BLD20170550 - Addition - E1OV EDAf
DATE: May 17, 2017
TO: Shawn Sullivan
CITY OF EDMONDS
PLAN REVIEW COMMENTS
ENGINEERING DIVISION
(425) 771-0220
City Website: www.edmondswa.go
Lure Design Solutions
Shawn@luredesignsolutions.com
FROM: Mitch Boyd, Stantec Consulting Services
Mitch.Boyd@edmondswa.gov
RE: Application #: BLD20170550
Project: Blas — Addition/Remodel
ProjectAddress: 11407t"AveS
During review of the above noted application, it was found that the following information,
corrections, or clarifications are needed. Reviews by other divisions, such as Planning, Building, or
Fire may result in additional comments. Please submit two (2) sets of revised plans/documents
including a written response to each item below.
Resubmittals can be made at the Development Services Department on the 2 nd floor of City Hall.
Permit Center hours are M, T, Th & F from 8am-4:30pm and on Wednesdays from 8:30am-noon.
City of Edmonds handouts, standard details, application and other forms, and development code
may be referenced on the City website: www.edmondswa.gov under Services/Permits and
Development.
GENERAL
1) Include construction sequence. Refer to sample on Ci1y website.
2) Include General Construction Notes. Refer to saMple on City website.
S I
ITE PLAN
1) Incorporate and reference City standard detail E L I for filter fencing.
2) Show construction entrance on the plans and incorporate and reference City standard detail
E1.2. Alternatively, if the existing driveway is to be used as the construction entrance,
please indicate how construction stormwater will be mitigated throughout the project.
3) Please show and add a note to the plans that filter socks will be added to any catch basins
downstream from the construction site. Incorporate and reference City standard detail E1.3.
4) Orange protective barrier fencing shall be placed at the drip line of trees to remain.
5) Add note: Install and maintain all TESC measures according to approved plans, City of
Edmonds standard details, and all other measures that may be required during construction.
6) Please show the downspout locations on the site plan.