Loading...
Building Permit (3)Type: RESIDENTIAL BLDG Subtype: ALTERATION OR REMODEL I Status: ISSUED Parcel No: 00544300000801 Site Address: 22317 93RD PL W EDMONDS,WA 98020 Subdivision: 005443, ZA 8906271 SP, SP S-2005-43 Lot: 0 Fire Sprinklers: Lot Area: Zoning: Valuation: $25,000.00 Occupancy Type: Construction Type: Code Edition: 0 No. Stories: 0 # of Dwelling Units: 0 Scope of Work: KAPPEN- REMODEL M INCL. P SEP. Applied: 2/25/2023 Issued:4/12/2023 Final: Expiration Date: 4/6/2024 Issued by: NED I WA State Contractor L & I #: VERTICG913PZ I CONTACTS NAME TYPE NAME ADDRESS PHONE EMAIL APPLICANT KEITH SMITH 1904 3RD AVENUE SUITE 409, (206)713-4076 SMITH98136@AOL.COM SEATTLE WA 98101 CONTACT SMITH CO LLC 1904 3RD AVENUE SUITE 409, (206)713-4076 ksmith@smithco.org SEATTLE WA 98101 CONTRACTOR VERTICAL CONSTRUCTION 5448 KIRKWOOD PL, SEATTLE (206)228-0135 STEVO@VCGTEAM.COM GRP LLC WA 98103 22317 93RD PL W, EDMONDS OWNER NEIL G KAPPEN WA 98020 DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT # 1 - BASE FEE FOR MECHANICAL 001.000.322.10.000. 00 $50.00 $50.00 4/12/23 R27752 PERMITS APPLIANCE VENTS 001.000.322.10.000.00 $15.00 $15.00 4/12/23 R27752 CITY TECHNOLOGY FEE CHARGED 001.000.321.99.100.00 $40.00 $40.00 2/27/23 R26726 PER PERMIT PERMIT FEE - RESIDENTIAL 001.000.322.10.000.00 $497.00 $497.00 4/12/23 R27752 PLAN REVIEW FEE - RESIDENTIAL 001.000.345.83.000.00 $422.45 $422.45 2/27/23 R26726 RESIDENTIAL STATE SURCHARGE 001.000.237.150 $6.50 $6.50 1 4/12/23 R27752 TOTALS: $1,030.95 $1,030.95 CONDITIONS CONDITION TYPE STATUS NOTES Printed: Wednesday, April 12, 2023 12:29:51 PM 1 of 3 'RESIDENTIAL BLDG PermitCity • • • • - EL 98020 1 1 . •. - 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests shall be established by Council and shall be paid upon submittal and are nonrefundable. 3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a ALL BUILDING PERMITS FOR result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only INFORMATION during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and potential monetary liability for work performed by unlicensed plumbing contractors. For more information contact L&I Department of Licensing at 1-800-647-0982. FOR Provide combustion air per IFGC Chapter 3 for commercial and multifamily residential COMBUSTION AIR INFORMATION installations, and IRC chapter 24 for one and two family dwellings. Pre -inspection required. Street to be cleaned of debris. Side sewer must be capped at DEMOLITION REQUIREMENTS FOR property line. Water Service must be disconnected from Water Meter and or hose bib INFORMATION with AVB installed. Dump at approved dump site only. ELECTRICAL PERMIT FOR Obtain Electrical Permit from State Department of Labor and Industries 425-290-1309. NFORMATION GAS PIPE TEST FOR Gas pipe test must be observed by City Building Inspector, affidavits shall not be accepted NFORMATION Installation, use and maintenance of equipment and components shall be per MANUFACTURER SPECS FOR manufacturers specifications, installation instructions, and applicable state codes. INFORMATION Provide manufactures installation instructions on site for Building Inspector. Sound or noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of FOR 7:00am to 6:00pm on weekdays and 10:00am and 6:00pm on Saturdays, excluding SOUND AND NOISE INFORMATION Sundays and Federal Holidays. At all other times the noise originating from construction sites and activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. INSPECTIONTYPE INSPECTOR COMPLETED RESULT NOTES A-1 BUILDING PRECON B-2 FOOTINGS B-3 GAS PIPING TEST B-3 MECH ROUGH IN B-3 UNDERFLR FRAMING B-4 DRYWALL FASTENING Printed: Wednesday, April 12, 2023 12:29:51 PM 2 of 3 Printed: Wednesday, April 12, 2023 12:29:51 PM 3 of 3