BLD2022-1691_Site_Plan_12.13.2022_1.05.25_PM_3266698Equipment Summary
Modules:
(29) Hanwha 40OW
Inverter(s):
(1) SolarEdge 1000OH-US
Racking:
Ironridge XR100
Table of Contents:
Cover Page
Al Site Overview
A2 Roof Layout
E1 Single Line
E2 Electrical Calculations
G1 Roof As Built
G2 Electrician As -Built
G3 Micro/optimizer map
G4 Placards
GS Equipment BOM
General Notes:
Additional Electrical Work:
VA.
t
Site
_dami � i` 1 ��. —
y�•
♦ Lim
C.
N
Net Meter
x
��
0000
A&RSOLAR
3211 Martin Luther King Jr Way S.
Seattle, WA 98144 (206)707-9937
THIS DRAWING CONSTITUTES THE
CONFIDENTIAL INFORMATION OF A&R SOLAR
AND ITS RECEPTOR. POSSESSION DOES NOT
CONFER ANY RIGHT IN OR LICENSE TO USE IT
OR THE INFORMATION DISCLOSED HEREIN
NOR ANY RIGHT TO REPRODUCE THIS
DRAWING OR ANY PART HEREIN WITHOUT
THE WRITTEN CONSENT OF A&R SOLAR.
U
=a
M
a)�a0
_o
N
o00
O
Q
M
-p
ra
a)
Q
V�
TI
cn
o
C
o
..
V
U
0-)
p
U
-�
U
O
N
or
—le�N
WL..
a�
REVISIONS
Rev. #: I Date:
Designed by: Brian G
Project Manager:
Will MacArthur
(206)307-1741
Current Date:Nov 11, 2022
Cover Page
Attachment Detail
Side View (Portrait)
FLASHING AS REQUIRED
TO SEAL ROOF
MINIMUM (1) 5/16 X 4.75 LAC
BOLT EMBEDDED 2" MINIMUM
CENTER ON ROOF FRAMINC
:connect, Inverter
Production Meter
PV MODULE,
BY OTHERS
IRONRIDGE
RAIL
(E) COMPOSITION
SHINGLE ROOF
IRONRIDGE
FLASHFOOT2
(E) ROOF FRAMING
Modules not to exceed height of existing ridge
-------i--------
'611
Building height
&M-1IPi.
A&RSOLAR
3211 Martin Luther King Jr Way S.
Seattle, WA 98144 (206)707-9937
THIS DRAWING CONSTITUTES THE
CONFIDENTIAL INFORMATION OF A&R SOLAR
AND ITS RECEPTOR. POSSESSION DOES NOT
CONFER ANY RIGHT IN OR LICENSE TO USE IT
OR THE INFORMATION DISCLOSED HEREIN
NOR ANY RIGHT TO REPRODUCE THIS
DRAWING OR ANY PART HEREIN WITHOUT
THE WRITTEN CONSENT OF A&R SOLAR.
'a7 U
Q
Manufactured trusses,
_
its
o
a) M a N
24" O.C. 1s,
�
O
C ;1- p CO
O
M -p p1
�. o
ra
Q Q
V� TI
C
cn o p
.. U
0-) p
U -�
O c
O
UN
�O�
� �N E
a�
(sample) Attachment point layout for array.
72" OC Max.
REVISIONS
Rev. #: I Date:
Designed by: Brian G
Project Manager:
Will MacArthur
(206) 307-1741
Current Date:Nov 11, 2022
Al Site
Overview
Required Setbacks from Ridge:
18"
Maximum Mount Spacina:
72^
Roof Type:
Comp
Roof Slope:
180
Array Tilt :
Flush
Array Azimuth(s):
1800,270°
Roof Area:
2308ft2
Array Area
613ft2
Array to Roof Coverage
26.S%
***Roof Attachments/ Fastners; see pg. G5 Equip. BOM * * *
117
Ln
"All
Bfy
Module and Rail Selection Guide
Q.peak DUO-BLK ML-G10+ 400
41.1 x 74
Clamp Zone "A"
0.79-11.8"
Clamp Zone "B"
0.79-25.6"
Mods per Row
Rail typel+ rail type2
(11)Portrait, (1)row
(4)14', (2)14'
(6)Landscape, (3)rows
(4)14', (2)14'
i
-.J
N
Net Meter
I
I
I
I
I
I
I
I
I
I
I
I
I
A&RSOLAR
3211 Martin Luther King Jr Way S.
Seattle, WA 98144 (206)707-9937
THIS DRAWING CONSTITUTES THE
CONFIDENTIAL INFORMATION OF A&R SOLAR
AND ITS RECEPTOR. POSSESSION DOES NOT
CONFER ANY RIGHT IN OR LICENSE TO USE IT
OR THE INFORMATION DISCLOSED HEREIN
NOR ANY RIGHT TO REPRODUCE THIS
DRAWING OR ANY PART HEREIN WITHOUT
THE WRITTEN CONSENT OF A&R SOLAR.
U
=a
0
a)�a0
_O
N
e
O
00
NONE
0
Q
M
-p
ra
a1
Q
C
O
EE
U
/o{-
UO
0
N
c
�O�
�
�N
E
L
7-1
W
a�
REVISIONS
Rev. #: IDate:
IDesioned bv: Brian G I
Project Manager:
Will MacArthur
(206)307-1741
Current Date:Nov 11. 2022
A2 Roof Layout
■=A&RScope
b
0 Equipment Schedule
Ref.
Category
Equipment
QTY
1
Modules
Q.peak DUO-BLK ML-G10+ 400
29
2
Optimizers
S440 SolarEdge Optimizer
29
3
Jbox
Jbox
2
4
Inverters
Solar Edge SE10000H
1
5
MeterBase
MeterBase-125A 4 Jaw w/ 3.5" AWCAP
1
Meter
Landis Gyr EA110000-OP29 240V
1
6
Disconnect
60A 240V 2 Pole I Heavy Duty, Fuse, Lockable
1
DisconnectFuse
FLNR - 60 A Fuses for Disconnect (qty 1 /pole)
Monitoring
I SolarEdge Integrated (inverter) Monitoring
1
Neutral Bar
w/ bonding jumper
Supply Side Connection
705.11
(Existing)
Main Service Panel
(1ph 240V Service)
Main Breaker: 200A
Bus Rating:200A
O
= Existing or
Others Scope
Service entrance conductors
4/0 XHHW-2
(L1 & L2)
2/0 XHHW-2
(N)
nverter Specs
Watts
LW-1
Output
JL
AC
Voltage
# of
Inverters
OCPD
Solar Edge SE10000H
10000
42
240
1
60
****N/A****
0
0
0
0
0
****N/A****
0
0
0
0
0
Module Specs
Watts w
Imp
Vmp
Voc
Isc
Q.peak DUO-BLK ML-G10+41
400
10.77
37.13
45.3
11.14
Temp. Adjusted
0
0
32.8
49.2
0
General Notes:
0 Conductor Schedule
Utility: SnoPUD
1. EGC Where exposed to physical damage will be #6AWG
Bare CU
Summary
Distance (ft)
Current
Operating
Voltage
Volt. Drop
@125%
Voltage
Drop
(total)
2. If installing conduit on the roof, maintain greater than 7/8"
above the surface
3. NEC 690.12: Rapid Shutdown initiated by loss of Grid or AC
Disconnect
A
(2)#10 CU, (1)#6 EGC, PV Wire 60OV, AIR
50
18.75A
400V
0.34%
1.03%
B
(6)#10 CU, (1)#10 EGC, THWN-2, 0.75"EMT(min)
50
18.75A
400V
0.34%
4. For supply side taps, a #6 GEC (min.) will be run separately
from the disconnect and connected to the grounding electrode
with an irreversible crimp
C
(2)#6 CU, (1)#8 N, (1)#10 EGC, THWN-2, 0.75"EMT(min)
10
52.5A
240V
0.17%
D
(2)#6 CU, (1)#6 N, THWN-2, 1"PVC(min)
10
52.5A
240V
0.17%
A&RSOLAR
3211 Martin Luther King Jr Way S.
Seattle, WA 98144 (206)707-9937
THIS DRAWING CONSTITUTES THE
CONFIDENTIAL INFORMATION OF A&R SOLAR
AND ITS RECEPTOR. POSSESSION DOES NOT
CONFER ANY RIGHT IN OR LICENSE TO USE IT
OR THE INFORMATION DISCLOSED HEREIN
NOR ANY RIGHT TO REPRODUCE THIS
DRAWING OR ANY PART HEREIN WITHOUT
THE WRITTEN CONSENT OF A&R SOLAR.
Q
I
a0
O
N
00
O
C
M
-p
a1
V�TI
Q
ra
C
o�
Q
(no
..
V0
U
��U-0
O
p
�k0O
UON
c
�O�
N
L
k.0
W
a�
REVISIONS
Rev. #: Date:
Designed by: Brian G
Project Manager:
Will MacArthur
(206) 307-1741
Current Date:Nov 11, 2022
E1 Single Line
PV Electrical Calculations
Inverter Specs
Watts
(W)
Output
AC
Voltage
# of
Inverters
OCPD
Total AC
Comb.
EGC
AC
out.(A)
OCPD
Solar Edge SE10000H
10000
42.00
240
1
60
42.0
60
#10
r
Ampe
****N/A****
0
0.00
0
0
0
****N/A****
0
0.00
0
0
0
Module Specs
at Watts
IMP
Vmp
Voc
Isc
Temp. Coef V(oc)
DC
Volt
D.peak DUO-BLK ML-G10+ 40
400
10.77
37.13
45.3
11.14
-0.27
#10
Max V(
Max,
Temp. Adjusted
32.8
49.2
Optimizer?
S440 SolarEdge Optimizer
Max current output: 15A, Max Voltage: 480V
Equipment
Solar EdgeSE10000H
****N/A****
****N/A****
Mppt Input
1
1 2
1 3
1
1 2
1 3
1
2
3
Module
eak DUO-BLK ML-G10+ z
****SELECT****
****SELECT****
# Modules per String
11
9
9
0
0
0
0
0
0
# Strings
1
1
1
0
0
0
0
0
0
# of Mods per group
11
9
9
0
0
0
0
0
0
# of Mods/inverter
29
0
0
# of Inverters
1
0
0
Total # of Modules
29
Ref. Conductor Description
A String to Jbox
B Jbox to Inverter
C Inverter to Disconnect
D Disco. to Interconnect
E
F
G
H
Arrav Saecs (Adiusted for Temperature
Inverter
Solar EdgeSE10000H
****N/A****
****N/A****
4pptInput
1
2
3
1
2
3
1
2
-age (Imp)
11.00
9.00
9.00
0.00
0.00
0.00
0.00
0.00
age (Vmp)
400.0
400.0
400.0
0.0
0.0
0.0
0.0
0.0
A&RSOLAR
3211 Martin Luther King Jr Way S.
Seattle, WA 98144 (206)707-9937
3
THIS DRAWING CONSTITUTES THE
CONFIDENTIAL INFORMATION OF A&R SOLAR
0.00
AND ITS RECEPTOR. POSSESSION DOES NOT
CONFER ANY RIGHT IN OR LICENSE TO USE IT
OR THE INFORMATION DISCLOSED HEREIN
NOR ANY RIGHT TO REPRODUCE THIS
DRAWING OR ANY PART HEREIN WITHOUT
0.0
THE WRITTEN CONSENT OF A&R SOLAR.
iltage(DC) 480.0 480.0 480.0 0.0 0.0 0.0 0.0 0.0 0.0
kmps (DC) 15.00 15.00 15.00 0.00 0.00 0.00 0.00 0.00 0.00
Max Array Power(STC): 11.6 kW DC
Max Continuous AC Power: 10kW AC
Interconnection Calcs
Main Breaker
200
Bus Bar
200
Max PV OCD AI lowed
40
PV OCPD Device Used
60
Tap or Breaker?
Tap
Site Conditions
ASHRAE Site:
Seattle
Low Temp (°F)
19
High 2%Temp (°F)
84
High 0.4%Temp (°F)
91
Q
o00
o
N
`��
=o
�
Vi
o
rl
0°,
o
Q
cn
o
y
�0
U
Z
ru�U-0
M
O
Ln
=
UON
�
O
�
�N
W
L
stance
AL CU
Wire
Gauge
(QTY) Phase
Neutral
Neutral
EGC
(AWG)
Wire Type
Conduit
Min.
Conduit
90°C
Rating
Temp
Correct.
Fill
Derate
Derated
75°C
Rating
Current
Operating
Voltage
ll
Conductors
AWG
(QTY)
Type
Ampacity
@125%
Voltage
Drop
50
Cu
#10
2
N/A
N/A
#6
PV Wire 600V
AIR
N/A
40
1
100%
40.00
35
18.8
400
0.34%
50
Cu
#10
6
N/A
N/A
#10
THWN-2
EMT
0.75"
40
1
80%
32.00
35
18.8
400
0.34%
10
Cu
#6
2
#8
1
#10
THWN-2
EMT
0.75"
75
1
100%
75.00
65
52.5
240
0.17%
REVISIONS
Rev. #:
Date:
10
CU
1 #6
1 2
#6
1
1 #6
THWN-2
PVC
1 1"
75
1
100%
75.00
65
52.5
1 240
10.17%
Designed by: Brian G
Project Manager:
Will MacArthur
Total Voltage Drop: 1.03% (206) 307-1741
Current Date:Nov 11, 2022
E2 Electrical
Calculations
Typical Placards
A) NEC 2020 690.13 & 691.15
B) NEC 2020 705.12 (13)(3)(2)
C) Utility Requirement
D) Utility Requirement (Utility -Owned)
D) A&R Solar Requirement (Customer -
Owned)
E) A&R Solar Requirement * if combiner used
F) NEC 2020 690.13 (B)
I) NEC 2020 690.31 (D)(2)
K) NEC 2020 690.13 (B)
SOLAR PV SYSTEM EQUIPPED
WITH RAPID SHUTDOWN
TURN RAPID SHUTDOWN
SWITCH TO THE
"OFF" POSITION TO
SOLAR ELECTRIC
PV PANELS
SHUTDOWN PV SYSTEM
AND REDUCE
SHOCK HAZARD IN THE
ARRAY
L) NEC 2020 690.56 (C)
Located on or no more than 3' from the
service disconnecting means to which the PV
system is connected
O) A&R Solar Requirement * if
multiple inverters
IAWARNING DUAL POWER SOURCE
SECOND SOURCE IS PHOTOVOLTAIC SYSTEM
P) NEC 2020 705.12(C) & 690.59
` • D• NOT INSTALL
ADDITIONAL LOADS IN THIS PANEL
R) AHJ Requirement * if combiner used
S) NEC 2020 230.85(1)
T) NEC 2020 230.85(3)
NEC 690.54
NEC 690.53
NEC 690.54
Custom Placards
PLACARD SPECS QN
Letter Height: 1/8"
Maintain 1/4" border
Red / White
Letter Height: 1/8"
Maintain 1/4" border
Red / White
Letter Height: 1/8"
Maintain 1/4" border
Red / White
Inverter
1
Interconnection Point
1 Solar Edge SE10000H
(1)for each
1 Disconnect or upstream
loadcenters.
&MIPi.
A&RSOLAR
3211 Martin Luther King Jr Way S.
Seattle, WA 98144 (206)707-9937
THIS DRAWING CONSTITUTES THE
CONFIDENTIAL INFORMATION OF A&R SOLAR
AND ITS RECEPTOR. POSSESSION DOES NOT
CONFER ANY RIGHT IN OR LICENSE TO USE IT
OR THE INFORMATION DISCLOSED HEREIN
NOR ANY RIGHT TO REPRODUCE THIS
DRAWING OR ANY PART HEREIN WITHOUT
THE WRITTEN CONSENT OF A&R SOLAR.
Q
O
N
000
O
M
-p
ra
0)
Q
V�TI
CL
v7o
C
o�
..
U
0-1
p
U
-�
UO
O
N
c
�O�
�
�N
E
L..W
la
rl
REVISIONS
Rev. #: I Date:
IDesioned bv: Brian G I
Project Manager:
Will MacArthur
(206)307-1741
Current Date:Nov 11, 2022
G4 Placards
J) NEC 2020 690.56 (C)(2)
Category Equipment QTY Notes
Solar Equipment
Modules Q.peak DUO- BLK ML-G10+400 29
Optimizers S440SolarEdge Optimizer 29
Inverters Solar Edge SE10000H 1
Monitoring SolarEdge Integrated (inverter) Monitoring 1
Electrical Equipment
Jbox Jbox 2
MeterBase MeterBase-125A 4Jaw w/ 3.5" AWCAP
Meter Landis Gyr EA110000-OP29 240V
Disconnect 60A 240V 2 Pole I Heavy Duty, Fuse, Lockable
DisconnectFuse FLNR- 60A Fuses for Disconnect (qty 1/pole)
Solar Racking
Iron Ridge Racking BOM
Description
XR100 Black,17'
XR100 Black,14'
Kit, XR100 Bonded Splice BOSS
Universal Module Clamp, Black
Stopper Sleeve 32mm
Grounding Lug, Low Profile
Square -Bolt Bonding Attachment Hardware
1/4 x 3/4 Microinverter Bonding Hardware, T-Bolt
End Caps, 10 sets(package) XR100
IronRidge Flash Foot2, Black (Spacing: 72")
Fastener: 5/16 x 4.75" Lag(Included) (1 /mount)
System Weights
Racking Weight(Ibs)
Total Weight(lbs)
Weight/Attachment(lbs)
DeadLoad(PSF)
CITY
1 �0
1
1 DH222NRK
0
24
16
66
16
4
61
29
1
61
339
1746
28.6
2.85
A&RSOLAR
3211 Martin Luther King Jr Way S.
Seattle, WA 98144 (206)707-9937
THIS DRAWING CONSTITUTES THE
CONFIDENTIAL INFORMATION OF A&R SOLAR
AND ITS RECEPTOR. POSSESSION DOES NOT
CONFER ANY RIGHT IN OR LICENSE TO USE IT
OR THE INFORMATION DISCLOSED HEREIN
NOR ANY RIGHT TO REPRODUCE THIS
DRAWING OR ANY PART HEREIN WITHOUT
THE WRITTEN CONSENT OF A&R SOLAR.
W
Q
�
"
a
O
N
00
O
�
0
O
�
V�
o
rl
0
0
Q
V)
o
..
U
M
0
UON
t.0
O
C:
�N
0
,-�
-0
a�
REVISIONS
Rev. #: I Date:
Designed by: Brian G
Project Manager:
Will MacArthur
(206) 307-1741
Current Date:Nov 11, 2022
G5 Equipment
BOM