ENG2023-0059 ROW PERMITRIGHT OF WAY PERMIT
PERMIT NU E
'
City of • • .
Edmonds:i 1 11 '
www.edmondswa.gov i
Description: ROW - 30 INCH WALL ON PRIVATE PROPERTY, STAGING IN ROW
ISSUED: 04/10/2023
Address: 803 6TH AVE S EDMONDS WA 98020-4009
EXPIRES: 04/04/2024
Permit Type: RIGHT OF WAY Permit Subtype: RESIDENTIAL Parcel Number: 00610900001102
NAME TYPE NAME ADDRESS PHONE
APPLICANT MANUEL DE DE JESUS 624 SW 128TH ST, BURIEN WA 98146 (206)353-0679
CONTACT ANGLE STONE LLC 624 SW 128TH ST, BURIEN WA 98146 (206)353-0679
CONTRACTOR ANGLE STONE LLC 624 SW 128TH ST, SEATTLE WA 98146 (206)353-0679
OWNER DEREK W & KACIE S TTE JANKE 803 6TH AVE S, EDMONDS WA 98020-4009
FEE INFORMATION
DESCRIPTION AMOUNT PAID
CITY TECHNOLOGY FEE CHARGED PER PERMIT
$40.00
$40.00
ENGINEERING INSPECTION FEE
$110.00
$110.00
ENGINEERING INSPECTION FEE
$110.00
$110.00
RIGHT OF WAY STANDARD PERMIT FEE
$330.00
$330.00
STREET RESTORATION - WATER METER INSTALL $1,000.00 $1,000.00
REQUIREMENTS
REQUIREMENT TYPE NOTES
TRAFFIC CONTROL
Traffic control and public safety shall be in accordance with City regulations as required by the City
Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification
verifying completion of the required training in their posession.
RESTORATION
Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with
asphalt or City approved material prior to the end of the workday - No Exceptions
WARRANTY The contractor is responsible for workmanship and materials for a period of one year following the final
inspection and acceptance of the work.
INSPECTION SCHEDULING: WWW.MYBUILDING PERMIT.COM
24 HR NOTICE REQUIRED
The Applicant has signed an application which states he/she holds the City of Edmonds harmless from injuries, damages or claims of
any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its
departments or employees, including but not limited to the defense of any legal proceedings including defense costs and attorney
fees by reason of granting this permit.
RELEASED BY: NED DATE: 04/10/2023
Printed: Monday, April 10, 2023 2:27:56 PM 1 of 2
RIGHT OF WAY PERMIT
PERMIT NU E
City of Edmonds
SID
www.edmondswa.gov • •
CONDITIONS
CONDITION TYPE
It is the owner's responsibility to repair/replace all damage of utilities or frontage improvements in
DAMAGE TO FRONTAGE
City right of Ways or Easements to City Standards caused by or occurring during the permitted
IMPROVEMENTS
project.
MAINTAIN EROSION AND SEDIMENTATION CONTROL PER CITY AND SWMMW STANDARD
ESC REQUIREMENTS
REQUIREMENTS.
Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to
indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and
agents from any and all claims for damages of whatever nature, arising directly or indirectly from the
HOLD HARMLESS
issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any
requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance
provision.
SCHEDULE REQUIRED INSPECTIONS AS NOTED THROUGH MY BUILDING PERMIT.
INSPECTIONS
www.mybuildingpermit.com
RESTORE LANDSCAPE
Restore landscape to like or better conditions
Sound or noise originating from temporary construction sites as a result of construction activity are
exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:OOam to 6:OOpm on
SOUND AND NOISE
weekdays and 10:OOam and 6:OOpm on Saturdays, excluding Sundays and Federal Holidays. At all
other times the noise originating from construction sites and activities must comply with the noise
limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.
All utilities shall be located prior to any excavation. New locates shall be called for if at time of
UTILITY LOCATES
excavation, original locates are no longer identifiable.
•
PECTION TYPE DATE
7RESTOR
RESULT
NOTES
17
COMPLETE
MITS
X-2 ENGINEERING FINAL"
Printed: Monday, April 10, 2023 2:27:56 PM 2 of 2
RECEIVED
of fvkt0
�Mt:. 1890
SECTION A
RIGHT OF WAY CONSTRUCTION FEB 2 2023
PERMIT APPLICATION CITY OF EDMONDS
DEVELOPMENT
Complete and submit this Application in accordance with the Submittal SERVICES DEPARTMENT
Requirements outlined in Right -of -Way permit Handout E6.i.
If any field is not applicable to your project, write "N/A" instead of leaving blank.
All fields required. Incomplete Applications will be denied.
•applicable)
Name of Company �t
�q L L L Franchise Ordinance No:
Point of Contact Min
Li
Title Ue Gts?? {
Address
�02 g ffot
City r, a
State zA2 /4-
I Zip epl q 6
Phone 12 0 G. _ S
b
Email &ol Itt-skan
/�t4: %• CD'�l
Name of Company
Primary Name
Agent Name
Title
77
Title
Mobile
Address
Email
City
State
Zip
SecondaryName
Phone
Title
Email
Mobile
City of Edmonds Business License No;
Email
State License No:
p Contractor verifies it is currently bonded
o Contractor verifies it currently has general liability insurance
!VOTE: ECUC 18.6o.o2o requires that the Application be signed by a licensed and bonded contractor unless otherwise approved by the city
engineer.
Type of Development — Check ALL that apply
❑ Multifamily residential ❑ Commercial ❑ City project
KSingle family residential subdivision ❑ Single family -other ❑ Industrial
n Demo and rebuild or from vacant land?
❑ Other, please specify:
❑ Utility Franchise Work associated with development (check one of the above boxes as welll
❑ Traffic Control Only (no associated development)
City of Edmonds ROW construction permit Application --Page 1 of 3 Updated 3/25/2021
❑ Utility Franchise Work (no associated development)
Include an overall narrative description of the proposed work. Be specific and detailed:
Describe infrastructure to be impacted, such as, poles, wires, conduit, utility mains, etc.
Include whether this is construction, maintenance, or repair.
Include description of proposed construction methods, (e.g., bores, trenches, overhead wires proposed, depth for
underground utilities, etc.)
of
44% �XA �L��R. :s no SJ�s Wa Ile -
RIGHT -OF -WAY
CLOSURE
AREA
TOTAL
DURATION
(Number of Months)
Sidewalk 72 hours +
LF
x
LF
SF
Alley 2 hours +
LF
x
LF
SF
LPanking 72 hours +
LF
x
5 LF
P70 SF
o
SECTION B - If you are not a utility company performing work in the City ROW, skip to SECTION
Type of Utility Facilities
1. The work in the right of way is on or for the following type of facilities:
Q telecommunications o cable o power Q gas
o water o sewer o storm
Details of Work to be Completed
L Does the utility owner have existing overhead infrastructure in the area of work?
Yes
No
2. Will any equipment be added under round or above ground (e.. pedestals, vaults, etc.)?
If Yes, describe:
3.
Does the proposed work connect a lot or commercial development with utilities that serve more
than one lot or commercial develo ment?
4.
Does the work involve rebuilding or relocating an existing aboveground utility system which
connects a lot or commercial develo ment to an existing under round common utility system?
Does the work involve proposed additions to an aboveground utility system? If es:
Are the additions for the purpose of serving new commercial development?
Are the additions for the purpose of serving a single-family residential subdivision?
Details6. 1 Does your project involve rebuilding or replacing utility equipment which currently serves more
than one lot or commercial develo ment?
City of Edmonds ROW construction permit Application --Page 2 of 3 Updated 3/25/2021
If yes, answer the following questions related to project area, i.e. the actual area in which the
project is proposed:
6a.
Does your project involve wires/cables/lines? If yes:
How many are existing? I I How man are to be added?
6b.
Does your project involve poles? If yes:
How many poles are existing in the project area?
-
What is the height of the existing poles?
AIM
ffim
How many poles are to be removed?
°'`Imm
Are additional poles to be laced?
How man ? What is the height of the additional oles?
6c.
Are any poles to be modified/rebuilt/replaced? If yes:
How man ? What is the height of the poles after?
Describe the modification rebuild:
='
-
SECTION C
Traffic Control and Public Safety. Traffic control and public safety shall be in accordance with City regulations as
required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have
certification verifying completion of the required training in their possession.
Restoration. Restoration shall be in accordance with City codes and Standards. All street cut trench work shall be
patched with asphalt or City approved material prior to the end of the worltday-NO EXCEPTIONS.
Insurance. The City may require the owner or contractor to provide proof of insurance acceptable to the City prior to
any permit approval.
Indemnification. The Applicant agrees to defend, indemnify, and hold harmless the City of Edmonds, its officials,
officers, employees, and agents against any injuries, damages, or claims of any kind or description whatsoever,
foreseen or unforeseen, including defense costs and attorney fees, resulting directly or indirectly from any act or
omission of the Applicant, its subcontractors, anyone directly or indirectly employed by them, and anyone for whose
acts or omissions they may be liable, arising out of, related to, or by reason of the granting of this permit; and
specifically including but not limited to all loss by the failure of the Applicant to fully or adequately perform, in any
respect, all authorizations or obligations under the permit. These indemnification requirements shall survive the
expiration, revocation, or termination of any resulting permit approval.
Acceptance of terms, conditions, and requirements. Applicant accepts the terms, conditions, and
requirements set forth in this Application and agrees they apply to any resulting permit and shall comply with them to
the satisfaction of the City Engineer. Applicant further agrees to comply with the conditions listed on the Submittal
Requirements; with all applicable city ordinances, including but not limited to ECDC Title 18; and with all applicable
requirements of state and federal law.
Statement of Applicant. I declare under penalty of perjury under the laws of the State of Washington that: I am a
licensed and bonded contractor; the information provided herein is correct and complete; and I am authorized by
owner to act on its behalf and have authority to bind the owner to this application.
Fees. The Applicant is responsible for all permit fees.
APPLICANT SIGNATURE:
APPLICANT PRINTED
APPLICANT TITLE:
04"Seal--de DATE:
NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE
City of Edmonds ROW construction permit Application --Page 3 of 3 Updated 3/25/2021
Applicant shall repair/replace all
damage to utilities or frontage
improvements in City right-of-way
per city standards that is caused or
occurs during the permitted project.
RETAINING
WALL SHALL BE
ENTIRELY ON
PRIVATE
PROPERTY
OWNER/CONTRACTOR IS RESPONSIBLE FOR OWNER/CONTRACTOR RESPONSIBLE FOR LOCATING
EROSION CONTROL AND DRAINAGE ALL ON SITE UTILITIES. RELOCATION/REVISION TO ANY
UTILITIES MAY REQUIRE A SEPERATE PERMIT.
RESTORATION LIMITS TO BE DETERMINED
BY CITY ENGINEERING INSPECTOR
ENGINEERING DIVISION
..,7TED
0--�v
13/30/2023
RECEIVED
FEB 2 2023
CITY OF EDMONDS
DEVELOPMENT
SERVICES DEPARTMENT
SIGN SPACING a X (1)
RURAL ROADS & URBAN ARTERIALS 35140 MPH 3501
RURAL ROADS. URBAN ARTERIALS, 25 / 30 MPH 20V S (Z)
RESIDENTIAL & BUSINESS DISTRICTS
URBAN STREETS 25 MPH OR LESS 1W1 (2)
(1)ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE
INTERSECTIONS AND DRIVEWAYS.
(2)THIS SPACING MAY BE REDUCED IN URBAN AREAS TO FIT
ROADWAY CONDRIDNS.
LEGEND
K
TEMPORARY SIGN LOCATION
F
CHANNELIZING DEVICES
®
PROTECTIVE VEHICLE
MINIMUM SHOULDER TAPER LENGTH n L/3 (feet)
SHOULDER
Posted Speed (mph)
WIDTH
(feet)
25 30
35
40
45
50
55
1 60
1 65
70
g'
40 4o
60
90
-
-
-
-
-
-
10'USE
A 3 DEVICES TAPER FOR SHOULDERS LESS THEN 8'
IF TWO 11' TRAVEL LANES CANNOT REMAIN
OPEN, USE FLAGGERS AND UTILIZE
ATTACHED SINGLE -LANE CLOSURE TRAFFIC
CONTROL PLAN.
O
p q O O 4
I I o
I X X I Ul
BUFFER DATA
LONGITUDINAL BUFFER SPACE = B
SPEED (MPH)
25
30
35
40
45
50
55
60 65
70
LENGTH (feet)
155
200
250
305
360
425
495
1 570 645
730
TRANSPORTABLE ATTENUATOR ROLL AHEAD DISTANCE = R
HOST VEHICLE WEIGHT
9.900 TO 22,000 Ibs-
HOST VEHICLE WEIGHT
> 22,000 Ibs-
< 45 MPH
45-55 MPH
> 55 MPH
< 45 MPH
45-55 MPH
> 55 MPH
1 DO'
123'
172'
74'
100,
150'
PROTECTIVE VEHICLE (WORK VEHICLE) = R
NO SPECIFIED DISTANCE REQUIRED
WORK AREA , j 0 C
CHANNELIZATiON DEVICE
SPACING feet
MPH
TAPER
TANGENT
7540
30
60
2530
20
40
rl `8 RECEIVED
ROAD <WO>RK
ENGINEERING DIVISION
WORK ^ ^^^^ '�^ ^
AHEAD "" �TED
41'
W2.1 W21-5 _ 0. I ��i-v(yJ 13/30/2022 F E B 2 2023
OWNER/CONTRACTOR IS RESPONSIBLE FOR
EROSION CONTROLAND DRAINAGE
Applicant shall repair/replace all
damage to utilities or frontage
improvements in City right-of-way SHOULDER CLOSURE - LOW SPEED
per city standards that is caused or
occurs during the permitted project. (40 MPH OR LESS)
NOT TO SCALE
CITY OF EDMONDS
DEVELOPMENT
SERVICES DEPARTMENT
NOTES
1, DEVICE SPACING FOR THE DOWNSTREAM TAPER SHALL BE 20'(FT).
2. ALL SIGNS ARE BLACK ON ORANGE.
FILE NAME SVaaIqn R P& SWS"rdard3U-Plan St l Linn 1-Pu ElHhod PSL C Wort Zone
Tmtf c Con tro C•5 Sheo War
Cloture -LO S ad 40 IAPt
a Laat)ITC-5.dpn
n
an
Washington State
Department of Transportation
Plot
n^a re
TC•
TIME 215:41 PM
"•"
FEDAJD PROJ.NO,
DATE iry nia
AS
PLOTTED BY RddeN
DESIGNED BY
..a�
ENTERED BY
CHECKED BY
DATE
BY
TRAFFIC CONTROL PLAN
PROD-ENGR.
REGIONAL An.
REVISION
40
BUFFER DATA
LONGITUDINAL BUFFER SPACE = B
SPEED (MPH)
25
30
35
40
45
50
55
60
65
70
LENGTH (feet)
155
200
250
305
360
425
495
570
645
730
TRANSPORTABLE ATTENUATOR ROLL AHEAD DISTANCE = R
HOST VEHICLE WEIGHT
9,900 TO 22,000 Ibs.
HOST VEHICLE WEIGHT
I > 22,000 lbs.
< 45 MPH
45-55 MPH
> 55 MPH
< 45 MPH
45-55 MPH
> 55 MPH
100,
123'
172'
74'
100,
150,
PROTECTIVE VEHICLE (WORK VEHICLE) = R
NO SPECIFIED DISTANCE REQUIRED
300'
ONE LANE .�
ROAD
AHEAD
48"
48" W20-4 48. W20-7A
ROAD BE
WORK PREPARED
AHEAD TO STOP
48" 48"
W20.1 W20-7111
W20.7B (OPTIONAL IF
40 MPH OR LESS)
LEGEND
FLAGGING STATION
b TEMPORARY SIGN LOCATION
D CHANNELIZING DEVICES
PROTECTIVE VEHICLE
SIGN SPACING = X (1)
RURAL HIGHWAYS 60 165 MPH
800't
RURAL ROADS 45/55 MPH
500'i
RURAL ROADS & URBAN ARTERIALS 35/40 MPH
350't
RURAL ROADS, URBAN ARTERIALS, 25 / 30 MPH
RESIDENTIAL & BUSINESS DISTRICTS
200't (2)
URBAN STREETS 25 MPH OR LESS
100'i (2)
(1) ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE
INTERSECTIONS AND DRIVEWAYS.
(2) THIS SPACING MAY BE REDUCED IN URBAN AREAS TO FIT
ROADWAY CONDITIONS.
50. TO 100'
6 DEVICE
MIN I I R
O RK
AREA
59TO 100'
6 DEVICE
W20-7A
ONE LANE
ROAD
AHEAD�
W20-4
W20_7B (OPTIONAL IF
40 MPH OR LESS)
481, 48'
BE ROAD
PREPARED WORK
To STOPrr AHEAD
48" 48" 48. 48'
Or . W20.713 ONE LANE W20.1
ROAD
AHEAD
48" 48"
W20-7A W20-4
BE
PREPARED > W20-713 IONAL IF
40 MPH OR(OPTLESS)
TO STOP
48'
W20-7B
48'
ROAD
CHANNELIZATION DEVICE
SPACING (FEET)
MPH
TAPER
TANGENT
50/65
10 TO 20
80
35/45
10 TO 20
60
25/30
1 10 TO 20
40
WORK NOTES
AHEAD
48' 1. ALL SIGNS ARE BLACK ON ORANGE.
ONE -LANE, TWO-WAY TRAFFIC CONTROL
WITH FLAGGERS
NOT TO SCALE
2. EXTENDING THE CHANNELIZING DEVICE TAPER ACROSS
SHOULDER IS RECOMMENDED.
3. NIGHT WORK REQUIRES ADDITIONAL ROADWAY LIGHTING AT
FLAGGING STATIONS. SEE THE STANDARD SPECIFICATIONS
FOR ADDITIONAL DETAILS.
4. SEE SPECIAL PROVISIONS FOR WORK HOUR RESTRICTIONS.
Plot 1
TIME 3:05:14 PM
s•"•s
"WAS
FED.AID PROJ.NO.
.e
" E
Amokxnx
�
�I/
Washington State
Department of Transportation
.ss
TC7�
DATE 1/212018
PLOTTED BY Ilddelf
DESIGNED BY
+". x... Ex
sx.E.
o.
ENTERED BY
CHECKED BY
c"x.xnm x"wnox
xo.
TRAFFIC CONTROL PLAN
PROJ. ENGR.
REGIONAL ADM.
REVISION
DATE
BY