Loading...
Building Permit (3)Type: SOLAR Subtype: SOLAR RESIDENTIAL I Status: ISSUED Parcel No: 00602200200200 Site Address: 1220 CORONADO PL EDMONDS,WA 98020 Applied: 12/13/2022 Subdivision: 006022 Lot: 0 Issued: 12/14/2022 Fire Sprinklers: Lot Area: Zoning: Final: Valuation: $0.00 Occupancy Type: Construction Type: Expiration Date: 6/12/2023 Code Edition: 0 No. Stories: 0 # of Dwelling Units: 0 Issued by: NED Scope of Work: SPILLANE- ROOFTOP SOLAR WA State Contractor L & I #: RSOLAS*903JM CONTACTS NAME TYPE NAME ADDRESS I PHONE EMAIL APPLICANT WENDY WENRICK 3211 MLK 1R WAY S SUITE B, (206)707-9937 PERMITS@A-RSOLAR.COM SEATTLE WA 98144 CONTACT A & R SOLAR 3211 MILK 1R WAY S SUITE B, (206)707-9937 permits@a-rsolar.com SEATTLE WA 98144 CONTRACTOR A&R SOLAR CORP 3211 MILK 1R WAY S SUITE B, (206)707-9934 PERMITS@A-RSOLAR.COM SEATTLE WA 98144 1220 CORONADO PL S, OWNER MICHAEL & HEIDI SPILLANE EDMONDS WA 98020 11 •' IRIM DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT # CITY TECHNOLOGY FEE CHARGED 001.000.321.99.100.00 $40.00 $40.00 12/13/22 R25005 PER PERMIT RESIDENTIAL STATE SURCHARGE 001.000.237.150 $6.50 $6.50 12/13/22 R25005 SOLAR - SUB RES BLDG PERMIT FEE 001.000.322.10.000.00 $60.00 $60.00 12/13/22 R25005 SOLAR - SUB RES FIRE INSP FEE 001.000.342.40.000.00 $60.00 $60.00 12/13/22 R25005 TOTALS: $166.50 $166.50 CONDITION TYPE STATUS NOTES Printed: Wednesday, December 14, 2022 8:48:06 AM 1 of 2 SOLARPerCity mit - • • • 9:020 1 . • www.edmondswa.gov • 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests shall be established by Council and shall be paid upon submittal and are nonrefundable. 3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a ALL BUILDING PERMITS FOR result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only INFORMATION during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and potential monetary liability for work performed by unlicensed plumbing contractors. For more information contact L&I Department of Licensing at 1-800-647-0982. INSPECTIONS - Schedule Online at https://inspection.mybuildingpermit.com INSPECTIONTYPE INSPECTOR COMPLETED RESULT NOTES X-1 FIRE FINAL X-3 BUILDING FINAL" Printed: Wednesday, December 14, 2022 8:48:06 AM 2 of 2