BLD2017-0550- ENTIRE PERMIT FILEM
RIF D
CITY OF EDMONDS
1215TH AVENUENORTH-EDMONTDS,WA 98020
PHONE: (425) 771-0220 - FAX: (425) 771-0221
STATUS: ISSUED 07/18/2017
Perniit#: BLD20170550,
Expiration Date: 8 Project Address: 1140 7TH AVE S, EDMONDS'
-7 41
(Q
Parcel No: 00619400800300 cv—
PROPERT11OWNER APPLICANT CONTRACTOR
TYLER& CAT HERINE KIMBROUGH SHAWN SULLIVAN PEDERSEN CONSTRUCTION
1] 40 7TH AVE S 4402 242ND PL SW 1274 HILLCREST DR
EDMONDS, WA 98020-6601 MOUNTLAKE TERRACE, WA 98043 BURLINGTON, WA 98233
(65 1) 210-8687 (425) 870-0383 (360) 424-4192
LICENSE #: PEDLRC*O 16KM EXP: 10/09/2017
JOB DESCRIPTION
NEW 2 STORY230 SF DININGROOM, BEDROOM, COVERED PATIO AND UPPER FLOOR COVERED DECK, NEW ROOFTOP
DECK. EXTEND MASTER AND FOYER. INTERIOR AND EXTERIOR UPGRADES. *** PLUMBINGAND MECHANICAL INCLUDED
VALUATION: $300,000.00
PERMIT TYPE: Residential
PERMIT GROUP: 02 - Addition
GRADING: N CYDS: 0
TYPE OF CONSTRUCTION:
RETAINING WALL ROCKERY:
OCCUPANT GROUP:
OCCUPANT LOAD:
FENCE: 0 X 0 FT.)
CODE: 2015
IOTHER: ------- OTHER DESC:
IZONE: RS-6
INUMBER OF S ORIES: 0
IVESTED DATE:
INUMBER OF DWELLING UNITS: 0
ILOT #:
E-MSTING ARE%
BASEMENT: 0 1 ST FLOOR: 0 2ND FLOOR: 0
PRO POSFD AREA
BASEMENT: 0 1 ST FLOOR: 2 5 7 2ND FLOOR: I 15
3RD FLOOR: 0 GARAGE: 0 DECK: 0 OTHER: 0
RD FLOOR: 0 GARAGE: 0 DECK: 971 OTHER: 0
_+3
BEDROOMS: 0 BATHROOMS: 0
BEDROOMS- 0 BATHROOMS: 0
FRONTSETBACK SIDESETBACK REARSETBACK
REQUIRED: 20'E PROPOSED: 20'-4"E 7-M-RED: 5'N PROPOSED: 3'- 1 1 RED: 15'W PROPOSED: 54'W
HEIGHT ALLOWED:O PROPOSED:O IREQUIRED: 5"S PROPOSED: 4'- 1 "S
SETBACK NOTES: Side setbacks are measured to existing non-conformhig building.
X61
I AGREE TO COMPLY WITH CITY AND STATE LAWSREGULATING CONSTRUCTION AND IN DOING THE WORK AUTHORIZED
THEREBY, NO PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATINGTO
WORKMEN'S COMPENSATION INSURANCE AND RCW 18:27.
THIS APYLICATION�ISNOT APERMIT UNTIL SIGNED BY THE BUILDING OFFICIAL OR HIS/HER DEPUTY AND ALL FEES ARE PAID.
o -7 i'-7 22LW4a4�& 71le Az, 0 �7—
Print Narne Date ATTENTION Released By bate
ITIS UNLAWFUL TO USE OR OCCUPY A BUILDING OR SIRUCTURE UNT11- A FINAL INSPEC'110N HAS BEEN MADE AND APPROVAL ORA CERnFlCATE OF
OCCUPANCY HAS BEEN GRANMD. UBC] 09/ IBCI 10/ IRCI 10.
ONLINE APPLICANT ASSESSOR OTHER
0�
STATUS: ISSUED
BLD20170550
• Final approval on a projector final occupancy approval must be granted by the Building Official prior to use or occupancy of
the building or structure. Check the job card for all required City inspections including final project approval and final
occupancy inspections.
• Any request foralternate design, modification, variance or other administrative deviation (hereinafter "variance") from
adopted codes, ordinances or policies must be specifically requested in writing and be called out and identified. Processing
fees for such request shall be established by Council and shall be paid upon submittal and are non-refundable.
• Approval of any plat or plan containing provisions which do not comply with city code and for which a variance has not been
specifically identified, requested and considered by the appropriate city official in accordance with the appropriate provision
of city code or state law does not approve any items not to code specification.
• Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits
of ECC Chapter 5.30 only during the hours of 7:00arn to 6:00prn on weekdays and 10:00arn and 6:00pm on Saturdays, excluding
Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the
noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.
• Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold
hannIess the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance for this permit. Issuance of this permit shall not be deemed to
modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance
provision.
THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE
PUBLIC DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE SEPARATE PERMISSION.
PERMITTIME LIMIT: SEE ECDC 19.00.005(A)(6)
CALL FOR INSPECTIONS
BULDING (425) 771-0220 EXT. 1333 ENGINEERING (425) 771-0220 EXT. 1326 RRE (425) 775-7720
I PUBLIC WORKS (425) 771-0235 1 PRETREATNIENT (425) 672-5755 1 RECYCLING (425) 275-4801
When calling for an inspection please leave the following information: Permit Number, Job Site Address, Type of Inspection being
requested, Contact Name and Phone Number, Date Prefereed, and whether you prefer morning or afternoon.
• E-Eros ion Control/Mobilization
• E-Engineering Final
• B-Preconstruction meeting
• B-Setbacks
• B-Footings
• B-Foundation Wall
• B-Foundation Drainage
• B-Isolated Footings/Piers
• B-Plumb Rough In
• B-Gas Test/Pipe
• B-MechanicalRough In
• B-Exterior Wall Sheathing
• 13-Roof Sheathing
• B-Window Flashing
• B-Shear"Nailing
• B-Height Verification
• B-Framing
• B-Wall Insulation/Caulk
• B-Insulation/Energy
9 1 B-Sheetrock Nail
• B-Building Final
City of Edmonds
DEVELOPMENT SERVICES
RESIDENTIAL BUILDING PERMIT
APPLICATION
121 5h Avenue N, Edmonds, WA 98020
Phone 425.771.0220 2 Fax 425.771.0221
PLEASE REFER TO THE RESIDENTIAL BUILDING CHECKLIST FOR SUBMITTAL REQUIREMENTS
PROJECT ADDVS� (Street, Suite #, City State, Zip):
I —71� AVC IAIA CIA
10 3
Parcel #:
0000N 9008CO-3m
L01-
Project Valuation: $
:W0, ow
APPLICANT:
5"kvJQ e��ULLIVMJ
Phone:
L4 25 - " -039331
Fax:
ddress (Street, City, State, Zip):
qo-z ZqZ1,iop=�5Lj ML-rWA98645
E-Mail Address:
5V4P,\,s00)LU 0SCLU1110,05011
PRQPERT'K OWNER:
T-/LeZ Ki m0yoQ4
Phone-
U51 , 21 o - �3 &S -71
Fax:
Address (Street E4y, State, Zip):
11 '4 0 -7 `1W Au tF - i!�. r5VMwP-;�-, WA 9 � I 0,�
E-Mail Address:
Vi mBygoC 4 1 oL4 0:) � MA IL COM
LENDING AGENCY: I I
ow �,J e_--1Z 10AIXET2
Phone:
Fax:
I
Address (Street, City, State, Zip):
E-Mail Address:
CONTRACTOR-* - ovr -Folz 'alp
Phone:
TTaa�_
Address (Street, City, State, Zip):
E-Mail Address:
*Contractor must have a valid City of Edmonds business license prior to
doing work in the City. Contact the City Clerk's Office at 425.775.2525
WA State License #/Exp. Date:
City Business License #/Exp. Date:
,W
DETAIL THE SCOPE OF WORK: 41e
U
J.
PROPOSED NEW SQUARE FOOTAGV
VOR THIS PROJECT: Lo we iZ F1_
Basement: sq. ft.
Select Basement Type: Finished Unfinished
— T7--
I" Floor: LOwt�� sq. ft.
Garage/Carport: sq. ft.
2 n' Floor: U 'PPEZ- V57 sq. ft.
Deck/Cvrd Porch/Patio: —sq. ft.
Bedrooms # Full-3/4 Bath # Half -Bath #
Other: sq. ft.
Fire Sprinklers: Yes
No
Wall: Yes
L] NoN
_::ERetaining
Grading: Cut JV_4_Zcu. yds. Fill —cu.yds.
I Cut/Fill in Critical Area: Yes LJ No'JKL
19=14C45 .1%
I declare under penalty ofperjury laws that the information I have provided on this formlapplication is true, correct and
complete, and that I am the propeny owner or duly authorized agent of the property owner to submit a permit application to
the City of Edmonds.
ri &A 0,<
Print Name: Owne gentlOth *Specify):
Signature: _zt/�W141 Date:
..."000" 1 1
FORM A LABuilding New Fole,-2010\DONE & x-ferred to L-Building-New driveTorm A2014,docx Updated: 1/17/2014
of ED
0
A,
16
DEVELOPMENT SERVICES
RESIDENTIAL BUILDING PERMIT
APPLICATION FORM A
S : t.
121 5h Avenue N, Edmonds, WA 98020
City of Edmonds
Phone 425.771.0220 9 Fax 425.771.0221
MECHANICAL
Equipment Type
Appliance/Equipment Information (new and relocated)
Total #
1
Furnace
77
Gas #TElec #—Other:— # BTUs: <100k— >100k— Location(s)
Air Handier / VAV
Gas #—Elec #—Other:— #_CFM: <10k— >10k— Location(s)
(circle selected)
AC / Compressor
Boiler / Heat Pump
Gas #)�Elec #—Other:— #_ BTUs:—<100k, _100k-500k, —500k-IMil
Roof Top Unit
HP: <3,3-15,15-30 Location(s)
(circle selected)
Hydronic Heating
Gas #—Elec #—In-Floor —Wall Radiant— Boiler BTUs: Location
Exhaust Fans (single
Bath #.X—Kitchen #X-Laundry # -Z—Other: #
duct)
Fireplace
Gas #—Elec #—Other:— # Location(s)
Dryer Duct
Appliance Type
Appliance/Equipment Information (new and relocated)
Total #
AC Unit
BTUs: Location(s): 4�4w 9ul-nv:�� 00'T '5�ve 44Y�iA
Furnace
BTUs: i7T?T1> Location(s): hWfl ZOO rYA
Water Heater
BTUs: Location(s): 1'2% 0 0 ryl
Boiler
BTUs: Location(s):
Other:
BTUs: Location(s):
Fireplace/Insert
BTUs: Location(s):
Stove/Range/Oven
Dryer
Outdoor BBQ
TOTAL OUTLETS
PLUMBING FIXTURE COUNT
Fixture Type (new and relocated) Total # Fixture Type (new and relocated)
Total #
Water Closet (Toilet)
-T7
Pressure Reduction Valve/Pressure Regulator
Sink (kitchen, laundry, lavatory, bar, eye wash, etc.)
Water Service Line
Tub/Shower
Drinking Fountain
Dishwasher
Clothes Washer
Hose Bib
Backflow Prevention Device (e.g. RBPA, DCDA, AVH)
Water Heater Tankless? Yes
V� NoEj
Hydronic Heat in: Floor Wall
Floor Drain/Floor Sink
Other:
Refrigerator water supply (for water/ice dispenser)
Other:
FORM A L:\Building New Folder 20 10\DONE & x-ferred to L-Building-New drive\Form A2014.docx Updated: 1/17/2014
................................................. 11.11.1
PreScripti v- - -E ........ C de � CoMpliante for All Washlhgton
......... 9�: , pe
MY � 0 ........... ..... . ..............
Additions less than 500 square feet: .5 credits
........... .............................
.....................................................
..::::.::::.:TableR 06.2:mSummar ....... .........................................................................
............ �.4 ................ y.
................. ....... ...............................
.. ............................
..........
... I I
11.1 ....................
.......
r I ....................
. . .... ..
...................
. ........................
.... ..................
. ... ...... .... ........................
...... ..... ....... ...............................
............ ......
I I I I r I I I I I I , I ........
fib i §
.... OM,
........
........
...................
............
..............
.......
. . . . ....
........
............ El—
.............
nveope�. --- ...
.. ........ . ...........................
...........
........
....
.............
j&:::::::::
.......
Efficlen .......
.. ... ......
2 0:::::::
.. .......
.....
�X:::::::
.. .. ..............
..........
...
..............................
....... ...
. .. .. .............
.. .......... ...... .
...
- --- -- . ........ ..
....
......
...... ............
.............
..........
.................
.....
...........................
............ ......................
I'll ...
..........
...... .........
. ..
.. .......
.. .
.. ...
........ ...
.... :26:::::::��:
...... - - ----
Ak O�i ...
...
..... ..
.
.....
.....
.....
........ . ...
. I .........................
.......
......... ....................
....................
....... ... ..................................
.. ... ..........
............
..........
.....
..................
....... .......................................
El
....
. ...................
.....
.....
............ . ..................
........... ...........
............
....................
............
......
..........
......
....
...........
Hic .......
ib:Efficjonc;y:HVAG3A: .........................
......................................
.. .... ...
.....
........
......... .................
. * .... ::,::::: '.. . . .........................
.........
................
... ....
. ....
..................................
..................................
..........
....
... ..........................
. .............
.......... ..................
.. ........ ............
...............
......
....
................ * ..............
......... ............
............ ........
....................................
.
.......
...
........
..............
.......................
......
........ . .
..........
. . . .
.... ::3d::::::::::
...
.........
.....
..................................
.................................
................
........... ........
:H-V :D'' 8 ....................
O.Effid ..... 'AC
ienc istri tion,.!,,y4toM ...........
... ........... ,
.....
......
......
.................
............................
..... . .............
.......
, ,
................
hig:��:�:�:�:�:�:�:�:�:�:�:� ............
...............
EffidientWalorlioti .......... ,
. .
::::::: 0;5::::: "
...........
'-*"""
...........
.............
"***"""" , , ,
....... ................
, , , , , .......
...............
....
...........
......
....
...............
Effibibhf.Mit ...............
.
........ .......
.............
..... .......
....... .......... .......
...........................
. ................... ..
...........
............... ...........
. ............... ... .....
.....
0
............................
....................
.......................
....... ...... ...........
i.wcibl6:EWbtr'li'c':.En, 'r.g,
e ............. .
. . ..................................
-.4-200: kWh:::
...
...........
.............
.......
..................
.......
.. .............. ..................................
.......... .... ............ .. ...........................................
............. .................. ..........
.............. ....... ........................
................................. ............................................................................
........................ .........................................................
......... . ......
........
......... .............
.............
........................
......................................
...........................
.......... ...........
I .........
.........
........
.. .......
P
Mwl.me 'SERVICES CTR.
. .
I Structural Calculations Cover Sheet I
Project Number: 2016.121
Project Name: Kimbrough
t5
Date: March 02, 2017
Architect: Shawn Sullivan
Structural Design For: Structural design for additions to an existing residence.
Construction Type: Conventional wood framing with conventional concrete foundation.
CODES
CITY COPY
2015 International Building Code (IBC)
2015 NDS
ASCE 7-10
2 '44 r
�43
11 t
LOADS J UN Z 9 2017
Dead Loads As required
BUILM,,10 DEPARI 7iMNT
Roof snow Load 25 psf CITY 6V ED�74�OkDS
Floor Load 40 psf. 60 psf Deck
Wind I 10 mph, Exposure B, Per ASCE 7-10 Section 28, Kzt = 1.0
Seismic Per ASCE 7-10 Section 12
Peak Ground Accelerations (PGA) based on USGS Hazards Program 2003.. by LatLon.
PGA I sec = .495 PGA.2sec=1.264 %V=.I')O*,DL
Material Design Values
Soils (assumed) Minimum 2.000 psf allowed bearing (subject to field verification)
Concrete fc=2,500 psi; 5-1,12 sack mix, or alternate mix pre-appToved by bldg. dept.
Reinforcing Grade 40 or 60; Fy=40,000 psi minimum
Sawn Lumber Joists, Rafters: Hem -Fir #2 and better
Beams: 4x—: DF-L #2
6x—: DF-L 42
Posts: DF-L #2
Studs & Plates: Hem -Fir Standard
Glu-Larn Beams 24F-V4 for simple span beams, 24F-V8 for cantilevered beams
Parallam Beams 2.OE PSL, Fb=2.900 psi, Fv=-290 psi, E=2.0* 10A 6 psi (minimum)
Microllarn Beams 1.9E LVL, Fb=2,600 psi, FNr--285 psi,. E=l .9*10A 6 psi (minimum)
Timberstrand Bnis 1.7E LSL, Fb=2.600 psi, F,.=400 psi. E=1.7* I OA6 psi (minimum)
Anchor Bolts F 15 54 Anchor Bolts, A3 07 other bolts
CONSULTING STRUCTURAL ENGINEERING SERVICES, INC.
6311 - l7th Avenue NE, Seattle WA 98115 (206) 527-1288 email john@cses-engincering.com
Structural Engineering CDnsulting and Design
�k
John S. Apolis, P.E.
CSES, Inc.
PROJECT:
ARCHITECT:
Kimbrough
Shawn Sullivan
Job Number: 2016.121
Designer: JSA
Date: 02/17/17
Page Number: f� I
IWOOD JOIST DESIGN -- 2012/1 5.111C AND NDS =
Xrz�RIW TkU55
Calculate the maximum span for joists under the foRowing conditions:
Simple Span, Uniform Load Visually Graded Sawn Lumber
Moisture Content < 19% Normal Temperature Range
C,
2". 3", or 4" thickjoists only Normal Deflection Requirements
Snow Load9 O=no.l=yes I
Enter T for incised PT lumber: Repetive Use9 0 = no, I = yes
Wet Use? 0 = no, I = yes
Nominal Joist Size and Spacing ==> 2 x 12 24 inches o.c.
Actual Dimensions 1.50 x 11.25 inches
Section Properties (Calculated): A = 16.88 in^2 -
S = 31.64 in^3
I = 177.98 ie4
Allowable Stress Values:
Base Values:
Fb= 850 psi
Fv= 150 psi
E= 1' )00 ksi
Loads: Dead load 15 psf
Live load 25 psf
Total Load factor: L / 240
Live Load factor: L / _3 60
Forces at governing joist length:
Species and Grade: Hem -Fir #2
Design Values:
Fb =
1124 psi
Fv =
173 psi
E=
1300 ksi
Wdl = 30.0 lb/ft
Wil = 50.0 lb/ft
Wti = 80.0 lb/ft
Reaction at the ends of the joist: 688.65 lb
Reaction at distance d from the ends of the joist: 613.65 lb
Joist forces and deflections: Maximum allowed joist length:
Maximum bending moment 2964 ft-lb L = 17.22 ft <� governs
Maximum shear at d
614 lb
L =
50.39 ft
Total Load Deflection
0.683 in
L =
18.59 ft
Live Load Deflection
0,427 in
L =
19.00 ft
11 MAXIMUM CLEAR SPAN: 17 feet 3 inches 11
k
K.
John S. Apolis, P.E. CSES, Inc. Job number: 2016.121
Project: Kimbrough Date: 17-Feb-17
Architect: Shawn Sullivan Page number:
11BEAM DESIGN (Uniform Load, SimDle Swn)
2015 International Building Code (IBC)
Beam Description: Lf WAA9 9-OOM -FXV�5 swo/-T
Enter'l' for incised PT lumber: Enter 'Y for snow load:
Enter'l' for fully su2ported: 1
Geometry and Loads:
Span: 19 ft
DL unit load: 15 psf
AddI unif DL: lb/fi
Enter'l' for repetitive member:
Enter'l'for wet use:
Enter'Y for reduced live load:
Tributary Width: 2 ft
LL unit load: 25 psf
Add'1 unif. LL: I b/ft
NDS
K11 * At:
76 ft/12
Reduced LL:
25 psf
DL uniform load:
3 0 lb/ft
Max DL reaction:
285 lbs
LL uniform load:
50 lb/ft
Max LL reaction:
475 lbs
Total load:
80 lb/ft
Max Total reaction:
760 lbs
Material Properties:
E
1.9 x 10/16 psi E'
1.9 x 10^6 psi
Fb
2600 psi
Fb'
3-016 psi
Fv
285 psi
FV
327.75 psi
Fc perp
750 psi
Fc perp'
750 psi
(Allowable desigm values include modificaiton factors per TJ-9000 and
NDS 2012)
Deflection analvsis:
For total load:
Allowed deflection criteria, span/
240
For LL only:
Aliowed deflection criteria, span/
360
Mm allowed total defl:
0.950 in
Max LL defl:
0.633 in
Total defl. * 1:
1231.5
Reqtdred 1:
130 jn14
LL def.l. * 1:
77.2
Required L
122 in^4
Actual deflections:
TOTAL:
0.595 inches LL:
0.372 inches
Force analvsis:
Max Shear:
760 lbs
Max. moment:
3610 ft-lb
Shear @ d
685 lbs
IlSelected Member:
LVL.1.9E 1.750
x jK.:2:5:]l
Member properties:
Provided:
Required:
Moment of inertia:
207.6 in^4
130.0 in"4
Section Modulus:
36.9 in^3
14.4 in^3
Section Area:
19.7 in/�2
3.1 in^2
Bearing Area:
g
1.0 in,'12
Minimum bearing dimensions:
1.8 X
0.6 inches
'k
John S. Apolis, P.E.
CSES, Inc.
PROJECT:
ARCHITECT:
Kimbrough
Shawn Sullivan
Job Number: 2016.121
Designer: JSA
Date: 02/17/17
Page Number: F, 5
IWOOD JOIST DESIGN -- 2012/15 IBC AND NDS =
Calculate the maximum span for joists under the following conditions:
Simple Span, Uniform Lead Visually Graded SaAm Lumber
Moisture Content < 19% Normal Temperature Ranize
2". 3 ", or 4" thick joists oaly Normal Deflection Requirements
Snow Load? O=no.l=ves
EnterT for incised PT iumber: RepetiveUse? O=no.l=yes I
Wet Use? 0 = no, I = yes
Nominal Joist Size and Spacing 2 x 10 24 inches o.c. 77
Actual Dimensions 1.50 x 9.25 inches
Section Properties (Calculated): A = 13.88 in^2
S = 21_39 in^3
I = 98.93 inN4
Allowable Stress Values:
Base Values:
Fb-- 850 psi
Fv= 150 psi
E= 1300 ksi
Loads: Dead load 15 psf
Live load 60 psf
Total Load factor: L / 240
Live Load factor: L / 360
Forces at governing joist length:
Species and Grade: Hem -Fir #2
Design Values:
Fb =
1075 psi
Fv =
150 psi
E, =
1300 ksi
Wdl = 30.0 lb/ft
W11 = 120.0 lb/ft
Wtl = 150.0 lb/ft
Reaction at the ends of the joist: 758.29 lb
Reaction at distance d from the ends of the joist: 642.67 lb
Joist forces and deflections: Maximum allowed joist length:
Maximum bending moment 1917 ft-lb L = 10.11 ft <=== governs
Maximum shear at d
643 lb
L=
20.04 ft
Total Load Deflection
0.274 in
L =
12.40 ft
Live Load Deflection
0.219 in
L =
11.67 ft
11 MAXIMUM CLEAR SPAN: 10 feet I inches 11
John S. Apolis, P.E.
CSES, Inc.
PROJECT:
ARCHITECT:
Kimbrough
Shawn Sullivan
WOOD JOIST DESIGN -- 2012/15 IBC AND NDS
N0977�4�-V
,�1_14A41�7 j-Qi5�r5
Job Number: 2016.121
Designer: JSA
Date: 02/17/17
Page Number: g �
Calculate the maximum span for joists under the following conditions:
Simple Span, Uniform Load Visually Graded SaAm Lumber
Moisture Content < 19% Normal Temperature RakQe
2". 3 ", or 4" thick joists only
Normal Deflection Requirements
�;now Load? 0 = no, I = yes
Enter T for incised PT lumber: Repetive Use? 0 = no, I = yes
Wet Use) 0 =no, I =yes
Nominal Joist Size and Spacing ==>JE�_.- 2 x 12 24 inches o.c, _3
Actual Dimensions 1.50 x 11.25 inches
Section Properties (Calculated): A 16.88 inA2
S .3
.31.64 in'
1 177.98 in^4
Allowable Stress Values:
Base Values:
Fb-- 850 psi
Fv= 150 psi
E= 1300 ksi
Loads.- Dead load 12 psf
Live load 25 psf
Total Load factor: L / 240
Live Load factor: L / 360
Forces at governing joist length:
Species and Grade: Hem -Fir #2
Design Values:
Fb = 1124 psi
Fv = 173 psi
E= 1300 ksi
�> Wdl = 24.0 lb/ft
Wll = 50.0 lb/ft
Wtl = 74.0 lb/ft
Reaction at the ends of the joist: 662.32 lb
Reaction at distance d from the ends of the joist: 592.95 lb
Joist forces and deflections: Maximum allowed joist length:
Maximum bending -moment 2964 ft-lb L = 17.90 ft <=� governs
Maximum. shear at d
5 9_3 1 b
L =
54.32 ft
Total Load Deflection
0.739 in
L =
19.08 ft
Live Load Deflection
0.499 in
L =
19.00 ft
MAXIMUM CLEAR SPAN: 17 feet 11 inches
11
John S. Apolis, P.E.
CSES, Inc.
PROJECT:
ARCHITECT:
Kimbrough
Shawn Sullivan
OOD JOIST DESIGN -- 2012/15 IBC AND NDS
/VF' �'/ 400r- J2� 1 �75
Job Number: 2016.121
Designer: JSA
Date: 02/17/17
Page Number: � 5
Calculate the maximum span for joists under the following conditions:
Simple Span, Uniform Load Visually Graded Sawn Lumber
Moisture Content < 19% Normal Temperature Range
211, 3 ", or 4" thick joists on1v Normal Deflection Requirements
Enter T for incised PT lumber:
Snow Load" O= no, I =ves
Repetive Use? 0 = no, I es
Wet Use? O= no, I =yes
Nominal Joist Size and Spacing 2 x 8 24 inches o.c.
Actual Dimensions 1.50 x 7.25 inches
Section Properties (Calculated): A = 10.88 in^2
S = 13.14 in^3
I = 47.63 in^4
Allowable Stress Values:
Base Values:
Fb= 850 psi
Fv-- 150 psi
E= 1300 ksi
Loads: Dead load 12 psf
Live load 25 psf
Total Load factor: L / 240
Live Load factor: L / 360
Forces at governing joist length:
Species and Grade: Hem -Fir #2
Design Values:
Fb =
1349 psi
Fv =
173 psi
E =
1300 ksi
Wdl = 24.0 lb/ft
W11 = 50.0 lb/ft
Wtl = 74.0 lb/ft
Reaction at the ends of the joist: 452.97 lb
Reaction at distance d from the ends of the joist: 408.26 lb
Joist forces and deflections: Maximum allowed joist length:
Maximum bending moment 1386 ft-lb L= 12.64 ft
Maximum shear at d 408 lb L = 35.01 ft
Total Load Deflection 0.604 in L = 12.30 ft
Live Load Deflection 0.408 in L = 12.24 ft <� governs
I
MAXIMUM CLEAR SPAN: 12 feet 3 inches
John S. Apolis, P.E.
CSES, Inc. Job number: 2016.121
Project:
Kimbrough Date: 20-Feb-17
Architect:
Shawn Sullivan Pagge number:
!.BEAM DESIGN (Uniform Load, Simple Span) _77
2015 lnternation�i Building
Code (IBC)
1!� 2015 NDS
Beam Description:
A[Ofi46KV _r
PJ'_ (4 � (f (3 i'/< Z 4
4
Enter-'r for incised PT lumber: Enter'l'for snow load:
Enter'Yforret)etitive me ber:
Enter T for "ut
Enter'l'for wet use:
Y supported: Enter'I'forreduced live load -
Geometry and Loads:
Span:
14.5 ft Tributany Width: 6 ft
DL unit load:
9 psf LL unit load: 60 psf
Add'l unif DL:
lb/ft Add'I unif. LL: lb/ft
K11 * At:
174 ft,',-) Reduced LL: 60 psf
DL uniform load:
54 lb/ft Max DL reaction: 392 lbs
LL uniform load:
360 lb/ft Max LL reaction: 2.610 lbs
Total load:
414 lb/fl Max Total reaction: 3.002 lbs
Material Properties:
E
1.33 x 10`6 psi E, 1.3 x 10^6 psi
Fb
875 psi Fb' 875 psi
Fv
170 psi Fv' 170 psi
Fc perp
625 psi Fc perp' 625 psi
(Allowable
design values include modification factors per NDS 2012)
Deflection an Ivsis:
_Ioad:
For toW
Allowed deflection criteria, span/ 240
For LL onl�y:
Allowed deflection criteria span/ 360
Max. allowed total defl:
0.725 in Max LL' defl: 0.483 in
Total defl. * 1:
316.7 Required 1: 437 in"4
LL defl. * 1:
275�4 Required 1: 570 in'14
Actual deflections:
TOTAL: 0.381 inches LL: 0.331 inches
Force analvsis: Max Shear: 3002 lbs
Max. moment: 10880 ft-lb Shear @ d 2622 lbs
Selected Member:
Member properties:
Moment of inertia:
Section Modulus:
Section Area:
Bearing Area:
Minimum bearing dimensions:
DF/L #2 7.500 x
Provided:
Required:
831.9 in1^14
569,9 in,'14
151.3 in-3
149.2 in"3
82.5 inA2
2" ). I in'2
4.8 in`�2
7.5 x
0.6 inches
11
John S. Apolis, P.E.
CSES, Inc.
Job number: 2016.121
Project:
Kimbrough
Date: 20-Feb-17
Architect:
Shawn Sullivan
Page number:
�BEAM DESIGN (Uniform Load, Simple Span)
2015 International Building Code (IBC)
2015 NDS
Beam Description:
F�A� (�g To
Enter'l' for incised PT lumber:
Enter'l'for snow load:
Enter'l'for repetitive member:
Enter'V for wet use:
Enter'I'for fully
supported:
Enter'l'for reduced live load:
Geometry and Loads:
Span:
5.5 ft
Tributary Width.: 9 ft
DL unit load:
12 psf
LL unit load: 60 psf
Add'l unif. DL.
lb/ft
Add'l unif LL: lb/ft
K11 * At:
99 ftA 2
Reduced LL: 60 psf
DL uniform load:
108 lb/ft
Max DL reaction: 297 lbs
LL uniform load:
540 lb/fi
Max LL reaction: 1,485 lbs
Total load:
648 lb/ft Max Total reaction: 1.782 lbs
Material Properties:
E 1.6 x 10`16 psi El
.1.6 x 1016 psi
Fb 900 psi
Fb'
1170 psi
Fv 180 psi
FV
180 psi
Fc perp 625 psi
Fc perp'
625 psi
(Allowable design values
include modification factors per
NDS 2012)
Deflection anaksis:
For total load:
Allowed deflection criteria- span/
240
For LL onlv:
Allowed deflection criteria, span/
360
Max. allowed total defl: 0.275 in
Max LL defl:
0.183 in
Total defl. * 8.3
Required 1:
30 in-'14
LL defl. * 6.9
Required 1:
38 in"4
Actual deflections: TOTAL:
0.075 inches LL:
0.063 inches
Force analvsis:
Max Shear:
1782 lbs
Max. moment: 2450 ft-lb
Shear @ d
1391 lbs
Member:
DF/L #2 3.500
x 7.25]
Member properties:
Provided:
Required:
Moment of inertia:
111.1 inA4
' ) 7.9 in,`4
Section Modulus:
'30.7 in",33
25.1 in A 3
Section Area:
25.4 inA2
11.6 inA2
Bearing
., Area:
2.9 in'�2
Minimum bearing dimensions:
3.5 x
0.8 inches
John S. Apolis, P.E. CSES, Inc. Job number: 2016.121
Project: Kimbrough Date: 21-Feb-17
Architect: Shawn Sullivan T�E �number: 0
BEAM DESIGN (Cantilever, Uniform Load+Concentrated Lo4#)
2015 International Building Code (IBC)(concentrated load at tip of cantilever 2015 NDS
Beam Description: FA57— CA�V7,Wao,
p
Enter'I'for snow load:
Enter'Vfor repetitive member:
Enter '1' for wet use:
Geometry and Loads:
Span:
10 ft
Tributary Width:
8 ft
DL unit load:
15 psf
LL unit load:
25 psf
Add'1 unif. DL:
lb/ft
Add'1 unif. LL:
lb/ft
Concentrated DL:
lbs
Concentrated LL:
lbs
Cantilever a:
4.25 ft
Total pointload:
0 lbs
DL uniform load:
120 lb/ft
Max DL reaction:
1.218 lbs
LL uniform load:
200 lb/ft
Max LL reaction:
2,031 lbs
Total load:
320 lb/ft
Max Total reaction:
3.'249 lbs
Material Properties:
E
1.6 x 1016 psi
E'
1.6 x 1 O"�6 psi
Fb
900 psi
Fb'
1217 psi
U
I V
180 psi
FV
207 psi
Fc perp
625 psi
Fc perp'
718.75 psi
Emin
0.58 x 10"16 psi
Emin'
0.58 x 10"16 psi
Deflection analysis:
For total load: Allowed deflection criteria. span/
240
For LL only: Allowed deflection criteria, span/
360
Max. allowed total defl:
0.5 in
Max LL defl:
0.3333333 in
Cantilever Deflections, TL:
0.425 in
LL:
0.2833333 in
Total Required 1:
101 in A 4
LL Required 1:
129 inA4
Actual midspan 6:
TOTAL: 0.216 inches
LL
0.122 inches
Actual, Cantilever 6:
TOTAL: 0.186 inches
LL
0.158 inches
Force anslysis:
Max Shear:
1889 lbs
Max. moment:
3639 ft-lb
Shear @ d =
1642 lbs
Selected Member:_ — (1) DF #2 3.5 x 9.25
Member properties: Provided: Required:
Moment of inertia: 230.8 in'14 128.6 in,,4
Section Modulus: 49.9 in,,3 35.9 in,'13
Section Area: 32.4 in/12 11.9 in'12
Beating Area: 4.5 inA2
Minimum bearina dimensions: 3.5 x 1.3 inches
N
John S. Apolis, P.E. CSES, Inc. Job number: QOI�)A I
Project: K //A 31Z C/C/6 // Date: 21-Feb-17
Architect: 54AWIV 5,,z�&IVAA/ Pa�-,e number: f,' , cf
11BEAM DESIGN (Uniform Load, Simple Span)
2015 International Building Code B
01V 2015 NDS
Beam Description: 6-71ZID 9 r-Wm TOO, 50AA45
.Enter '1' for incised PT lumber:
Enter 'V for fully supported: 1
Geometry and Loads:
Span: 10 ft
DL unit load: 15 psf
Add'l unif. DL: lb/ft
Enter'l' for snow load:
Enter'l'for repe itive member:
Enter'V for wet use:
Enter'I'for reduced live load:
Tributary Width: 6 ft
LL unit load: 25 psf
AddI unif. LL: lb/ft
K11 * At:
120 ftA2
Reduced LL:
25 psf
DL uniform load:.
90 lb/ft
Max DL reaction:
450 lbs
LL uniform load:
150 lb/ft
Max LL reaction:
750 lbs
Total load:
240 lb/,ft
Max Total reaction:
1,200 lbs
Material Properties:
I
E 1.6 x 10116 psi Ef 1.6 x 10/16 psi
Fb 900 psi Fb' 1346 psi
Fv 180 psi FV 207 psi
Fc przrp 625 psi Fe perp' 718.75 psi
(Allowable design values include modification factors per NDS 2012)
Deflection analvsis:
For total load:
For LL only:
Max. allowed total defl:
Total defl. * 1:
LL defl. * 1:
Actual deflections:
Force analvsis:
Max. moment:
Member:
Allowed deflection criteria. span/
Allowed deflection criteria, span/
0.506 in Max LL defl:
.33.8 Required 1:
21.1 Required 1:
TOTAL: 0304 inches LL:
3000 ft-lb
Member properties.
Moment of inertia:
Section Modulus:
Section Area:
Bearing Area:
Minimum bearing dimensions:
Max Shear:
Shear @ d, =
DF/L #2 3.500
Provided:
I IL I in,-4
30.7 in"-3
25.4 in,^,—)
3.5 x
240
360
0.333 in
68 in,^,4
63 in,4
0.190 inches
1200 lbs
1055 lbs
X 7.25
Required:
67.5 in^4
26.8 i n '13
7.6 in^2
1.7 in'12
0.5 inches
John S. Apolis, P.E. CSES, Inc. Job number: 2016.121
Project: Kimbrough Date: 2 1 -Feb- 17
Architect: Shawn Sullivan Page number:
BEAM DESIGN (Uniform Load+Concentrated Load)
2015 International Building Code (IBC)
2015 NTS
Beam Description: -Fo 9
Enter '1' for snow load:
Enter '1' for repetitive member:
Enter 'I' for wet use:
Geometry and Loads:
Span: 16 ft Tributary Width: 2 ft
DL unit load: 12 psf LL unit load: 25 psf
Add'l unif. DL: lb/ft Addl unif. LL: lb/ft
Concentrated DL: 1218 lbs Concentrated LL: 2031 lbs
@X > (L-x)= 8 ft
Total point load: 3249 lbs
DL unifonn load: 24 lb/ft Max DL reaction: 801 lbs,
LL uniform load: 50 lb/ft Max LL reaction: 1.416 lbs
Total load: 74 lb/ft Max Total reaction: 2,217 lbs
Material Properties:
E
1.6 x 10`6 psi
Ef
1.6 x JOA6 psi
Fb
900 psi
Fb'
1132 psi
Fv
180 psi
FV
207 psi
Fc perp
625 psi
Fc perp'
718,75 psi
Ernin
0.58 x 10'16 psi
Emin'
0.58 x 10,'�6 psi
Deflection analvsis:
For total
load: Allowed deflection criteria,
span/
240
For
LL only: Allowed deflection criteria,
span/
360
Max. allowed total defl:
0.8 in
Max LL defl:
0.53333'13 in
Total defl, * 1:
367.6
Required 1:
460 in,,4
LL defl. * 1:
233.3
Required l:
417 in'14
Actual deflections:
TOTAL: 0.387 inches
LL
0.246 inches
Force anaivsis:
Max Shear.
2217 lbs
Max. moment:
15364 ft-lb
Shear @ d =
2147 lbs
Selected Member: (1) DF #2 8 X 11.25
Member properties: Provided: Required:
Moment of inertia: 949.2 in1\4 459.5 in,4
Section Modulus: 168.8 in,",3 162.8 inA3
Section Area: 90.0 inA2 15.6 in12
Bearina Area: 3.1 inA2
Minimum bearing dimensions: 8.0 X 0.4 inches
N
John S. Apolis, P.E.
Project:
Architect:
CSES, Inc.
Kimbrough
Shawn Sullivan
Job number: 2016.121
Date: 21-Feb-17
Page number:
BEAM DESIGN
(Uniform Load+Concentrated Load)
2015 International Building Code (113C)
2015 NDS
Beam Description:
6-7tZ1f)'
7 a e?i��Vlvl
Enter '1' for snow load:
Enter '1' for repetitive member:
Enter'Y for wet use:
Geometry and Loads:
Span:
12.5 ft
Tributary Width: 2 ft
DL unit load:
122 psf
LL unit load: 25 psf
Add'l unif. DL:
lb/ft
Add'l unif. LL: lb/ft
Concentrated DL;
480 lbs
Concentrated LL: 1000 lbs
@x > (L-x)=
6.25 ft
Total point load: 1480 lbs
DL uniform load:
24 lb/ft
Max DL reaction: 390 lbs
LL uniform load:
50 lb/ft
Max LL reaction: 813 lbs
Total load:
74 lb/ft
Max Total reaction: 1.203 lbs
Material ProDerties:
E 1 2 x 10/16 psi
E'
2 x 10116 psi
Fb 2900 psi
Fb,
3423 psi
Fv 290 psi
FV
334 psi
Fc perp 750 psi
Fe perp'
750 psi
Emin 0 x 1016 psi
Emin'
0 x 1016 psi
Deflection analysis:
For total load: Allowed deflection criteria,
span/
240
For LL only: Allowed deflection criteria,
span/
600
Max. allowed total defl: 0.625 in
Max LL defl:
0.25 in
Total defl, * 1: 72.4
Required 1:
116 in'14
LL defl. * 1: 48.9
Required 1:
196 in14
Actual deflections: TOTAL: 0.289 inches
LL
0.196 inches
Force analvsis:
Max Shear:
1203 lbs
Max. moment: 6070 ft-lb
Shear @ d
1144 lbs
Selected Member: (1) PSL
3.5
x
Member properties: Provided:
Required:
Moment of inertia: 250.1 in,'14
195.6 in",4
Section Modulus: 52.6 in"13
21.3 in`3
Section Area: 3 3. 3 in/12
5.1 in/12
Bearing Area:
1.6 in,2
Minimum bearina dimensions: 15
-1
x
0.5 inches
9.5
I
John S. Apolis, P.E. CSES, Inc. Job number: 2016.121
Project: Kimbrough Date: 21-Feb-17
Architect: Shawn Sullivan Page number:
11BEAM DESIGN (Uniform Load, Simple Span)
2015 International Building Code (IBC) 2015 NDS
Beam Description: �;�Z)�IIILL f)jC,,41Vt1(V-F(7(5
Enter'l' for incised PT lumber: Enter'Vfor snow load:
Enter'Vfor fully supported: 1
Geometry and Loads:
Span: 16.5 ft
DL unit load: 15 psf
AddI unif DL: lb/ft
Enter'l' for.repetitive member.
Enter'I'for wet use:
Enter '1' for reduced live load:
Tributary Width: 11.5 ft
LL unit load: 25 psf
Add'] unif. LL: lb/ft
Kil * At:
379.5 ftA2
Reduced LL:
25 psf
DL uniform load:
173 lb/ft
Max DL reaction:
1.423 lbs
LL uniform load:
288 lb/ft
Max LL reaction:
2,3 72 lbs
Total load:
460 lb/ft
Max Total reaction:
3,795 lbs
Material Proverties:
E 2.0 x 1016 psi E! 2.0 x 10A6 psi
Fb 2900 psi Fb' 3359 psi
Fv 290 psi FV 3331.5 psi
Fe perp 750 psi Fc perp' 750 psi
(Allowable design values include modificaiton factors per TJ-9000 and NDS 2012)
Deflection analvsis:
For total load:
For LL oniy:
Max. allowed total defl:
Total defl. * 1:
LL defl, * 1:
Actual deflections:
Force analvsis:
Max. moment:
Selected Member:
Allowed deflection criteria, span/
Allowed deflection criteria, span/
0.825 in Max LL defl:
3 8 16 Required 1:
239.7 Required 1:
TOTAL: 0.616 inches LL:
15654 ft-lb
Member properties:
Moment of inertia:
Section Modulus:
Section Area:
BearinQ Area:
Minimum bearing dimensions:
PSL 2.OE
Provided:
622.9 in"4
110.7 in13
59.1 in A 2
5.3
240
360
0.550 in
465 inA4
436 in14
0385 inches
Max Shear: 3795 lbs
Shear @ d = 3364 lbs
5.250 x 11.25
X
Required:
464.9 in,4
55.9 in^3
15.1 inl�'-?
5.1 in A 2
1.0 inches
John S. Apolis, P.E. CSES, Inc. Job number: 2016.121
Project: Kimbrough Date: 21 -Feb- 17
Architect: Shawn Sullivan P�,Qe number: ... R_13
11BEAM DESIGN (Uniform Load+Concentrated Load)
2015 International Building Code (IBC) 2015 NDS
Beam Description: 14/ 0�-J -/O(p
Enter '1' for snow load:
Enter'l'for repetitive member:
Enter '1' for wet use:
Geometry and Loads:
Span:
8 ft
DL unit load:
12 psf
Add') unif. DL:
lb/ft
Concentrated DL:
1423 lbs
@X > (L_X)�
6 ft
Tributary Width:
9 ft
LL unit load:
25 psf
Add'l unif. LL-
lb/ft
Concentrated LL:
2372 lbs
Total point load:
DL uniform load: 108 lb/ft Max DL reaction;
LL un-iform load: 225 lb/ft Max LL reaction:
Total load: 333 lb/ft Max Total reaction:
Material Pronerties:
3795 lbs
1,499 lbs
2,679 lbs
4,178 lbs
E
2 x 10/16 psi
E'
2 x 1,0^6 psi
Fb
2900 psi
Fb'
3423 psi
Fv
290 psi
FV
3' )4 psi
Fc perp
750 psi
Fc perp'
750 psi
Ennin
0 x 10/16 psi
Emin'
0 �x 10'6 psi
Deflection anaivsis:
For
total load: Allowed deflection criteria,
span/ 240
For LL only: Allowed deflection criteria, span/ 600
Max. allowed total defl:
0.4 in
Max LL defl:
0,16 in
Total defl. * 1.
39.8
Required 1:
99 in14
LL deft. * 1:
25.6
Required 1:
160 i.nA4
Actual deflections:
TOTAL: 0.159 inches
LL
0.103 inches
Force analysis:
Max Shear:
4178 lbs
Max. moment:
7691 ft-lb
Shear @ d =
3915 lbs
IlSelected Member: (1) PSL 3.5 x 9.511
Member properties:
Moment of inertia:
Section Modulus:
Section Area:
Bearing Area -
Minimum bearina dimensions:
t,
Provided:
Required:
250� 1 in,'14
160.3 in"14
52.6 in'13
27.0 in'13
33_3 in"12
17.6 in^2
5.6 in",2
3.5 x
1.6 inches
John S. Apolis, P.E. CSES, Inc.
Job number: 2016.121
Project: Kimbrough
Date: 21-Feb-17
Architect: Shawn Sullivan
Page number: Z-Lf—
BEAM DESIGN (Uniform Load, Simple
Span)
2015 International Building Code (IBC)
2015 NDS
Beam Description: 6,1�1f) ' I�C-Al,�
CU) /
/711)
e 70V
Enter'l' for incised PT lumber:
Enter'Ffor snow load:
Enter 1' for repetitive member:
Enter'l'for wet use:
EnterTfor fully supported: 1
Enter'I'for reduced live load:
Geometry and Loads:
Span: 13.5 ft
Tributary Width: 2 ft
DL unit load: 15 psf
LL unit load: 25 psf
Add'l unif. DL: lb/ft
Add'! unif. LL: lb/ft
K11 * At: 54 ft/1-2
Reduced LL: 25 psf
DL uniform load: 3 0 lb/f,
Max DL reaction: 203 lbs
L.L uniform load: 50 lb/ft
Max LL reaction: 338 lbs
Total load: 80 lb/ft
Max Total reaction: 540 lbs
Material Properties,
E 2.0 x 10^6 psi E' 2.0 x 10116 psi
Fb 2900 psi FU 3423 psi
Fv 290 psi Fv' 333.5 psi
Fc perp 750 psi Fe perp' 750 psi
(Allowable design values include modificaiton factors per TJ-9000 and NDS 2012)
Deflection analvsis:
For total load:
For LL only
Max. allowed total defl:
Total defl. * 1:
LL defl. * 1:
Actual deflections:
Force analvsis:
Max. moment:
Selected Member:
Allowed deflection criteria, span/
Allowed deflection criteria, span/
0.675 in Max LL defl:
29.9 Required 1:
18.7 Required 1:
TOTAL: 0.120 inches LL:
1823 ft-lb
Member properties:
Moment of inertia:
Section Modulus:
Section Area:
Bearina Area:
Minimum bearing dimensions:
PSL 2.OE
Provided:
250.1 in"\4
52.6 in",3
33.3 in"12
240
360
0,450 in
44 inA4
42 in'14
0.075 inches
Max Shear: 540 lbs
Shear @ d = 477 lbs
3.500 x 9.5
Required:
44.' ) in^4
6.4 iff3
2.1 in^2
0.7 inA2
0.2 inches
N
John S. Apolis, P.E. CSES, Inc. Job number: 2016.121
Project: Kimbrough Date: 21-Feb-17
Architect: Shawn Sullivan Page number:
11BEAM DESIGN (Uniform Load, Simple Span)
2015 International Building Code (IBC) 7-015 NDS
Beam Description: 6p,)gg AZEA,�I, OB —/()g
Enter '1' for incised PT lumber:
Enter '1' for fully supported: 1
Geometrv- and Loads:
Span: 14.5 ft
.DL unit load: 15 psf
Add'1 unif DL: 120 lb/ft
Enter'l' for snow load:
Enter'l' for ret)etitive member:
Enter'Ffor wet use:
Enter'l'for reduced live load:
Tributai), Width: 4 ft
LL unit load: 45 psf
Add'I unif, LL: 150 lb/ft
K11 * At:
116 ft%)
Reduced LL:
45 psf
DL uniform. load:
180 lb/ft
Max DL reaction:
1,305 lbs
LL uniform load:
330 lb/ft
Max LL reaction:
2 '.' :)93 lbs
Total load:
5 10 lb/ft
Max Total reaction:
3,698 lbs
Material ProDerties:
1
E
2.0 x 101,6 psi E'
2.0 x 10A6 psi
Fb
2900 psi Fb'
3423 psi
Fv
290 psi FV
333.5 psi
Fc parp
750 psi Fc perp'
750 psi
(Allowable design values include modificaiton factors per TJ-9000 and NDS 2012)
Deflection analvsis:
For total load:
Allowed deflection criteria, span/
240
For LL only:
Allowed deflection criteria, span/
360
Max. allowed total defl:
0.725 in Max LL defl:
0.48' ) in
Total defl. *1 1:
253.6 Required 1:
350 in A4
LL defl. * 1:
164.1 Required 1:
340 in',4
Actual deflections:
TOTAL: 0.676 inches LL:
0.438 inches
Force analwis:
Max. moment: 13403 ft-lb
Max Shear: 3698 lbs
Shear @ d = 3294 lbs
i
IlSelected Member: PSL 2.OE 5.250 x 9.511
Member properties:
Provided:
Required:
Moment of inertia:
375.1 in/4
349.8 in"4
Section Modulus:
79.0 in^3
47.0 inA3
Section Area:
49.9 in"'2
14.8 in"2
Bearina, Area:
4.9 in'�?-
Minimum bearing dimensions:
-5. 3 x
0.9 inches
,Ivlv-hn S. Apolis, P.E.
CSES, Inc.
Job number:
2016.121
Project:
Kimbrough
Date:
I-Mar-17
Architect: Shawn Sullivan Page number:
DESIGN (Uniform Load, Simple Span)
2UIS International Building Code (IBC)
Beam Description: �,),120T �5r5'
A �, 0 7 (e)
2015 NDS
Enter 'V for incised PT lumber:
Enter' V for snow load:
Enter'V for rei)etitive member:
Enter'V for wet use:
Enter'Vfor fully
supported:
1 Enter'l1or reduced live load:
Geometry and Loads:
Span:
8.5 ft
Tributary Width:
15 ft
DL unit load:
12 psf
LL unit load:
25 psf
AddI unif. DL:
lb/ft
Add'l unif, LL:
lb/ft
K11 * At:
255 ft`2
Reduced LL:
25 psf
DL uniform load:
180 lb/ft
Max DL reaction:
765 lbs
LL uniform load:
375 lb/ft
Max LL reaction:
1 �594 lbs
Total load:
555 lb/ft
Max Total reaction:
2,359 lbs
Material Properties-,
E
1.6 x 10A6 psi E'
1.6 x 1016 psi
Fb
900 psi
Fb'
11242 psi
Fv
180 psi
Fv'
207 psi
Fc perp
625 psi
Fc perp'
718.75 psi
(Allowable
design values include modification factors per NDS 2012)
Deflection analvsis:
For total load:
Allowed deflection criteria, span!
240
For LL only:
Allowed deflection criteria, span/
360
Max. allowed total defl:
0.425 in
Max LL defl:
0.283 in
Total defl. * 1:
40.7
Required 1:
96 inA4
LL defl, * 1:
27.5
Required 1:
97 in/14
Actual deflections:
TOTAL:
0.176 inches LL:
0.119 inches
Force ansivsis: Max Shear: 2359 lbs
Max. moment: 5012 ft-lb Shear @ d = 1931 lbs
Member: DF/L #2 3.500 x
Member properties:
Provided:
Required:
Moment of inertia:
230.8 in,'14
97.2 in'14
Section Modulus:
49.9 in'13
48A in"3
Section Area:
'02.4 inA2
14.0 in'�-'
Bearin ' - Area:
3.3 in'�2
Minimum bearina dimensions:
3.5 N
0.9 inches
9.25
John S. Apolis, P.E. CSES, Inc. Job number: 2016.121
Project: Kimbrough Date: 21-Feb-17
Architect: Shawn Sullivan Page number:
BEAM DESIGN (Uniform Load, Simple Span)
2015 International Building Code (IBC) 2015 NDS
Beam Description:
Enter'l' for incised PT lumber: Enter'l' for snow load:
Enter'l' for fully supported: I
Geometry and Loads:
Span: 7 ft
DL unit load: 15 psf
Add'1 unif. DL: lb/ft
Enter']'for repetitive member:
Enter'Vfor wet use:
Enter'l'for reduced live load:
Tributan, Width: 15 ft
LL unit load: 25 psf
Add'I unif. LL: lb/ft
K11 * At:
210 ftA2
Reduced LL:
25 psf
DL uniform load:
225 lb/ft
Max DL reaction:
788 lbs
LL uniform load:
375 lb/ft
Max LL reaction:
1,313) lbs
Total load:
600 lb/ft
Max Total reaction:
2,100 lbs
Material ProF)erties:
E 1.6 x 10^6 psi E' 1.6 x 10116 psi
Fb 900 psi Fb' 1242 psi
Fv 180 psi FV 207 psi
Fc perp 625 psi Fe perp' 718.75 psi
(Allowable design values include modification factors per NDS 2012)
Deflection analvsis:
For total load:
For LL only:
Max. allowed total defl:
Total defl. " 1:
LL defl. * 1:
Actual deflections:
Force analysis:
Max. moment:
Allowed deflection criteria, span/
Allowed deflection criteria, span/
0.350 in Max LL defl:
20.3 Required 1:
12.7 Required 1:
TOTAL: 0.088 Inches LL:
3675 ft-lb
240
360
0.233 in
58 in4
54 ie4
0.055 inches
Max Shear: 2 100 lbs
Shear @ d = 1638 lbs
IlSelected Member: DFIL #2 3.500 x 9.2511
Member properties:
Moment of inertia:
Section Modulus:
Section Area:
Bearina Area:
Minimum. bearing dimensions:
Provided:
Required:
230.8 in'14
57.9 in14
49.9 i n,,'3
35.5 in-13
32.4 inA2
11.9 in^2
2.9 in/2
3.5 X
0.8 inches
John S. Apolis, P.E. CSES, Inc. Job number: 2016.121
Project: Kimbrough Date: 2 1 -Feb- 17
Architect- Shawn Sullivan Page number:
BEAM DESIGN (Cantilever, Uniform Load+Concentrated L2A!11_
2015 International Building Code (IBC)(concentrated load at tip of cantilever, 2015 NDS
Beam Description: 5t,/
Enter'V for snow load:
Enter'l' for repetitive member:
Enter '1' for wet use:
Geometry and Loads:
Span:
1.75 ft
Tributary Width:
4�5 ft
DL unit load:
15 psf
LL unit load:
25 psf
AddI unif. DL:
lb/ft
Add'I unif. LL:
lb/ft
Concentrated DL:
lbs
Concentrated LL:
lbs
Cantilever a:
1.5 ft
Total point load:
0 lbs
DL uniform load:
68 lb/ft
Max DL reaction:
204 lbs
LL uniform load:
113 lb/ft
Max LL reaction:
340 lbs
Total load:
180 lb/ft
Max Total reaction:
543 lbs
Material Proverties:
E
1.3 x 10"16 psi
E'
1.3 ) x 10/16 psi
Fb
850 psi
Fb'
1365 psi
Fv
150 psi
Fv'
173 psi
Fc perp
405 psi
Fc perp'
465.75 psi
Ernin
0.47 x 1016 psi
Emin'
0.47 x 10,16 psi
Deflection analy,,,is-
For total load: Allowed deflection criteria,
span/
240
For LL only: Allowed deflection criteria, span/
360
Max. allowed total defl:
0.0875 in
Max LL defl:
0.0583333 in
Cantilever Deflections, TL:
0. 15 in
LL:
0. 1 in
Total Required 1:
2 inA4
LL Required 1:
2 in/14
Actual midspan 6:
TOTAL: 0.001 inches
LL
0.000 inches
Actual Cantilever 6:
TOTAL: 0.008 inches
LL
0.005 inches
Force analvsis:
Max. moment: 203 ft-lb
Max Shear: 273 lbs
Shear @ d = 191 lbs
.qember: (1) HF#2 3.5 x 5.5�
Member properties:
Provided:
Required:
Moment of inertia:
48.5 inA4
2.4 in,14
Section Modulus:
17.6 inA3
1.8 in",3
Section Area:
19.3 in^2
1.7 in,`2
Bearing Area:
1.2 in'2)
Minimum bearincy dimensions:
33. 5 x
03 inches
John S. Apolis, P.E. CSES, Inc. Job number: 2016.121
Project: Kimbrough Date: 21 -Feb- 17
Architect: Shawn Sullivan Page number: i'\J I
BEAM DESIGN (Cantilever, Uniform Load+Concentrated Load)
2015 International Building Code (IBC)(concentrated load at tip of cantilever, 2015 NDS
Beam Description:
Enter'V for snow load:
Enter'V for repetitive member:
Enter '1' for wet use:
Geornetry and Loads -
Span:
7.5 ft
Tributary Width: 4 ft
DL unit load:
15 psf
LL unit load: 25 psf
Add'I unif. DL:
lblft
Add'l unif LL: lb/ft
Concentrated DL:
lbs
Concentrated LL: lbs
Cantilever a:
2 ft
Total point load: 0 lbs
DL uniform load:
60 lb/ft
Max DL reaction: 361 lbs
LL uniform load:
100 lb/ft
Max LL reaction: 602 lbs
Total load:
160 lb/ft
Max Total. reaction: 963 lbs
Material Properties:
E
1 .6 x 1 V6 psi
E'
1.6 x 1016 psi
Fb
900 psi
Fb'
1330 psi
Fv
180 psi
Fv'
207 psi
Fc perp
625 psi
Fc perp'
718,75 psi
Emin
0.58 x 101,6 psi
Emin'
0.58 x 10`16 psi
Deflection analvsis:
For total load: Allowed deflection criteria,
span/
240
For
LL only: Allowed deflection criteria. span/
360
Max. allowed total defl:
0.375 in
Max LL defl:
0.25 in
Cantilever Deflections. TL:
0.2 in
LL:
0.1333333 in
Total Required 1:
20 in14
LL Required 1:
18 in"\4
Actual midspan 6:
TOTAL: 0.067 inches
LL
0.040 inches
Actual Cantilever 6:
TOTAL: 0.005 inches
LL
0.01.2 inches
Force analysis:
Max. moment: 1085 ft-lb
Max Shear: 643 lbs
Shear @ d = 546 lbs
IlSelected Member: (1) DF #2 3.5 x 7.2511
Member properties: Pro-vided: Required:
1�4oment of inertia:
111.1 in`4 19.8 in'14
Section Modulus: 30.7 in ',3 9.8 in,'S
Section Area: 25.4 in^2 4.0 in^2
Bearin g Area; 1.3 in"2
Minimum bearing dimensions: 3.5 x 0.4 inches
John S. Apolis, P.E.
CSES, Inc.
Job number:
2016.121
Project:
Kimbrough
Date:
21 -Feb- 17
Architect:
Shawn Sullivan
Page number:
R,�
BEAM DESIGN
(Uniform Load+Concentrated Load)
2015 International Building Code (IBC)
2015 NDS
Beam Description:
Enter'V for snow load:
Enter '1' for repetitive member:
Enter '1' for wet use:
Geometry and Loads:
Span:
7.5 ft
Tributary Width:
2 ft
DL unit load:
12 psf
LL unitload:
25 psf
Add'I uDif. DL:
lb/ft
Add'1 unif. LL,
lb/ft
Concentrated DL:
361 lbs
Concentrated LL-,
602 lbs
@x > (L-Y)=
3.75 ft
Total point load:
963 lbs
DL uniform load:
24 lb�ft
Max DL reaction:
271 lbs
LL uniform load.
50 lb/ft
Max LL reaction:
489 lbs
Total load:
74 lb/ft
Max Total reaction:
759 lbs
Material Proverties�
E
1.6 x 1016 psi
E'
1.6 x 10",6 psi
Fb
900 psi
Fb'
1330 psi
Fv
180 psi
FV
207 psi
Fc perp
625 psi
Fc perp'
718.75 psi
Emin
0.58 x 101,6 psi
Emin'
0.58 x 10^6 psi
Deflection anaivsis:
For total load: Allowed deflection criteria,
span/ 240
For
LL only: Allowed deflection criteria,
span/ 360
Max. allowed total defl:
0.375 in
Max LL defl-.
0.25 in
Total defl, * 1:
12.4
Required 1-
33 inA4
LL defl. * 1:
7.9
Required 1:
32 in^4
Actual deflections:
TOTAL: 0. 112 inches
LL
0,071 inches
Force analvsis:
Max. moment: 2326 ft-lb,
Max Shear: 759 lbs
Shear @ d = 7 14 lbs
I �4ember: (1) DF#2 3.5 x =-25 1
Member properties:
Provided:
Required:
Moment of inertia:
111.1 in`4
33.2 in"4
Section Modulus:
30.7 in,`3
21.0 in,13
Section Area:
25.4 in12
5.2 inl�'-)
Bearina Area:
1.1 in,'12
Minimum bearinc, dimensions:
3.5 x
0.3 inches
John S. Apolis, P.E. CSES, Inc. Job number:
Project: Kimbrough Date:
Architect: Shawn Sullivan Page number:
BEAM DESIGN (Uniform Load+Concentrated Loadj_
2015 International Building Code (IBC) 1 7. —
4-
Beam Description: `�/ lk/� . ",/- Tol�*-I�
rl
Enter']' for snow load:
Enter 'Y for repetitive member:
Enter 1' for wet use:
Geometry and Loads:
Span:
7.5, ft
DL unit load:
12 psf
AddI unif. DL:
lb/ft
Concentrated DL:
361 lbs
@X > (L-x)=
3.75 ft
2016.121
21-Feb-17
Tributary Width:
15 ft
LL unit load:
25 psf
Add'I unif. LL:
lb/ft
Concentrated LL:
602 lbs
Total point load:
DL uniform load: 180 lb/ft Max DL reaction:
LL uniform load: 375 lb/ft Max LL reaction:
Total load: 555 lb/ft Max Total reaction:
Material Properties:
E 2 x 10^6 psi
Fb 2900 psi
Fv 290 psi
Fc perp 750 psi
Emin 0 x 10^6 psi
96' ) lbs
856 lbs
1,707 lbs
2,563 lbs
2015 NDS
.E'
2 x 10`6 psi
Fb'
3423 psi
Fv'
3334 psi
Fe perp'
750 psi
Emin,
0 x 1016 psi
Deflection anaivsis:
For total load: Allowed deflection criteria, spaa! 240
For LL only: Allowed deflection criteria, span/ 360
Max. allowed total defl: 0.375 in Max LL defl:
Total defl. * 1: 27.1 Required 1:
LL defl. * 1: 17.9 Required 1:
Actual deflections: TOTAL: 0.108 inches LL
Force analvsis:
Max. moment: 5708 ft-lb
Selected Member: (1) PSL
Member properties: Provided:
Moment of inertia: 250.1 inA4
Section Modulus: 52.6 inA3
Section Area: 33.3 in'12
Bearing Area:
Minimum bearing dimensions: 3.5
Z,
0.25 in
72 inA4
72 in-14
0.072 inches
Max Shear: 2563 lbs
Shear @ d = 2123 lbs
3.5 x
Required:
72.2 in/14
20.0 in/,.)
9.6 inA2
3.4 in,'12
X LO inches
9.5
I
John S. Apolis, P.E. CSES, Inc. Job number: 2016.121
Project: Kimbrough Date: 2 1 -Feb- 17
Architect.- Shawn Sullivan Page number: K,--Z 2,
11BEAM DESIGN (Uniform Load, Simple Span)
2015 International Building Code (IBC) 2015 NDS
Beam Description: 'TY111Y4fX,1
Enter '1' for incised PT lumber:
Enter'Vfor fully supported: 1
Geometry and Loads:
Span: 4 ft
DL unit load: 15 psf
Add!l unif. DL: lb/ft
Enter 'Ffor snow load:
Enter'l'for rei)etitive member:
Enter'V for wet use:
Enter'l ' for reduced live load:
Tributar,y Width: 15 ft
LL unit load: 25 psf
Add'l unif. LL: lb/ft
K11 * At:
120 ftA2
Reduced LL:
25 psf
DL uniform load:
225 lb/ft
Max DL reaction:
450 lbs
LL unifonn load:
375 lb/ft
Max LL reaction:
750 lbs
Total load:
600 lb/ft
Max Total reaction:
1,200 lbs
Material Proi)erties-
I
E 1.3 x 10A6
psi E'
1.3 x 10A6 psi
Fb 850 psi
Fb'
1173 psi
Fv 150 psi
FV
172.5 psi
Fc perp 405 psi
Fc perp'
465.75 psi
(Allowable design values include modification factors per
NDS 2012)
Deflection anaivsis:
For total load:
Allowed deflection criteria, span/
240
. For LL only:
Allowed deflection criteria, span/
360
Max. allowed total defl: 0.200 in
Max LL defl:
0.133 in
Total defl. * 1: 2.7
Required 1:
13 inA4
LL defl. * 1: 1.7
Required 1:
12 inA4
Actual deflections: TOTAL:
0.028 inches LL:
0.017 inches
Force analvsis:
Max Shear:
1200 lbs
Max. moment: 1200 ft-lb
Shear @ d
838 lbs
IlSelected Member:
HF #2 3.000
x 7.25
Member properties:
Provided:
Required -
Moment of inertia:
95.3 in,4
13.3 in^4
Section Modulus:
26.3 in13
12.3 in,13
Section Area:
21.8 in A 2
7.3 in^2
Bearin ' - Area:
2.6 in"2
Minimum bearing dimensions:
3.0 X
0.9 inches
John S. Apolis, P.E. CSES, Inc. Job number:
Project: Kimbrough Date:
Architect: Shawn Sullivan Page number:
�BEAM DESIGN (Uniform Load,- Simple Span)
2015 International Building Code (IBC)
Beam Description: A14-� 6�,rt5,Pjok P-z�,qf:� er-Atj
Enter 'V for incised PT lumber:
Enter'l'for fully supported: 1
Geometry and Loads:
Span, 15.5 ft
DL unit load: 12 psf
Add'l unif. DL: lb/ft
2016.121
1 -Mar- 17
Enter '1' for snow load:
Enter'l'for repetitive member:
Enter '1' for wet use:
Enter 'I' for reduced live load:
Tributary Width: 3 ft
LL unit load: 25 psf
Add'1 unif LL: lb/ft
K11 * At:
93 ftA2
Reduced LL:
25 psf
DL uniform load:
36 lb/ft
Max DL reaction:
279 lbs
LL unifon-n load:
75 lb/ft
Max LL reaction:
581 lbs
Total load:
I I I lb!ft
Max Total reaction:
860 lbs
Material Pronerties:
2015 NDS
I
E 1.6 x 10A6 psi El 1.6 x 10`16 psi
Fb 900 psi Fb' 1242 psi
Fv 180 psi Fv' 207 psi
Fc: perp 625 psi Fc perp' 718.75 psi
(Allowable design values include modification factors per NDS 2012)
Deflection analvsis:
For total load.
For LL only:
Max. allowed total deft:
Total defl. * 1:
LL defl. * 1:
Actual deflections:
Force analysis:
Max. moment:
Allowed deflection criteria, span/
240
Allowed deflection criteria. span/
360
0.775 in
Max LL defl:
0.517 in
90.1
Required 1:
116 jnA 4
60.9
Required 1:
118 in A 4
TOTAL:
0.390 inches LL:
0.264 inches
Max Shear:
860 lbs
333-31 -ft-lb
Shear @ d =
775 lbs
ILSelected Member: DF/L #2 3.500 x
Member properties:
Moment of inertia:
Section Modulus:
Section Area:
Bearine Area:
Minimum bearing dimensions:
Provided:
Required:
230.8 in'14
117.8 in-4
49.9 in'13
32.2 in"3
32.4 in,12
5.6 in^2
1.2 inA2
3.5 x
0.3 inches
R T I E MEMBER REPORT Level, Grd�93bearrl
1 piece(s) 5 1/4" x 14" 2.OE Parallam@ PSL
r
Overall Length: 17'7"
17'
f 11 9
All locations are measured from the outside face of left support (or left canti *-er end).All dimensions are horizontal,
I Design Resuft
Actual (b Location
Allowed
Result
LDF
Load; Combination (Pattern)
i 'Member Reaction (lbs)
7819 @ 2"
11484 (3.50")
Passed (68%)
1.0 D + 0.45 W + 0.75 L + 0.75 S (All
SDans)
Shear (lbs)
7008 C5 V 5 1/2"
22736
Passed (31%)
1.60
1.0 D + 0.45 W + 0.75 L + 0.75 S (All
Spans)
Moment (Ft-lbs)
21,510 @ 8'9 1/2"
40743
Passed (53%)
1.00
1.0 D + 1.0 L (All Spans)
1 Live Load Defl. (in)
0.418 9) 8'3/8"
0.431
Passed (Li495)
--
1.0 D + 0.45 W + 0.75 L + 0.75 5 (A.11
Spans)
1 1 otal Load Defl. (in
0,534 @ 8'2 1/4"
0.863
I
Passed (L/388)
1
1.0 D + 0.45 W + 0.75 L + 0.75 5 (All i
Spans)
L-erlecoon criteria: LL �Lj4ttu) and TL (1.1240).
Bracing (Lu): All compression edges (top and bottom) must be braced at 17' 7" o/c unless detailed otherwise. Proper attachment and positioning of lateral
bracing is required t� achieve member stability.
System : Floor
Member Type: Flush Beam
Building Use: Residential
Building Code: ISC 2015
Design Methodology: ASD
i Supports
ring Length
Loads to Supports (lbs)
Accessories
Tab] Available
Required
Dead
floor
Live
Snow
Wind--[ Total
I - Column - SPF
3.5T 3.5T
2.38'
1152
3956
1029
6508 1 12645
None
2 - Column - SPF
3.50- 3.50s'
1152
3956
1029
-6508 E61:37/1-_650�_j
None
Loads
Location (Side)
Tributary
Width
Dead
(0.90)
Floor Live
(1-00)
Snow
Wind
(1-60)
Comments
I
0 -Self Weight (PLF)
0 to 17' 7"
N/A
23.0
I - Uniform (PSF)
0 to 17'7" (Front)
91
12.0
50.0
13.0
Residential - Uving
Areas
2 - Point Vb)
Y(Front)
N/A
9164
3 - Point (lb , I
is, 3" (Front)
N/A
-9164
Weyerhaeuser warrants that the sizing of its products will be in accordance with Weyerhaeuser product design critena and published design values,
Weyerhaeuser expressly disclaims any other war-anbes related to the software. Refer to current Weyerhaeuser literature for Installation details.
(w,.vw.woDc1bywy.com) Accessories (Rim Board, Blocking Panels and Squash Stocks) are not designed by this software. Use of this software is not Intended to
circumvent the need for a design professional as determined by the authority having jurisdiction. The designer of record, builder or framer is responsible to
zassure that this calculation is compatible with the overall project. Products manufactured at Weyerhaeuser Wc litles are th:rd-party certified to sustainable
iforesby standards. Weyerhaeuser Engineered Lumber Products have been evaluated by ICC ES under technical reports ESR-1153 and ESR-1367 and/or tested
jin accordance with applicable ASrM standards. For current code evaluation reports refer to http://%vww�woodbywy.coii/servi--es/�-CodeRepoM.aspx.
The product application, input design loads, dimensions and support information have been provided by Forte Software ODerator
Forte Software operator
Eva- Ap- :s
^SES �--
21�F, 524' , -255
Jot., Note-�
im 6/"- 06/
_Cz
SUSTAINABLE FORESTRY INIM47,IVE
1 2/21/2017 4:28:56 PfVI
Fo�,e v5. 1. Design Engine: V6.5. 1. It
Page 1 of I
John S. Apolis, P.E.
CSES, Inc.
PROJECT:
ARCHITECT:
Kimbrough
Shawn Sullivan
WOOD JOIST DESIGN -- 2012/15 IBC AND NDS
PELI� Tal�_F5
Job Number: 2016.121
Designer: JSA
Date: 02/28/17
Page Number:
Calculate the maximum span for joists under the following conditions:
Simple Span, Uniform Load Visually Graded SaAm Lumber
Moisture Content < 19% Normal Temperature Range
2". 3 ", or 4" thick joists only Normal Deflection Requirements
Snow Load? 0 =no, I =yes
EnterT for incised PT lumber: Repetive Use? 0 = no, I = yes
Wet Use" O=no,l=yes
Nominal Joist Size and Spacing �> 2 x 10 16 inches o.c.
Actual Dimensions 1.50 x 9.25 inches
Section Properties (Calculated): A = 13.88 in^2
A"
S = 21.39 in )
I = 98.93 in^4
Allowable Stress Values:
Base Values:
Fb= 850 psi
Fv= 150 psi
E= 1300 ksi
Loads: Dead load 12 psf
Live load 60 psf
Total Load factor: L / 240
Live Load factor: L / 360
Forces at governing joist length:
Species and Grade: Hem -Fir #2
Design
Values:
Fb =
1075 psi
Fv =
150 psi
E =
1300 ksi
Wdl = 16.0 lb/ft
Wil = 80.0 lb/ft
Wtl = 96.0 lb/ft
Reaction at the ends of the joist: 606.631 lb
Reaction at distance d from the ends of the joist: 532.63 lb
Joist forces and deflections: Maximum allowed joist length:
Maximum bending moment 1917 ft-lb L = 12.64 ft <=� governs
Maximum shear at d 531 3 1 b L = 30.45 ft
Total Load Deflection 0.428 in L = 14.39 ft
Live Load Deflection 0_357 in L= 13.35 ft
11 MAXIMUM CLEAR SPAN: 12 feet 8 inches' 11
John S. Apolis, P.E. CSES, Inc. Job number: 2016.121
Project: Kimbrough Date: I I -Apr- 17
Architect: Shawn Sullivan Page number: U
jIBEAM DESIGN (Uniform.Load, Simple Span)
2015 International Building Code (IBC) 2015 NDS
Beam Description: C,�100 JMA� (Ale<-H)
Enter'l' for incised PT lumber: I Enter'l'for snow load:
Enter'Vfor fullV supported:
Geometry and Loads:
Span: 14.331 ft
DL unit load: 12 psf
Add'1 unif. DL: lb/ft
Enter'V for repetitive member:
Enter']' for wet use:
Enter'l'for reduced live load:
Tributary Width: 5 ft
LL unit load: 60 psf
Add'l unif. LL: lb/ft
K11 * At:
143.3 ftA2
Reduced LL:
60 psf
DL uniform load:
60 lb/ft
Max DL reaction:
430 lbs
LL uniform load:
300 lb/ft
Max LL reaction:
2,150 lbs
Total load:
360 lb/ft
Max Total reaction:
2,579 lbs
Material Properties:
E
1.6 x 10,',6 psi Et
1.6 x 10/16 psi
Fb
1200 psi
Fb'
960 psi
Fv
170 psi
Fv'
136 psi
Fc perp
625 psi
Fc perp'
500 psi
(Allowable design values include modification factors per
NDS 2012)
Deflection analvsh:
For total load:
Allowed deflection criteria, span/
180
For LL only:
Allowed deflection criteria, span/
240
Max. allowed total defl:
0.955 in
Max LL defl:
0.717 in
Total defl. * 1:
213.5
Required 1:
223 in14
LL defl, * 1:
177.9
Required 1:
248 in`4
Actual deflections:
TOTAL:
0.327 inches LL:
0.273 inches
Force analvsis:
Max Shear:
2579 lbs
Max. momen-,.:
9241 ft-lb
Shear @
2242 lbs
IlSelected Member:
DF/L #1 & Befter 5.500
x 11,25]
Member properties:
Provided:
Required:
Moment of inertia:
652.6 inA4
2483 in"4
Section Modulus:
116.0 in"13
115.5 inA3
Section Ai -ea:
61.9 inA2
24,7 in^2
Bearina Area:
5.2 iff-2
Minimum bearincr
dimensions:
5,5 x
0.9 inches
L 13'- 11"
John S. Apolis, P.E. CSES, Inc. Job number: 2016.121
Project: Kimbrough Date: I I -Apr- 17
Architect: Shawn Sullivan Page number: (j I
11BEAM DESIGN (Uniform Load, Simple Span) :3
2015 International Building Code (IBC) 2015 NDS
Beam Description: 6,jUPCJ)Pi�Ot6,�AM (,5al&)
Enter'l' for incised PT lumber: I
Enter'Vfor fully supported: 1
Geometry and Loads:
Span: 15.75 ft
DL unit load: 12 psf
Add'] unif DL: lb/ft
Enter'l'for snow load:
Enter'l' for repetitive member:
Enter '1' for wet use:
F-nter'l'for reduced live load:
Tributary Width: 6.5 ft
LL unit load: 60 psf
Add'l unif. LL-. lb/ft
K11 * At:
204.75
ft/�'—)
Reduced L.L:
60 psf
DL uniform load:
78
lb/ft
Max DL reaction:
614 lbs
LL uniform load:
390
lb/ft
Max LL reaction:
3,071 lbs
Total load:
468
lb/ft
Max Total reaction:
3,686 lbs
Material Proverties:
E
1.6 x 10116 psi El
1.6 x 10/16 psi
Fb
1200 psi
Fb1
960 psi
Fv
170 psi
Fv'
1 33 6 psi
Fc perp
625 psi
Fc perp'
500 psi
(Allowable design values include modification factors per NDS 2012)
Deflection analvsis:
For total load:
Allowed deflection criteria, span/
180
For LL only:
Allowed deflection criteria, span/
240
Max. allowed total defl:
1.050 in
Max LL defl:
0,788 in
Total defl, * 1:
405.0
Required 1:
386 inA4
LL defl, * 1:
337.5
Required 1:
429 in^4
Actual deflections:
TOTAL:
03 )69 inches LL:
0.307 inches
Force analysis:
Max. momen-L: 14512 ft-lb
Max Shear: 3686 lbs
Shear @ d = 3247 lbs
IlSelected Member: DF/L #1 & Befter 9.250 x 11.25
Member properties:
Moment of inertia:
Section Modulus:
Section Area:
Bearing Area:
Minimum bearinc, dimensions:
Provided:
1,097.5 in-4
195,1 in`3
104.1 in,"12
9.1
.3 x
Required:
428.5 in^4
181.4 in^3
35.8 in"2
7.4 in"2
0.8 inches
John S. Apolis, P.E. CSES, Inc. Job number: 2016.121
Project: Kimbrough Date: 11-Apr-17
Architect: Shawn Sullivan lage-number: V
�BEAM DESIGN (Uniform Load, Simple Span)
2015 International Building Code (IBC) 2015 ND9
Beam Description: 6�AAA C,0 FAf— V../, OF 01�6q
Enter'l' for incised PT lumber:
1 Enter ' V for snow load,
Enter'Vfor repetitive member:
Enter'V for wet use:
Enter'Vfor fully
supported:
1 Enter'I'for reduced live load:
Geometry and Loads:
Span:
16 ft
Tributary Width:
1.5 ft
DL unit load:
12 psf
LL unit load:
60 psf
Add'I unif. DL:
lb/ft
Add'] unif. LL:
lb/ft
KII * At:
48 ftA22
Reduced LL:
60 psf
DL uniform load:
IS lb/ft
Max DL reaction:
144 lbs
LL uniform load:
90 lb/ft
Max LL reaction:
720 lbs
Total load:
108 lb/ft
Max Total reaction:
864 lbs
Material Pi-werties:
E,
1.6 x IV6 psi E?
1.6 x 10^6 psi
Fb
900 psi
Fb,
792 psi
Fv
180 psi
Fv'
144 psi
Fc perp
625 psi
Fc perp'
500 psi
(Allowable design values include modification factors per NDS 2012)
Deflection analysis:
For total load:
Allowed deflection criteria, span/
180
For LL only:
Allowed deflection criteria, span/
240
Max. allowed total defl:
1.067 in
Max LL defl:
0.800 in
Total defl. * 1:
99.5
Required 1:
93 in^4
LL defl. * 1:
82.9
Required 1:
104 in,4
Actual deflections:
TOTAL:
0.240 inches LL:
0.200 inches
Force analvsis:
Max Shear:
864 lbs
Max. moment:
3456 ft-lb
Shear @ d =
763 lbs
Selected Member: DF/L #2 3.500 x 11.25
Member properties:
Provided:
Required:
Moment of inertia:
415.3 in'14
103.7 in"4
Section Modulus:
73.8 in",3
52.4 in^,3
Section Area:
39.4 in^2
7.9 in^2
Bearing Area:
1.7 in,�?-
Minimum bearing dimensions:
3.5
0.5 inches
John S. Apolis, P.E. CSES, Inc. Job number: 2016.121
Project: Kimbrough Date: 11-Apr-17
Architect: Shawn Sullivan Page number: U 6
BEAM DESIGN (Cantilever, Uniform Load+Concentrated L2�i�d
2015 International Building Code (IBC)(concentrated load at tip of cantilever 2015 NDS
Beam Description: /-(- �;eAM5
Enter'l ' for snow load:
Enter'l' for repetitive member:
Enter'l' for wet use:
Geornetry and Loads:
Span:
10 ft
Tributary Width:
1.31) ft
DL unit load:
12 psf
LL unit load:
60 psf
Add'l unif. DL:
lb/ft
Add'l unif LL:
lb/ft
Concentrated DL:
240 lbs
Concentrated LL:
1200 lbs
Cantilever a:
3 ft
Total point load:
1440 lbs
DL uniform load:
16 lb/ft
Max DL reaction:
447 lbs
LL uniforrn load:
80 lb/fT
Max LL reaction:
2.234 lbs
Total load:
96 lb/ft
Max Total. reaction:
2,681 lbs
Material ProDerties:
E
1.6 x 10`6 psi
E'
1.6 x 10,16 psi
Fb
900 psi
Fb'
792 psi
Fv
180 psi
Fv'
ISO psi
Fc p-,rp
625 psi
Fc perp'
625 psi
Emin
0.58 x 10'6 psi
Emin'
0.58 x 10`16 psi
Deflection analvsis:
For total load: Allowed deflection criteria, span/
For LL only: Allowed deflection criteria, span/
Max. allowed total defl: 0.5 in Max LL defl:
Cantilever Deflections, TL: 0.3 in LL:
Total Required 1: 132 inA4 LL Required 1:
Actual midspar, 5: TOTAL: 0.041 inches LL
Actual Cantilever 5: TOTAL: 0.095. inches LL
Force analysis:
Max. moment: 4751 ft-lb
Selected Member: (1) DF #2
Member properties:
Moment of inertia:
Section Modulus:
Section Area:
Bearing Area:
Minimum bearincy dimensions:
Provided:
415.3 in'14
73.8 in'13
39.4 in',2
3.5
240
360
0.3333333 in
0.2 in
276 in\4
0.027 inches
0.133 inches
Max Shear: 1727 lbs
Shear @ d 1638 lbs
3.5 X 11.25
x
Required:
276.5 in,,4
72.0 in,,,)
13.6 in,12
43 in,,2
1.2 inches
John S. Apolis, P.E. CSES, Inc. Job number: 2016.121
Project: Kimbrough Date: 28-Feb- 17
Architect: Shawn Sullivan Page number: �j 77
11BEAM DESIGN (Uniform Load+Concentrated Load) 11
2015 International Building Cod C) 2015 NDS
Beam Description: 6.7,Vl)�Y IvaloW Vi1Vt)0w_5fA1,t
Enter'Ffor snow load:
Enter'l' for repetitive member:
Enter 1' for wet use:
Geometry and Loads:
Span:
6 ft
Tributan,, Width:
9 ft
DL unit load:
12 psf
LL unit load:
60 psf
AddI unif. DL:
lb/ft
Add'l unif. LL:
lb/ft
Concentrated DL:
432 lbs
Concentrated LL:
2160 lbs
@x > (L-X)=
4.25 ft
Total point load:
2592 lbs
DL uniform load:
108 lb/ft
Max DL reaction:
630 lbs
LL uniform load:
540 lb/ft
Max LL reaction:
3,150 lbs
Total load:
648 lb/ft
Max Total reaction:
3,780 lbs
Material Pronerties:
E
2 x 10^6 psi
E'
2 x 10^6 psi
Fb
2900 psi
Fb'
2976 psi
Fv
290 psi
Fv'
290 psi
Fc perp
750 psi
Fc perp'
750 psi
Emin
0 x 10^6 psi
Emin'
0 x 10`16 psi
Deflection analvsis:
For total load: Allowed deflection criteria,
span/ 240
For LL only: Allowed deflection criteria,
span/ 360
Max. allowed total de-fl:
0.3 in
Max LL defl:
0.2 in
Total defl, 1:
17.4
Required 1:
58 in"4
LL defl. 1:
14.5
Required 1:
72 inA4
Actual deflections:
TOTAL: 0.069 inches
LL
0.058 inches
Force analvsis:
Max. moment: 5625 ft-lb
Max Shear: 3780 lbs
Shear @ d = 3267 lbs
IlSelected Member: (1) PSL 3.5 x 9.51
Member properties:
Provided:
Required:
Moment of inertia:
250.1 in"14
72.4 in14
Section Modulus:
52.6 in'")
22.7 in,`3
Section Area:
33.3 in'22
16.9 in12
Bearing Area:
5.0 in'2
Minimum bearing dimensions:
3. 5 x
1.4 inches
John S. Apolis, P.E. CSES, Inc.
Project; Kimbrough
Job number: 2016.121
Date: 24-May- 17
1 -
krchitect: Shawn Sullivan Page number: U*
BEAM DESIGN (Uniform Load, Simple Span)
2015 International Building Code (18C)
Beam Description: Grid 4 beam, C to D
Enter'l' for incised PT lumber:
Enter'Vfor fully supported: 1
Geometry and Loads:
Span: 12 ft
DL unit load: 12 psf
Add'l unif. DL: lb/ft
Enter 'Y for snow load:
Enter']' for rmetifive member:
EnteT'I'for wet use :
Enter'Yfor reduced live load:
Tributary, Width: 10 ft
LL unit load: 40 psf
Add'l unif. LL: lb/ft
Zul:) INIE!0
K11 * At:
240 ft,^'2
Reduced LL:
40 psf
DL uniform load:
120 lb/ft
Max DL reaction:
720 lbs
LL uniform load:
400 lb/ft
Max LL reaction:
2,400 lbs
Total load:
520 lb/ft
Max Total reaction:
3,120 lbs
Material Properties:
E
2,2 x 10^6 psi F
2.2 x 1 0/\6 psi
Fb
2900 psi
Fb'
2985 psi
Fv
290 psi
Fv'
290 psi
Fc perp
750 psi
Fc perp'
750 psi
(Allowable design values include modificaiton factors per TJ-9000 and NDS 2012)
Deflection analysis:
For total load:
Allowed deflection criteria, span/
240
For LL only:
Allowed deflection criteria, span/
360
Max. allowed total defl:
0.600 in
Max LL defl:
0.400 in
Total defl. * 1:
110.11
Required 1:
184 in/4
LL defl. * 1:
84.8
Required 1:
212 in A 4
Actual deflections:
TOTAL:
0.478 inches LL:
0.367 inches
Force analysis:
Max Shear.
3120 lbs
Max. momen:
9360 ft-lb
Shear @ d =
2719 lbs
IlSelected Member: PSL 2.2E 3.500 x 9.2511
Member properties:
Provided:
Required,
Moment of inertia:
230.8 in,'14
212.1 in"4
Section Modulus:
49.9 in13
37.6 in"13
Section Area:
32.4 in^2
14.1 ie2
Bearine Area:
4.2 inA2
Minimum bearine dimensions:
3.5 x
1.2 inches
John S. Apolis, P.E. CSES, Inc. Job number:
Project: Kimbrough Date:
Architect: Shawn Sullivan Page number:
BEAM DESIGN (Uniform Load+Concentrated LoadL_
2015 International Building Code (IBC)
Beam Description:
Enter '1' for snow load:
Enter'l' for repetitive member:
Enter '1' for wet use:
Geometry and Loads:
Span:
DL unit load:
Add'1 unif DL:
9��O ;��Concentrated DL:
X 91 @x > (L-X)=
DL uniform load:
LL uniform load:
Total load -
Material Proi)erties:
2016.121
28-Feb-17
U C(
2015 NDS
S tV H a C- 0 120i.��
14 ft
Tributary Width:
1.33 ft
12 psf
LL unit load:
40 psf
lb/ft
Add'l unif. LL-
lbt'ft
2878 lbs
Concentrated LL:
lbs
10 ft
Total point load:
2878 lbs
16 lb/ft
Max DL reaction:
2,167 lbs
53) lb/ft
Max LL reaction:
372 lbs
69 lb/ft
Max Total reaction:
2,540 lbs
E
2 x 10116 psi
E'
2 x 10`16 psi
Fb
2900 psi
Fb'
2976 psi
FY
290 psi
Fv?
290 psi
Fc perp
750 psi
Fc perp'
750 psi
Emin
0 x 10A6 psi
Emin'
0 x 10^6 psi
Deflection analvsis:
For total load: Allowed deflection criteria, span/
240
For
LL only: Allowed deflection criteria, span/
360
Max. allowed total defl:
0.7 in
Max LL defl:
0.4666667 in
Total defl, * 1:
140.0
Required 1:
200 in/14
LL defl, * 1:
23.0
Required 1:
49 in,�4
Actual deflections:
TOTAL: 0.560 inches
LL
0.092 inches
Force annivsis:
Max. moment: 9606 ft-lb
Max Shear: 2540 lbs
Shear @ d = 2485 lbs
ISelected Member: (1) PSL 3.5 x 9.5 �
Member properties:
Moment of inertia:
Section Modulus:
Section Area:
BearinQ Area:
Minimum bearing dimensions:
Provided:
Required:
250.1 in"14
199.9 in,4
52.6 inAl
.3
inA'
38.7 .1
333 in'12
12.9 inA2
3.4 in,12
3.5 x
1.0 inches
John S. Apolis, P.E. CSES, Inc. Job number: 2016.122
Project: Peper Date: I -Mar- 17
Architect: Page number:
11BEAM DESIGN (Uniform Load+Concentrated L-oad)
2015 International Building Code (111C) 2015 ND9_
Beam Description: 644P Cl)� 6AMZ�eaj�7AM
Enter'l'for snow load:
Enter 'F for repetitive member:
Enter'F for wet use:
Geometry and Loads:
Span:
21 ft
DL unit load:
12 psf
Add'l unif DL:
lb/ft
Concentrated DL:
1302 lbs
@x > (L-x)=
12.5 ft
Tributan, Width:
10 ft
LL unit load:
30 psf
Add'l unif, LL:
lb/ft
Concentrated LL:
2363 lbs
Total point load:
DL uniform load: 120 lb/ft Max DL reaction:
LL uniform load: 3 300 lb/ft Max LL.reaction:
Total load: 420 lb/ft Max Total reaction:
Material Proverties:
3665 lbs
2,035 lbs
4,557 lbs
6,592 lbs
E
2 x 1016 psi
E'
2 x 10^6 psi
Fb
2900 psi
Fb'
3278 psi
Fv
290 psi
Fv'
334 psi
Fc perp
750 psi
Fc perp'
750 psi
Ernin
0 x 10/16 psi
Emin'
0 x 10^6 psi
Deflection analvsis:
For total load: Allowed deflection criteria, span/ 240
For
LL only: Allowed deflection criteria,
span/ 360
Max. allowed total defl:
1.05 in
Max LL defl:
0.7 in
Total defl, * 1:
1501.1
Required 1:
1,430 in1\4
LL-defl, * 1:
103 1.8
Required 1:
1,474 in1\4
Actual deflections:
TOTAL: 0.938 inches
LL
0.645 inches
Force analvsis:
Max Shear:
6592 lbs
Max. moment:
40856 ft-lb
Shear @ d =
6102 lbs
Member: (1)
PSL
7 x
Member properties:
Provided:
Required:
Moment of inertia:
1,600.7 in,,4
1.473.9 inA4
Section Modulus:
228.7 in/13
149.5 in,'13
Section Area:
98.0 in/12
27.4 inA2
Bearing Area:
1�
8.8 inIN2
Minimum bearin- dimensions:
=I
7.0 x
1.3 inches
14
John S. Apolis, P.E. CSES, Inc.
Project: Kimbrough
Job number: 2016.121
Date: I -Mar- 17
Architect: Shawn Sullivan Page number: (-/I(
11BEAM DESIGN (Uniform Load, Simple Span) =1
2015 International Building Code (IBC)
Beam Description: e-� -
6-100 CF)
Enter '1' for incised PT lumber:
Enter'l' for fully supeorted: 1
Geornetry and Loads:
Span: 14 ft
DL unit load: 12 psf
,Add'I unif DL: lb/ft
5 FAAA
En ter'l'for snow load:
Enter'Yfor repetitive member:
Enter'V for wet use:
Enter'I'for reduced live load:
Tributary Width: 7.5 ft
LL unit load: 25 psf
Add'l unif. LL: lb/ft
all][30M
Kil * At:
2 10
Reduced LL:
25 psf
DL uniform load:
90 lb/ft
Max DL reaction:
630 lbs
LL uniform load:
188 lb/ft
Max LL reaction:
1,313 lbs
Total load:
278 lb/ft
Max Total reaction:
1,943 lbs
Material Properties:
Z7
2.0 x 10/16 psi E,
2.0 x 10`�6 psi
Fb
2900 psi
Fb'
3433 psi
Fv
290 psi
FV
333.5 psi
Fc perp
750 psi
Fc perp'
750 psi
(Allo,wable design values include modificaiton factors per TJ-9000 and NDS 2012)
Deflection analysis:
For total load:
Allowed deflection criteria, spm'
240
For LL only:
Allowed deflection criteria, span/
360
Max. allowed total defl:
0.700 in
Max LL defl:
0.467 in
Total defl. * 1:
119.9
Required 1:
171 inA4
LL defl. * 1:
81.0
Required 1:
174 in A 4
Actual deflections:
TOTAL:
0.520 inches LL:
0.351 inches
Force analvsis:
Max. moment:
6799 ft-lb
Max Shear: 1943 lbs
Shear @ d = 1729 lbs
IlSelected Member: PSL ME 3.500 x 9.25
Member properties: Provided: Required:
Moment of inertia: 230.8 in,'14 1,73.6 in'14
Section Modulus: 49.9 in1,3 23.8 inA3
Section Area: '12.4 inA 2 7.8 in"2
Bearina Area: 2.6 in/'-)
Minimum bearincy dimensions: 3,5 X 0.7 inches
Im
John S. Apolis, P.E. CSES, Inc. Job number: 2016.122
Project: Peper Date: I -Mar- 17
Architect: Page number: U i,�
11BEAM DK� �GN Uniform Load+Concentrated Load)
2015 International Building Code (IBQ 2015 NDS
Beam- Description: (,2AjW7A-p0,-14
Enter'Ffor snow load:
Enter '1' for repetitive member:
Enter'Y for wet use:
Geometry and Loads:
Span:
17.5 ft
DL unit load:
12 psf
_1z Add'l unif, DL:
lb/ft
Concentrated DL:
1456 lbs
@X > (L-X)=
9.75 ft
Tributary Width:
4 ft
LL unit load:
40 psf
AddI unif. LL:
lb/ft
Concentrated LL:
lbs
Total point load:
DL uniform load: 48 lb/ft Max DL reaction.
LL uniform load: 160 lb/ft Max LL reaction:
Total load. 208 lb/ft Max Total reaction:
Material Prouerties:
E
2 x 10`6 psi
Fb
2900 psi
Fv
290 psi
Fc perp
750 psi
Emin
0 x 10^6 psi
1456 lbs
1,231 lbs
1,400 lbs
2.63 1. lbs
E'
2 x 1016 psi
Fb'
2921 psi
FV
290 psi
Fc perp'
750 psi
Emirf
0 x 10116 psi
Deflection analvsis:
For total load: Allowed deflection criteria, span/
For LL only: Allowed deflection criteria, span/
Max. allowed total defl: 0.875 in Max LL defl:
Total defl. * 1: 357.5 Required 1:
LL defl. * 1: 168.8 Required L
Actual deflections: TOTAL: 0.861 inches LL
Force analysis:
Max. moment: 14145 ft-lb
240
360
0.5833333 in
409 in"4
289 in^4
0.407 inches
Max Shear: 2631 lbs
Shear @ d = 2436 lbs
Member: (1) PSL 3.5 x 11.25
Member properties:
Provided:
Required:
Moment of inertia:
415.3 in'14
408.6 in'14
S.-ction Modulus:
7' ).8 in'13
58.1 in,'13
Section Area:
39A inA2
12.6 inA2
Bearing Area:
3.5 in^2
Minimum bearing dimensions:
3.5 X
1.0 inches
John S. Apolis, P.E. CSES, Inc. Job number: 2016.121
Project: Kimbrough Date: I -Mar- 17
Architect: Shawn Sullivan Page number:
11BEAM DESIGN (Uniform Load, Simple Span)
2015 Internati Building Code (IBC) 2015 NDS
Beam Description: �7-,tjg L3j5A/v\
Enter 'V for incised PT lumber:
EnterT for fully supported: I
Geometry and Loads:
Span: -7 ft
DL unit load: 12 psf
Add'I unif. DL: lb/ft
EnterTfor snow load:
Enter'V for repetitive member:
Enter'I'for wet use:
Enter'I'for reduced live load,
Tributary Width: 5 ft
LL unit load: 40 psf
Add'l uni.f. LL: lb/ft
K11 * At:
70 ftA 2
Reduced LL:
40 psf
DL uniform load:
60 lb/ft
Max DL reaction:
210 lbs
LL uniforrn load:
200 lb/ft
Max LL reaction:
700 lbs
Total load:
260 lb/ft
Max Total reaction:
910 lbs
Material Properties:
E 1.6 x 1016 psi Ey 1.6 x 1016 psi
Fb 900 psi Fb1 1080 psi
Fv 180 psi Fv1 180 psi
Fc perp 625 psi Fc perp' 625 psi
(Allowable design values include modification factors per NDS 2012)
Deflection analvsis:
For total load:
For LL only:
Max. allowed total defl:
Total defl, * 1:
LL defl, * 1:
Actual deflections:
Force analvsis:
Max. moment:
Allowed deflection criteria, span/
240
Allowed deflection criteria, span/
360
0.350 in
Max LL defl:
0.233 in
8.8
Required 1:
25 in^4
6.8
Required 1:
29 in A 4
TOTAL:
0.038 inches LL:
0.029 inches
Max Shear:
910 lbs
1593 ft-lb
Shear @ d =
710 lbs
IlSelected Member: DF/L #2 3.500 x 9.2511
Member properties:
Moment of inertia:
Section Modulus:
Section Area:
Bearing Area:
Minimum bearing dimensions:
Provided:
Required:
230.8
inA4
28.9 inN
49.9
1
in A-
17.7 inA3
3 )2.4
inA2
5.9 in"2
1.5 in"2
3.5
x
0.4 inches
John S. Apolis, P.E. CSES, Inc. Job number: 2016.121
Project: Kimbrough Date: I -Mar- 17
Architect: Shawn Sullivan Page number: 4
PEAM DESIGN (Uniform Load, Simple Span)
2015 International Building Code (IBC) 2015 NDS
Beam Description: NA � 6 - A C,///A 4001"t 131�,41v�
Enter'l' for incised PT lumber:
Enter 'V for fully supported: 1
Geometry and Loads:
Span: 5.5 ft
DL unit load: 12 psf
AddI unif DL: lb/ft
Enter'l'for snow load:
Enter'V for repetitive member:
Enter'l' for wet use:
Enter 'F for reduced live load:
Tri butar), Width: 9 ft
LL unit load: 40 psf
AddI unif. LL: lb/ft
K11 * At:
99 ft"12
Reduced LL:
40 psf
DL uniform load:
108 lb/ft
Max DL reaction:
297 lbs
LL uniform load:
360 lb/ft
Max LL reaction:
990 lbs
Total load:
468 lb/ft
Max Total reaction-
1.287 lbs
Material Proverties:
E 1.3 x 1 0,'�6 psi E' 1.3 x 10/16 psi
Fb 850 psi Fb- 1020 psi
Fv 150 psi FV 150 psi
Fc pe.rp 405 psi Fc perp' 405 psi
(Allowable design values include modification factors per NDS 2012)
Deflection analvsis:
For total load:
For L.L only:
Max. allowed total defl.
Total defl, * 1:
LL defl, * 1:
Actual deflections:
Force analvsis:
Max. moment:
Member:
Allowed deflection criteria, span/
Allowed deflection criteria, span/
0.275 in Max LL defl:
7.4 Required 1:
5.7 Required 1:
TOTAL: 0.078 inches LL:
1770 ft-lb
Member properties:
Moment of inertia:
Section Modulus:
Section Area:
Bearing Area:
Minimum bearing dimensions:
Max Shear-.
Shear @ d =
HF #2 3.000
Provided:
95.3 in^4
26.3 in,,3
21.8 in^2
3.0 x
240
360
0.183 in
27 in'14
31 in^4
0.060 inches
1287 lbs
1004 lbs
X 7.25
Required:
31.1 inA4
20.8 in"3
10.0 in A 2
3.2 in�`2
1.1 inches
John S. Apolis, P.E. CSES, Inc. Job number: 2016.121
Project: Kimbrough Date: 24-May- 17
Architect: Shawn Sullivan Page number: (5-
JPost Design (Combined Axial and Moment Loading)
2015 International Building Code (IBC) 2015 NDS
Beam Description: 9 — 4
Geometry and loads:
Height
Le(d)
Material Properties:
Fbi
Fb-1
Fc
E
Ernin
DF #2
EnterT for wind load:
EnterTfor repetitive member:
EnterT for wet use:
8 ft w(d) 0 Plf
13850 lbs w(b) 0 plf
I ft LeO) 8 ft
900 psi
900 psi
1350 psi
1.6 xlO^6psi
0. 5 8 x I 0^6psi
Member properties:
Section Modulus (d):
30.7 in^3
Section Modulus (b):
14.8 in,*,33
Section Area:
25.4 in^2
Member stresses. Provided
FcE(d)
174026 psi
FcE(b)
6' )4 psi
FbE
12250 psi
FbE
12250 psi
BendinZ and Axial Cornvression
Check:
NDS 2010 EQ 3.9-3
Fb(d)'
900 psi
Fb(b)'
900 psi
Fc'
556 psi
F
1.6 x1016psi
Ernin'
0.58 xIO",6psi
3.5
x 7.2E]
b
d
Variables:
Cqx to v5eo)
Rb(d)
0.89
Rb(b)
7.54
c
0.8
Required
>
fc 546 psi
>
fe 546 psi
>
fb(d) 0 psi
>
fb(b) 0 psi
0.96 <
1.0
Address Verified
WS U
More Data About this Address
(I'limate Contribu-11ors income —lax Home Sales Nearest Mailina House
Nqnprpfits Propertv Info 5treat Detail Emaiis
Address 1140 7th Ave S
Edmonds WA L8_020-66QLI
Melissa Address Key (MAK) 5139135091
Address Type Residential
Area Code 425
Carrier Route - DPC C012 - 404
Time Zone (Local time) Pacific Time (2113/2017 3:49:55 PM )
Representative, Party & District Pramilla Jayapal (D! (07)
Carrier Routes in a Radius CarrierfRoute Radius
Latitude & Longitude 47.80049 Degrees North -122.37263 Degrees West (GSOO)
Census Entities City or Town Edmonds 5320750 Mar,
County Snohomish 53061 Ma2
County Subdivision Edmonds I'Viap
Tract 0505.00 M�jp
Block 2013 tkji?�p
Unified School District 5302400 EDMONDS Map
State Upper District 021 ME-�p
State Lower District 021 rvla-p
Delivery Post Office Perrinville
7601 Olympic View Dr
Edmonds WA 98026 hLap
Phone: 425-672-4437
-!v-- USGS Design Maps Summary Report
User -Specified Input
Building Code Reference Document 2012/2013 international Building Code
,which ut'lizes USGS 11-lazard date available in 2008)
Site Coordinates 47.800491N, 122.37263OW
Site Soil Classification Site Class D — "Stiff Soil"
Risk Category I/H/H!
f- —7
7 rT �7�.=
A
-PIE,
L od
Mourittakee. errace
PW�
�7
Suquamish
USGS—Provided Output
Ss = 1.264 g Sms = 1.264g Sos = 0.843 g
S, = 0.495 g Smi = 0,745 g SDI'= 0.497 a
For information on how the SS and S! values above have been calculated from probabilistic (risk-taroeted) and
deterministic ground motions in the direction of maximum horizontal response, please return to the application and
select the "2009 NEHRP" building --ode reference document.
1.42
1.04--
0.9i .-
V M
Q.52
0. 1 9
0.2c
D.00 0.20 0�40 O'so 0.80 1.00 i.20 1.4o 1,G0 I.So 2.0o
Period, T (sec)
MCER Response Spectrum
Design Response Spectrum
0.90.-
0.72--
0.6? -
0.5a.-
0.45-
0.1p.
:-Oo: L i - 4 t
0.00 0.20 0,40 0,60 0,90 1.00 1,20 I.ALE, i.Go 1.80 2.00
Period, T (sec)
Altnough this information is a product cfthe U.S. Geological Survey, we povidenovmrranty, expressed or implied, as to the
accuracy of the data contained therem,Thls toot is not a subsuitute for technica I subject—rnafterknowledge.
John S. Apolis, P.E. CSES, Inc. Job number: 2016.121
Project: Kimbrough Residence Date: 21-Feb-17
Architect: Shawn Sullivan Page number: L 1
IlLateral Loads Design per ASCE 7-10, Wind: Section 28 Seismic: Section 12
taimplified Envelope irroceaurerart 2)
2015 International Building Code (IBC)
WIND LOADS 110
mph Basic Wind
Speed
2015 NDS
Ps = lambda * Kzt * Ps(30) * 0.6
Exposure
B
Roof Slope: 7.00 :12 3 )0.3
Least Horizontal Dimension, feet:
45
Mean Roof Ht. Peet: 24 (degrees)
lambda = 1.00
a =
4.5
ft. 2a 9.0 ft
1 -,A, = 1.00
KzT =
1.00
(By Inspection)
Tabulated Ps(30): Zone
(Refer to ASCE 7-10, Figure 28.6-1)
(horizontal) A
it B
it C
T1 D
(vertical) E
It F
G
H
(uplift on overhangs) E(oh)
it G(oh)
Tabulated
Calc'd
Wind
Design
Pressure
Pressure
(*Iambda*KzT*0.6)
21.6
psf
13.0
14.8
psf
8.9
17.2
psf
10.3
11.8
psf
7.1
8.3
psf
5.0
-13.1
psf
-7.9
7.2
psf
4.3
-11.3
psf
-6.8
-7.6
psf
-4.6
-8.7
psf
-5.2
(Equivalent Lateral Force Procedure, Section 12.8)
Min
(Per section 28.6.4
Design
minimum wind pressure
Pressure
is 16 PSF for zones
A.C. and 8 PSF for
13.0
zones B, D)
8.9
10.3
7.1
.SEISMIC LOADS le 1.0
R = 6.5
ASCE 7-1.0. Table 12.2.1
Seismic Parameters Group I Site Class:
D
per ASCE 7-10) PGA (.2 sec) 1.2640
Fa = 1.00
ASCE 7-10 Table 11.4-1
PGA (I sec) 0.4950
Fv = 1,60
ASCE 7- 10 Table 11.4-2
Seismic Design Categories per ASCE 7-10 Tables 11.6-1,11.6-2
Based on Sds: D
Based on Sd]:
D
PGA's based on peak ground accelerations per latest USGS Hazards Program
(based on lat/lon).
Ss = 1.2640
Sms = Fa * Ss =
1.26 Equation 11.4-1
S1 = 0.4950
Sml=Fv*S] =
0.79 Equation 11.4-2
Equations 11.4-3.11.4-4 Sds = 2/3 * Sms = 0.84 Sdl = 2/3 * Sm] 0.51
1
Equation 12.14-11 s (or %V) = (Sds / (R/1) ) = 0.130 Building period <0.5 s per IBC eq 12.8-7
Base Shear = %V * W * 0.7 = 4.54 psf, uniformly distributed over floor area
(0.7 reduction factor per ASCE 7-10. Section 2.4. 3. Eq (seismic vertical distribution per IBC eqs 12.8-11 & 12)
Floor DL
Wall DL (Dsf) Story Height
Lateral
Base = top of foundation
(Psf)
dist. over floor aref Above Base (ft)
Load (PsO
Roof
12
6 18
2.40
Upper Floor
12
0,20 9
2.14
x_
0.00
Total Seismic DL:
50
Sum
4.54
CONSULTING STRUCTURAL ENGINEERING SERVICES
Residential and Commercial Structurai Design
6311 17th Avenue NE, Seattle, WA 98115
Phone: (206)527-1288 Email: john(el,cses-engineering.com
Project No. Date
Project Name
Comments
Revision
Page
CO.N-SULTING STRUCTURAL ENGINEERING SERVICES
Residential and Commercial Structural Design
6311 17th Avenue NE, Seattle, WA 98115
Phone: (206)527-1288 Email: johnOkses-engineering.com
Project No.,2d/0/. 12 1 Date
Project Name X//K C/�
Comments
Revision
Page
CONSULTING STRUCTURAL ENGINEERING SERVICES
Residential and Commercial Structural Design
6311 17th Avenue NE, Seattle, WA 98115
Phone: (206)527-1288 Email: johnC(rcses-engineering.com
0
Project No. 1242 — Date
JU
Project Name hIM-641, 64
Comments
Revision
Page
M
CONSULTING STRUCTURAL ENGINEERING SERVICES
Residential and Commercial Structural Design
6311 17th Avenue NE, Seattle, WA 98115
Phone: (206)527-1288 Email: johnCacses-en-ineering.com
Project No. -ROI� Date
Project Name
Comments
Revision
Page
L 57
CONSULTING STRUCTURAL ENGINEERING SERVICES
Residential and Commercial Structural Design
6311 17th Avenue NE, Seattle, WA 98115
P1 ione: (206)527-1288 Email: john6 cses-engineering.com
Project No. c2 0 1�o. /,2 1 Date
Project Name - VIM16417611�#
Comments
Revision
Page L
CONSULTING STRUCTURAL ENGINEERING SERVICES
Residential and Commercial Structural Design
6311 17th Avenue NE, Seattle, WA 98115
Phone: (206)527-1288 Email: jol-in@cses-engineering.com
Project No. 2!2161F I — Date '5z/z/
Project Name - 9 1A M=W�c * ---
Comments
Revision
Page L
Wi
V a Anchor DesignerTm
o, are
Version 2.4.6025.40
I.Proiect information
Customer company:
Customer contact name.,
Customer e-mail:
Comment
2. Inout Data 4 Anchor Parameters
General
Design method:ACI 318-11
Units: Imperial units
Anchor Informabon:
Anchor type: Concrete screw
Material: Carbon Steel
Diameter (inch): 0.625
Nominal Embedment depth (inch): 5.000
Effective Embedment depth, ho (inch): 3.820
Code report: ICC-ES ESR-2713
Anchor category: I
Anchor ductility: No
h.�,m (inch): 7,67
c.- (inch): 5.75
Cmm (inch): 1.75
Sm�,, (inch)� 3.00
Load and Geometry
Load factor source: ACI 318 Appendix C
Load combination: not set
Seismic design: Yes
Anchors subjected to sustaineditension: Not applicable
Ductility section for tension: D.3.3.4.2 no', applicable
Ductility section for shear. D.3.3.5.2 not applicable
.0c, factor: not set
Apply entire shear load
Anchors only resisting i
<Figure 1>
Company:
Date-
2/91/2017 1
Engineer:
Page: 1114
1
Project:
Address:
Phone:
_E%mail:
Project description:
Location:
Fastening description:
Base Material
Concrete: Normal-weiaht
Concrete thickness, h (inch): 8.00
State: Cracked
Compressive strength, N (psi): 2500
4JC'V: 1.0
Reinforcement condition: A tension, A shear
Supplemental reinforcement: Not applicable
Reinforcement provided at comers: No
Do not evaluate concrete breakout in tension: No
Do not evaluate concrete breakout in shear: No
Ignore 6do requirement: Not applicable
Build-up grout pad: No
Base Plate
Length x Width x Thickness (inch): 18.00 x 3.00 x 0.19
00 0 g 6, it 00 4- 51e -S 5 OL 7-
AZ
1- �,/OOV COMA16C T79AI; 1,, q to Ot )( 1.6g-
0 lb
lb
Q
,5 A-,-/ ( <' 7 rZ.,.. / -r C,
7 12-L I ,
Input data and results rnus� be cheicke, for ao-reerneent with the e)dsbrg drournstancez, the standards and guidelines Must be Checked for plausini fty.
S,r-
,,p,-, S� 5955 W. Las PQsU.s Soulev�rd Pieasanton, CA 945SS Phone: 925.560.e.000 Pax 925.847.3871 vAw�.sttrongtie.00rn
.rc' - - - �.. I
H 1) 1�
Anchor Designer TM
Software
V -aba Version 1.4.6025.40
5 5.
1P ?I I �,6S
<Figure 2>
Date:
2/912017
Engineer:
Page:
2/4
Project
Address. -
Phone:
E-mail:
Recommended Anchor
Anchor Name: Titen. HM - 5/6"0 Titen HO (THDB model), hnom:5" (1 27mm)
Code Report, ICC-ES ESR-2713
In put data and results mustbee checked for agreement Mth the wdsting circumstances, the standards and guidelines must bas checked for plausibility.
sn"Pst� C---mj:an�' I i-c� $956 W. Las Plositas SOUIMrd Pleasanton. CA 94588 Phone: 925.560.9000 Fax- 925.8-47.3871 vmw.strongtie.corn
ME
Anchor DesignerTm
Softwar
Version 2.4.6025.40
3. Resulting Anchor Forces
Company:
Date:
12/9/2017
Engineer
Page:
13/4
Address.
Phone:
E-mail:
Anchor Tenslon load,
Shear load x,
Shear load yt
Shear load combined.
N. (lb)
V�. (lb)
V�y (lb)
4(V-)II-(W.y)I (1b)
1 0.0
4666�7
0.0
4656�7
2 0.0
4666.7
0.0
4666.7
3 0.0
4666.7
0.0
4666.7
Sum
M
14000.0 0.0
Maximum concrete compression strain (%.): 0.00
Maximum concrete compression stress (psi): 0
Resultant tension force (lb): 0
Resuftant compression force (loy 0
Eccentricity of resultant tension forces in x-axis, e'ti. (inch): 0.00
Eccentricity of resultant tension forces in y-exis, e'Ny (inch): 0.00
Eccentricity of resultant shear fcrces in x-axis, e',,,, (inch): 0.00
Eccentric4 of resultant shear forces in y-axis, e'vy (inch): 0.00
B. Steel Strength of - chor in -Shear U-Sec. 0.6;1)
V. (lb) ow.,eoV�a (lb)
8000 1.0 0.65 5200
<Figure 3>
9. Concrete Breakout Strength of Anchor in Shear fSec. D.6.2
Shear perpendicular to edge in x-directfon:
Vb� = min 1 7(1� / Cfa)10.2�dtj�, fC,, I -r,; 9.;,�4foce"I (Eq. D-33 & Eq. D-34)
I" (in) d� (in) ;4 f� (psi) cs'� (in) Vz. (lb)
3.82 0.63 1.00 2500 6.00 5841
14000.0
YI
+ I da
ovcb. =6 (Avt!lAyco) (Sec. 0.4.1 & Eq. D-30)
Av, (in� Av. (W) Y/e d, V YjC' V Y'a V Vbx (lb) OVb. (lb)
144.00 162.00 1.000 1.000 1.061 5841 0.85 4681
10. Concrete Pryout Strength of Anchor in Shear (See. D.6.3
0m. Ok,-PtVcti� = KC.N Te�-,hf T-,N Wcp�N& (Ec. D-41)
k�� AAt (in2) Amw (i n2) S%C'n V'ed' tv Kli V�p�N Nb (lb) Wqpp (I b)
2.0 268.85 131.33 1.000 t000 1.000 1.000 6345 0.75 1 . 9487
11, Ptesuft
11 - Out data and results must be checked for agreement with the existing circ�jmstancqs, the standards and guidelines must be checked for plausibility.
&71..� �r' --'; -- 1-.
5956 W. Las Positas Boulevard Pleasanton, CA 945se Phone: 925.560.9000 Fax: 925.847,3871 vmw.strongtie.com
H 0 Lt
11�
Anchor Designer"
Software
V e r s i o r 12. 4 � 6 0 2 5. 4 0
Company:
Date:
12/912017
Engineer:
Project
Address:
Phone:
E-mail:
Interaction of Tensile and Shear Forces (See. D.7)
Shear Factored Load, Vua (lb)
Design Strength, OVn (lb)
Ratio
Status
Steel 4567
5200
0-90
Pass
T Concrete.breakout x+ 4667
4681
11.00
Pass (Govems)
Pryout 14000
19487
0.72
Pass
5/8"0 Titan HD (THDB model), hnom:6" (127mm) meets the selected design criteria,
12. Warnincts
- Per designer input, the tensile component of the strength -level earthquake force applied to anchors does not exceed 20 percent of 'the total
factored anchor tensile force associated with the same load combination. Therefore the ductility requirements of D.3.3.4.3 fortension need noi
be satisfied — designer to verify.
- Per designer input, the shear c,:;mponent oil the strength -level earthquake force applied to ancriors does not exceed 20 percent of the total
factored anchor shear force associated with the same load combination, Therefore the ductility requirements ol D.3.3.5.3 for shear need not be
satisfied — designer to verify,
- Designer must exercise own judgement to determine if this design is suitable,
- Refer to manufacturer's Product literature for hole cleaning and installation instructions,
InPut dMa and results Must , be --hecked for agreement Wfth tie eyistinG c1roumstancess, the standzrds and guidelines must, be- cher—ked for piauvibilfty.
1,956 W. Las Positas Boulevard Reasanton. CA 94588 Pho.ie: 925.560.9000 Fax., 925.847.3871
vmv.strongbe.co, n
GENERAL NOTES
LIVE SAYETY NOTES (continued
FRAMING NOTES (confinuedl
Nothing in this permit approval process shall be interpreted as
allowing or permitting the maintenance of any currently existing
illegal, nonconforming, or unpermitted building, structure, or site
condition which is outside the scope of the pen -nit application,
regardless of whether such building, structure, or condition is
shown on the site plan or drawing. Such building, structure, or
1condition may be the subject of a separate enforcement action.
Sound/noise originating from temporary construction sites as a
result of construction activity are exempt from the noise limits
only during the hours of 7:00am to 6:00pm on weekdays and
10:00am and 6:00pm on Saturdays, excluding Sundays and
Federal Holidays. At all other times the noise originating from
construction sites/activities must comply with the noise limits,
unless a variance has been granted. ECC Chapter 5.30
All changes in plans and field modifications shall be approved by
the local jurisdiction. The design professional shall prepare
drawings as required for approval. IBC 107.4
Temporary address shall be clearly visible from street during all
phases of construction. Failure to properly post house/building
numbers may result in no inspection by the City Inspector.
Curb signage is not acceptable.
Address numbers (4" min. ht. & 1/2" min. stroke width) shall be
posted to be plainly visible from the street or road fronting the
property. IRC R319
LIFE SAFETY NOTES
Smoke alarms shall be installed in each sleeping room, outside of
each separate sleeping area in the immediate vicinity of the
bedrooms, and on each level (including basements and habitable
attics) in new construction and in existing dwellings when
alterations, repairs or additions requiring a permit occur. Smoke
alarms shall be hard -wired with battery backup, and when more
than one smoke alarm is required within an individual dwelling
unit, they shall be interconnected. Discuss exceptions to the
power source requirements with the Building Inspector.
IRC R314 IBC 907.2.11.2
Carbon monoxide alarms shall be installed outside of each
separate sleeping area in the immediate vicinity of the bedrooms
and on each level in new construction and in existing dwellings
when alterations, repairs or additions requiring a permit occur, or
lwhen one or more sleeping rooms are added or created. IRC R3151
Handrails and guards must be capable of resisting a concentrated
load of 200 pounds per square foot applied in any direction at any
point along the top. Guard in -fill components must be capable of
resisting 50 pounds per square foot.
IRC Table R301.5 IBC 1607.8
Handrails shall be continuous through stair flights of four or more
risers, without interruption by newel posts (unless at a turn) or
other obstructions, and return to a wall, newel post, or safety
terminal. The grip -size shall be Type I or 11 or of equivalent
graspablity. IRC 311.7.8
Provide one operable escape window in the basement, habitable
attic and in each sleeping room meeting all of the following
requirements:
-An operable area of not less than 5.7 sq. ft. (5 sq. ft. for grade
floor opening)
-A minimum clear opening height of 24 inches
-A minimum clear opening width of 20 inches
-Not more than 44 inches. between the finished floor and the
bottom of the clear opening.
Escape windows located under decks or porches must have a path
36 inches in height to a yard or court. R310 IBC 1029
The greatest riser height within any flight of stairs or the greatest
tread depth within any flight of stairs shall not exceed the smallest
by more than 3/8 inch.
IRC R311.7.5.1 IRC R311.7.5.2 IBC 1009.7.4
FOOTINGS/FOUNDATIONS
Footing drains are required around concrete/masonry foundations
that retain earth and enclose habitable or usable spaces located
below grade, or for crawl spaces when a minimum 6 inch slope
within the first 10 feet of the foundation wall is not achieved. A
separate footing drain inspection by the Building Inspector is
required. IRC R401.3 IRC R405.1
Slab -on -grade floors shall be a minimum 3.5-inch thick concrete
over a 6 mil vapor barrier and 4-inch base of sand/gravel/etc.
There shall be a thermal -break for slabs inside a foundation wall,
and if the slab is less than 24" below the exterior grade, 24" wide
R-10 perimeter insulation must be provided. Slabs used as part of
a hydronic heating system shall have R- 10 insulation provided
throughout the entire slab area.
'IRC R506 WSEC R402.2.9 WSEC Table R402.1.1
Vertical rebar must be hooked and tied in place at time of footing
inspection. Maintain minimum 3" clearance to earth, 1-1/2" to
form -work for reinforcement. R403.1.3 R404.1.2.3.7.4
Anchor bolts shall be at least 1/2 -inch in diameter and extend 7
inches into concrete. There shall be a minimum of two bolts per
plate, with one bolt within 12 inches but not closer than seven bolt
diameters from the end of the plate. The bolt spacing shall not
exceed 6 feet o.c. and shall have a nut and 3"x3"xO.229" washers
unless engineered. IRC R403.1.6
FRAMING NOTES
Hardware and fasteners in contact with preservative -treated wood
shall be of hot -dipped zinc galvanized steel, stainless steel, silicon
bronze or copper. IRC R317.3.1 IBC 2304.9.5.1
oists less than 18" and beams less than 12" to grade and all wood
xposed to weather shall be preservative -treated or naturally
esistant to decay. IRC R317 IBC 2304.11
oists shall have not less than 1.5 inches bearing on wood or metal
nd 3 inches on concrete. Joists shall be prevented from rotating
t the ends and at intermediate support by approved hangers, 2
h nominal blocking, or attachment to a rim board.
C 502.6/502.7 IBC 2308.8
Foundation cripple walls shall be framed of studs not less in size
than the studs above. Walls over 4 feet in height shall be framed
of studs having the size required for an additional story. Cripple
walls studs less than 14 inches in height shall be sheathed on at
least one side with a wood structural panel that is fastened to both
the top and bottom plates in accordance with Table R602.3(l), or
cripple walls shall be constructed of solid blocking. Cripple walls
Ishall be supported on continuous foundations. IRC R602.9
Prior to the framing inspection, the building must be dried in with
a minimum of roofing, windows, and siding paper installed.
Truss layouts showing girder truss/hip-master locations are not
permitted to change and must be followed correctly. If the truss
manufacturer requests to change, in part or in whole, the layout
shown, they must contact the architect/designer to ensure that the
structural design of the building is maintained. If the layout
shown is changed, in part or in whole, the Building Division
requires new engineering calculations and must approve the
changes prior to the installation of the roof sheathing.
Exterior and bearing wall studs may be notched <25% and bored
<40% of the stud width. Non -bearing wall studs may be notched
<40% and bored <60% of the stud width. Any bore located <5/8"
from the stud face is considered a notch. Rafters and joists may
be notched in the outer thirds of the span with a maximum notch
depth 1/6th and a notch width 1/3rd the depth of the member.
Rafters and joists may be bored up to 1/3rd the depth of the
member no closer than 2" to each edge or to another bore. Top
plates notched or bored >50% of the width must have a l6ga.
strap, 6 inches past and fastened with 8- 1 Od nails at each side of
,the opening. IRC R502.8 IRC R602.6 IBC 2308
Attic access openings are required for buildings with combustible
ceiling or roof construction over an area >30 sq. ft. and with a 30"
vertical space between ceiling and roof framing members. The
rough -framed opening shall be 22"00" and located in a hallway
or other readily accessible location. The access cover shall be
weather- stripped and insulated to a level equal to the surrounding
isurfaces. IRC R807.1 WSEC 402.2.4
Attic ventilation openings shall not be less than 1/150 of the area
of the space ventilated. It may be reduced to 1/300 if at least 50
percent and not more than 80 percent of the required openings are
at least 3 feet above the eave vents with the balance provided by
the eave vents. The net free cross -ventilation area may also be
reduced to 1/300 when a Class I or II vapor barrier is installed on
the warm -in -winter side of the ceiling. IRC R806.2
ADDITIONAL REQUIREMENTS
A survey may be required prior to the foundation wall inspection if
the Building Inspector is unable to verify setbacks. Lot line stakes
should be in place at the time of the foundation inspection and
established property pins should be made visible.
Z 00
C'4
rq
E 7�,
U
Z
E
C) 0�
,2.E
(U
U C)
Z
U
�D
4 0
0
U
0.1 0
W
Z
C_� U
CN
MECHANICAL N MEN
PLUMBID4U INU'IhN
PIKL-KAIED UUNNTKUUT1UN
P70��door air inlets in all habitable spaces.IRC 1507.3.4.4
A 30"00" level working space shall be provided in front of the
control side to service appliances. In attics and underfloor areas,
a passageway a minimum of 30 inches high and 20 inches wide
traveling not more than 20 feet from the access shall be provided.
A 24 inch wide solid pathway shall be provided in attics. A
switch -controlled luminaire is required at the passageway opening
and a receptacle outlet at or near the appliance. A means of
electrical disconnect is required within sight of the appliance or
the breaker is to be capable of being locked in the open position.
IRC M1305 IMC 306 NEC 422.31(B)
Provide the combustion air required for the proper operation of the
appliance(s). The minimum required volume per the standard
method is 50 cubic feet per 1000 BTU/hr. Where exhaust fans,
clothes dryers, and kitchen ventilation systems interfere with the
operation of appliances, makeup air shall be provided. Fuel -fired
appliances shall not be located in sleeping rooms, bathrooms,
toilet rooms, or storage closets unless specific installation
requirements are met. IRC G 2406.2 G2407.4 G2407.5.1
1FGC 303.3 304.4 304.5
An exhaust hood/system of >400cfm installed or required by the
range or cooktop manufacturer must be provided with makeup air
equal to the exhaust air rate. IRC M1503.4 IMC 505.2
Provide required makeup air in the laundry room. Louvered doors
or openings/grilles into other spaces may be used to meet the
requirements. Other limitations may arise if a gas dryer is
installed. IMC 504.5 G2407.4 G2407.9.1
Dryer ducts shall terminate outside of the building, 3 ft. from any
openings into the building. The termination shall have a backdraft
damper and no screen. The dryer duct shall be a minimum
.016-in. (27 ga.) thick, a minimum 4 inches in diameter, have a
smooth interior finish, have sections joined with the insert end in
the direction of airflow without the use of fasteners, be supported
at 4 ft. intervals, and secured in place and protected by nail plates
that extend 2" aboveibelow bottomAoP plates. The joints shall be
sealed with UL 18 1 A listed mastic or tape. Dryer duct maximum
lengths are 25 ft. for electric and 35 ft. for gas with deductions for
fittings (or sized/length per manufacturer). If concealed, the
equivalent length of the duct shall be permanently labeled or
tagged within 6 ft. of the dryer connection.
,IRC M1502 M1601.4.1 G2439 IMC 504 IFGC 614
Hydronic heating system piping shall be tested at 100 psi water
pressure or 1 1/2 times the operating pressure, whichever is greater,
for a minimum of 15 minutes. Piping embedded in concrete shall
be pressure tested prior to the placing of concrete and be
maintained at operating pressure during concrete placement. The
test must be observed by the Building Inspector prior to concrete
placement. Note: a means of providing outdoor air per IRC
R303.4, M1507 and IMC 403.2 is required. IMC 1208 - 1209
Refrigerant circuit access ports located outdoors shall be fitted
with locking -type tamper- resistant caps.
IRC M1411.6 IMC 1101.10
installed on a floor level that is lower than the next
upstream manhole cover of the public or private sewer shall be
protected from backflow of sewage by installing an approved type
of backwater valve. Fixtures on floor levels above such elevation
shall not discharge through the backwater valve. UPC 710.1
Vent all plumbing fixtures through the roof per UPC 906.0 or
with a loop vent per UPC 909.0. Air admittance valves are not
permitted unless first approved by the Building Inspector on a
case by case basis.
Water heaters installed in attics, attic -ceiling assemblies,
floor -ceiling assemblies or a floor/sub-floor assembly, where
damage may occur from a leak, shall be installed in a watertight
pan made of corrosion -resistant materials. The pan shall have a
minimum 3/4" drain and the drain shall terminate in a visible
location. The drain cannot empty into the crawlspace beneath a
building. Discharge from a relief valve into a water heater pan
shall be prohibited. UPC 507.4 UPC 507.5
Access will be required for the whirlpool/jetted tub pump and the
tempering valve for all tubs. The tempering valve may also be
installed at the water heater. UPC 409
Showers shall be a minimum of 900 square inches and be capable
of encompassing a 30 inch circle. The shower receptor shall have
a finished dam, curb, or threshold between 2" and 9" above the
top of the drain. The floor of the shower shall slope a minimum ol
1/4" and a maximum of 1/2". Lining materials for built-up showers
and shower seats shall be sloped, extend upward 3" above the
horizontal surface, and over the top of the dam or threshold.
Shower receptors shall be tested by filling with water to the top of
the rough threshold while plugged at the drain. Protect the weep
holes in the sub -drain clamping ring from clogging.
UPC 408.5 - 408.7
[Kfaa�ing shut-off required on water supply line. UPC 606.2
Pressure reduction valve on main water supply line required by
City code.
Vent hot water tank relief valve directly to the outside.
UPC 608.5
lot water heater must be seismically anchored or strapped at
oints within the upper one-third and lower one-third of its
ertical dimensions. At the lower point, a minimum distance of 4"
iust be maintained above the controls with the strapping.
507.2
All pressure absorbing devices (e.g. air chambers, mechanical
devices, hammer arrestors) shall be accessible or installed per
manufacturer. UPC 609.10
JMinimum I" air -gap required at dishwasher. UPC 414.3
Hose bibs (exterior faucets) are required to have a permanently
affixed anti -siphon device installed. UPC 603.5.7
Soaker and jetted tubs shall be installed and supported per the
manufacturer's installation specifications. UPC 409.6
Dwelling/garage separation shall be maintained by installing 1/2" gypsum
wallboard on the garage side ftom the foundation to the underside of the
roof sheathing. Ceiling of garages with habitable space above shall have
5/8-inch Type X gypsum wallboard attached with 1-7/8 inch 6d coated
nails or equivalent drywall screws and the structural elements supporting
the ceiling protected with 1/2 gypsum wallboard. Enclosed accessible space
under stairs shall have walls, under -stair surface and any soffits protected
on the enclosed side with 1/2" gypsum wallboard. Water resistant gypsum
shall not be used as a tile backing board where there will be direct
exposure to water, or in areas subject to continuous high humidity
(showers, etc.). IRC R302 IRC R702.3.8.1
Fireblocking shall be provided to cut off all concealed draft openings (both
vertical and horizontal) and to forrn an effective fire barrier between
stories, and between a top story and the roof space. Fireblocking shall be
provided in wood -frame construction in the following locations:
1) In concealed spaces of stud walls and partitions, including furred spaces
and parallel rows of studs or staggered studs as follows:
1. 1 Vertically at the ceiling and floor levels.
1.2 Horizontally at intervals not exceeding 10 feet.
2) At all interconnections between concealed vertical and horizontal spaces
such as occur at soffits, drop ceilings and cove ceilings.
3) In concealed spaces between stair stringers at top and bottom of the run.
4) At openings around vent, pipes, and ducts at ceiling and floor level,
with an approved material to resist the free passage of flame and products
of combustion. For additional requirements see IRC 302.11
Draftstops shall be installed in combustible construction where there is
usable space both above and below the concealed space of a floor/ceiling
assembly, so that the area of the concealed space does not exceed 1000 sq.
ft. and shall divide the space into approximately equal areas. Where the
assembly is enclosed by a floor membrane above and a ceiling membrane
below, draftstopping shall be provided in floor/ceiling assemblies under
the following circumstances:
I.Ceiling is suspended under the floor framing.
2.Floor framing is constructed of truss -type open -web or perforated
members.
-Istopping materials shall not be less than 1/2 inch gypsum board, 3/8
wood structural panels or other approved materials adequately
Drted and installed parallel to the floor framing membersIRC R302.12
ADDITIONAL REQUIREMENTS
Height verification shall be done by the applicant's agent/contractor and
observed by the Building Inspector on site. The agent/contractor shall set
up the equipment (transit/builders level), establish the datum point, and the
point of average grade. These items must be consistent with the approved
plans. If the proposed height of a building (as shown on the plans) is
within 12 inches of the maximum height pennitted for the zone, an
elevation survey is required. An elevation survey consists of three
components to be conducted by a licensed surveyor. 1) Prior to
construction, the surveyor shall establish average grade as specified in
ECDC 21.40.030, and shall establish a reference datum point that will be
undisturbed and can be freely accessed. 2) The surveyor shall locate the
elevation of the first floor prior to the City under -floor inspection. 3) A
final letter of height confirmation shall be provided upon completion of the
structure.
= 0
�, CA
CC
cc",
C.,
Cq C'Q
E
(U 0
V) -,7
C)
,2
>
U C�
OV E04,
Poo'
U
Z
Z 0
U
�T.
Z
0 U
CN
2
U,
w
>1
134.9G'
l�: 944'44" W
PPOPERTY LINE
E-�AI�D-5ffll-A
POB
PRO T ED,
5TIMATEV 2" STAIR'
C
NTOUR5
NEW 5TUNI: STEPS
TO SPADE, / I -AWN
BELOW
C)
0
NEWIMPERV US
'uj
SUR PAC E (64 sr)
LLJ
I
U)
LAND5CIPED 4 I`I'W.T'U'
D- ABOVI
z
TERRA ED
A
=EAP RD
<
EXISTING I& CM /5". If
RffAINING WALL 5TON
lu�
STEPS. ADJUST X� RE
2
DE T MKMAENMDFENCING
OV� 0 COS.
RO
EPP 5 N9N
PROTECT 0151ING TREES. 5M;6135
AND NG WITHIN CON TRUCTION
ARFAWA5 RECXD VE PYWIOWNER
Z��jl
EYAPD5FTBACK
Del 9141
SITE PLAN
PARCEL# 00619400800300
12'
PROP05ED NEW
EXISTING FENCE
>
LL
EXISTING FE!NCE
EXISTING STONE RETAJNING. GATE AND FI!NC2
ADJUST AS RECID.
FKOPOSED NEW
HEAT PUMP
gt IN
PROPOSED 5rIML
Al
STAIR CASE
_--?
TBM-A
C15CArING
ELEV: 201.30
SET NAIL IN PAVEMENT
DO" 1:� , Ire
21'-8"
PROPOSED 2 SIND
U-1
BEDROOM AND DINING
L'j
i;
3:
ROOM VITION
(115 5F EACH)
NEW IMFEPIVIOU5 -1
-�
PROF05EO MASTER
SURFACE (217 5P)
-0
>
BATH ADDrTON ABOVE
EX15TING EX15TING GARAACar
EX15TING
L' i DO
CONCRETE
<
0 IG SO
DRIVEWAY
HOME
2(y F RONT
2
z
FOOTPRINT po,,,,,
YARD SETBACK Z
0
NEW FOYER
PROPOSED COVERED ADDITION
DECK PATIO ADDITION (15 5r)
PARCEL #
D
E 0"
500300
OVERHANG
20'-4"
PROPOSED
NEW BAY
COVERED 11011T
LEW
ILZT R
BEI
W DOW
(I I SF)
ENTRY PORCH 51DEAA� I
AND 15TER5 5TEF/ rLANTE
in
1
(53 5F) (1 17
SF)
- - - - - -
- - - - - - - - - - -
OO"5rOUT5
'PROPERTY LINE�
-j
— . .-I-
11 IN
*5
N 88*44*5 W
- —
- — - — - — -
)*
30.00'
134-94'
ELMC MrrM GAS METER
EXISTING DOWN5POUT
t
FENCE ON
PROPERTY UNE
HATCH REPRESENTS AREA 12'
Of NEW IMPERVIOUS SURFACE
N.qh
HATCH REPRESENTS AREA
A A Of NEW CONSTRUCTION
ENGINEERING
FILTEIt ""' ---
�E RREIT IT.% . E'\
E I -A
27,0"',
A - T "'C" Or
ILI. r- C. RUITRCE, -R. 1.
WIRE 4T�
XF-ROT
u
'0' R
EADDIRLE.1
RICTER111-111 -L RAINTAII A A-AX
S'AA' RALES TO NR-A EACRITY CC.-U
IEI 'F
... R
C.-EIR". '..'E E"..
G
ED
DARIN
-1 ""U"IT"
C. ITT t1%,
-I-TION PER-
-1 - DE -D III
A REGULAR PASUE TO HADINTAIN
F311RAIDIN
CITY TNSP IT5,11 REQUIRED DEN ALL ERRISM C ROOM
'EASUEER 2-RE VCRK CAN BEGIK
-1-FAIIIII-1011
A �_o
A
A
ENGINEEERON.
ENGINEERING
ZL
ENGINEERING
ENGINEERING
A
.(ONIEFUNG
GENERAL NOTES NOTE
1, ALL THE D15TURBED SURFACE A?EAS WILL
BE COMP05T AMENDED PEP 5MP DOE T5.13
2. PROVIDE EROSION CONTROL FILTER SOCKS
TO ANY CATCH BASINS DOWIN15TRZAM FROM
PROPERTY.
3. ORANGE PROTECTIVE BARRIER fENCING WILL
BE PLACED AT OFIF LINE Of TREES TO REMAIN
4. SEE DETAIL E 1. 1 / A 1. 1 FOR CITY
STANDARD SILT FENCE DETAILS
5. INSTALL AND MAINTAIN ALL'TE5C"
MEASUREMENTS ACCORDING TO APPROVE[)
PLANS, CITY OF EDMONDS STANDARD DETAJI-5,
AND ALL OTHER MEASUREMENTS THAT MAY BE
REQ'D DURING CONSTRUCTION
G. THE! EX15TING DRIVEWAY MLL BE USED AS
THE CONSTRUCTION ACCE55 FOP THE PROPERTY.
PLEA5E PROVIDED FENCING AND FILTER 50CK5
TO ENSURE CONSTRUCTION 5TOPMWATEP
15 CONTAINED
VICINITY MAP
PROJECT SITE:
7�7-
5 ".
Y
-F-y
N,
7,ElmWy
�M
Liz
�A
A,
NA,
PROJECT PARTICIPANTS
PROJECT DATA
OWNER: TYLER KIMBROUGH
JURISDICTION ........ CITY OF EDMONDS,
1140 7TH AVE. S.
SNOHOMISH COUNTY
EDMONDS, WA 98103
PH: 651-210-8687
PROJECT 11407TH AVE S.
CONTRACTOR: TBD
ADDRESS .......... EDMONDS, WA 98020
TAX ACCOUNT NOS - .. - #00619400800300
ENGINEERING: CSES
ZONING .... RS-6
6311 17TH. AVE NE
SEATTLE, WA 98115
LOT SIZE ........ .. 55'X135' = 7425 SF
PH: 206-527-1288
. 17 ACRES
OCCUPANCY GROUP R
DESIGNER / DRAFTSMAN: SHAWN SULLIVAN
4402 242ND PLACE SW
CONSTRUCTION TYPE . . . TYPE V—NR
MOUNT LAKE TERRACE, WA
98042
PH: (425) 870-0383
LEGAL DESCRIPTION
SECTION 25 TOWNSHIP 27 RANGE 3 QUARTER NW YOSTS IST ADD TO EDMONDS PLAT OF BLK 008
D-00-LOT 3 LESS S 1OFT THOF PLUS PTN OF VAC ALLEY LESS 55FT OF LOT 3 TGW Ej VAC ALLEY
ADNI THIRTO AKA LOT 3 CITY OF ED SP S-37-76 REC AFN 7610050117
IMPERVIOUS SURFACES
SQUARE FOOTAGE BREAKDOWN
NEW / EXISTING SQUARE FOOTAGE - LIVING
NEW/ REPLACED IMPERVIOUS SURFACES
EXISTING LOWER FLOOR
985 SF
NEW BEDROOM/ DINING ADDITION
EXISTING MAIN FLOOR
1288 SF
135SF
(INCLUDING OVERHANGS)
EXISTING STAIR I ENTRY
80 SF
NEW COVERED REAR DECK / PATIO STRUCTURE
NEW FOYER EXPANSION
15SF
(INCLUDING OVERHANGS) 465 SF
NEW LOWER FLOOR BEDROOM EXPANSION
115SF
NEW SPIRAL STAIR 44 SF
NEW MA N FLOOR DINING ROOM
115SF
NEW M= FLOOR M. BEDROOM EXPANSION
116 SF
NEW COVERED FRONT PORCH /STEPS
NEW MAIN FLOOR BEDROOM BAY WINDOW
11 SIF
(INCLUDING OVERHANGS) 73 SIF
TOTAL LIVING
2725 SF
NEW FOYER EXPANSION 15SF
NEW MAIN FLOOR BEDROOM BAY WINDOW
EXISTING GARAGE
440 SF
(INCLUDING OVERHANGS) 29 SIF
EXISTING PROTABLE SHED 8X8
64 SF
NEW ROOF OVERHANG AT M. BEDROOM EXPANSION 100 SF
NEW FOOTAGE -CITHEIR
NEW FRONT SIDEWALK /STEPS 117 SF
TOTAL NEW IMPERVIOUS SURFACE 978 SF
NEW FRONT PORCH /STEPS
53 SF
NEW LOWER FLOOR CONCRETE REAR PATIO
322 SF
978 SF � 2000 SIF NEW ALLOWED THUS NO DRAINAGE PLANS REDD
NEW MAIN FLOOR COVERED REAR DECK
368 SF
NEW ROOF TOP DECK
228 SF
NEW FRONT SIDEWALK /STEPS
LOT COVERAGE
JUL I
BUILDING FOOT PRINT (INCLUDING GARAGE)- 1621 SF LOT SIZE- 7425 SF
FRONT PORCH /STEPS - 53 SF
322 SF 2060 / 7425 =.27 OR 27 % LOT COVERAGE APPROVED BY PLANN
64 SF 27% < 35% ALLOWABLE THUS OK
2060 SF zone &S Comer v I Flag EJ
ACCEPTABLE TIGHTLINE
MATERIAL
REAR
CONCRETE COVERED PATIO -
$DR 35
PORTABLE
SHED -
SCH 40
"- 12
TOTAL
LOT COVERAGE
F810 HANCOF
Applicant shall repair/replace all dam to
OWNERCONTRACTOR IS RESPONSI BLE
'990
utilities orfrontage improvements in City
MH LWXM ALL 1*411 MMM
FOR EROSION CONTROL AND DA MAGE
right-olf-wary per city standards that . Is caused
KILWATOPWAMN 70 ANY Vill"
_or occurs during the permitted project
111w KWW NPAPM ~
REVISIONS:
1. CD SET �UBMITTAL 04-204017
2. RESUBMITTIED06-26-207
3.
4.
5.
LU
Uj
a-
(3)
L)
C:
(3)
0::) .00
(D 0
E
ry a)
UO)
z
0
CD
0
E
�e
im
z
D
LU
017
W
G
-14
DATE: 02-2016
DESIGNED: SLS
DRAWN: SILS
APPROVED BY ENGINEERING Setbnks
Reguired
Actugl
R 2,21 U 3
JOB Na 2016-04
Front
Sides
-741e—
JUN Z 9 2017
SHEE
Rear
is, vj
5'r, �R'l
Date: _2Z Other
—
BUILDING DEPARTNIFENT
CITY OF EDMONDS
eight
-- 'L5
f5Lb2,L�ij-b650
FOUND 4"X4"CONCRETE MONUMENT WIr
BRASS DISC WIPUNCH, IN CASE, DOWN 0.2-
F 1p:
-3D- ei T!
8
;z
zi ""'o
BASIS OF BEARING
--_.!N!8S'43';t77 W FIRST
330.11'
269.72'
S 88-'IV31- E
329.70'—ELMST
FOUND IRREGULAR SHAPED
CONC ETEMONUMIENTW/LEADAND
TACK, IN CASE, DOWN 1.0-
SAW
FOUND IRR83ULAR SHAPED CONCRETE
MONUME W/2' DOMED BRASS DISC W/PUNCH,
IN CASE, DOWN 0.9'
1140 7TH AVE S
EUEV:. 201.30
SET NAIL IN PAVEMENT
20 0 40 66
Scale 1" 2 0)
MERIDIAN
ASSUMED
DATUM
NAVD 88
LEGAL DESCRIPTION
FROM STATUTORY WARRANTY DEED RECORDING NUMBER 201206120683
LOT 3 OF CITY OF EDMONDS SHORT PLAT NO. S-37-76' RECORDED
OCTOBER 5. 1976 UNDER RECORDING NO. 7610050117. RECORDS OF
SNOHOMISH COUNTY. WASHINGTON;
SITUATE IN THE CITY OF EDMONDS. COUNTY OF SNOHOMISH. STATE OF
WASHINGTON.
LEA3END
EFNC BOARD FENCE
0 SET 112- X 24- REBAR WITH 1 314- PLAS77C CAP
STAMPED "TYEE LS 29276'
X SET LEAD AND TACK WIWASHER STAMPED -rfEE LS
29276"
FOUND MONUMENT AS DESCRIBED
BLDG HATCH
F T-I CONCRETE HATCH GRAVEL HATCH
Li m
EQUIPMENT & PROCEDURES
FIELD SURVEY CONDUCTED USING A COMBINATION OF GPS USING A
REFERENCE NETWORK AND A 5* ELECTRONIC TOTAL STATION WAS USED
FOR THIS FIELD TRAVERSE SURVEY.
SURVEY PROCEDURES MEET OR EXCEED STATE STANDARDS AS SPECIFIED
BY WA.C. 332-1130 WITH REGARD TO LINEAR AND ANGULAR CLOSURES.
ALL MEASURING NSTRUMENTS FOR THIS SURVEY HAVE SEEN MAINTAINED
ACCORDING To MANUFACTURES SPECIFICATIONS AND HAVE BEEN
COMPARED WITH A NATIONAL GEODETIC SURVEY CALIBRATED BASELINE
WITHIN THE LAST 12 MOMS.
GENERAL NOTES
1. THIS MAP DOES NOT PURPORT TO SHOW EASEMENTS OF
RECORD, IF ANY.
2. MONUMENTS VISITED IN APRIL 2016
3. SEE RECORD OF SURVEY FOR ADDITIONAL SURVEY DATA.
PARCEL NUMBER 00619400800300
SW1/4, NW1/4, SEC. 25, T. 27 N., R. 3 E., W.M.
CITY OF EDMONDS, WASHINGTON
SITE PLAN
for
TYLER KIMBROUGH DRAWN
DWL
-CHKD B
Fnmnmn.q wARmimnTom a— TG
Tyee
Surveyors
PROFESSIONAL LAND SURVEYORS
10007 GREENWOOD AV NE, SEATTLE, WA. 98133 (206) 525-3M
DATE:
JOB NO.:
4-27-2016
16069
SCALE:
SHEET".
11. = 20'
1
REVISIONS:
1. CDS -SUBMITTAL 04-20-2017
2. RESUBMITTEI)0�2-017
3.
4.
Uj
0.
(D
0
C:
p
C\I
(3)
0
Z:)
0
Cf)
C>
Do
(m
ry
E
a)
Uj
C
0
r
C6
0
z
0
0
E
V
w
ry
D
co
CITYCOPY
DATE: 02-2016
DESIGNED: SLS
DRAWN: SLS
73U'�
JOB NO: 2016-04
JUN 2 9 2117
SHEET:
BUILDfN1DEP—,n Iff
ITYOFE§
C "�:%,
I A1.2--
REVISIONS:
1, CD SET �SUBM17llAL 04-20-2017
2, RESUBMIWED08-26,2017
At
3.
Kimbrough
Residence
VV,
S
CO SID 70 C71
4.
5.
CO
Remodel /
Addition
W LU
LU 0
1140 7th Ave. South
0-
Edmonds,
WA 98020
Nis
ABBREVIATIONS
PROJECT PARTICIPANTS
PROJECT DATA
DRAWING INDEX
21
EXISTING
L
LENGTH
BCD SEE CIVIL DRAWINGS
OWNER: TYLER KiMBROUGH
PROJECT 1140 7TH AVE. SOUTH
ADDRESS EDMONDS, WA 98020
ARCHITECTURAL
V
& AND
ANGLE
(E)
EA
EACH
LAV
LAVATORY
SCH SCHEDULE
PH: 651-210-8687
..........
A
COVER
@ AT
ECS
EROSION CONTROL BARRIER
UP
LINEAL FOOT
SO SMOKE DETECTOR
JURISDICTION ............ CITY OF EDMONDS,
Go NSTRUCTION AND SEQUENCING NOTES
D AMETER
ELEC
ELECTRICAL
LPG
L QUID PROPANE GAS
K
SECT SECTION
SNOHOMISH COUNTY
OA
S ITE PLAN
DEGREE
ENG
NGINEER(ING)
EQUAL
LVL
M AX
LAMINATED VENEER LUMBER
MAXIMUM
S S
ED EE ELECTRICAL DRAWINGS
SF SQUAREFEET
CONTRACTOR: TO BE DETERMINED
TAX ID NOS ......... #00619400800300
1
SURVEY
# POUND OR NUMBER
SQUAREFOOT
EQ
EXT
E
EXTERIOR
MB
MACHINE SOLT
SH SINGLE HUNG
LOT SIZE
A1.3
AVERAGE GRADE I BUILDING HEIGHT
AB ANCHOR BOLT
FAU
FORCED AIR UNIT
MECH
MFR
MECHANICAL
MANUFACTURER
SHT SHEET
Sim SIMILAR
........... 7425 SF
OCCUPANCY
A2'O
A2.1
LOWER I MAIN FLOOR -ASSUILT-DEMO PLAN
EXISTING EXTERIOR ELEVATIONS
ABV ABOVE
FD
FLOOR DRAIN
MINIMUM
SL SLIDER
ENGINEERING: CSES
GROUP ........ R
LOWER FLOOR PLAN
ACOUS ACOUSTIC
ACT ACOUSTIC CEILING TILE
FE
FF
FIRE EXTINGUISHER
FINISH FLOOR
MIN
'E
MSC
MISCELLANEOUS
SMD SEE MECHANICAL DRAWINGS
6311 17TH AVE NE
ZONING RS-6
f
UPPER FLOOR PLAN
AFF ABOVE FINISH FLOOR
FG
FULL GLASS
M813
MODULAR
SMS HEET METAL SCREW
S
SEATTLE,'WA98115
PH: 206-627-1288
........
EXTERIOR ELEVATIONS
ALUM ALUMINUM
FHWS
FLAT HEAD WOOD SCREW
MTD
MOUNTED
SPD SEE PLUMBING DRAWINGS
CONSTRUCTION TYPE TYPE V-NR
A3.2
EXTERIOR ELEVATIONS
ARCH ARCHITECTURAL
FIN
FINISH
MTL
METAL
SPEC SPECIFICATIONS
.......
A4.1
BUILDING SECTIONS
AWN AWNING
FLR
FLOOR
MUL
MULLEDWINDOW
SS STAINLESS STEEL
STD STANDARD
DESIGNER DRAFTSMAN: SHAWN SULLIVAN
WATER .............. IN ROAD
A4*2
A5.1
WALL SECTIONS
WINDOW SCHEDULE
BD BOARD
SIP BIFOLD
FOC
POP
FACE OF CONCRETE/COLUMN
FACE OF FRAMINGIFINiSH
(N)
NG
NEW
NATURAL GAS
STK SELECT TIGHT KNOT
4402 242ND PLACE SW
SEWER ............... IN ROAD
p
BLDG BLKG BUILDING BLOCKING
FOIC
FURNISHED BY OWNER, INSTALLED
NIC
NOT IN CONTRACT
STL STEEL
MOUNT LAKE TERRACE, WA
98042
GAS IN ROAD
a) :0)
BLW BELOW
BEAM
FOS
BY CONTRACTOR
FACE OF STRUCTUREISTUDISTEEL
NOM
NITS
NOMINAL
NOT TO SCALE
STRUC STRUCTURAL
STS SELF ING SCREW
PH: (425) 870-0383
...............
STRUCTURAL
Cn OCO,
0 M
BM
BTM BOTTOM
FT
FO OR FEET
OT
OC
ON CENTER
SV SHEETTAVPINPYL
DRAJNAGE SYSTEM ......... EXISTING SPLASH BLOCK
(j)
E
BUR BU LT -UP ROOFING
FTG
FOOTING
0 D
OPH
OUTSIDE DIAMETER
OPPOSITE HAND
T PERED
(T) EM
T&G TONGUE & GROOVE
S1
ROOF FRAMING / UPPER SHEAR WALL PLAN
Lj
CENTERLINE
FX
FIXED GLASS
OS
ORIENTED STRAND BOARD TBD TO BE DETERMINED
PROJECT DESCRIPTION
S2
UPPER FLOOR FRAMING / LOWER FLOOR SHEAR WALL PLAN
CLG CEILING
C UR CLEAR
GA
G LV
A
GA GE
U
GALVANIZED
PH
H DWARE
PANIC AR
OF
TOO Top CONCRETE
S3
FOUNDATION PLAN
(6
AN INTERIOR AND EXTERIOR REMODEL OF AN EXISTING (2) STORY
CMU CONCRETE MASONRY UNIT GLB GLULAM BEAM P PLATE TOp TOP OF PLATE
GSM GALVANI ED SHEET METAL PLAM PLASTIC LAMINATE TOF TOP OF FLOOR
Z
S4
BE
STIR CTURAL DETAILS
U
STRUCTURAL NOTES /SHEAR WALL SCHEDULE
0
COL COLUMN
COMP COMPOSITE
GWB
GYPSUM WALLBOARD
PLWD
PLYWOOD
TOS TO OF SLABISTEEL
P
RESIDENCE TOINCLUDE THE FOLLOWING:
z
CONIC CONCRETE
CONT CONTINUOUS
GY
HC
GYPSUM
HOLLOW CORE
FIR
PSF
PAIR TOW TOP OF WALL
POUNDS PER SQUARE FOOT TS TUBESTEEL
NEW UPPER FLOOR MASTER SUITE ADDITION / EXTENSION OVER GARAGE
0
C)
CS CASEMENT
HDR
HEADER
PT
PRESSURE (PRESERVATIVE) TYP TYPICAL
W/ NEW GABLE ROOF STRUCTURE.
0 4
CPT CARPET
HHS
HEX HEAD SCREW
TREATED
UNO UNLESS NOTED OTHERWISE
NEW FOYER ADDITION /EXTENSION W/ NEW FRONT PORCH, SIDEWALK
DEL DOUBLE
HKII
HOLLOW METAL
REINF
REINFORCING
VERT VERTICAL
AND COVERED ROOF STRUCTURE.
w
DEMO DEMOLISH
HORIZ
HORIZONTAL
RET
RETAINING
VIF VERIFY IN FIELD
A LOWER FLOOR REMODEL TO INCLUDE A NEW BEDROOM SUITE
LEGAL DESCRIPTION
DET DETAIL HVAC HEATINGNENTILAT ON/ RHWS ROUND HEAD WOOD SCREW VPF VEGETATION PROTECTION FENCE
W WIDTH
ADDITION, MECHANICAL ROOM AND MISC. FRAMING ALTERATION TO THE
DH DOUBLE HUNG
DIM D MENSION
AIRCONDITIONINGI
INSIDE DIAMETER
RM
RO
ROOM
ROUGH OPENING
w/ WITH
REMAINING BEDROOM, BATHROOM AND ENTRY HALL. (FINISH UPGRADES).
NEW LOWER FLOOR REAR PATIO ADDITION.
�D RWL RAINWATER LEADER WD WOOD
CWG DIRAWING
NEW UPPER FLOOR DINING ROOM ADDITION AND KITCHEN REMODEL
INSUL
NT
:NSULATION
NTERIOR
SC
SOLID CORE
WT WEIGHT
(FINISH UPGRADES)
SECTION 25 TOWNSHIP 27 RANGE 3 QUARTER NWYOSTS ISTAOD
NEW UPPER FLOOR REAR COVERED DECK ADDITION
TO EDMONDS PLAT OF BILK 008 D-00-LOT 3 LESS S 1OFT THOF PLUS
NEW ROOF TOP DECK W1 CUSTOM SPIRAL STAIR CASE ACCESS
PTN OF VAC ALLEY LESS 55FT OF LOT 3 TGW Ej VAC ALLEY ADJ THR
NEW WINDOW UPGRADES
TO AKA LOT 3 CITY OF ED SP S-37-76 REC AFN 7610050117
NEW EXTERIOR MATERIAL UPGRADES
VICINITY MAP
SYMBOLS
DRAWING NUMBER
REVISION REFERENCE
A— REVISION NUMBER
B L.,.. SECTION
UI I
OR WALL SECTION
SHEET NUMBER
MASONRY
REFERENCE
Dw'� N.d-
FFP1-
STRUCTURA L
CONCRETE
i
Li� L
DRAWING NUMBER
REFERENCE
fk F I is -f
CITY COPY
EXTERIOR ELEVATION
GRIDS
T
INSULATION (LOOSE OR BATT)
REFERENCE
SHEET NUMBER
INSULATION (RIGID)
CITY OF EDMONDS
GRID LINES LOCATE FACE OF
FRAMING AND/OR
CI
BUILDING DEP MENT
G
I DRAWIN NUMBER
AT
FOU )ON STEM WALLS
UNO NO
Effl-M EARTH
El. w-y
WORK
ADDRESS vt::: <-
ClEA—VE
INTERIOR ELEVATION 4 A 5:1 2/
REFERENCE
TRUE
NORTH
U
lh M,
OWNER I Z
Uj
SHEET NUMBER
SAND/ PLASTER/ MORTAR
�-Z
APPROVED DATE:
DRAWING NUMBER
NORTH ARROW
NORTH
ROCK FILL
BLDG. OFFICIAL:
L IC
U)
DETAIL REFERENCE
SHEET NUMBER
METAL (LARGE SCALE)
El. 8,
El�Sl
El. 31
PERIM11' R
NUMBE
UP 7R
STAIR DIRECTION,
# RISERS & TREADS
11T
GYPSUM WALLBOARD
2
1 4'
>
Ell" pi
0
ROOM NAME & NUMBER
ROOM
FINISHED WOOD
DOOR REFERENCE REFERENCE LETTER
101
STRUCTURAL WOOD
EIMPI
PROJECT LOCATION
EQUIPMENT NUMBER
(CONTINUOUS MEMBER)
WINDOW REFERENCE
REFERENCE NUMBER
rz<Z::] STRUCTURAL WOOD
CENTER LINES, FLOOR
LINES
(NON -CONTINUOUS MEMBER)
AT EXTERIOR ELEVATIONS,
DATE: 02-2016
WALL TYPE WALL TYPE PROJECTED LINES PLYWOOD
PROPERTY LINES, BOUNDARY
LINES
IM TILE (CERAMIC)
DESIGNED: SLS
DRAWN: SLS
KEY NOTE REFERENCE
REFERENCE
NUMBER
JOB NO: 2016-04
HIDDEN LINES
-
- - - - - - - -
Z�
PIZ El: a U B
EET
wo
JUN Z 9 �jfllf
CASEWORK REFERENCE
SCHEDULE
NUM13ER
BREAK LINES
BUNLIDNG DEPAR;IAENT
0
Ck
WINDOWTYPE
Ty F EDMO S
1. cosu�uamirrAL04-20.2017
2. RESUBMI�ED 0�26-2W
A
ENGINEERING
GENERAL
(4
CONSTRUCTION SEQUENCE NOTES
CONSTRUCTIONSEQUENCE NOTES
1. SCHEDULE A PRF-CONSTRINTION MEETING WITH CITY ENGMEERING DIVISION
AT 425-771-0226, Exr. 1326. TWO DAY (49 HRI NOTICE 13 REQLTMED-
2. REVIEW TEMIPORARY EROSION AND SEDIMENT CONTROLNOTES.
3. CAM FORUT= LOCATES.
4. INSTALL TESC N[EASURES AND MAINTAIN DUST CONTROL WHME PREVENTING
DISTURBANCE OF ANY AREAS OFF. THE CONSTRUCTION*
ZONE.
5. HAVE EROSION CONTROL MEASURES INSPECTED BY CITY.4 EDMONDS
cny ENGINEERING INSPECTOR- Am TEMPORARY SEDDAENTATIONAND
EROSION CONTROL NIEASURES MUST BE IN PLACE AND INSPECTED PRioRro
ANY CONSTRUCI"IONCIR-SITE CLEARING RROSIONANDSEDIMENTATION
coNmoLPRAcrwmAN)YORDMcEssiLULBF.MAMTAUiMU,nM,.
PER2vLkNENTVEGErATICNISESTABLL9BM.
&DEMOLISHEMSTINGSTRUCTURES
7 ROUGRGRADE,SIMASREQUEEDTO,INSTA.LLII)RAMAGEFFATURES-
.9. CLEAK.CRUB & ROUGH GRADE SITE. REVESETATE,
DISTURBED AREAS NOT SUEUECT.TO ADDITIONAL SURFACE DISTURBANCE
MUDIAT&Y AFTERROUGH GRMINGT (OUIER EXPOSED AREAL SHALL. BE
STABILIZED PER EROSION CONTROL NOTES BELOV)
9. INSTALL mim AND OTHER sm wwvEmmrs, iNcLuviNqFRonAuE
MMOVENIENTS.
13. STABILIZE AND CONTOST AMENDAIL EXPOSEDSOILIS PRIORTO:
REVEGETATION OF ENTIRE SITE.
14 ESTABLISH LANDSCAPING AND PERN[ANENT VEGETA-RON All, TEMPORARY
EROSIONcoNTROLMEASUREs sHAiLBEREmovEDuPoNFTNALsrrE
sTABiLizAnoNANDArpRovALBycrryiNs=oiL
GENERAL CONSTRUCTION NOTES
GE%T,RALN'OIES
1. ALLMATERIALS AND WORK SHOWN ONTHESE PLANS SHALL CONFORM TO
THE CITY OF. EDMONDS STANDARD PLANS AND DETAILS, THE FOLLOWING
spEcmcATjoNs AND CODES, AND ALL oTHERAPIucABlElOcAL
M[MCIPAL, STATE, AND FEDERAL CODES. RULES AND REGULATIONS:
CURRENT INTERNATIONAL BUILDING CODE (IBC)
2016 WSDOTIAFWA STANDARD SPE CIFICATTONS FOR ROADi BRIDGE
AND MUNICIPAL CONSTRIXITON
WASHINGTON STATE DEPARTMENT OF ECOLOGY STORMWAMM
MANAGEIAMU MANUAL FOR THE PUGET SOUND BASIN (CURRENT
EDITION)
2. STANDARD pLANAND TypENUMBERS MICATED ONnEsEDRAwjNGs
REFERTO CITY OF EDMONDS STA24DARD DETAILS, UNLESS NOTED
OTHEPVME
3..ACOPYOFTBESEAPPROVF2DPLAM=T.B.EoNVMIOBSTMSI.MCM
OONSTR.ucnON IS IN PROGRESS.
4. DEVIATIONS, FROM THESE PLANS MUST BE APPROVED BYTHE ENGRWIEROF
RECORDAND THE LOCAL GOVERNING AUTHORITY
5. CONTRACTOR SMALL RECORD ALL APPROVED DEVIATIONS FROM THESE
FIANS ON A SET OF 'AS -BUILT! DRAWINGS AND SHALL SUZ&AARRE AIL AS -
BUILT C ONDITIONS ON ONE SET OF REPRODUCIBLE DRAWINGS FOR
suBmrrTAL To THE OWNER PRIOR FRojEcr commEnom AND ACCEPTANCE
A SET OF AS-BUMT DRAWINGS SHALL BE suBNn= To THE CITY OF
EDMONDS PRIOR TO FINALL APPROVAL OF TEE BUILDING OCCUPANCY/PINAL
PROJECTAPPROVAL
6. ELEVATIONS SHOWN ARE INFEET. SEE SURVEY FORBENCHMIARK
INFORMATION.
T THE LOCATIONS OFEXISTINGUTELITTES AND SUE FEATURES SHOWNHEREON
HAVE BEEN FURNISHED BY OTHERS BY FIELD SURVEY 01 OBTAR14ED FROM
----vD=rnunqA QT.TnTTnTRPR=ni?y;nT7r.cw.qTnPRTzn
VERIFY I OCATION, DEEM SIZE, TYPE AND CONDITION OF EXLSTING UTILITY
LINES AT CONNECTION 0 R CROSSING POINTS BEFORE TRENCHING FORNEW
UTTTITTE& ENIGHqEERASS=SXORESPONSE3RXlYFORTIHE
FEATURES PRESENTED ON THESE DRAWINGS. ]ENGINEER SHALL BE NOTIPII
MWEDIATELY OF CONFLICTS THAT AME.
S. CONTRACTORSHAIL LOCATE AM PROTECTALLUT311TIES DURING�
CONSTRUCTION AM SHALL CONTACT THE UNDERGROUND UTILITIES
LOCATION SERVICE (I MO-424-5555) AT LRAST 48 HOURS PRIOR TO
CCNSMUCllON-
9. CONTRACTORSHALLVERIFYALL CONDITIONS AND DZMNSIONSATTHE
PRojEcTsrmBEFoREsTARTiNGivoRKANDsKA.LLNo=owNEP,s
REP'RESENTATIVEOFANYDISCREPANCIES
10 PIPELENGTHS WHERE SHOWAREAPIPROXIMATEANDMAYCHANGE DUE TO
I= CONDITIONS.
11; CONTRACTOR SHALT. OBTAIN A COPY OF THE GEOTE=CAL REPORT
(WHERE APPLICABLE) AND SHALL THOROUGHLY FAMILIARIZE HIMSELF V,11171
THE CONTENTS THEREOF. ALL SITE WORK SHALL BE PERFORMED IN STRICT,
COIRMIMCE WITH THERECONUvMNI)ATIONS OF THIS REPORT
12. STRUCTURAL FILL MATERLAL AND PLACEMENT SHALL CONFORM TO THE
RECOMMENDATIONS OF THE PROJECTGEOTECHNICAL REPORT.
.13. SUBGRADE SOIE A IN AIL AREASWHERE RAIN GARDENS, INFU-TRATION OR
PEFLVIOlUSPAVE]vffiNT IS T0.13E PLACED SHALL BE DELINEATED AND
PROTECTED AT ALL TIMES FROM CONIPACTTVE ACTIVITIES (i.e. HEAVY
EQUIPMENT, STOCKPILJNG).
MANHOLES, CATCH BASINS, U=EES AND PAVEMENT SHALLBEARON
MEDIUM DENSE TO VERY DENSE NATIVE SOIL OIL COMPACTED STRUCTURAL
FELL. IF SOIL IS DISTURBED, S0Fr, LOOSE, WET OR IF ORGANIC MATERIAL IS
PRESENT AT SUBGRADE ELEVATION REMOVE AND RBPLACE WITH
CONTACTED STRUCTURALFILL PER GEOTFCkMCAL REPORT
15. SEE SURVEY AND ARCHITECTURAL DRAVMGS FORDIMENSIONS AM
LOCATIONS OF BUILDINGS, LANDSCAPED AREAS AND OTHER:PROPOSED OR
EMTING SITE, FEATURES.
a SEE ARc=cTuRALDRAwjNGs FORPERSETERFOUNDATION DRAINS.
FOUNDATIONDRAINS SHALLBE IISIDEPENIDENT OF OTHER SITE DRAIN I S
AND SHALL BE TIGHILINED TO TIE STORMDRAIN SYSTEMWEERE
INDICATED ONTHEPLANS.
17. ALL REQUIRED STORMWATERFACZXIIES MUST 13E CONSTRUCTED AM IN
OPERATION PRIOR TO INSTALLATION OF ANY PAVEM[ENT UNLESS
OTHERWISE APPROVED BY THE ENGITiEER.
19. ALL ROOF DRAMS, PERIMEMYOUNDATION DRAINS, CATCRTIASINS AND
OTHER EXTERNAL DRAINS SHALL BE CONNECTED TO THE STORM DRAINAGE
SYS Mi. UNLESS NOTED OTHERWISE.
19 ALL FOOTING DRAINS SMVINGBUILDINGS, WALLS, ROCKERIES, ETC SHALL
CONNECT TO THE DRAINAGE SYS112el DOWNSTREAM OF THE SITE
STORWATER DETENTION SYSTEML
20 CONTRAC17OR SHALL OBTAINAND PAYFOKAILL PERMITS REQUIRED FOR
INSTALLATION OF ALL SITE IMFR0VM4ENTS INDICATED ON THEM
DRAWNGS.
21. ASEPAP-ATEMMGATIONPERbUrW=BECOTAMM;FROMTHECrrypLIBUC.
WGRKsDEPARTMENT PRIORToFiNALcoNsTRucnoNAccEprANcy,
PROVIDE TO TEE CITY wATERQUALITY TECHNICIAN, ACOPY OF THE
BACEFLOW TEST REPORT TEST REPORTS CANSE FAXIED70425-744-&570R
MLULMTO=XQR�LM0NDSWA-G0V RACKFILOWTESTINGSHAIL
BE, COMPLETED BY TIM OWNER ANNUALLY THEREAFTER.
22 ASAAMMAUN[REQUIREMENT, ALLDISTURBEDAREASONAND OFF SITE�
SHALLBERETURNEDTO THE EQUIVALENT OF-THEIRPRECONSTRUCTION
CONDITION IN ACCORDANCE WITH APPROPRIATIE REQUIREZYMNTS AND
STANDARDS.
23. AILDISTURIKED SOIL AREAS SHALL BE CONRIOST AMENDED AND SEEDED OR
STABILL7ED By OTHER ACCEPTABLE YTETHODS FOR TEE PREVENTION OF ON -
SITE EROSION AFTER. Tim coNEPLETION oF coNSTELuCTION. SEE. EROSION
CONTROL PLANS FOP, SPECIFIC GRADING AND EROSION CONTROL
REQUIREMEMS.
24 THIRCONTRACTOISHAIL CFF-SrrE STREEM'S CLEAN AT ALL TD&S BY
SWEEPING WASEING OF THESE STRIMTS WILL NOT BE AILOWEDaMOUT
PRICRAPPROVAL.
25. THIS PROJECT ISNOTA BALANCED EARTHWORK11ROJECT BOTHEXPORT
AND IMPORT OF SOIL AND ROCKMATERIALS AREREQUIRED.
26 SLOPE OF FINISHED GRADE SHALLBE CONSTANT BETWEEN FINISHED
CONTOURS OR SPOT ELEVATIONS SHOWN.
2.7 FRUMMGRADF-SHALLSLOPEAWAYFROMBUaDIKGWALISATNUNDEM
5%SLOPEFORANIDMIUMINSTANCEOF 10FEET,
28. CONrRACMRSM4.LLBEREOONSMLEFOP.ANDSHAUINSTALLAND
MAINTAIN SHORINGAND BRACING AS MCESMY TO PROTECr WORKERS
EXISTINGHURDINGS, STREEM, WALKWAYS, UTILITIES AND OIHEREMTJNG
AND PROPOSED MiPROVENCENTS AND EXCAVATIONS AGAINST LOSS OF
GROUND ORCATING ENSANfUdEN17S. 0ONTRACTORSHALLAISOBF
RESPONSIBLE FOR REMOVAL OF SHORING AND BRACING, AS REQUIRED.
29. CONTRACTOR SHALL OBTAINAPPROVALMMTHE CITYAND FOLLOW CITY
PROCEDURES FORALL WATER SERVICE INTERRUPIIONS� HYDRANT
SHUTOFFS, STREET CLOSURES OR OTHER-ACCESSRESTPICTIONS.
CONTRACTOR SHALL NOT RELOCATE OR ELIMIINATE ANY HYDRANTS
WITHOUT FIRST OBTAINING WRITTEN APPROVAL FRml TIM FIRE MARSHAL
30. COORDINATEAND ARRANGE FOR AT L DTILITV CONNECIIONS, unirlY
RELOCA-71ONS AND,'OR SERVICE INTERRUPTIONS WITH THE AMCTED
OWNERS AND APPROPRIATE UTILITY CONWANIES. CONNECTIONS TO
'q44 4.
0 '*9t/
mv. "o P, 9&&
-4'D
""z'D 44,62-
"o"Z. C, �/o�
op
---_�Okp 'V POy
P41%
C
EmTlgGura=ssRALLBEmADEoNLywniiADvANcEvauTTEN
APPROVAL OF THE AumoRrIms GovERNjmG SAID urnmEs.
31. ALLvrmnm sHALLBEPLAcmumERGRoum.
3Z EXESTIMr.UMMLUiM]NSMVICEIVIECHAREDAMArMMETO�
OONSTRUCnONWORKSHALLMEmAmmArcoNTBAcrowsEmmEAND
mPEcrfmANDAocEnmByaryoFEDmomsANDomqms
REPRESENTATIVE PRIOR TO BACKFRLING- I �
31 NEW UTILITY LO CATIONS ARE GENERALLY SHOWN BY DIMENSION, WHERE
NO DIMENWNS ARE INDICATED. LOCATIONS MAY BE SCALED FROM
DRAWINGS. FIELD ADJUSTMENTS SHALL BE APPROVED BY OWNERS
REPRESENTATIVE AND CITY-
34. FIELD sTAxE ALL urmny STUBS AT THE ERopzavLm�
35., TRENCH RACK1111. OF LTITTITIEs LOCATED WITHIN THE CITY RIGHT-OF-WAY
SHALL ]BE coymcm To 95%. coNpAcmN TEST REPORTS SHALL BE
PROVIDED TO THE CITYTRIOR TO PAVING.
36 tvmnNEwpeEciRARsANExEgrjmGoRmEwurz=BY6,,oRLEss,
PLACEPOLYMnIZM.PLASTTCFOAMAS,ACUSMCNBPTWPMMM
UTxrrlmlg-
37. SEE MECHANICALDRAWINGS CkVHERE APPUCABLE)FoRCONTINUAnDNOF
srrEuTrLrrTE&wnmvTHBBuu-DiNG-,
38. SEE RIJECTRICAL DRAWINGS (WHERE APPLIcABLE)mItExrEnoR
FTE TRICALWORK
39. SEE LANDSCAPEDRAWINGS I W I HEREA . PF , LI I C . ABLE . FORSITE . 1WRICIATION
SYSTEYL
40 PIPE MATERIAL AND SIGNAGE SLTMMALS SHALL BE pRovIDED To Crry
I ENGDUKMVGDIVISIONFOR-APPROVALPMORTOINSTALLAlTON
uj
UJ
0.
rZ
U) CD
o 00
(3) 0 U) (3)
E <
(D Ld Zl>
>
<
T
Z
r-- 0
0 o :E
0 < .4
E
�e
z
0
U)
z
0
C)
-1:
uj
(D
U)
LLJ
0
z
(D
z
C)
z
w
cl)
DATE: 02-2016
DESIGNED: SLS
DRAWN: SLS
JOB NO: 2016-04
JUN z 9
'ING
Mac;�m"envx 1 . 0
KIMBROUGH REMODEL
AVERAGE GRADE / MAX BUILDING HEIGHT STUDY
PARCEL# 00619400800300
uj
IZ
00
0 �'
L6 r—
Lr) �
0 EL
FCIkT�A
'�M]�
TBM-B
ELEV: 201.09
SET HUB
134.00
N 89*44'44" W
PROPERTY LINE
201.4 ----------- 5 203.3
p P05ED 2 SFOKY
BEDROOM AND D NING
ROOM ADDITION
PROPOSED MASTER
LJNCON�EUD DECK BATh ADDITION ABOVE
AND
�0" OVERHANG
REMAINING
OPERTY LINE
N 88*44'59" W
134.94'
EXISTING GARAre I I �1111NG
DNIIWAY
ff OA51VIENT
203.3 ri
EX15TING r POSED L
HOME A'0Drf'10N
F`OOTPPINT
67M9N—d'— PARCEL# 00
#00GI9400500300 :—
U-i Ln
(Li
01
z
7VFZ7AW7 — — — — — C
- — - — - — - — - — - — - — - — - — - — - — -
RECTANGLE CONTAINING PPOP05ED
AREA BUILDING OUTLINE TO INCLUDE
ADDITION5, COVERED DECK5 AND
ROOF OV`fRHANG5 NOT EXCEED 30'
C R��
---SITE PLAN
Scale: 1 1 0�4'
North
1� i
u-
30.00'
TBM-�
ELE1. 201.30
SET NAIL IN PAVEMENT
AVERAGE BUILDING ELEVATION CALCULATIONS
A = 201.40
B = 203.30
C = 205.80
D = 205.00
TOTAL: 815.5
815.5
4
AVERAGE GRADE= 203.87'
BUILIING HEIGHT MAX.— 25 FT ABOVE AVERAGE GRADE
MAXIMUM BUILDING HT= 228.87'
PROPOSED BUILDING HT= 227.0'
-144 4,
01
4"q '-0
"�40
o
PR 2 1131 u B)
JUN 2 9 2017
BUILDING DEPARTMENT
CrFYOFEMMONDS
REVISIONS:
1 . CD SET �SIJBMITTAL �20-2017
2. RESUMTTED06.264017
3.
4.
5.
uj
Lu
0.
C
cc,:4,
75 :D C�
0 0 00
(D 0
E
Uj
C6
0) F— Z
:3 0
0
<
E
v
w
z
U)
w z
(n Q 0
w
:D
0
z <
< L)
DATE: 02-2016
DESIGNED: SLS
DRAWN: SLS
JOB NO: 2016-04
SHEET:
A1.3
DEMO EXISTING CONCRETE PATIO.
ROCKERY, AND DECK STRUCTURE
AS RECeD TO ACCOMMODATE NEW
CONSTRUCTION. -
REMOVE rXI5T HOT TUB
' T I
I T I
I L
DEMO FX15TING EXTERIOR �R
WALLS AS "M TO ACCO�'�66TTI!
FROF06121) NEW CONSTRUCTION.
- TIE NEW SEWER INTO EX15T.
SEWER LINE AS RECID TO
ACCOMMODATE NEW BATH.
/-D'\
IV -
STORAGE
-n
L- — — — — — — —
DEMO WAL AS REC`D
FOP NEW MECH ROOM
ACCESS
FAMILY
ROOM
REMOVE FX15TING
1URNACE AND
DUCTING AS REQT)
REMOVE EXISTING WINDOWS
WALLS AND SAW CUT FOUNDATIOZIN 41
11
e - -
-1
HALL
WALL AS RECID TO INSTALL NEW
WINDOW5 AND FRENCH DOOR.
RJRN
L
F — fl — — — 1
- � -1 - -
FRMC CLO ET
-
�7
ANTE
-
r�
ROOM
IN '-L
DEMO EX NG RPLC
INSERT HEARTH ANDL,:��
I
SURROUND WALLS
GARAGE
LINEN
13ATH F4iv"�
F7)) \ 11: / X \
TT 11111 F�
7
iFOYER
r ' 17
LAUNDRY
ROOM
DEMO EX15-11NG EXTERJORA
M NTERIOP REMOVE ALL PLUMBING
WALL5 AS REO'D TO ACCO MODATE
PPOP05ED NEW CONSTRUCTION. FIXTURES AND FIN15HE5.
PREP SPACE FOP NEW
UPGRADES
" i vi
11 OWER FLOOR- ASBUILT-DEMO
Kimbrough Residence Scale: 1/4" = V-0"
North
STP
DEMO EXISTING DECK STRUCTURE
AND EXT ERJOP WALLS AS REQ'D
REMOVE! UPPER WALLS AS REOD TO
ACCOMMODATE NEW FULL LENGTH
SIDE. SEE STFUC.
REMOVE EXIST. GARAGE DOORS
REMOVE EX15TING COLUMNS
AND SUPPORT BEAMS. PROVIDE
SHORING AS RECrD. SEE 5TRUC.
nqw
DEMO EX15T FRONT PORCH, STEPS.
51DEWALK AND ROOF 5TPUCTURE
TO ACCOMMODATE NEW FOYER AND
FRONT PORCH EXPANSION / ADDITION
F—TER,
REMOVE EXIST WINDOW, DOOR
AND FRAMING TO ACCOMMODATE
PROPOSED FOYER EXPANSION
DEMO LOWER STEPS AND WALL
TO ACCOMMODATE NEW EXPANDED
FLOOR PLAN LAYOUT
C
�Sr
DEMOLITION NOTES.
1. REMOVE ALL EXISTING SIDING TO ACCOMMODATE NEW
INSTALLTIONS.SEE EXTERIORELEVAT(ONS FOR DETAILS.
2. REMOVE ALL EXTERIOR WINDOWS TO BE REPLACED WITH
NEW. SEE PLANS IWINDOW SCHEDULE FOR LOCATIONS.
3. REMOVE ALL INTERI R ANDEXTERIOR DOORS TO BE
REPLACED WITH NEW. SEE PLANS FOR LOCATIONS.
4. REMOVE ALL EXISTING COMPOSITION ROOFING MATERIAL.
S.. REMOVE EXISTING FURNACE AND HVAC DUCTING AS
REQUIRED TO ACCOMMODATE NEW
6. SEE DEM DEMO PLANS FOR OTHER MISC. ITEMS TO
REMOVED.
I.DASH LINES INDICATE ITEMS TO ----
DEMOUSHEDIREMOVED.
G. PROVIDE SHORING METHODS AS NECESSARY PRIOR
TO REMOVAL OF STRUCTURAL WALLS IBEAMS.
9. REMOVE ALL ELECTRICAL. PLUMBING, CARPET, DOOR
TRIM, BASE MOLDING AND DRYWALL AS REQUIRED TO
ACCOMMODATE THE NEW CONSTRUCTION. COORDINATE W1
ELECTRICAL AND PLUMBING CONTRACTOR.
10. REMOVE ALL EXISTING ROOF GUTTER AND DOWNSPOUT
SYSTEM.
REMOVE ALL EXIT. KITCHEN
cAmwom APPLIANCES
AND FINISHES.
o
DII
\�111 RC
LIVING
ROOM
TO INSTALL NEW NANA-WALL
REMOVE WINDOWS AS REQ'D
DOOR SYSTEM
N
0 "'�19�tJ4
1%, �t 4
0?
GARAGE WALLS
BELOW TO REMAIN
DEMO EXISTING EXTERIOR/ INTERIOR
WALLS AS RECID TO ACCOMMODATE
PROPOSED NEW CONSTRUCTION,
ER
BEDROO
u-
-1 F-=
MASTER
CLO5.
L! 4 -E`p I
11 11 IL -J-�T
I BATH
REMOVE ALL PWMbING
FIXTURES AND FINISHES
REMOVE EX15T WINDOW, DOOR
OPEN
TO
BELOW AND FRAMING TO ACCOMMODATE
PROPOSED FOYER EXPAN51ON
HALL
umN 13EDROOM
BATH
X/
REMOVE ALL PLUMBING
FIXTURES AND FINISHES.
PREP SPACE FOR NEW
UPGRADES
MAIN FLOOR- ASBUILT-DEMO
�JL.) Kimbrough Residence Scale: 1/4"= 1�0"
North
REMOVE EX15T VONDOW AND
FRAMING TO ACCOMMODATE
PPOP05ED BAYMONDOW
Piz r-- 1, j-'U, E-:;
JUN 2 9 2011
13UILDING DEPARTME141
.,T,.,.D,,ONDS
1. CDSE—USMITTALQ�2�017
2. RESURMITTED06-26-2017
4.
5.
uj
UJ
0.
Z 81
Oil
'M
C:
a)
-0
— �- cli
U) Z) 00
0
0 U)
ry E
>
0
Z
0
C)
0 <
L- w
-0
E
�e
W,
[If z
C) <
0 n
-i
u- 0
z :5;
w
06 F--
O� -J
Lu
0
DATE: 02-2016
DESIGNED: SLS
DRAWN: SLS
JOB NO: 2016-04
SHEET:
A2.0
� EXTERIOR ELEVATION- ASBUILT(EAST)
X
K!.Tbough Residence Scale: 114- V-X
EXTERIOR ELEVATION- ASBUILT(WEST)
Kimbough Residence Scale: 114" = V-0"
EXTERIOR ELEVATION- ASBUILT(SOUTH)
Kimbough Residence Scale: 114-1-.0-
M M �Lm M M =j
(�--) EXTERIOR ELEVATION- ASBUILT(NORTH)
Kimbough Residence S-1. 1/4-1--0-
1 . CD SET -SUWI�AL C4�20.2017
)10 841&j,
2. RESUOMI=064.2017
3.
4.
0 01) ;11
5.
LU
UJ
0-
IN
0
U)
(Z)
00
cj�
E
uj
3:
O)o
Z
0
w
E
Ile
z
0
U)
Cn
<
DATE: 02-201
DESIGNED: SLS
DRAWN: SLS
,z::� UP 3?
joB No: 2016-04
SHEET:
I A2.
JUN 2 9 2017
.U.I.I...
r 5LTRT.11IT
,oN Ds
GENERAL NOTES.
1. PROVIDE ROOF GUTTERS DOWNSPOUTS AS REOID
2. PROVIDE SPLASH BLOCKS AT ALL DOWN SPOUT
LOCATIONS
3. SLOPE GRADE AWAY FROM FOUNDATION
4. PROVIDE WATERPROOF MEMBRANE AT ALL FLAPLOW
SLOPE ROOF CONDITIONS. CONSULT ROOFING
CONTRACTOR/ WATERPROOFING CONSULTANT FOR
WATERPROOF SYSTEMS
5.. WRAP CONTINUOUS WATERPROOF MEMBRANE UP ALL
VERTICAL SURFACES A MIN'OF 12". PROVIDE CONTINUOUS
WRAP UP AND OVER TOP OF ALL CURB LOCATIONS
6. PROVIDE METAL FLASHING CAPS AT ALL EXPOSED BEAM
LOCATIONS
7. PROVIDE ICE AND WATER -SHIELD MEMBRANE AT
SLOPES 2/12
OR LESS.
S' ALL OVERHANG DIM. ARE FROM FACE OF
EXTERIOR STUD WALL OR EDGE OF BEAM TO
EXTERIOR EDGE OR RAFTER TAIL
9. ROOF MATERIAL TO BE COMPOSITION SHINGLE UNLESS
NOTED OTHERWISE - (OPTIONAL MEMBRANE ROOFING)
10. PROVIDE SPRAY FOAM INSULATION AT RAFTERS OF
NEW ROOF
111. ALL TOP PLATE HEIGHTS ARE NOTED BY[ 1
12. COORDINATE WITH CONTRACTOR FOR PROPER
FLASHING AND WATERPROOF METHODS AT NEW ROOF
COVERED DECK AND ACCENT CANOPY
13. SEE EXTERIOR ELEVATIONS FOR GENERAL EXTERIOR
MATERIAL TYPE
14. DRAWING REVISIONS ARE INDICATED BYA
15' CENTER DOORS IN ROOMS OR PROVIDE
4"MIN. WALL RETURN UNLESS OTHERWISE NOTED
16. SMOKE DETECTOR (PLACED IN EVERY BEDROOM AND
IN HALLWAY OUTSIDE OF BEDROOM DOOR) SIGNIFIED BYO
17. CARBON MONOXIDE DETECTORS PLACED IN HALLWAY
OUTSIDE OF BEDROOM DOOR) SIGNIFIED BY 0:0
3. TNG "R� "' �'
N" I S_
5..' . . "". B
1:47.4 AXDR.1M
gl, 2,0" 1_4"' ""
RM1.1,
20. STAIRWAY REQUIREMENTS
(INTERIOR AND EXTERIOR)
MAX. 7-3/,V'RISE AND MIN. IQ " RUN
MIN. 6'-B" HEADROOM CLEARANCE
HANDRAIL$ AT 34-38" ABOVE THE STAIR NOSING
HANDRAIL GRASP DIMENSIONS BETWEEN 1-114" -2"
PROVIDE CONTINUOUS HANDRAIL OR TERMINATE AT
NEWEL POSTS OR SAFETY TERMINAL
WHERE HANDRAIL IS USED AS GUARDRAIL, A MAX.
OPENING OF 4".
ALL GUARDRAIL TO BE A MIN OF 3WHT.
2I.DUCT TESTING:
CONTRACTOR TO PROVIDE A COPY OF THE "DUCT LEAKAGE
AFFIDAVIT FOR NEW CONSTRUCTION" TO THE BUILDING
INSPECTOR, PRIOR TO APPROVED FINAL INSPECTION.
22. SLOWER DOOR TESTING:
AIR LEAKAGE SHALL NOT EXCEED 6 AIR CHANGES/ HOUR, AND
SHALL BE TESTED PER R402A.1.2. PROVIDE A WRITTEN REPORT
OF THE TEST RESULTS, SIGNED BY THE TESTING PARTY, TO THE
BUILDING INSPECTOR, PRIOR TO APPROVED FINAL INSPECTION.
23. INSULATION CERTIFICATE:
CONTRACTOR SHALL COMPLETE AND POST A "INSULATION
CERTIFICATE FOR RESIDENTIAL CONSTRUCTION" WITHIN & OF
THE ELECTRICAL PANEL PRIOR TO FINAL INSPECTION.
24. PROVIDE A PROGRAMMA13LE THERMOSTAT FOR THE
PRIMARY SPACE CONDITIONING SYSTEM WITHIN EACH
DWELLING UNIT PER SEC R403.1.1
25. A MIN. OF 75% OF PERMANENTLY INSTALLED LAMPS IN LIGHT
FIXTURES SHALL BE HIGH EFFICACY LAMPS.
26. ALL EXHAUST FANS TO VENT DIRECTLY TO THE EXTERIOR OF
THE BUILDING PER MI 501A
27. P OVIDE WHOLE HOUSE FAN EOUiPPED WITH THE OPTION
TO OPERATE INTERMITTENT / CONTINUOUSLY WITH AUTO
MANUAL TIMER CONTROLS
CONTINOUS PROVIDE FAN SIZE PER TABLE M1507.3.3(l)
DWELLING UNIT 1501-3000$F WITH 4-5 BEDROOMS = 75 CFM MIN.
INTERM117ENT PROVIDE FAN SIZE PER TABLE M1507.3.3(2)
(25% MIN. RUN -TIME EA. 4 HR SEGMENT)
75 CFM X 4 = 300 CFM MIN
REVISIONS:
1. CBS �UBMITTAL��017
2. RESUamirreDO.2�2017
t-D 3.
4.
5.
STONE VENEER ACCENT COLUMNS -
NEW CONCRETE PUNTH5 FIN15HED @
81 ABOVE LANDING. 2X FRAMING FOP I
REMAINING COLUMN BA5E.PROVIDE
I
TIE NEW 5EWEP INTO EXIST
CHAMFERED CONCRETE CAP. SEWER LINE AS RffQ'D TO W uj
1Y-0 ACCOMMODATE NEW 13ATH.
LLJ
NEW CUSTOM METAL 5PIPAL STAIR kl TANKLE55
1 HOT WATER
CASE ACCE55ING LOWER PATIO, MAIN
DECK AND ROOF TOP DECK. COOPD. 2
W1 SPIRAL STAIR FABRICATOR FOR DESIGN PROVIDE HIGH EFFICIENT WATER 9
HEATING: GA5 WATER HEATER
DETAILS. WITH A MIN F . OF O.G2
.15-12" RETAINED. (5ffE f!NeRGYCMDIT5 R40G.2)
CONCRETE
------ ------ -91DFWALL 42- TANM55 PROVIDE 1116M EFFICANCAIR 5OURCF NEW ACCENT ENTRY
5HWR iHOT WATER HEAT PUMP WITH MIN. H5PF OF 8.5
'9 rA (SEE ENERGY CREDIT R40G.2) ROOF ABOVE
- - - - - - - - - - ECH 2
C-ONCRETE FOOT-ING I SLA1 .5 - < r - - - - - - - - - -
FOR SPIRAL STAIR ACHORJNG CF.
r
-COORDINATE W1 SPIRAL STAIR ;r _
FABRICATOR POP DEI5fGN BENCH
51PIRATI.N
Yx 6, EGRE55 2) 2X G' i -6 11 k..
FULL LITE DOOR 11r, NEW O.H.
FRENCH u 'e"Icy PROVIDE 112 GWD AT WA115 -11 r -t t
q FURN. 5/8'TYrE W AT CftUNG51BTM Or GARAGE DOOR
GwING 6 i A W11�5 5UPPORT MEMBER5 4 WARM WALLS PROVIDE 2X fUR1NG AS REQ'D TO
ZD sm 2 1.. 3'-G" L OFG E
5TA R BEAM PEP ACCOMMODATE NEW GARAGE DOOR
EDPOOM
5TRUC. 3 2' MECH
NEW BEAM ABOVE GARAGE
ZPX d,
I X4 T*G NEW BEAMS A50VE DOOR PER STPUC.
TTAAIRI SOFFIT INFILL WINDOW b NICHE LINEN �:4 PEP STRUC.
L ACCEE5 ABOVE PENING t 9 BUILDING 5ECTION
mlw,.G
(:�D G" G - - - - - - - -
7
F_ CLOSET ADDITION WAIL 5"T'C'
(�O:go GARAGE OFFSET ABOVE
ANTE
f
- - - - - - - - - - - P= - - - - - - ........ - - - - - - - - - - - - - - - - 441
Room - - - - - - - - . . . . . .
T T NEW ACCENT ENTRY ROOF CD
PROVIDE 1-3/8"50LID A50VE
CANTILEVIRED 11f C"I
Nr CORE OR HONEY COM13 J' A�\ 7T) C)
rc - _ _Z _W EX15T BEAM STEEL DOOR POP REQUIRED -0 0 00
PEP 5TPUC - l'UPRING WA
KTF If COVERED @ EXP05ED I TO REMAIN FIRE SEPARATION /'-2'\ NT) (3) 0 u)
CONCRETE FNDTN WALL I E <
(]� a) pj
RI WALL 5-1-
PATIO u I 1 3" SLOPING 51DE >
MEDIA SEWER CLEAN OUT 7--41-
ROOM NEW WALL 20" HT RETAINING WALL U)
DECK SEE 51' �IETNIIN
zo TE PLAN FOP 3:
0) 2 z
13EAM PER 5TRUC. CANTILIN NEW 51DEWALK
ABOVI! CENTER VIDOI! t- 0
(9) 3,X d, I I c)
SCREEN WALL E'l 8
I X4 T*G ON BEAM H 1 1 5� 0 <
FRENCH r Lu
it SOFFIT FULL LITE T TUP 8X8 R 5. SUPPORT COLUMN-
5X& R5 COLUMN ABOVE u HALL PROVIDE CLEARANCE FOR
0 "U"r""'
dd I�
I V=t
'X'
"OVI DE
PEP 5TRU OVERHANG Of ACCENT ROOF
3
C (TYP.) 3 1/2' 3 1/2' 3 1/2" 5TfP EAPETY W/ NEW 3u HALF ROUND GUTTER
NEW CO
uF jt7NCRETff ENTRY
�rl FOYER 5IDfLITE LA .
1 3-1- LANDING AND STEPS
NICHE VW�R.BEMNI)
505.UKLIT�'�'Ll
LINEN
CANTILEVERED BEAM 5D 3�80
CO ANTE 3XG
PER 5TFILIC < STONE VENEER ACCENT COLUMNS -
ROOM z
2-0 Zx e LAUNDRY I NEW CONCRETE PLINT115 FIN15HED @
ROOM &ABOVE LANDING. 2X FRAMING FOP
3--l' DEDROOM REMAJNING COLUMN BA5E.PROVIDr
(0 CHAMFERED CONCRETE CAP. FACE OF
nc FRAMING NOT TO EXTEND PAST 20'
(2) �X FRONT YARD SETBACK.
103 EGRE55 fRENCH
WINDOW BAT NEW BEDROOM BAY
NEW ACCENT ROOF @ 3 0 WINDOW W1 KNEEBRACE
ROOF W1 KNEEBRACE 50 CF M H
PAN SUPPORTS ABOVE
5UPPORT5 ABOVE CD
. . . . . . . . . . . . .
Q ----- - - - ----- --- ------
PROVIDE CONTROL5
rOR "OLE FAN 7-0
EXTERIOR SIDING MATERIALS PURRING WALL OPERATION
N-�SEE-RIOREL-I.t4.(A3.IANDA3.2)FOR
PROPOSED SIDING MATERIALS AND STONE VENEER LOCATIONS
z,
I i 2- 0' 1 E
ENERGY CODE COMPLIANCE
PRESCRIPTIVE ENERGY CODE COMPLIANCE FOR ALL CLIMATES IN �9) 8
WASHINGTON
(ADDITIONS LESS THAN 500 SF)
PROPOSED ADDITION- 372 SF THUS.5 ENERGY CREDITS REQ`D
PER TABLE R406.2 SUMMARY
SELECTION: OPTION 3A -HIGH EFFICIENCY GAS FURNACE- I CREDIT
OPTION 3B -HIGH EFFICIENCY GAS HEAT -PUMP- I CREDIT
OPTION 6A -HIGH EFFICIENCY WATER HEATER- .5 CREDIT
S CREDITS REOD- 2.5 CREDITS SELECTED THUS OK
LOWER FLOOR- PROPOSED REMODEL
,][,) Kimbrough Residence
North
Scale: 1/4" = 1'-0"
NEW /EXISTING SQUARE FOOTAGE - LIVING
EXISTING LOWER FLOOR
985 SF
EXISTING MAIN FLOOR
1288 SIF
EXISTING STAIR / ENTRY
80 SF
NEW FOYER EXPANSION
15 SF
NEW LOWER FLOOR BEDROOM EXPANSION
115SIF
NEW MAIN FLOOR DINING ROOM
115 SF
NEW MASTER BEROOM EXOPANSION
116 SF
NEW MAIN FLOOR BEDROOM BAY WINDOW
19 SF
TOTAL LIVING
2733 SF
EXISTING GARAGE
440 SF
NEW FOOTAGE -OTHER
NEW FRONT PORCH /STEPS
53 SF
NEW LOWER FLOOR CONCRETE REAR PATIO
322 SF
NEW MAIN FLOOR COVERED REAR DECK
368 SF
NEW ROOF TOP DECK
228 SIF
I NEW FRONT SIDEWALK /STEPS
z
0
00
J
LL]
Lj_
W
re
0
LU
[�_
�:
0
0
C�
_j
0-
DATE:
02-2016
DESIGNED:
SLS
DRAWN:
SLs
JOB NO:
2016-04
SH T.
JUN 2 9 2011 A2.2
-DING DEPARTI
immomm" 11 _j
GENERAL NOTES.
1. PROVIDE ROOF GUTTERS DOWNSPOUTS AS REaD
2. PROVIDE SPLASH BLOCKS AT ALL DOWN SPOUT
LOCATIONS
3. SLOPE GRADE AWAY FROM FOUNDATION
4. PROVIDE WATERPROOF MEMBRANE AT ALL FLATILOW
SLOPE ROOF CONDITIONS. CONSULT ROOFING
CONTRACTOR/ WATERPROOFING CONSULTANT FOR
WATERPROOF SYSTEMS
5.. WRAP CONTINUOUS WATERPROOF MEMBRANE UP ALL
VERTICAL SURFACES A MIKOF 12". PROVIDE CONTINUOUS
WRAP UP AND OVER TOP OF ALL CURB LOCATIONS
6. PROVIDE METAL FLASHING CAPS AT ALL EXPOSED BEAM
LOCATIONS
7. PROVIDE ICE AND WATER -SHIELD MEMBRANE AT
SLOPES 2/12
OR LESS.
8. ALL OVERHANG DIM. ARE FROM FACE OF
EXTER:OR STUD WALL OR EDGE OF BEAM TO
EXTER OR EDGE OR RAFTER TAIL
9. ROOF MATERIAL TO BE COMPOSITION SHINGLE UNLESS
NOTED OTHERWISE - (OPTIONAL MEMBRANE ROOFING)
10. PROVIDE SPRAY FOAM INSULATION AT RAFTERS OF
NEW ROOF
11. ALL TOP PLATE HEIGHTS ARE NOTED BY
12. COORDINATE WITH CONTRACTOR FOR PROPER
FLASHING AND WATERPROOF METHODS AT NEW ROOF
COVERED DECK AND ACCENT CANOPY
13. SEE EXTERIOR ELEVATIONS FOR GENERAL EXTERIOR
MATERIAL TYPE
14. DRAWING REVISIONS ARE INDICATED BYA
15* CENTER DOORS IN ROOMS OR PROVIDE
4"MIN. WALL RETURN UNLESS OTHERWISE NOTED
16. SMOKE DETECTOR (PLACED IN EVERY BEDROOM AND
IN HALLWAY OUTSIDE OF BEDROOM DOOR) SIGNIFIED By(�)
5D
17. CARBON MONOXIDE DETECTORS PLACED IN HALLWAY
OUTSIDE OF BEDROOM DOOR) SIGNIFIED BY 0.
1: D_-?111)1,,.11"0DPI IN
�,4 A
FFGRESS/IRC-R310
rB-,ft-0-111644 �-ht,
I """' ' ' """ 37".
I�I�Ift-h MD1.1-,
20. STAIRWAY REQUIREMENTS
(INTERIOR AND EXTERIOR)
MAX. 7-314!'RISE AND MIN. 10"RUN
MIN. V-8" HEADROOM CLEARANCE
HANDRAtLS AT 34-38" A80VE THE STAIR NOSING
HANDRAIL GRASP DIMENSIONS BETWEEN 1-114" 1"
PROVIDE CONTINUOUS HANDRAIL OR TERMINATE AT
NEWEL POSTS OR SAFETY TERMINAL
WHERE 14ANDRAIL IS USED AS GUARDRAIL, A MAX.
OPENING OF IV.
ALL GUARDRAIL TO BE A MIN OF 36- HT.
21.DUCT TESTING:
CONTRACTOR TO PROVIDE A COPY OF THE "DUCT LEAKAGE
AFFIDAVIT FOR NEW CONSTRUCTION" TO THE BUILDING
INSPECTOR, PRIOR TO APPROVED FINAL INSPECTION.
22. BLOWER DOOR TESTING:
AIR LEAKAGE SHALL NOT EXCEED 5 AIR CHANGES/ HOUR, AND
SHALL BE TESTED PER R402.4.1.2. PROVIDE A WRITTEN REPORT
OF THE TEST RESULTS , SIGNED BY THE TESTING PARTY, TO THE
BUILDING INSPECTOR, PRIOR TO APPROVED FINAL INSPECTION.
23. INSULATION CERTIFICATE:
CONTRACTOR SHALL COMPLETE AND POST A "INSULATION
CERTIFICATE FOR RESIDENTIAL CONSTRUCTION" WITHIN 3- OF
THE ELECTRICAL PANEL PRIOR TO FINAL INSPECTION.
24. PROVIDE A PROGRAMMABLE THERMOSTAT FOR THE
PRIMARY SPACE CONDITIONING SYSTEM WITHIN EACH
DWELLING UNIT PER SEC R403.1.1
25. A MIN. OF 75% OF PERMANENTLY INSTALLED LAMPS IN LIGHT
FIXTURES SHALL BE HIGH EFFICACY LAMPS.
26. ALL EXHAUST FANS TO VENT DIRECTLY TO THE EXTERIOR OF
THE BUILDING PER M1501.1
- PROVIDE WHOLE HOUS FAN EQUIPPED WITH THE OPTION
TO OPERATE INTERMITTENT / CONTINUOUSLY WITH AUTO
MANUAL TIM R CONTROLS
CONTINOUS PROVIDE FAN SIZE PER TABLE M1607.3.3(l)
DWELLING UNIT 1501-3000SF WITH 4-5 BEDROOMS = 75 CFM MIN.
INTERMITTENT PROVIDE FAN SIZE PER TABLE M1507.3.3(2)
(25% MIN. RUN -TIME EA. 4 HR SEGMENT)
76 CFM X 4 = 300 CFM MIN
r-C'11.
�Sr
D H --
9
EXTENDED BEAM W1 GX 10 R5.
KNEE BRACE W GENTLE CURVE
CUT TO DTM EDGE! (SEE 5TRUC.)
NEW CUSTOM METAL SPIRAL STAIR
CASE ACCE55ING LOWER PATIO, MAIN
DECK AND POOP TOP DECK. COORD.
W/ SPIRAL STAIR FABRICATOR FOR
DE51GN DETAILS,
5UIUXNG 5e7IIDN
BUIMING 55710N
b CUSTOM 30 HT. RAILING: GXG R5
NEWEL POSTS W1 CUSTOM WROUGHT
IRON RAILING W1 2X4 CAP. NO
OPENINGS TO EXCEED 4" OW.)
8X8 R5 COLUMN
PER 5TPUC. UYP.)
-4-
T4 (�5,
F
I 3�0
rD
r- - - -
- - - - - - - - - - - - - - - -
- - - - - - - -
8X8 R5 COLLIMN
PEP, 5TPUG. (TYP-)
- - - - - - - - - - - - - - -
- -
o
5-
4
KITCHEN
I CA
r7T mmimr
NEW fP AMING
4�-O-
mr
PROVIDE FURRING
NEW DINING
0 I
AND NEW R-2 I BATT
INSULATION
EGRE55
WINDOW
�,A
ROOM
0 C'M
looc M
2X MA5TFR
ADDITION
j4'-O
(1)
FRFNCHG 13EDROOM
(1 15 5f)
'-T'y
-T1Y
2'1
I-L.1'
(VAULTED CfIUNG)
AIR
LA'-T'
NG
IARTY
D (:o
1
LL LI GU2 NG
(io
ZX e
ZX e
----------- ------
--
------------
NEW
N EW
C
COVERED
0 V E p 'E
BUILDING
DECK
D K
E C 5
G
(3G8 5F)
(3
NEW COLUMN ANt
_C
(TREX DECKING)
K1)NG)O
5EAM SUPPORT P p
5TRUC. PROVIDE IX
-DA 50 FIT
(I X4 T4-G CEDAR 500FIT)
X4 T C
WPAPWD WRAP
.j
LIVING
ROOM
L(TD
12X 6,
ACCORDION
02
DOOR SYSTEM
HALL
AA.
. . . . . . . . .
BUILDING
co
COPPER ACCENT ROOF W1
5TUDY
BATH
KNEE BRACE 5UPPOPT5
AND CEDAR T*G SOFFIT
@
50 CFM
CID
)c
70
--0
BUILDING �10N
�G -I VIDIING INMIOR WX1
Z-A
L
MASTER MA5TEP
5HM ATI1 CL
CL05.
PAN
50 CFM
CL05,
'T"
DN
FOYER.
OPEN
TO
BELOW
. . . .
. . Kwn� wxL �D
CL05ET
EGRE55
WINI)OW
t --------- t. - -1 1 - -
L- --- - - - - - - - - - - - - - -- - - - - - - - -
EXTERIOR SIDING MATERIALS
NOTE: SEE EXTERIOR ELEVATIONS (A3.1 AND A3.2) FOR
PROPOSED SIDING MATERIALS AND STONE VENEER LOC ATIONS
North
BEDROOM
------------- j
ol
" E
MAIN FLOOR- PROPOSED REMODEL
Kimbrough Residence
Scale: 1/4" = 1�0"
NEW/EXISTING SQUARE FOOTAGE - LIVING
EX�ST:NG LOWER FLOOR
985 SF
EX ST NG MAIN FLOOR
1288 SF
EXISTING STAIR / ENTRY
80 SF
NEW FOYER EXPANSION
15SF
NEW LOWER FLOOR BEDROOM EXPANSION
115SF
NEW MAIN FLOOR DINING ROOM
115SF
NEW MASTER BEROOM EXOPANSION
116 SFI
NEW MAIN FLOOR BEDROOM BAY WINDOW
19 SF
TOTAL LIVING
2733 SF
EXISTING GARAGE
440 SF
NEW FOOTAGE -OTHER
NEW FRONT PORCH /STEPS
53 SF
NEW LOWER FLOOR CONCRETE REAR PATIO
322 SF
NEW MAIN FLOOR COVERED REAR DECK
368 SF
NEW ROOF TOP DECK
228 SIF
NEW FRONT SIDEWALK /STEPS
11�!
REVISIONS:
1 . CD SET -SUBMITTAL M-20-2017
2. RESUBMI77ED 06-2f-2017
3.
4.
5.
LU
UJ
0-
C
CD
0 0 DO
0 U) m
E .<
a) W
>
u�
0) 0 z
0
C)
0 <
w
E
2
0
cj�
00
0 uj
_j co
u- 0
z a_
0
ry
DATE: 02-2016
DESIGNED:
SLS_
DRAWN:
SLS
JOB NO:
2016-04
SH T:
A111 2 LA23
j
CUSTOM CUSTOM WROUGHT IRON
RAILING ACCENT INSERT - NO
OPENINGS TO EXCEED 4"
NEW 2 X STRUCTURAL FLOOR MEMBERS W1
WATERPROOF MEMBRANE FLOOR SYSTEM. SLOPE
CRICKET SURFACE TO INTERNAL DRAINS / EXTERNAL
SCUPPERS. PROVIDE FLOATING TILE OR TREX DECK
SURFACE ON STANDOFF SYSTEM.
—INTERNALFL-00RD—RAIN
AND PIPE TIGHTLINED TO COLLECTOR
DOWNSPOUTS EACH 51DE —EEIOW�--N�
SCUPPER TO DRAIN u
DRAIN
ON ACCENT ROOF OVEER FLOW
EACH 51DE
SLOPE
NEW CUSTOM METAL 5PIFAL STAIR 7u
CASE ACCESSING LOWER PATIO. MAJN SLOPE NEW ROOF
DECK AND ROOF TOP DECK, COORD. TOP
W1 SPIRAL STAR FABRICATOR FOR DECK
DESIGN DETAILS. SrIF AL
IF, (228 5F)
STAR G' SLOPE SLOPE i -30—PE
BUILDING 5S-ON ACCESS C - - m
z DRk ROOF CRICKET -
FF
H NEI
NEW STANDING --xOP
SEAM
EI SECTION I /
COPPER ROOFING NEW
PRESIDENTIAL
COMP051TION
ROOFING
NEW RIDGE
", / PR
NEW
PRESIDENTIAL
COMP051TION
ROOFING
kkk
" 7
- - - - - - - - -- - - --
----------
L24
. Nf.WFOOFSY5TEM
(D - - - - - - - - - -
NOTE: RIDGE HEIGHT CAN NOT EXCEED
25 FT A15OVE AVERAGE GRADE (CIVIL 203.87)
THUS MAXIMUM HT. ALLOWED
(CIVIL 228.57)- SEE SHT A 1.3 FOR ABE CALCS
3G HT FRAMED WALLS OF RIDGE MUST BE SURVEYED If WITHIN I �-O"
Poor TOP DECK W1 CEDAR Of MAX HT. ALLOWED
SHINGLE 51DING AND 2X IND
CHAMrERED CAP
. . . . . . . . . . . .
�%�76TJJ'
EXI
SLOPE - - - - - - - - - - - - - - - -
//=PC
-/ - - - - - - - - - - - - - - - - --
SLOPE lf�
/NEW/, -9 1 1/17/
RE51DENTI 4PRE51DENtl
g 1 - - - - - - - - - --- - — - — - — - — - — - — - — - — -
0 /o6MFo N '694 4/ -- - - Ll
R2 141 X, - - - - - -
7 /1
NEW ROOF SYSTEM:
PROVIDE PREMANF. TRU55
PEP STRUCTURE.
NEW NEW
PRESIDENT] V. RDGf I?
AL
COMP051TION
ROOFING
DULOING SECTION
NEW RIDGE
-9
Ti — — --- — — — — E
NEW 11
ANDING PRE51DENTIAL 11
140 COMPOSITION I I
ROOFING 11 -'\ -'\
rB r2
2--O�
5-ION
v
--Gi +/-j L
--JL -T- -11
A
L
M
fX15T T.
4� L7 W�
GO
/Al/Z
MW POYER WALI- BEYOND
L
J7/
Z/Yl u
Z
NEW CURVED COPPER
L ACCENT ENTRY
Poor STRUCTURE
W/ CEDAR T*G SOFFIT
RE51P /FRESIDENTI L
CoMf"05
ROOFING
EXIST. NEW ARCHED ACCENT Poor
SLOPE/ OVER PPOP05ED 13AY WINDOW.
PROVIDE CUSTOM COPPER ROOFING
7 - - - - - - - - - - - - - - - - -
RAIN GUTTER SYSTEMS
NOTE: REMOVE ALL BUILT-IN RAIN GUTTER SYSTEMS FROM
EXISTING OVERHANGS AND REPAIR AS REaD. INSTALL NEW
COPPER HALF ROUND UTTERS W1 T ROUND COPPER
DOWNSPOUTS AS NEED TO PROPERLY DRAIN ENTIRE ROOF
STRUCTURE.
ROOF PLAN- PROPOSED REMODEL
,J[.,) Kimbrough Residence
North
Scale: 1/4" = T-0"
1444
//V'9'4�b uls�
'/��4 '�'C;'
COD Cl-/, 0
0/v
P0,9
j( A
NT)
HATCH AREA INDICATED AREA OF EX15TING ROOF STRUCTURE TO REMAIN. REMOVE
EX15TING COMPO51TION ROOF AND IN5TALL NEW PRESIDENTIAL. COMPOSITION ROOFING.
ALL OTHER AREAS CONTAIN PROPOSED ROOF STRUCTURE ADDITIONS / REV15ION5.
REVISIONS:
1. CD SET -SUBMI�A. 04�2O�17
2. RESUBMITTED 06-26,M17
3.
4.
5.
uj
Lu
(L
(3)
0
C:
(3)
CD
0i
C)
a 0 00
0 U) 17,
ry E LLi <
(D
> 3;
< U)
0) .2 z
:3 0
0 :2
< 0
w
E
�e
z
u-
0
0
w
DATE:
02-2016
DESIGNED:
SILS
DRAWN:
SILS
RES U
JOB NO.'
2016-04
JUN 2 9 nil
SHEET.
BUILDING DEPARTMENT
CITY OF EDMONDS
I A2.41
NEW ARCHED ACCENT POOP
OVER PROP05EO 13AY WINDOW. NEW CHIMNEY W1 DECORATIVE
PROVIDE CUSTOM COPPER ROOFING T� GLE
METAL CAP AND CEDAR SHIN
Mr ""L'
51DING
I X ACCENT TRIM W1
HARDI-PANEIL INSERT
ff.AX �LLDWAIBLE BUILDING HT - - - - - - - - - - - - - - - - - -
---------------- - --------------
E_ t�ll..E
E C __
E-V
NEW CERTAINTEED PRE51DENTIAL
COMPOSITION PoorING
NEW HALF ROUND GUTTER SYSTEM
W1 3" DIA DOWNSPOUTS AND
BOW TIE FASTENERS
NEW CEDAR SHINGLE 51DING
WIAVRAPPED CORNERS b
NEW 2X CORNER TRIM
TO WRAP SIDES
NEW X ACCENT TRIM W/ V 0
HAPD�-PANEL INSERT P
NEW 2X BELLY BAND mu E:1
NEW CONCRETE CAP W/
CHAMFERED TOP 111 F_77___1
NEW 5TONE VENEER WAIN5COT —
NEW 2X 51DE TRIM
TO WRAP SIDES
NEW WINDOW SILL W1 APRON
CUSTOM 4X KNEE BRACE
W1 COPPER FLASHING CAP
NEW 8X8 R5. COLUMN AND GX 10 KNEE BRACE
W/ GENTLE CURVE CUT TO 13TM EDGE (SEE 5TRUC.)
NEW LARGE COLUMN BASE W1 STONE VENEER
AND CONCRETE CAP
NEW FOYER EXPANSION W1 NEW
DOOR / 51DEUTE / AND
ARCHED UPPER WINDOW
3G HT. FRAMED WALLS Of
Roof TOP DECK W1 CEDAR
SHINGLE SIDING AND 2X WD
CHAMFERED CAP
ACCENT LIGHT fMURE
NEW CERTA NTEED PRE51DENTIAL
IN
COMPOSITION ROOFING
NEW &X 2 R5.BEAM W1 COPPER
FLA5HINI� CAP (SEE 5TRUC.) —
NEW GX 10 P5. KNEE BRACE
W1 GENTLE CURVE CUT TO
BTM EDGE (SEE 5TPUC.)
NEW &X8 R5. COLUMN
(SEE 5TPUC.)
NEW CUSTOM WROUGHT IRON
5FIPAL STAIR CASE ACCE55ING
LOWER PATIO, MAIN DECK AND
ROOFTOP DECK. COORD. W1 SPIRAL
STAIR FABRICATOR POP DE51GN —
NEW 2X LAYERED BELLY 15AND
WRAPPING RIM J015T Of DECK
NEW 8X8 R5. COLUMN
(3EE 5TRUC.)
NEW LARGE COLUMN BASE W1 STONE
VENEER AND CONCRETE CAP —
TG)
T
r
N TRIM: 3XG WINDOW
FW WINDOW
*N DE. TP
EADII W1 .4 VERTICAL 5 ,M
C
IT
NOTE: RIDGE MIGHT CAN NOT EXCEED
25 FT ABOVE AVERAGE GRADE 203.87)
REVISIONS:
1. CDSETSUBMITtAL�2�2017
2. RESUBMITTED 06��2017
i
2 X SILL WITH CHAMFERED TOP AND
(CIVIL
15.
3.
2X4 APRON (TYPICAL)
THUS MAXIMUM HT. ALLOWED
(CIVIL 228.87)- SEE SHT A 1.3 FOP A15E CALC5
4.
jig
NEW CEDAR SHINGLE SIDING
RIDGE MUST BE SURVEYED IF WITHIN 1 '-0'
OF MAX HT. ALLOWED
GA13LE ACCENT
- -
- - - - -
- - - - - - - - - - - - - - -
- - -
- - - - - - - - - - - -
2X TRIM PERIMETER GABLE
ACCENT WRAP
ALL yV01?K SUB
--- - - - - - -
- - - - -
- - -
- - - - - - - - - - - - - -
- - -
- - - - - - - - - - - - - - -
NEW OPTIONAL DENTAL TRIM ACCENT
W1 2X 51LL AND BELLY BAND
F/'�t Cr
P cr,
L aj
EXISTING RIDGE H
ELEV 225.
C
C
PLIA
LU
1
11
NG Roof BEYOND
CS
EY15TING Poor BEYOND
! I
" , - -1
UJ
!A. L 0, f
NEW CEDAR SHINGLE SIDING
W / WRAPPED CORNERS
u it I
NEW COPPER ACCENT Roof
F_7_�
WITH KNEE 13RACE SUPPORTS
NEW HALF: ROUND GUTTER SYSTEM
LI
WT3'DIA DOWNSPOUTS AND
210
to
BOWTE FASTENERS
NEW LARGE R5 KNEE BRACE
SUPPORTING R5 BEAM / ROOF
_IL
11
LLJt
EXTENTION
NEW CURVED COPPER ACCENT
"Ill
it III! III Mlflftflih
Poor 15EYOND
NEW 2X WINDOW TRIM
it
IMP!"
L
` ---------- 7-7--7 -------- 7 --- T__
I T-
=f
CUSTOM 30 MT. RAILING: GXG R5 NEWEL
POSTS W1 CUSTOM WROUGHT IRON RAILING
W1 2X4 CAP. NO OPENINGS TO EXCEED 4"
NEW HARDI-BOARD PANELS W1
IX3 BATTENS
NEW CEDAR SHINGLE 51DING
NEW CURVED COPPER ACCENT
Poor
NEW R5 HEAVY TIMBER TRUSS A55EMBLY
W1 KNIVE PLATES AND CARRIAGE BOLTS.
PROVIDE GENTLE CURVE TO BTM Of HORJZ.
TRU55 MEMBER. (SEE 5TRUC.)
NEW CURVED COPPER ACCENT ENTRY
ROOF STRUCTURE W/ CEDAR T*G SOFFIT
NEW CONCRETE PORCH A
TO SIDEWALK / GRADE A PROPOSED EXTERIOR ELEVATION- (EAST)
(�) Kimbough Residence SaMe: 1/4' = 1W
?2o T T
Poor MCKET W/
COPPER ROOFING
------------
---------------------------- -
NEW COVERED Roof
OVER NEW DECK ADDITION
NEW CHIMNEY W1 DECORATIVE METAL
CAP AND CEDAR SHINGLE SIDING
T7 T8
T_
T9
191
NEW ARCHED ACCENT ROOF
OVER PROP05ED BAY WINDOW.
PROVIDE CUSTOM COPPER POOVING
F.
N
1�
---------------------
------------
-
NEW GABLE Poor
ADDITION
"It IL 11. L
202
I WN It
u
It
11 I i ILI
�Ll 11
I kit 1- 11 t 11 1 111 HI 111 11 ly III t III III ii III
GWF
NEW WINDOW TRIM: 3Yr. WIND OW — NEW STONE VENEER WAINSCOT W1
HEADER W1 2X4 VERTICAL SIDE
COPPER ACCENT ROOF W1 . TRIM CHAMFERED CONCRETE CAP
KNEE 15RACE 5UPPORT5 2 X SILL WITH CHAMFERED TOP AND
AND CEDAR T*G SOFFIT 2X4 APRON \-�]EW CEDAR, SHINGLE 51DING
GA13LE ACCENT
PROPOSED EXTERIOR ELEVATION- (SOUTH)
Kimbough Residence S�.I.: 114- V-0"
NEW GATE / PENCE W1 CEDAR 5HINLGIf
AND STONE VENEM PROVIDE CURVED
TOP PLATE W1 COPPER FLASHING CAP
TOP OF CONCRETE LGA!�GE)
eLr
zV 203.7
NEW I X ACCENT TRIM W1
HAPDI-rANEL IN5EPT
NEW HALF POUND GUTTER SYSTEM
W/ 3" DIA DOWNSPOUTS AND
13OW TIE FASTENERS
NEW STONE VENEER WAINSCOT W1
CHAMfrRED CONCRETE CAP
NEW LIGHT FIXTURES FLANKING WINDOW.
PROVIDE CEDAR MOUNTING BASE
NEW NARDI-BOARD PANELS W1
IX3 BATTENS
NEW CEPTAINTrED PRESIDENTIAL
COMP051TION POOPING
NEW 8' DECORATIVE Poor
EMN51ON
MAX.AULOWABUIE BUILDING HT
ELEV 228,87
NEW RID E
ELEV 227.62
NEW CURVED COPPER ACCENT ENTRY
Poor STRUCTURE W/ CEDAR T*G SOFFIT
NEW 8X 10 R5. BEAMS wl COPPER
FLASHING CAP (SEE 5TRLIC.)
NEW HAPDI-130APD PANELS W1
9 1 X3 BATTENS
NEW GX 10 R5. KNEE BRACE
W1 GENTLE CURVE CUT TO
EITM EDGE (SEE 5TPUC.)
NEW CURVED COPPER ACCENT
Poor BEYOND
NEW 80 R3. COLUMN
(SEE STPUC.)
NEW 2X CORNER TRIM W/
HARDI-PANEL INSERT
CUSTOM GX KNEE BRACE
W1 COPPER FLASHING CAP
_T_NEW LARGE COLUMN BASE W1 STONE
VENr1EK IN140 CONCRETE CAly,
CUSTOM 3G" HT. RAILING: GXG R5 NEWEL POSTS
W/ CUSTOM WROUGHT IRON RAILING W1
2X4 WD CAP. NO OPENINGS TO EXCEED 4"
C:
a)
M p
C)
0 CO
a) 0u)m
E <
>
<
0 z
0
0 <
E
v
z
0
0
E 0
UJ 0-
F- 0
x
APPROVED BY PLANNING
' IQ
Z, I A
P-11 SUNE3
JUN 2 9 21117
BUILDING DEPTP� RNT
DATE: 02-2016
DESIGNED:
SLS
DRAWN: SLS
JOB NO: 2016-04
SHEET:
A3.
CUSTOM CUSTOM WROUGHT IRON
PALING ACCENT INSERT - NO
OPENINGS TO EXCEED 4'
ACCENT LIGHT FIXTURE
3G HT. FRAMED WALL5 Of
Roof TOP DECK W1 CEDAR
SHINGLE 51DING AND 2X WD
CHAMFERED CAP
NEW COPPER ROOFING
E XS NG RIDGE HT
E L —.ITI'2 S. 5 W
NEW 8Y 12 R5.15EAM W1 COPPER
FLASHING CAP (SEE 5TRUC.)
NEW HALF ROUND GUTTER SYSTEM
W1 3" DIA DOWNSPOUTS AND
13OW TIE FA5TENER5
NEW GX 10 R5. KNEE DPACr
W1 GENTLE CURVE CUT TO
BTM EDGE (SEE 5TRUC.)
NEW 8X8 IRS. COLUMN
(SEE 5TPUC.)
NEW I X ACCENT TRIM W
HARDI-PANEL INSERT
CUSTOM SG"HT. RAIUNG: GXG R5 NEWEL
POSTS W1 CUSTOM WROUGHT IRON RAILING
W1 2X4 CAP. NO OPENINGS TO EXCEED 4"
NEW 2X LAYERED BELLY BAND
WRAPPING RIM J015T OF DECK
NEW CEDAR SHINGLE 51DING
NEW 8X8 R5. COLUMN
(SEE 5TRUC.)
NEW LARGE COLUMN BASE W1 STONE
VENEER AND CONCRETE CAP
NEW CUSTOM WROUGHT IRON
SPIRAL STAIR CASE ACCE55ING
LOWER PATIO, MAIN DECK AND
POOF TOP DECK. COORD. W1 SPIRAL
5TAIP FABRICATOR FOR DE51GN
CONCRETE FOOTING/ SLAB
FOR SPIRAL STAR. ACHORING
-COORDINATE W1 SPIRAL 5TAIP
FABRICATOR FOR DE15IGN
NEW CERTAINTEED PRE51DENTIAL
COMP051TION ROOFING
NEW &DECORATIVE ROOF
FXTEN51ON
NG RIDGE HT
;N111—S2125.50'
NEW CURVED COPPER ACCENT ENTRY
ROOF 5TPUCTURE W1 CEDAR T*G SOFFIT
NEW LARGE R5 KNEE BRACE
SUPPORTING R5 BEAM / POOF
EXTENTION —
NEW CURVED COPPER ACCENT
ROOF BEYOND —
1� T
EXISTING POOF BEYOND
NEW CHIMNEY W/ DECORATIVE
METAL CAP AND CEDAR SHINGLE
SIDING- PROVIDE 5"5LOPE TO SIDE
NEW CERTAINTEED PRESIDENTIAL
COMP051TION ROOFING
MAXALLOWABLE BUILDING HT
ELEV 228.87
NE DGE
VRL—
ELEV 227 62 -/-
NEW CEDAR SHINGLE 51DING
AT REAP WALL GABLE
NEW HARDI-BOAPD PANELS W1
I X3 BATTENS
IL
LIE,
I! Pi I
NEW HALF POUND GUTTER SYSTEM
W1 3" DIA DOWNSPOUTS AND
BOW TIE FA5TENER5
NEW CEDAR SHINGLE SIDING
COPPER ACCENT ROOF W1
KNEE BRACE! SUPPORTS
AND CEDAR T*G SOFFIT
7
NEW 0011 0 N
Sk", I
- 9
— - - - - - - - - -
I on
N
7—�� �P5111Y�TIIIIPTPIJ�55A5511�lff
W1 KNIVE PLATES AND CARRIAGE BOLTS.
NEW I X ACCENT TRIM W1 PROVIDE GENTLE CURVE TO BTM Of HORIZ.
MARDI-PANEL INSERT TRUSS MEMBER. (SEE 5TRUC.)
PROPOSED EXTERIOR ELEVATION -(WEST) S.I.: 1w = 1--o"
Kimbough Residence
TNEWCEDAR SHINGLE SIDING
NEI
W / WRAPPED CORNERS
POOF CRICKET W/ ROOFTOP DECK
ACCENT LIGHT
COPPER ROOFING DRAIN 45CUPPER.
FIXTURE
— — -- -------------------
- — - - — - — - — - — - — - — —
NEW LARGE COLUMN BASE W1 STONE
VENEER AND CONCRETE CAP
TOP OF CONCRETE (ENTRY)
ELEV2D8.3
NEW CEDAR SHINGLE SIDIN
W I WPAPPED CORNER5
TOP OF CONCRETE (GARAGE)
ELEV203.7
NEW GATE /FENCE PROFILE
NEW HARDI-BOAPD PANELS W1
I X3 BATTENS �_x
NEW STONE VENEER WAINSCOT W1
CHAMfEPED CONCRETE CAP —
NEW WINDOW TRIM: 3XG WINDOW
HEADER W/ 2X4 VERTICAL SIDE TRIM
2 X SILL WITH CHAMFEPED TOP AND
?X4 APRON
NEW HARDI-50APD PANELS W1
I X3 BATTENS
PROPOSED EXTERIOR ELEVATION -(NORTH)
Kimbough Residence S.1c 1/4' = T-W
NEW STONE VENEER WAINSCOT W/
CHAMFERED CONCPETE CAP
NEW WINDOW TRIM: 2X5
VERTICAL 51DE TRIM 2X
SILL WITH CHAMrERED
TOP AND 2X4 APRON
NEW LIGHT fIXTUPE5 FLANKING
DOOR /WINDOWS. PROVIDE
CEDAR MOUNTING EASE
CUSTOM CUSTOM WROUGHT IRON
RAILING ACCENT INSERT - NO
OPENINGS TO EXCEED 4'
3G HT. FRAMED WALLS Of
FOOf TOP DECK W1 CEDAR
SHINGLE 51DING AND 2X WD
CHAMFERED CAP
NEW ELDGE
rLFV227.62-1.
NEW 8X 10 R5.15EAM W1 COPPER
FLASHING CAP (SEE 5TPUC.)
NEW CUSTOM WROUGHT IRON
5PIPAL STAIR CASE ACCE55ING
LOWER PATIO, MAIN DECK AND
N\
I
ROOF TOP DECK. COORD. W1 SPIRAL
W
STAIR FABRICATOR FOR DESIGN
NEW GX 10 R5. KNEE BRACE
W/ GENTLE CURVE CUT TO
4 oil
I LI —
BTM EDGE (SEE 5TRUC.)
NEW 8X8 R5. COLUMN
(SEE 5TRUC.)
I
CUSTOM 36" HT. RAILING: GXG R5 NEWEL
I
r I
POSTS W1 CUSTOM WROUGHT IRON RAILING
L
W1 2X4 CAP. NO OPENINGS TO EXCEED 4'
NEW 2X LAYERED BELLY BAND
WRAPPING RIM J015T Of DECK
NEW 5X8 R5. COLUMN
I - F.
FT
(SEE 5TRUC.)
NEW LARGE COLUMN BASE W/ STONE
VENEER AND CONCRETE CAP
L
AVERAGE GRADE 4�
ELEV203.87
CONCRETE FOOTING / SLAB
FOR SPIRAL STAIR ACHORING
-COORDINATE W/ 5PIFAL STAR
FABRICATOR FOP, DEISIGN
NEW I X ACCENT TRIM W1
HAPDI-PANEL INSERT NEW HALF ROUND GUTTER 5Y5TEM
W1 3- D(A DOWNSPOUTS AND
NEW CEDAR SHINGLE 51DING BOW TIE FASTENERS
W / WRAPPED CORNERS
1 MSET�UM77TAL
- cD sET �uomiTTAL
RESUBMITTED2�DV
_2.
3.
-144
?"o
4.
5.
C;r�
0�"P4 Ao
0
LU
UJ Cl)
0-
g glE
a)
0
U) Z :D C:)
0 0 00
0 US
E uj
4)
13� >
U)
C: Q
z
0
CD
0 < "T
E
�e
z
0
LL]
_j
w
Q�
0
LLJ
0
u)
APP PMG
F�;
LLI
x
U,
0
0-
0
0�
Q_
DATE:
02-2016
DESIGNED: SLS
DRAWN:
SLS
JOB NO:
2016-04
JUN 2 9 2C117
—
SHEET:
BUILDING DEPARTMFNT
WYOFEDMONDS
A3.2-4
NEW ROOF TPU55E5
MAX.,BLI.IGHT.
Fr
T.O. RIDGE -(TRUSS)
NEW ARCHED ACCENT ROOf
�F TO �M�AT
Nw �r 5��
D(15TING TRU55 CUT / REMOVED
TO ACCOMMODATE NEW ROOF
rz-AiE
TRU55 SY5TEM
MA5TER KITCHEN
BEDROOM
NEW ARCHED ACCENT ROOF
0 L .0 PL .(MAIN FLOOR�) I I
ELEVZ
GARAGE MECH.
CLO5.
0. CON.. -(GARAGE)
E�E�
--.. — o,-
EX15TING TKU55 CUT/
TO ACCOMMODATE N
TRU55 5Y5TEM
NEW ARCHED ACCENT
T.0 PLYWD-(MA
ELEV 21-2 7
(� T.O. CON . -(GAI
r ELEV 203.7
r,-\ BUILDING SECTIONS
'-��Ki.b�lough Residence Scale: 1/4" = V-01.
BUILDING SECTIONS
\-�K,.�bmgh R�esidence� �Sc-le.
�5 4
NEW ACCENT POOf
W1 ROOF CRJCKET
ROOFTOP
DECK
DINING COVERED
DECK
15EDROOM
�5 T4
COVERED
DECK
NEW ROOF TRU55 5Y5TEM
OVER MA5TT!P BEDROOM 5UITE
NEW 2 X 5TRUCTURAL FLOOR MEMBER5 W1
WATERPROOF MEMBRANE FLOOR SY5TFM. 5LOPE
CRICKET 5URFACE TO INTERNAL DRAIN5 / EXTERNAL
5CUPPER5. PROVIDE FLOATING TILE OR TREX DECK
SURFACE ON 5TANDOFF 5Y5TEM.
NEW ACCENT ROOF
OVERfPAMING PER 5TRUC.
NEW ARCHED ROOF RAFTER
5Y5TEM PEP 5TRUC
NEW P.5 DIFAM5
NEW R.5 BEAM5
5CI55OR
-OFT. VAULT I
VAU LT
OFT. FLAT
UNDEP FRAMING
MA5TEP
I
MA5TER
BATH
BEDROOM
GARAGE
BUILDING SECTIONS
'-��Kmb�mgh Residenc.�
LALLWOT, Stiejecr
7-00 � E)
I I
IEFLI)
r
Pon
Co. C_r1o1V Fon
Tl
cor)e COA4pj
LIAMcE
MAX - BLDG HT.
ELEV 228.84
Alm 2 q
Et
REVISIONS:
1. CDSU�UBMI�ALN201
2. RESUBM17ED 08-26-2017
3.
4.
5. 1
uJ
W
CL
M
Z) CD
U) a o Cc
0 U) m
E <
a) uj
>
<
C:
0
Z
0
0 <
w
E
�e
Cn
z
0
w
Co
(D
z
0
DATE: 02-2017
DESIGNED: SLS
DRAWN: SILS
JOB NO: 2016-04
SHEET:
A4.1--i
PRE MANF. TRUSSES @ 24�' O.0
�/ R-49 BATT INSUL, 11Z' CDX
PLYWD, RIDGE VENT AND
ROOFING MATERIAL OVER
15# BLD FELT —
BLOCKING
2X LOOKOUTS
CEDAR SOFFIT —
DOUBLE 2X6 TOP PLATE
2 X 6 #2 D.F. STUDS
@ iv, O.C. W/ � COX
PLYWD IOS13 AND MIN.
R-21 BATT INSUL. —
COPPER ACCENT ROOF:
2X 12 RAFTERS Wl GENTLE
SLOPE, j PLYWD, COPPER
ROOFING, IX FASCIA, AND
CEDAR SOFFIT. KNEE BRACE
BEYOND
WINDOW HEADER
PER STRUCTURE
NEW WINDOW- SEE
SCHEDULE —
IX ACCENT TRIM W/
HAROI-PANEL INSERT
OVER AIR INFILTRATION
BARRIER
2 X 6 #2 D.F. STUDS
@ 16'O.C. W/J'CDX
PLYWD /OSB AND MIN.
R-21 BATT INSUL.
COPPER ACCENT ROOF:
2X RAFTER CUT W/ GENTLE
CURVE, I PLYWD, COPPER
ROOFING, 1X FASCIA, AND
CEDAR SOFFIT
CEDAR SHINGLE SIDING
OVER AIR INFILTRATION
BARRIER -SEE EXTERIOR
ELEVATIONS —
NEW BEAM ABOVE GARAGE
DOOR PER STRUC.
EXISTING FOUNDATION
/FOOTER TO REMAIN
(SEE STRUCT. FOR INFO)
OVERHANG
5EE ROOF PLAN
518" GWB
(VAULTED CEILING)
IIZ'GWB
14 1 MASTER
BEDROOM
— R-30 BATT INSULLATION
FLOOR STRUCTURE
(SEE STRUCT . FOR INFO.)
GARAGE
SfPERATION
FRO 11V - AT
"�ATr
"'U'IGwTm Of
Surrow MEMBERS $ WARM WALLS
Of GARAGE I
W'EXISTING CONCRETE
FLOOR SLAB.
(NO CHANGE)
WALL SECTION
Kimbrough Residence Sc.le: 11T � V-0-
1. CDSET�UBMI�ALN.
RESUBMInED QB-2&201 A
2. 7
4.
5.
-ro jj
:AQ
0
J'E�tt
jvsp'� 4EZD
I /JVSP
_C
'C7-/OJv
CO 'D Poo
OR
Colo
cojopt/')
qjVC
LU
Lu
PRE MANE TRUSSES @ 24' O.C.
0.
w/ R-49 BATT INSUL, lir COX
PLYWD, RIDGE VENT AND
ROOFING MATERIAL OVER
15# BLD FELT
OVERHANG
5EE P'OOF PLAN
BLOCKING
2X LOOKOUTS
CEDAR SOFFIT
DOUBLE 2X6 TOP PLATE
2X GABLE PERIMETER
ACCENT TRIM
OPTIONAL DENTAL TRIM
21
ACCENT W1 SILL AND 2X
BELLY BAND
5/&'GWI3
2 X 6 #2 D.F. STUDS
(VAULTED CEILING)
@ 16" O.C. W1 �'CDX
1/2.. GWB
PLYIND JOSB AND MIN. MASTER
R-21 BATT INSUL.
CLOSET
WINDOW HEADER
PER STRUCTURE
NEW WINDOW. SEE
C
SCHEDULE
1XACCENTTRIM W1
p
HARDI-PANEL INSERT
4714
OVE R AIR INFILTRATION
C:)
BARRIER
-0 0 00
2 X 6 #2 D.F. STUDS
CY)
0 (j)
E <
@ 16, O.C. wl �' COX
PLYND l0SB AND
a) LLj
MIN.
R-21 BATT INSUL.
COPPER ACCENT ROOF:
0
Z
2X RAFTER CUT W/ GENTLE
CURVE, I PLYWD, COPPER
0
ROOFING, iX FASCIA, AND
LATT
o Z>
<
CEDAR SOFFIT
"t 0
CEDAR SHINGLE SIDING
LLJ
OVER AIR INFILTRATION
BARRIER -SEE EXTE
ELEVATIONS
R410 INSULLATION
FLOOR STRUCTURE
NEW BEAM ABOVE GARAGE
(SEE STRUCT. FOR INFO.)
DOOR PER STRUC.
GARAGE
512PERATION
rROVIDE 1/2' GM AT WAL� AND
50 TYPE -X AfCElUNG5,5Tll 01
5UF?ORT MEM5EP5 * WAM WALL5
OF GARAGE
EXISTING FOUNDATION
/FOOTER TO REMAIN
(SEE STRUCT. FOR INFO)
4"EXISTING CONCRETE
FLOOR SLAB.
(NO CHANGE)
EXITING GRADE
U)
z
r,_�
WALL SECTION
0
���Kim�brough
Riesiden
W
DATE: 02-2016
DESIGNED: SLS
DRAWN: SLS
�2 S L PI
JOB NO: 2016-04
juw 2 9 2017
SHEET:
Bu "'A""'T
CITY E "I-N---
A4.2-A
*SUDEP *CASEMENT
*WD 51M. DIV. LlTff5 *WD SIM. DIV. UTES
TYPE A TYPE B
EQ D
� w � w I
*51NGLE HUNG
:WD SIM, DIV. UTE5
MULLED
TYPE C
*FICTURE
*FICTURL
51M. DIV. UTff5
*WD SIM. DIV. UTE5
*WD SIM. DIV. UTE5
TYPE G
TYPE H
TYPE J
W
*PICTUPE
*WD SIM. DIV. LITES
TYPE K
PROPOSED WINDOW TYPES
KIMBROUGH RESIDENCE
WINDOW SCHEDULE
WNDW NO.
ROOM NAME
SIZE W X H
MATERIAL
TYPE
OPERATION
EGRESS
NOTES
101
LAUNDRY
IN 3'
ALUM. / WD CLAD
A
SLIDER
WOOD SIM. DIV. LITES
102
BATH
YX 2'
ALUM. I WD CLAD
B
CASEMENT
WOOD SIM. DIV. LITES
103
BEDROOM
IN 3'
ALUM. WD CLAD
A
SLIDER
EGRESS
WOOD SIM. DIV. LITES
104
MEDIA ROOM
(2) 2�X 5' MULLED
ALUM. WD CLAD
C
S.HUNG
WOOD SIM. DIV. LITES
105
BEDROOM
(2) 2�X 5o MULLED
ALUM. WD CLAD
C
S.HUNG
WOOD SIM. DIV. LITES
106
BEDROOM
4�X 20
ALUM. WD CLAD
A
SLIDER
WOOD SIM. DIV. LITES
107
BATH
2'X 2'
ALUM. WD CLAD
B
CASEMENT
WOOD SIM. DIV. LITES
108
GARAGE
�X 2'
ALUM. WD CLAD
A
SLIDER
WOOD SIM. DIV. LITES
201
BEDROOM
dX 4'
ALUM. WD CLAD
D
SLIDER
EGRESS
WOOD SIM. DIV. LITES TEMP.
202
BATH
2X 3'
ALUM. WD CLAD
E
S.HUNG
WOOD SIM. DIV. LITES
203
DINING ROOM
4X 4'
ALUM. WD CLAD
F
SLIDER
WOOD SIM. DIV. LITES
204
DINING ROOM
A 4'
ALUM. WD CLAD
F
SLIDER
WOOD SIM. DIV. LITES
205
DINING ROOM
eX 4'
ALUM. WD CLAD
G
PICTURE
WOOD SIM. DIV. LITES
206
KITCHEN
1 10 X4'
ALUM. WD CLAD
H
PICTURE
WOOD SIM. DIV. LITES
207
KITCHEN
YX 4'
ALUM. WD CLAD
i
PICTURE
WOOD SIM. DIV. LITES
208
M. BEDROOM
(2) 3N 56 MULLED
ALUM. WD CLAD
C
S. HUNG
WOOD SIM. DIV. LITES
209
M.CLOSET
YX 4'
ALUM. I WD CLAD
E
S.HUNG
WOOD SIM. DIV. LITES
210
FOYER
5X 4' ARCHEDI
ALUM. / WD CLAD
K
PICTURE
WOOD SIM. DIV. LITES
*CONTRACTOR TO VERIFY ALL R.O. FOR WINDOWS SIZE PRIOR TO
MANUFACTURING
• SEE PLANS AND ELEVATIONS FOR WINDOW TAG LOCATION
• SAFTEY GLAZING TO BE PROVIDE PER LOCAL CODE REQUIREMENTS
PROPOSED WINDOW SCHEDULE
KIMBROUGH RESIDENCE
444 1 . CD SET -SUBMI�AL N-20-2
2. RMSM$�ED 0-017
3.
Ab (Ik'
Cp 4.
CO 5.
I q
,q
LU
Lu
0.
c
a)
70
04
c�
V) 0 00
E 0 U)
a) uj
>
<
C;) 0 =
Z
0
<
0 w
E
v
Lu
ui
0
n
z
9
DATE: 02-2016
DESIGNED: SLS
DRAWN: SILS
JOB NO: 2016-04
:5 SHEET:
JUN 2 3 �!q/
-01i'InDIEPAnnif, 17 A5.1
j7yG�2a17(lND"3 —
Cantilever beam Atk
per plan r U&,
Framing on top of f&S 0 41��Cr
Connect beam to -C
P" 0
beam not shown 7*/()/V
S
post with knife plate P0
%P4 R
per detail FD73
HDR denotes (2) 2x8
HF#2 header
z Denotes (2) stud:
post, typical, unless:
Perpendicular beam,
Sister new 2xi 2 H F#2 to existing otherwise noted '
p hang with CJT5
truss bottom chord @ 24" o.c., with
Existing trusses to remain a concealed hanger 6x6 architectural
1ANT SD.S screws @ 12" o.c.
a diagonal brace
CS16 SW1 (14.67')
2x12 HF#2 @ 24" o.c SW11 (8) 2A HF#2 @ 24" o.c. Counter -sink
Post per plan
HUC410 to 4X6 a 1/2"x6" lag screw
2x10 HF#2 @ 24" o.c. C—S 1 6--\
HDR post in wall 4xl 0 DF#2, each end of brace
.......... ......... .. . .... ......... ............. ............ ....IF cantilevered 3' ...............
D2:
. . .... . ..... ... ... ....
WWI rough sawn post,
F F� 1-7'1
typical of (3) Cantilever with Brace Detail
HnR..... ............ ... CS.16 ....... ..77.7 .......... .......... .............................................
/2 PSL 1/2" 1 I -Off
8x12 DF#2
. .......... ...... ........
............. ......... .............. ............. ....... ..... .... .... .... . .....
8x8 DF rough
SW1 (16.5') SWI (3.5') Framing on top of
Rough -sawn DF beam, min. 8" sawn beam beam not shown
-116
wide x 11.25" deep New scissor
manufacture HDR
Manufactured spiral N I trusses @ 24" o.c.
staircase by others Line of ridge CJT5 concealed
4x8 DF#2 hanger
g to beam architectural
Overframe per note "OF" in the CS16 6x6
A Plow
structural notes at shaded areas — — — — - — — SWI (3 5) diagonal brace
8x12 DF#2.— HDR �HD r-sink
....... S1.6 ................ Counte
Post in wall per
. ........ .. 1/2"x6" lag screw
]an, provide
2x8 HF#2 @ 24" o.c. each end of brace (2) A35 to plate
top and bottom
W fro 8x8 rough sawn lumber
post
-idg post
HqR.
W post from ridge beam to b p
rough sawn beam :header A OS16
Rough sawn DF beam, min. 8x10. hitectural Brace Detail
Arc
Rini W
2x8 HF#2 @ 24" o.c.
.......... ... ... ........... ........ ...... . ............
.......... ........
1/2" V-1)"
-7.
D1 8x10 DF#2 ridge beam,
3-1/2x9- _,#'I CS161 (16')
8x12 DF#2 ridge beam, Existing trusses cantilever 2'
1/2 SL I Beam 18"x3"xl/4"
cantilever 4.25' 2x6 min. HF#2 @ 24" o.c., cut per plan A36 steel
4x4 post from
Rough -sawn DF beam, min. 8" CMSTC16 to ridge to beam 1: larger joists to curve 5" knife plate
beam below 5...
wide x 11.25" deep W post from ridge to beam
............. ................ ........ ....... .......... NA
.. .... (4) 112"
5"
bolts total
R o ugh sawn DF beam, min. 8x10. Post per 4
;S1
SW1 (T) W1 (3.33')
L 2x6 HF#2 @ 24" o.c. plan E
8x12 DF#2
a S16 HDR Z5..
S 5') Knife Plate Detail
-011
.4x6 HF#2, cantilever 11.5% 1/2"
CMSTC16 HDR
Existing trusses to re ain CS16.to post at backspan T,�b 1
Contractor to verify or insi 2 LU F, 0
1/4xi 1-1 A PSL or girder truss 2
g 0C
SW1 (3 0_..
S T) 4X10 DF#2
W!
HDR
S16
... . ......... .. . .... .. . . ... ......... ........ . ... ....... ...... ........ ........ ........ ......... ............
CS16
CS16
4)
0 00
U)
PO
6 6-
d
d
N
0 0
E
LU
E
Roof Framing and Upper Floor Shear Wall Plan
1/4" = 1 1-011
1/17
�h�eet:
JUN Z 9 zjv S1
BU'LDIN(�D S
CITYO
P.T. 2XII
2 DF ledger w/
Rough sawn 8x8 DF P.T. (2)1/4"k3_11/2" SDS
post, typical of (3) a crews:@ 16" o.c.
... .......... ...... ... ............ .........................
... .... . . Fl. u-s h -f r-amed P.T... :DTT2z Pair per
6x12 D Detail D5/S1O4
q HDR
...........
a
... .......... ............. .
. ............. .. ......... ......... .. .......
W& (3.25')
HDU5 w/ 4A
DF pos
Manufactured spiral
193
SW3x (5.33')
HDU5 Hold down per
detail' HD1
HD�R
�X� 61'120
st0'
�' 11
"X'3'j
.... .... ..... .....
3-1/2x9-1/4 PSL
t2.2E
staircase by others
/2
2xIO HF#2 @ 16" o,.c. 3- X9-1 Existing joists -
L
PS
4x12 P.T. DF#2,
cantilevered 3' S 3x (4.75') (3) stud post w/
CS16 to beam
...........
...... ..... ........ .. .......... ... ... .........
HUC410
(3) stud post
Flush framed P.T. 4xI 0
a
DF post
1 Ox1 2 DF#1
Hold do n er HDU5, align
w
de ii HD1 ith hold down
above
Flush framedP.T. ,Ji
............ ...... ............... 4xl2.DF#2.. ........... ... ....... .......... .......... ........... . ... ... —
Existing I Y
4x12 P.T. DF#2, joist$ I Existin beam
cantilevered 3' HDR
U3-17110
HDR denotes (2) 2AVI I
HF#2 hPqdqr
0 Denotes (2) stud
post, typical, unless
otherwise noted
6x6 post
............... ](9/.5'):
.... ........ .......................
a
HDU5
SW2 (2'-2')
HDU5 -J
HDIL15
Existing
p
Is a
header
7x14 PSL
3-1/2x9-
114 PSIL
3-1/2xl 1-1 /4 PSL, 21'4"
long, with CS 16 strap to
HHUS410
i: post each end
......... ..
a
n . ...... .... ... .. .
...........................
j:
with hold
HDU5
down above
SW1 (16.5')
HDU5
4x6 DF
post
SW2 (2 -2'
.. .. .... . .... ... .... ........ . .. .... . .......
HDU5
4x1
P.T. 2xI2 Hrg2 10 O.G. Existing p st
S 3x (25)
w/ U212 hangers
.......... .... ... .............. ...... ........ ...... . —
................... I. ................. I .... I.. . - --- : ......
HUCOO ...... . ..... ....................
........................................... ...... . .....
.............. ...... ..
W3 (3
5-1/4x14 PSL, 18'long, with H 2 (3.33')
Hold d Existi g joists
CMSTC16 strap to post each end 0
Jpe
TT2z air
D P
11 10 r' Existing
tdetail ID5/S104. header
SWI
............... ........
.. ... ... .... .. .. ...... H D U75 SW1
HDU5
Existing
header
SW2 (3.33')
OR
N
Upper Floor Framing and Lower Floor Shear Wall Plan
1/4" = 1 1-011
Nail end joist to
wall plate with 16d
nails @ 6" o.c.
joists per plan
sli,
I'V&Pp Pkz4j) C7.
C 100� _,Crlo�
01) P1019
EPC66
--��4"%q&
post cap
0
0, t3x6 DF #2
42"
5/8"A" lag screw,
counter -sink to
allow min. 2" of
wood to remain
6x6 DF #2 brace
6x6 DF #2 post in wall
Diagonal Brace Detail
1/2" = 1 1-011
2" 6x6 min. DF Post
o (5) 5/8"xT lag
-'screws
Plate and
Yt
YL
:
rim joist as
applicable
3/16" thick 3" wide A36
steel strap (galvanized)
t-!n
Concrete
stem wall
(3) 5/8"x5" Titen
HD anchors
Diagonal Brace Detail
3/4" = 1 1-011
WA.
23434
NAL
RI 2 3 U 13)
JUN 2 9 2017
BU"D'N'3
C 0
E.%ARNIII�E
.. �.T
;I: E
A A
L ,00
U
Ld
Z
@
2.� o
6,
r IL .17
E
0
0
C14,
U) 0 CD
<
CD 0
E
E
2
Revisions:
,105/25/17
1 / 17
Sheet:
S2
EG
8
OEM-]
24Vx24��xl 2" deep
.... . ...........
.......... I .........
. .
.............. ...... ....... ........................................
foundation with (2) #
r --- - - - - - - - - - - - - -
4 bars each way.
. .............. ............ ........
1E]
- - - - -
- - ---
. ............ - ...........
.................................................
...................................
......................................
.....................
. ........ ...............
. ..... .... .. .....
L - - - - - - - - - - - - --- - ---
........................... ...........
Spiral staircase
footing per
q
manufacturer's
New foundation
2xI 0 H F#2 @ 16" o.c.
specificaions
per.
Contractor to verify
F1
existing interior
S'S
I
foundation is
minimum 12"xI2"
4" concrete
30"x30"x12" deep
patio�
Contractor.. to verify
foundation with (3) #
existing footin
4 bars each way.
continuous at garage
...........
..............
- - - -
................... .....
- -
..
........
..........
........... . .
..........................
. ..... ** ....... ...... Aoor: lQcati.Q.n ......
... ... ......................
......... ...............
F-
Existing
slab on
Connect
new foundation to
grade
existing
jer note "NP in the
Existing
structural notes.
crawlspace
-:J
......................................................... ..
..........................
..........
.......
-ProVide new 3'x3'xl 2"...
Er
T
........
.........................
deep footing with (4) #4 2xIO HF#2 16" o.c. I
a
bars each way, under
existing interior to
Connect new foundation
24"x24"x12" deep
foundation corner
t
existing per note "NF in he�Z
I
I
foundation with (2) #
structural not es.
4 bars each way.
.............
......... .................. .................. ... ........... ....... ..
..... ...........
..........................................................
.......... .....
..............
......................... ................... ..................
......... ............... .... ....
:
....... ...
:New porch and stair
Contractor to verify existing
Ioundation per F2
foundation is in:good condition,
New foundation
with a minimum 8� thick stem wall
per F1
and 12" wide footing,, with a total
height of 24" minimum
a
- - - - - - - - --- - - - - - - --- - - - - - - - - --
..........
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - �j .....
a
I&
N
Fooundation Plan
1/4" = 1 1-011
itQ,
st/,q,
.0
New framing
per pla n
PI -C/
8VSPIIO P/st
(2) bars at top S C 7'/OAf
CODS p,
0:�" /OAf,
C Of,
04IP4/ Pot?
Exterior grade /IqAfc,-
18" min,
36" max
30"
6"
#4 @12" o.c.
min.
horizontal
Crawlspace
10
#4 @ 18" o.c. vertical,
grade
....
....
hook into footing
8" P'i
(3) #4 bars
continuous
New Foundation
Detail
1/2" 1 1-011
#4 @ 18" o.c.
horizontal bars
#4 @ 18" o.c. vertical
bars, hook into footing
Upper slab on
grade, 4" thick
E
with #3 bars @
18" o.c. each
Lower slab on CO
way
grade
6-7
A�
1 0..j�17
�
�6"�V-16--j
Entry Foundation Detail
1/211 = 1 0-011
, Ok S. P
WA
4
- 2304
AL
N A I
P, 2 -. 11
,P9
jul;�I Z I k�vW
WIMIT"Irp
Cily img
r=
2 LLI a
Z
L -2�
ZZ E
0
cc,
00
U) a)
4) U)
0
2 E
E
2
Revisions:
2105/25117
Ute:
D4/11/17
Sheet:
S3
Ventilation opening, refer to architect's
requirements for size and position
Solid blocking between
joists or rim joist, as
applicable. No gap
permitted between the
blocking and the roof
sheathing
Exterior wall ;
Diaphragm edge nailing, refer to
diaphragm schedule and diaphragm
notes on framing plans, as
applicable. Diaphragm nail spacing
may be adjusted to account for holes
in the blocking, provided the same
number of nails are used. Nail
spacing may not be less than 3" o.c.
Roof
diaphragm
sheathing
Roof framing
members
Refer t) plans for member sizes.. L- Wall top plate
/ A35 per shear wall schedule
Roof framing, flat or W1
sloped per plan
A35 per shear wall schedule
Roof Ventilation Typical Detail
11V = 1 1-011
At roof framing, roof
vent block per vent
block typical detail
Edge nailing per
shear wall
schedule
Plate nailing per
Diaphragm edge nailing per
shear wall schedule
diaphragm schedule
Rim joist, provide
Diaphragm sheathing per
hangers to match joist
diaphragm schedule
size where rim joist is
used as a header
Where joists are
parallel to wall,
1� 11
Edge nailing per
provide I bay of
1,
shear wall schedule
solid wood
blocking @ 4'0"
A35 per shear wall
o.c. attached with
schedule
A35 both ends
Joists perpendicular
Shear wall sheathing per -
to wall, where
shear wall schedule
applicable
Edge nailing per shear
Anchor bolt per
wall schedule
shear wall schedule
Concrete foundation
2" clear,
minimum
Edge nailing per shear
--A wall schedule
v
A35 per shear wall
schedule.
Anchor bolt per
shear wall schedule 4�;
Concrete foundation V�ET clear,
minimum
Alternate Condition
Exterior Shear Wall Framing Typical Detail
Iif = I I -Off
Existing wall
studs
Existing double
top plate
No. 1 OxY screws, spaced
to match shear wall edge
nailing spacing
New 2x—
bottom plate
Existing P.T.
bottom plate
New wall stud at panel edges, sister
to existing wall stud with No. 10xY
screws to match shear wall edge
nailing spacing
Sheathing and nailing
per shear wall shedule,
cut away to show
framing
Existing foundation
Retrofit High
Shear wall end post
Strap hold down, wrapped around
beam below as needed to meet
minimum length requirements
Strap hold down, wrapped
around beam above as
needed to meet minimum
length requirements
Post per plan, hold down per
plan at base of post (not shown)
New anchor bolts per
shear wall schedule.
Washer edge shall be
no more than 1/2" from
the sheathing side of
the plate
Ith Shear Wall Detail
1/2" = V-0"
Bottom plate
Shear wall sheathing
with edge nailing . Edge nailing
I 1� Finto stud post
I --�_ Strap hold down
(3) 2x4 stud post with 1/4"xY per plan
SIDS screws @ 6" o.c. to tie
posts together as shown
StraQ Hold Down Configuratio!1
Bottom plate HDLI hold down w/
5/8" anchor bolt both
sides of post
Hold down per plan, refer
to current simpson
----catalogue for connection
requirements
2" clear Shear wall
minimum anchor bolt
Hold down bolt as
close as possible to
center of concrete
concrete wall
Studs @ 16"
o.c. max
End stud min.
double stud
Hold down
bolt
Concrete
foundation
Retrofit HDU Hold Down Typical Detail
3/4" = 1 1-011
Shear wall sheathing
2x4 railing connected to
Provide 2x2 railings
with edge nailing
post with A34 each end
@ 4" o.c.
Shear wall
Sheathing or decking,
above
4x4 post @ 4'o.c. A—
42" per plan
Beam below
(3) 2x4 stud post with 1/4"xY Edge nailing
2"
Joists per plan
shear wall
SIDS screws @ 6" o.c. to tie into stud post
6 1/4"
posts together as shown
2"
Joist hangers
1/2" bolt with 3"
Beam per
HQU Configuration
washers each end
plan
Simpson A35 unless a
Corner Hold Down Detail
post cap is specified
1 1/2"= V-0"
Typical Railing Details
2x— ledger to match
3/4" = 11-011
Exterior wall of house —rvF- r deck framing
Discontinuous Hold Down Detail
3/4" = 11-011
Wood framed
Sheathing per shear
wall per framing
wall schedule
plan
Floor framing
Vertical strap hold
down per plan
Strap end length,
nailing per
Wood post per
structural notes
plan
Strap Hold Down Detail
3/4" = 19-011
Note: Contractor to verify that
existing foundation is sound and in
good condition. Contact the
engineer of record for clarfication, or
if the existing foundation does not
meet the minimum requirements of
this detail.
6" min, 12" max
Existing foundation, verify
existing wall thickness,
minimum 5-1/2"
4" mini
Floor framing per plan Decking per plan
Dock framing
per plan
1/4" /2"
x 3 1 U-series exterior
stainless steel �DS
I joist hanger
screws per plan
New or existing wall
(Minimum 3) #4112"
r str ctural plan
dowels, epoxy grouted into
5" deep holes drilled into
existing foundation. Dowels
shall be spaced minimum 6"
apart, and no less than 4"
from top and bottom of
footing. For taller walls,
provide dowels at 12" o-c-
vertically, for the full height
of the wall
New reinforced concrete
foundation, refer to new
foundation detail
New Foundation Connection to Existing Detail "W"
3/4" = 1 1-011
Deck Ledger Typical Detail
3/411 = 1 1-011
Ledger per plan
1/2" threaded rod
Decking per plan
Deck framing
ner plan
At parallel joists, provide (2) bays
of blocking with A35 each end. Simpson DTT2z
Connect DTT2z to blocking connector
At perpendicular joists,
connect DTT2z to joist.
Deck End Connection Typical Detail
15 1- 3/411 = 1 1-011
Exterior wall of house
Floor diaphragm, per
diaphragm schedule
CS 16 x 32" at blocking,
where applicable
/-A, won,� ,,,
PO decr
IN �c F14
C SP r/olvl)
ODE C FOR
OAIPL ANce
WAs
NAL
LU
Z
E
E
C4
0
— 0 co
(n
00
e E
E Lu
gr--
05/25117
1/117
r— 01 1 U T) —
eet
JUN Z2� 21,ill
BUILDN3 DEPA MPENT S4
C1 ry CF ED�'�K�Zs
Structural Notes:
Applicable Codes and Standards:
2015 International Building Code (IBC) and other applicable local building codes.
ASCE/SEI 7-10 - "Minimum Design Loads for Buildings and Other Structures"
2015 NDS for wood structures.
American Wood Preservers Bureau - AWPB Standards for Pressure Treated Material.
American Concrete Institute - ACI 315, ACI 318, ACI 301, ACI 307.
Structural design shall be in accordance with the latest edition of above codes and standards.
Contractor shall comply with the latest edition of all applicable codes and standards.
Design Loads:
Live load: roof 25 par (snow)
floors 40 par floor live load
Decks 60 psf floor live load
Wind load: Basic mind speed 110 mph, exposure B, KzT=1.0
Building Category: Enclosed, Wind Important Factor lw = 1.0
Refer to calculation page Ll for design wind forces.
Internal pressure 5 psf, Components and cladding design per 1609.6.1.2
Seismic loading per HIC Sections 1603 and 1613 through 1622, Site Class D.
The basic structural type is a bearing wall system with light framed walls with shear
panels. Rw = 6.5 (wood structural panels), soil type D.
Seismic importance factor 1.0, Seismic Use Group I
Design and Analysis by Simplified Design Procedure
Peak Ground Accelerations (PGA) based on USGS Hazards Program, by tattling.
PGA I see =.495 PGA.2 see = 1.264
Seismic base shear = 0.130 - Dead Load
Foundations:
Soil parameters (assumed): Vertical allowable soil pressure: 2,000 psf
All soil conditions are to be field verified during construction. Footings shall bear on firm natmrah�
soils or on structural fill placed over firm natural soils, and inspected In place. Footings shall
extend 18 inches minimum below adjacent exterior finished grade and shall extend 12 inches
minimum below existing Interior grade unless otherwise noted on plans. Structural fill shall bei-
placed in 12-inch maximum horizontal lifts (loose thickness) and compacted to 90 percentof
maximum dry density in accordance with ASTM D-1557. Imported structural rill Shan be
granular material containing no more than 5 percent flnes, passing no. 200 sieve. Structural fill
In place shall be tested by a licensed soil engineer or approved by the building inspector.
Cast in Place Concrete:
Concrete shall attain a minimum compressive strength of2,500 psi at 28 days (5-1/2 sack,mix)..$ n
alternate mix provided by the concrete supplier and pre -approved by the building department is
acceptable. Reinforcing steel shall conform to ASTM A-615, Grade 40 (FY=40,000 psi) for all
bars except retaining wall vertical bars, which shall be Grade 60 (Fy=60,000 psi). Provide all Wall
and footing horizontal bars with 2'-0" x 2'-011 corner bars ofthe same size at all corners and wall
Intersections. Minimum lap splice 32 bar diameters for Grade 40 bars, and 48 bar diameters for
Grade 60 bars.
Concrete protection for reinforcement shall be:
Concrete exposed to earth or weather 1.511 (#5 & smaller) 2" (#6 & larger)
Concrete cast against earth 3"
slabs 0.75"
Bolts:
Anchor bolts shall conform to F1554. All other bolts shall conform to ASTNI A307.
Minimum anchor bolt size and spacing shall be %" diameter bolts @ 6' o.c. Shear wall anchor
bolts per the shear wall schedule.
For cast -in -place anchors, provide 711 minimum embedment into the new concrete foundation.
For retrofitted anchors, provide 5" minimum embedment into the existing concrete foundation.
Epoxy grout with Simpson SET epoxy.
Provide 3"x311 square x 0.229" thick bolt washers where anchor bolts connect the sill plate to the
concrete foundation.
Wood Framing Specifications:
All sill plates and other wood framing which is in contact with concrete or masonry must be
pressure treated. For anchor bolts connecting wood sill plates to concrete or masonry, provide
galvanized steel washers on top of the sill, minimum size 31, x 311 x 1/411 thick.
Where toenails are used for stud wall construction, a minimum of (2) toenails at top and bottom
of each stud shall be provided. Toenails shall be 16d nails driven at approximately a 45 degree
angle, with a minimum of 1-1/21' of the nail shank shall be embedded in both the stud and the
plate. End nails driven through the plate and into the stud end grain are not permitted. Simpson
A34 clips at top and bottom of each stud are permitted where correct tocnailing is not provided.
Wherever joists bear on a wall or beam, either a continuous rim joist or solid wood blocking must
be provided. Blocking shall be connected to the joists with A35 angles at each end.
Unless noted otherwise, the following grades and species shall be used for Structural lumber:
ZX joists
Hem -Fir #2
2x, 3x, and 4x studs
DF/L standard for plywood or WSP shear walls
Hem -Fir standard for other walls
4x and 6x beams
DF-L #1
Microllarn LVLlumber
LVL 1.9E, Fb = 2600 psi, Fv = 285 psi (minimums)
Paraflant lumber
2.0 WS, Fb = 2900 psi, Fv = 290 psi (minimums)
Glu4am lumber
24F-V4 or 24F-V8 as applicable
All framing connections shall be per Table 2304.9.1 of the HIC, unless otherwise noted.
Pl3Xood Thickness. Grade, and Nailing:
Install plywood sheets with face grain perpendicular to framing. Stagger joints in adjacent sheets.
If not otherwise noted, use nailing schedule, Table 2304.9.1 of the IBC.
Existing sheathing may be used if it is free of damage. Nail holes may not be closer than 1-1/2"
o.c., existing nails must be free of rust and in good condition.
Manufactured Trusses:
Manufactured Trusses specified on the plans are prefabricated products manufactured by a truss
manufacturer. The contractor shall submit shop drawings and stamped structural design
calculations for review. Truss design and shop drawings shall include location and weight of all
equipment being supported by these trusses.
Metal Frantintz Connectors:
Unless ntherwise notedi Metal framing connectors shall be manufactured by the Simpson
company, or approved equal. Unless noted otherwise, use U-series joist hangers to match joist
size (e.g., U210 for 2xI0 joist). Provide III or H2.5 hurricane ties, or other connectors with
similar capacity, at every roofjoist, and H6 or H7 at ends of roofbeams and girder trusses.
Where supported by wood posts, wood beams shall be connected to the tops of the posts using
Simpson AC, PC or PCC post caps, and to the bottoms of the posts bearing on wood framing
using Simpson AC connectors. Where supported by perpendicular beams, wood beams shall be
connected by HU-series face mount beam hangers. Provide Simpson PB post bases to connect
posts to concrete foundations.
Roof Over Framing Note. Note OF:
The new roof area shown hatched consists of new roof framing constructed over the
existing roof framing below. The over built framing shall be constructed in such a way as to
distribute the roof loads from the new framing uniformly to the existing roof structure (for
example, no new concentrated loads, such as from a beam, shall be added to the existing roof
structure). This equal distribution may be accomplished by constructing the new overbuild roof
using framed 2x4 cripple walls spaced at 2 feet on center, located on top of and perpendicular to
the existing roof sheathing supported by the existing roof framing. No sheathing is required for
these cripple walls.
The new cripple walls and roof rafters (spanning 2 feet, perpendicular to the cripple walls)
may be constructed using 2x4 lumber, stud grade at minimum. The new plates shall be nailed to
each existing rafter with (2) 16d nails minimum. New roof sheathing shall be per the diaphragm
schedule.
A new 2x— plate shall be constructed along the new valley lines, and nailed to each existing
rafter, along its entire length, with (2) 16d nalls per existing rafter.
If desired, an alternate method for distributing the loads may be submitted to the
structural engineer of record, for review and approval prior to construction.
Connection of New Foundation to Existing, Note NF:
At each location where the new concrete foundation abuts the existing foundation, connect
the new to the existing using minimum (3) #4 by 18" long rebar dowels, epoxy grouted into 5/8"
diameter by 5" deep holes drilled Into the existing foundation. Each dowel shall be no closer than
311 to any edge or corner of concrete. Minimum spacing between dowels shall be 6". For concrete
wall intersections longer than 31-0" in any direction, additional dowels shall be located at 1211 o.c.
for the full height or length of the new foundation concrete.
Contact the engineer (prior to construction) for evaluation and approval of the existing
foundation system, if there are any significant cracks In the existing foundation within 6 feet of
the new foundation, or if there Is any indication that the existing foundation is in poor condition,
including visible rock pockets, non -uniform concrete, spalling, noticeable settlement of the
existing footing, or other distress.
Hold Down Notes
Convention for showing shear walls and hold downs: Shear walls are shown on the framing plan
for the floor above. (For example, first floor shear walls will be shown on the second floor
framing plan, and the shear walls for the topmost floor will be shown on the roof framing plan.)
Hold downs are located at the bottom of that shear wall, and connect the end of the shear wall to
wall framing or a structural beam located in the floor below the shear wall. Contact the engineer
of record for clarification if needed.
Hold downs for each floor must be continuously connected to hold downs on the floor
below (or to other intermediate wood framing where so indicated), until they are finally
connected to the concrete foundation.
Hold downs shall be installed so as to be as far apart as is reasonable. Hold downs may be
located on either the near side or the far side of the post or double stud to which they are
attached. In no case shall a hold down bolt be located farther than 611 from the end of the shear
wall, except with prior written approval of the engineer. Refer to the latest edition of the
Simpson Catalog for details.
Where multiple studs are called out at a hold down, nail studs together with (2) 16d nails at 811
o.c. or 1/4" x 3" Simpson SDS Screws at 12" ii.c.
Stran Hold Downs:
Provide a vertically oriented strap hold down consisting of one or two of the Simpson vertical
strap ties listed below, connecting the end stud or post of the shear wall indicated to new or
existing studs in the wall framing below, or to a wood beam supporting the shear wall, where
a
pplicable.
Stiiaps shall be installed so that the minimum end length is provided to both connected posts or
studs.
Where a strap is connected to a below below, the strap shall be wrapped around the beam until
the minimum end length is reached.
CS16 denotes a Simpson CS16 strap, with a minim end length of14", and (13) 8d nails each end.
CMSTC16 denotes a Simpson CMSTC16 strap, with a minim end length of2511, and (29)16d
sinker nails each end.
CMST14 denotes a Simpson CMST14 strap, with a minim end length of 3411, and (38) 10d
nails each end.
Rod Hold Downs:
HDUX denotes a Simpson HDU(2,4,5,8,or ll)-SDS2.5 hold down. For hold down bolts at
existing concrete foundations, use the following bolts:
For HDU2.4.5: 5/811 diameter A307 threaded steel rod may be used, which
shall be epoxy grouted into a 3/4" diameter hole with a minimum embedment of
10".
For hold downs at new concrete foundations, provide the following bolts.
For HDIJ2.4.5: 5/8" diameter A307 threaded steel rod may be used, which shall be
cast In place with a minimum embedment of 10".
Special Note:
Ali holes for hold down bolts which are installed into existing foundations must be
inspected during the installation of the hold down. Either the building inspector, the structural
engineer of record, or the special Inspection agency must perform the inspection and approve it
before the bolts may be epoxy grouted into the holes. The epoxy grout used must be Simpson
SET-XP unless otherwise noted by the engineer of record.
For drilled holes into existing concrete, no less than 211 must be provided between the edge
of the hole and the face of concrete. The Engineer of Record or Special Inspector must witness
the installation of hold down bolts, including cleaning the holes with compressed air and a wire
brush before the anchor is installed. The hole shall be filled with enough epoxy that when the
anchor is inserted, the epoxy rises to the top of the concrete. Care shall be taken that no air
bubbles persist in the epoxy.
The contractor must verify that the existing foundation stem wall is uncracked and
continuous, and is sound and in good condition, within 5 feet of any retrofitted shear wall or hold
down, in any direction, except with prior written approval of the engineer. The existing concrete
foundation stem wall shall be at least 6" thick and 21-611 in height. The concrete shall be of good
quality, hard and uniform, with appropriate aggregate type, size and distribution, and with no
visible rock pockets or other similar deficiencies.
Any existing cracks located within 10' of any hold down must be completely filled with an
appropriate epoxy based concrete repair product. The product to be used shall be approved in
writing by the engineer prior to filling the cracks.
Contact the engineer of record prior to proceeding if any of these requirements are not
met, or if the installation of the hold downs results in any visible damage to the existing
foundation.
SHEAR WALL SCHEDULE
for
shear walls
is 11F#2 or better, unless otherwise
g2LE!L_
— ----- +(Lumber
_TMe_
Material
Edge
1 Nailing
Field
Nailing
A.B.
Size/Spacing
Plate
Plates
A35
Spadng_i
Shear
Capacity-
SWI
SW2
15/32" WSP
one side
15/32"
one side
8d @ 6"
41'
I
8d @ 12"
8d @ 12-
1/2"0 @ 48"
1/2"0 @ 32"
(2) 16d @ 911
(2),16d @ 6"
2x-
2x
241-
161#
230 plf
350 plf
SW3
15/321- WSP
one side
10d @ 3"
10d @ 1211
518"0 @ 2411
(2) 16d @ 4"
3x-
12"
550 plf
SW3X
,
15/32" WSP
one side
10d @ 2
@ 121-
I
5/81-0 @ 24"
I
518"0 x 8"
Lag ra) 24"
3x-
i
91,
710 plf
For shear wall callouts on the Structural Framing Plans* SW x (yl) denotes a shear wall type 11V with
a minimum length of 11y" feet.
- For SW3 and studs. plates, and blocking where two WSP panels abut shall hme a minimum 3- nominal thickness. Double 2x_
Imembers may be usedfor Studs ifthe members are connected by plate failing. Note 10d nods at WSP panel edges.
• "WSP" refers to "Wood Structmal Panel", either plywood or other Wood materials.
• "SIS" refers to "Structural I Sheathing". either pl)7,vood or other wood materials. Apply any "WSP"notes to "SIS" as wel
• Provide double stud mininflura at both ends of all shear walls.
• At the roof or top level of any shear wall, "A35 spacing7, and all other relevant connector specifications, apply to assemblies at both the top
and bottom of the shear wall. At lower levels, apply to the bottom of the wall only.
Provide floor diaphragm edge nailing per diaphragm schedule through floor plywood into blodking, parallel joist framing, or top plates
(wilkliever applies) of all shear walls.
• Provide 3x- plates, and 4x rim joists. minimum, where tag screws are specified for plate failing.
• Where shear wall edge nails are spaced closer than 3" o.c., or spaced 3" o.c. with I Od nods, foundation Sill plates and an framing members
Kepq�iilg edge ng comabuttigg nds s4gnqbe less than a singJe 3x member.
-Pro,vide4x ordouble2x framingwhere A35 angles are used on both sides of one piece of wood.
- Where a shearwall terminates above the foundation level (no shear wall below). provide ininimurn 4x I blocking or double joist framing (as
applicable) below the shear wall."W' Plate nailing per this schedule shall be naded into this blocking at the bottom of the shear wall.
• Shear wall naRs shall b e placed no closer than, 3/8" from a panel edge or perpendicular face of Stud.
• iNtwLimum Spac between nags shall not exceed ir.
• Shear wall nailing shall be common or galvanized box nods, unless tag screws are noted. Gah-anized nags shall not be hot dipped or
tumbled.
• Lag screw plate connectors shall penetrate 3.5" mbhmm� and plates or beams receiving lag screws shall have a minimum width of 3.5".
• Where hold downs are specified, the shear wan bolt shall be located within 6 inches of the end of the shear wall, unless otherwise approved
by the engineer of record- Mininuturt end studs shall be as specified in the most recent Simpson catalog.
Shear wall edge nailing through shear wall sheathing shall be p�TLde#Liwnto_Sll studs attached to a hold down-
-Retrofit anchor b. t� s�have a minimum, embedment of 5" into the concrete foundation-
• Cast in place anchor bolts shall have a minimum embedment of 7" into the concrete foundation.
• Plate nails shall be nailed into a sold wood rim joist.
• 2x- plates may be substited for 3x- plates if paiiels aie nailed with edge nailing directly to the rim joist
- Where 3x- plates are used, (2) 20d common nails umst be used instead of (2) 16d common nails to connect studs to the bottom plate.
- Where Reof'ventilation is req*ed over a shear wall, see roofvenblation detail
Diaphra= Schedule
for di
rasm construction
is 11IFF42 or
efter. unless otherwise noted.)
T—
.L,bar
Time
Material
Edge Nailing
leld NaffinU
Edge Blocicing
Remarks
Roof
15/32" CDX 24/0
8d @ 6" ox,
8
-" 1211 o.c.
no
Minimum Standard
Floor
23/32" CDX 48/24
8d g-1—r o.c.
no
Minimum Standard
• "WST refers to "Wood Structural Paner, either plywood or other wood materials.
• Rim ioists at exteriorwalls shall be continuous for tension. At tin joist sl�h:ce locations, pnide (2) CS 16 horizontal qr�s, minimma ZV
• Where TdcLljoor fm*g Lisc �tgeve�ed -S - exteri5xr wall b�!o!��, pr i e solid �LoqFj!�g with Diaphragm edge naMng between ts-
jois
• This is the minimurn required diaphragm construction. Where othenvise noted on the plials. additional blocking or nailing may be required.
; 4Q K,01?k
Wojqk
IAISp$C Q)
110
710
fV
J
Co D
V J�rop
COD poi?
/,J�JC,�r
,IS.
WA
ONAL
E
LLI n
Z
V
(L _O
E
C14
V Q
— = 00
U) 0 M
CD
00
E
-0
W
Z!�
Z:L 05/25/17
ate:
D4/11/17
nuou 31