/2017 by sasamp 1/4 2/24/2020 23 of 27 02/09/2017 03/23/2017 Owner Added Property Transfer Filing No.: 1126118 02/09/2017 by sasamp 12:16:00 1017 14:13:0:00 14: 02/09/2017 Taxpayet Changed Property Transfer Filing No.: 1126118 02/09/2017 by straml 02/09/2017 02/14/2017 Excise Processed Property Transfer Filing No.: 1126118, Statutory Warranty Deed 02/09/2017 by 14:13:00 straml 07/10/2012 08/27/2012 13:29:00 Owner Terminated Property Transfer Filing No.: 1003647 07/10/2012 by sasdas 07/10/2012 08/27/2012 13:29:00 Owner Added Property Transfer Filing No.: 1003647 07/10/2012 by sasdas 07/10/2012 07/18/2012 09:18:00 Taxpayer Changed Property Transfer Filing No.: 1003647 07/10/2012 by strbrl 07/10/2012 07/17/2012 Excise Processed Property Transfer Filing No.: 1003647, Statutory Warranty Deed 07/10/2012 by 14:14:00 strj ff 03/03/2012 03/29/2012 Owner Property Transfer Filing No.: 450473 03/03/2012 by sassls 10:01:00 Terminated 03/03/2012 03/29/2012 10:01:00 Owner Added Property Transfer Filing No.: 450473 03/03/2012 by sassls 03/03/2012 03/12/2012 15:47:00 Taxpayer Changed Property Transfer Filing No.: 450473 03/03/2012 by strtjg 03/03/2012 03/12/2012 15:47:00 Excise Processed Property Transfer Filing No.: 450473, Quit Claim Deed 03/03/2012 by strtjg 08/04/2009 08/27/2009 13:26:00 Owner Terminated Property Transfer Filing No.: 318597 08/04/2009 by sasset 08/04/2009 08/27/2009 13:26:00 Owner Added Property Transfer Filing No.: 318597 08/04/2009 by sasset 08/04/2009 08/13/2009 Taxpayer Property Transfer Filing No.: 318597 08/04/2009 by strbjp 14:38:00 Changed 08/04/2009 08/13/2009 14:38:00 Excise Processed Property Transfer Filing No.: 318597, Quit Claim Deed 08/04/2009 by strbjp 05/11/2007 05/29/2007 11:29:00 Owner Terminated Property Transfer Filing No.: 114578 05/11/2007 by saskng 05/11/2007 05/29/2007 11:29:00 Owner Added Property Transfer Filing No.: 114578 05/11/2007 by saskng 05/11/2007 05/14/2007 Taxpayer Property Transfer Filing No.: 114578 05/11/2007 by strnls 16:16:00 Changed 05/11/2007 05/14/2007 Excise Processed Property Transfer Filing No.: 114578, Statutory Warranty Deed 05/11/2007 by 16:16:00 strnls 11/27/2006 12/28/2006 07:38:00 Owner Terminated Property Transfer Filing No.: 303520 11/27/2006 by sasmmt 11/27/2006 12/28/2006 07:38:00 Owner Added Property Transfer Filing No.: 303520 11/27/2006 by sasmmt 11/27/2006 12/06/2006 13:44:00 Taxpayer Changed Property Transfer Filing No.: 303520 11/27/2006 by strssl 11/27/2006 12/01/2006 10:17:00 Excise Processed Property Transfer Filing No.: 303520, Trustee Deed 11/27/2006 by strphb 09/29/2005 09/29/2005 Taxpayer Party/Property Relationship by strpcs 15:30:00 Changed 09/23/2005 12/17/2005 Owner Property Transfer Filing No.: 570283 09/23/2005 by sasmns 08:41:00 Terminated 09/23/2005 12/17/2005 08:41:00 Owner Added Property Transfer Filing No.: 570283 09/23/2005 by sasmns 09/23/2005 09/28/2005 Excise Processed Property Transfer Filing No.: 570283, Statutory Warranty Deed 09/23/2005 by 15:27:00 strrlw 07/31/2002 10/04/2002 Owner Property Transfer Filing No.: 464589 07/31/2002 by sasmns 11:13:00 Terminated 07/31/2002 10/04/2002 11:13:00 Owner Added Property Transfer Filing No.: 464589 07/31/2002 by sasmns 07/31/2002 08/12/2002 14:24:00 Excise Processed Property Transfer Filing No.: 464589, Quit Claim Deed 07/31/2002 by strtab 2/4 2/24/2020 24 of 27 07/31/2002 08/12/2002 Taxpayer Property Transfer Filing No.: 464589 07/31/2002 by strtab 14:24:00 Changed 06/07/2002 06/07/2002 Taxpayer Party/Property Relationship by strsjb 16:05:00 Changed Tax Balance Installments Pa able Tax Year Installment IDue Date I Principall Interest, Penalties and Costs Total Due Cumulative Due 2020 1 04/30/2020 1 $1,010.501 $0.00 $1,010.50 $1,010.50 2020 2 10/31/2020 1 $1,010.501 $0.00 $1,010.50 $2,021.00 Installments Payable/Paid for Tax Year(Enter 4-digit Year, then Click -Here). 2020 Distribution of Current Taxes District Rate Amount Voted Amount Non -Voted Amount CENTRAL PUGET SOUND REGIONAL TRANSIT AUT 0.20 $43.26 $0.00 $43.26 CITY OF EDMONDS 1.33 $288.57 $81.05 $207.52 EDMONDS SCHOOL DISTRICT NO 15 3.71 $804.81 $804.81 $0.00 PUB HOSP #2 0.06 $13.95 $0.00 $13.95 SNO-ISLE INTERCOUNTY RURAL LIBRARY 0.44 $95.72 $0.00 $95.72 SNOHOMISH COUNTY-CNT 0.67 $144.40 $0.00 $144.40 STATE 2.87 $622.29 $0.00 $622.29 SNOHOMISH CONSERVATION DISTRICT $8.00 $0.00 $8.00 TOTAL 9.281$2,021.001 $885.86 $1,135.14 Pending Property Values Pending Tax Market Land Marl Year Value Improvement Val No Pendine Pronertv Values Found Levy Rate History Tax Year 2019 2018 2017 Real Property Structures Market Total Current Use Value Land Value Current Use Current Use Total nprovementl Value Total Levy Rat 9.20449 10.65591 10.17372 Description IType lYear Built Imore Information 1 Story IDwelling 11979 IView Detailed Structure Information Receipts Date lReceipt No. I Amount Tenderedi Amount Due 10/24/2019 00:00:00 110706978 1 $1,002.191 $1,002.19 04/18/2019 00:00:00 10409694 $1,002.18 $2,004.37 10/22/2018 00:00:00 10148560 $975.35 $975.35 04/20/2018 00:00:00 9888705 $975.35 $1,950.70 10/27/2017 00:00:00 9621058 $775.70 $775.70 02/21/2017 08:34:00 10/31/2016 00:00:00 04/29/2016 00:00:00 10/28/2015 00:00:00 04/27/2015 00:00:00 Sales History $775.70 $1,551.40 $718.10 $718.10 $718.09 $1,436.19 $626.21 $626.21 $626.21 $1,252.42 Sale Date Entry Date Recording Date Recording Number Sale Amount Excise Number Deed Type Transfer Type Grantor(Seller) Grantee(Buyer) other Parcels 07/31/2002 08/12/2002 07/31/2002 $0.00 464589 QC S CUDDY JACKIE CUDDY No 3/4 2/24/2020 25 of 27 4/4 2/24/2020 www.snoco.or /a 2/ ro s s/Pro lnfoO5-StructData.as arcel=00669500370100&Irsn=1169774&Ext=R01&StClass=Dwellin &Yr=19Ff27 9 pp p p Y p p?p 9 n o h o m 1 h Onllno Government In%rmatlon & Sorvlcas County 4* Washington Structure Information Close Window General Description Parcel Number 0066950037010 01) Structure Class Dwelling Structure Type IStory UNIT 701C SELECTED FOR Year Built 1979 REPRESENTATIVE PURPOSES, Exterior Features Foundation ConcorCB SIM. AT 702C, 801C, 802C, 901C, 902C Exterior Stucco ROOF Type: Gable Pitch Low Cover Built llp Interior Features Bedrooms 2 Full or 3/4 Baths 2 1/2 Baths 0 Heat Electric Baseboard Fireplace 1 Story pre-fab fireplace Floor Area Floor 1 Base SF 928 Finished SF 928 Garage(s), Carport(s) and major outbuilding(s) None Other Features 4 > l6 yQc. r www.snoco.org/app2/propsys/Propinfo05-StructData.asp?parcel=00669500370100&Irsn=1169774&Ext=R01 &StClass=Dwelling&Yr=1979&ImpI&D&I... 1/2 27 of 27 UNIT 701C SELECTED FOR REPRESENTATIVE PURPOSES, SIM. AT 702C, 801C, 802C, 901C, 902C A) Street view of property per jurisdictional records. Balk (Upper) . s.f. B) Existing plan of unit 701C per jurisdictional records. Similar at 801C, 901C. Opposite at 702C, 802C, and 902C. -eet views provided by Snohomish County records for Parcel #:00669500370100 for address: 15 242ND ST SW UNIT 701C, EDMONDS, WA 98026-9077 Note that analysis assumptions such as building geometry, tributary areas, and loading were determined through examination of these photographs and industry knowledge of standard construction practices. -L120