Loading...
ENG2023-0059 ROW PERMITRIGHT OF WAY PERMIT PERMIT NU E ' City of • • . Edmonds:i 1 11 ' www.edmondswa.gov i Description: ROW - 30 INCH WALL ON PRIVATE PROPERTY, STAGING IN ROW ISSUED: 04/10/2023 Address: 803 6TH AVE S EDMONDS WA 98020-4009 EXPIRES: 04/04/2024 Permit Type: RIGHT OF WAY Permit Subtype: RESIDENTIAL Parcel Number: 00610900001102 NAME TYPE NAME ADDRESS PHONE APPLICANT MANUEL DE DE JESUS 624 SW 128TH ST, BURIEN WA 98146 (206)353-0679 CONTACT ANGLE STONE LLC 624 SW 128TH ST, BURIEN WA 98146 (206)353-0679 CONTRACTOR ANGLE STONE LLC 624 SW 128TH ST, SEATTLE WA 98146 (206)353-0679 OWNER DEREK W & KACIE S TTE JANKE 803 6TH AVE S, EDMONDS WA 98020-4009 FEE INFORMATION DESCRIPTION AMOUNT PAID CITY TECHNOLOGY FEE CHARGED PER PERMIT $40.00 $40.00 ENGINEERING INSPECTION FEE $110.00 $110.00 ENGINEERING INSPECTION FEE $110.00 $110.00 RIGHT OF WAY STANDARD PERMIT FEE $330.00 $330.00 STREET RESTORATION - WATER METER INSTALL $1,000.00 $1,000.00 REQUIREMENTS REQUIREMENT TYPE NOTES TRAFFIC CONTROL Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification verifying completion of the required training in their posession. RESTORATION Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with asphalt or City approved material prior to the end of the workday - No Exceptions WARRANTY The contractor is responsible for workmanship and materials for a period of one year following the final inspection and acceptance of the work. INSPECTION SCHEDULING: WWW.MYBUILDING PERMIT.COM 24 HR NOTICE REQUIRED The Applicant has signed an application which states he/she holds the City of Edmonds harmless from injuries, damages or claims of any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its departments or employees, including but not limited to the defense of any legal proceedings including defense costs and attorney fees by reason of granting this permit. RELEASED BY: NED DATE: 04/10/2023 Printed: Monday, April 10, 2023 2:27:56 PM 1 of 2 RIGHT OF WAY PERMIT PERMIT NU E City of Edmonds SID www.edmondswa.gov • • CONDITIONS CONDITION TYPE It is the owner's responsibility to repair/replace all damage of utilities or frontage improvements in DAMAGE TO FRONTAGE City right of Ways or Easements to City Standards caused by or occurring during the permitted IMPROVEMENTS project. MAINTAIN EROSION AND SEDIMENTATION CONTROL PER CITY AND SWMMW STANDARD ESC REQUIREMENTS REQUIREMENTS. Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the HOLD HARMLESS issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. SCHEDULE REQUIRED INSPECTIONS AS NOTED THROUGH MY BUILDING PERMIT. INSPECTIONS www.mybuildingpermit.com RESTORE LANDSCAPE Restore landscape to like or better conditions Sound or noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:OOam to 6:OOpm on SOUND AND NOISE weekdays and 10:OOam and 6:OOpm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites and activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. All utilities shall be located prior to any excavation. New locates shall be called for if at time of UTILITY LOCATES excavation, original locates are no longer identifiable. • PECTION TYPE DATE 7RESTOR RESULT NOTES 17 COMPLETE MITS X-2 ENGINEERING FINAL" Printed: Monday, April 10, 2023 2:27:56 PM 2 of 2 RECEIVED of fvkt0 �Mt:. 1890 SECTION A RIGHT OF WAY CONSTRUCTION FEB 2 2023 PERMIT APPLICATION CITY OF EDMONDS DEVELOPMENT Complete and submit this Application in accordance with the Submittal SERVICES DEPARTMENT Requirements outlined in Right -of -Way permit Handout E6.i. If any field is not applicable to your project, write "N/A" instead of leaving blank. All fields required. Incomplete Applications will be denied. •applicable) Name of Company �t �q L L L Franchise Ordinance No: Point of Contact Min Li Title Ue Gts?? { Address �02 g ffot City r, a State zA2 /4- I Zip epl q 6 Phone 12 0 G. _ S b Email &ol Itt-skan /�t4: %• CD'�l Name of Company Primary Name Agent Name Title 77 Title Mobile Address Email City State Zip SecondaryName Phone Title Email Mobile City of Edmonds Business License No; Email State License No: p Contractor verifies it is currently bonded o Contractor verifies it currently has general liability insurance !VOTE: ECUC 18.6o.o2o requires that the Application be signed by a licensed and bonded contractor unless otherwise approved by the city engineer. Type of Development — Check ALL that apply ❑ Multifamily residential ❑ Commercial ❑ City project KSingle family residential subdivision ❑ Single family -other ❑ Industrial n Demo and rebuild or from vacant land? ❑ Other, please specify: ❑ Utility Franchise Work associated with development (check one of the above boxes as welll ❑ Traffic Control Only (no associated development) City of Edmonds ROW construction permit Application --Page 1 of 3 Updated 3/25/2021 ❑ Utility Franchise Work (no associated development) Include an overall narrative description of the proposed work. Be specific and detailed: Describe infrastructure to be impacted, such as, poles, wires, conduit, utility mains, etc. Include whether this is construction, maintenance, or repair. Include description of proposed construction methods, (e.g., bores, trenches, overhead wires proposed, depth for underground utilities, etc.) of 44% �XA �L��R. :s no SJ�s Wa Ile - RIGHT -OF -WAY CLOSURE AREA TOTAL DURATION (Number of Months) Sidewalk 72 hours + LF x LF SF Alley 2 hours + LF x LF SF LPanking 72 hours + LF x 5 LF P70 SF o SECTION B - If you are not a utility company performing work in the City ROW, skip to SECTION Type of Utility Facilities 1. The work in the right of way is on or for the following type of facilities: Q telecommunications o cable o power Q gas o water o sewer o storm Details of Work to be Completed L Does the utility owner have existing overhead infrastructure in the area of work? Yes No 2. Will any equipment be added under round or above ground (e.. pedestals, vaults, etc.)? If Yes, describe: 3. Does the proposed work connect a lot or commercial development with utilities that serve more than one lot or commercial develo ment? 4. Does the work involve rebuilding or relocating an existing aboveground utility system which connects a lot or commercial develo ment to an existing under round common utility system? Does the work involve proposed additions to an aboveground utility system? If es: Are the additions for the purpose of serving new commercial development? Are the additions for the purpose of serving a single-family residential subdivision? Details6. 1 Does your project involve rebuilding or replacing utility equipment which currently serves more than one lot or commercial develo ment? City of Edmonds ROW construction permit Application --Page 2 of 3 Updated 3/25/2021 If yes, answer the following questions related to project area, i.e. the actual area in which the project is proposed: 6a. Does your project involve wires/cables/lines? If yes: How many are existing? I I How man are to be added? 6b. Does your project involve poles? If yes: How many poles are existing in the project area? - What is the height of the existing poles? AIM ffim How many poles are to be removed? °'`Imm Are additional poles to be laced? How man ? What is the height of the additional oles? 6c. Are any poles to be modified/rebuilt/replaced? If yes: How man ? What is the height of the poles after? Describe the modification rebuild: =' - SECTION C Traffic Control and Public Safety. Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification verifying completion of the required training in their possession. Restoration. Restoration shall be in accordance with City codes and Standards. All street cut trench work shall be patched with asphalt or City approved material prior to the end of the worltday-NO EXCEPTIONS. Insurance. The City may require the owner or contractor to provide proof of insurance acceptable to the City prior to any permit approval. Indemnification. The Applicant agrees to defend, indemnify, and hold harmless the City of Edmonds, its officials, officers, employees, and agents against any injuries, damages, or claims of any kind or description whatsoever, foreseen or unforeseen, including defense costs and attorney fees, resulting directly or indirectly from any act or omission of the Applicant, its subcontractors, anyone directly or indirectly employed by them, and anyone for whose acts or omissions they may be liable, arising out of, related to, or by reason of the granting of this permit; and specifically including but not limited to all loss by the failure of the Applicant to fully or adequately perform, in any respect, all authorizations or obligations under the permit. These indemnification requirements shall survive the expiration, revocation, or termination of any resulting permit approval. Acceptance of terms, conditions, and requirements. Applicant accepts the terms, conditions, and requirements set forth in this Application and agrees they apply to any resulting permit and shall comply with them to the satisfaction of the City Engineer. Applicant further agrees to comply with the conditions listed on the Submittal Requirements; with all applicable city ordinances, including but not limited to ECDC Title 18; and with all applicable requirements of state and federal law. Statement of Applicant. I declare under penalty of perjury under the laws of the State of Washington that: I am a licensed and bonded contractor; the information provided herein is correct and complete; and I am authorized by owner to act on its behalf and have authority to bind the owner to this application. Fees. The Applicant is responsible for all permit fees. APPLICANT SIGNATURE: APPLICANT PRINTED APPLICANT TITLE: 04"Seal--de DATE: NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE City of Edmonds ROW construction permit Application --Page 3 of 3 Updated 3/25/2021 Applicant shall repair/replace all damage to utilities or frontage improvements in City right-of-way per city standards that is caused or occurs during the permitted project. RETAINING WALL SHALL BE ENTIRELY ON PRIVATE PROPERTY OWNER/CONTRACTOR IS RESPONSIBLE FOR OWNER/CONTRACTOR RESPONSIBLE FOR LOCATING EROSION CONTROL AND DRAINAGE ALL ON SITE UTILITIES. RELOCATION/REVISION TO ANY UTILITIES MAY REQUIRE A SEPERATE PERMIT. RESTORATION LIMITS TO BE DETERMINED BY CITY ENGINEERING INSPECTOR ENGINEERING DIVISION ..,7TED 0--�v 13/30/2023 RECEIVED FEB 2 2023 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT SIGN SPACING a X (1) RURAL ROADS & URBAN ARTERIALS 35140 MPH 3501 RURAL ROADS. URBAN ARTERIALS, 25 / 30 MPH 20V S (Z) RESIDENTIAL & BUSINESS DISTRICTS URBAN STREETS 25 MPH OR LESS 1W1 (2) (1)ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERSECTIONS AND DRIVEWAYS. (2)THIS SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDRIDNS. LEGEND K TEMPORARY SIGN LOCATION F CHANNELIZING DEVICES ® PROTECTIVE VEHICLE MINIMUM SHOULDER TAPER LENGTH n L/3 (feet) SHOULDER Posted Speed (mph) WIDTH (feet) 25 30 35 40 45 50 55 1 60 1 65 70 g' 40 4o 60 90 - - - - - - 10'USE A 3 DEVICES TAPER FOR SHOULDERS LESS THEN 8' IF TWO 11' TRAVEL LANES CANNOT REMAIN OPEN, USE FLAGGERS AND UTILIZE ATTACHED SINGLE -LANE CLOSURE TRAFFIC CONTROL PLAN. O p q O O 4 I I o I X X I Ul BUFFER DATA LONGITUDINAL BUFFER SPACE = B SPEED (MPH) 25 30 35 40 45 50 55 60 65 70 LENGTH (feet) 155 200 250 305 360 425 495 1 570 645 730 TRANSPORTABLE ATTENUATOR ROLL AHEAD DISTANCE = R HOST VEHICLE WEIGHT 9.900 TO 22,000 Ibs- HOST VEHICLE WEIGHT > 22,000 Ibs- < 45 MPH 45-55 MPH > 55 MPH < 45 MPH 45-55 MPH > 55 MPH 1 DO' 123' 172' 74' 100, 150' PROTECTIVE VEHICLE (WORK VEHICLE) = R NO SPECIFIED DISTANCE REQUIRED WORK AREA , j 0 C CHANNELIZATiON DEVICE SPACING feet MPH TAPER TANGENT 7540 30 60 2530 20 40 rl `8 RECEIVED ROAD <WO>RK ENGINEERING DIVISION WORK ^ ^^^^ '�^ ^ AHEAD "" �TED 41' W2.1 W21-5 _ 0. I ��i-v(yJ 13/30/2022 F E B 2 2023 OWNER/CONTRACTOR IS RESPONSIBLE FOR EROSION CONTROLAND DRAINAGE Applicant shall repair/replace all damage to utilities or frontage improvements in City right-of-way SHOULDER CLOSURE - LOW SPEED per city standards that is caused or occurs during the permitted project. (40 MPH OR LESS) NOT TO SCALE CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT NOTES 1, DEVICE SPACING FOR THE DOWNSTREAM TAPER SHALL BE 20'(FT). 2. ALL SIGNS ARE BLACK ON ORANGE. FILE NAME SVaaIqn R P& SWS"rdard3U-Plan St l Linn 1-Pu ElHhod PSL C Wort Zone Tmtf c Con tro C•5 Sheo War Cloture -LO S ad 40 IAPt a Laat)ITC-5.dpn n an Washington State Department of Transportation Plot n^a re TC• TIME 215:41 PM "•" FEDAJD PROJ.NO, DATE iry nia AS PLOTTED BY RddeN DESIGNED BY ..a� ENTERED BY CHECKED BY DATE BY TRAFFIC CONTROL PLAN PROD-ENGR. REGIONAL An. REVISION 40 BUFFER DATA LONGITUDINAL BUFFER SPACE = B SPEED (MPH) 25 30 35 40 45 50 55 60 65 70 LENGTH (feet) 155 200 250 305 360 425 495 570 645 730 TRANSPORTABLE ATTENUATOR ROLL AHEAD DISTANCE = R HOST VEHICLE WEIGHT 9,900 TO 22,000 Ibs. HOST VEHICLE WEIGHT I > 22,000 lbs. < 45 MPH 45-55 MPH > 55 MPH < 45 MPH 45-55 MPH > 55 MPH 100, 123' 172' 74' 100, 150, PROTECTIVE VEHICLE (WORK VEHICLE) = R NO SPECIFIED DISTANCE REQUIRED 300' ONE LANE .� ROAD AHEAD 48" 48" W20-4 48. W20-7A ROAD BE WORK PREPARED AHEAD TO STOP 48" 48" W20.1 W20-7111 W20.7B (OPTIONAL IF 40 MPH OR LESS) LEGEND FLAGGING STATION b TEMPORARY SIGN LOCATION D CHANNELIZING DEVICES PROTECTIVE VEHICLE SIGN SPACING = X (1) RURAL HIGHWAYS 60 165 MPH 800't RURAL ROADS 45/55 MPH 500'i RURAL ROADS & URBAN ARTERIALS 35/40 MPH 350't RURAL ROADS, URBAN ARTERIALS, 25 / 30 MPH RESIDENTIAL & BUSINESS DISTRICTS 200't (2) URBAN STREETS 25 MPH OR LESS 100'i (2) (1) ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERSECTIONS AND DRIVEWAYS. (2) THIS SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS. 50. TO 100' 6 DEVICE MIN I I R O RK AREA 59TO 100' 6 DEVICE W20-7A ONE LANE ROAD AHEAD� W20-4 W20_7B (OPTIONAL IF 40 MPH OR LESS) 481, 48' BE ROAD PREPARED WORK To STOPrr AHEAD 48" 48" 48. 48' Or . W20.713 ONE LANE W20.1 ROAD AHEAD 48" 48" W20-7A W20-4 BE PREPARED > W20-713 IONAL IF 40 MPH OR(OPTLESS) TO STOP 48' W20-7B 48' ROAD CHANNELIZATION DEVICE SPACING (FEET) MPH TAPER TANGENT 50/65 10 TO 20 80 35/45 10 TO 20 60 25/30 1 10 TO 20 40 WORK NOTES AHEAD 48' 1. ALL SIGNS ARE BLACK ON ORANGE. ONE -LANE, TWO-WAY TRAFFIC CONTROL WITH FLAGGERS NOT TO SCALE 2. EXTENDING THE CHANNELIZING DEVICE TAPER ACROSS SHOULDER IS RECOMMENDED. 3. NIGHT WORK REQUIRES ADDITIONAL ROADWAY LIGHTING AT FLAGGING STATIONS. SEE THE STANDARD SPECIFICATIONS FOR ADDITIONAL DETAILS. 4. SEE SPECIAL PROVISIONS FOR WORK HOUR RESTRICTIONS. Plot 1 TIME 3:05:14 PM s•"•s "WAS FED.AID PROJ.NO. .e " E Amokxnx � �I/ Washington State Department of Transportation .ss TC7� DATE 1/212018 PLOTTED BY Ilddelf DESIGNED BY +". x... Ex sx.E. o. ENTERED BY CHECKED BY c"x.xnm x"wnox xo. TRAFFIC CONTROL PLAN PROJ. ENGR. REGIONAL ADM. REVISION DATE BY