APPROVED BLD GEOTECH REPORT BLD2019-0951Gary A. Flowers, PLLC
Geological & Geotechnical Consulting
5205 23rd Avenue W
June 8, 2019
Project No. 18019
Constantin Korovkin
Principal
Rnk Eastside, LLC
2603 78th Ave NE
Medina, WA 98039
Subject: Geotechnical Services Report — Edmonds Apartments
23830 Edmonds Way
Edmonds, Washington
Everett, WA 98203
PLAN REVIEW ACCEPTANCE
FOR COMPLIANCE WITH THE APPLICABLE
CONSTRUCTION CODES IDENTIFIED BELOW.
® BUILDING ® STRUCTURAL
® MECHANICAL ® PLUMBING
❑ ELECTRICAL ® ENERGY
® ACCESSIBILITY ❑ FIRE
PLAN REVIEW ACCEPTANCE OF DOCUMENTS
DOES NOT AUTHORIZE CONSTRUCTION TO
PROCEED IN VIOLATION OF ANY FEDERAL,
STATE, OR LOCAL REGULATIONS.
BY: o.-Tw-d..-' DATE: 07/29/2020
WEST COAS CODE CONSULTANTS, INC.
This report summarizes the results of our geological and geotechnical evaluation of the property
located at the above noted address in Edmonds, WA. It is our understanding that the existing
structures on the property will be demolished and a new 10-unit apartment building will be
constructed on the site.
EXISTING CONDITIONS
The property is currently developed with 3 single family residences. Two of the residences are
located on the lower, western portion, of the site. The third structure is located on an upper bench
level, about 6 feet higher in elevation than the other two structures. Egress to all the existing
residences is off of Edmonds Way. Single family residences are present to the west, southwest
and south, an automotive repair business is located to the east/southeast and Edmonds Way borders
the property to the north.
The upper portion of the property is located on the north end of a slight north -south trending ridge
that terminates at the north end of the property. The area around the residence on the upper portion
is generally flat lying at an approximate elevation of 404 feet. The property slopes gently down
to the north and northeast to approximate elevation 400 feet.
The lower, western, portion of the property is generally flat lying at an approximate elevation of
396 feet. The western descending slope between the upper and lower portion of the property is on
the order of 5 to 6 feet tall and is relatively steep.
Gary A. Flowers, PLLC.
5205 23rd Avenue W Everett, Washington 98203 206-819-4304
Rnk Eastside, LLC Property Geotechnical Services Report
23830 Edmonds Way, Edmonds Washington
At the time of our field study there was no evidence of standing or flowing water on the property.
Vegetation consists primarily of landscape bushes and grass, several small deciduous trees and
multiple large evergreen trees.
Subsurface Exploration
In order to confirm subsurface conditions on the property a series of 5 exploration pits were
excavated on the property on October 8, 2018. Logs of the exploration pits are attached with this
report. Generally, very dense glacial till was observed on the western and northeastern portions
of the site (EP-1 and EP-2. Significant quantities of fill soils were observed in all of the exploration
pits on the upper portion of the site. The fill extended to a maximum depth of 5 feet and was
underlain by loose recessional outwash sediments. Significant organics and ash was observed
within some of the fill soils. In the northwest corner (EP-2) large gravels up to 4 inches in diameter
were encountered. Ground water seepage was not observed in any of the exploration pits.
Moderate caving conditions was observed within the loose fill soils.
Mappings
According to the Draft Composite Geologic Map of the Sno-King Area, Central Puget Lowland,
Washington, by Booth, Cox, Troost and Shimel, January 5, 2004, the site is mapped as Vashon
age glacial till. Our explorations are in agreement with the published geology map of the area.
Seismic Hazards
Generally, there are four types of potential geologic hazards associated with large seismic events:
1) surficial ground rupture; 2) seismically induced landslides; 3) liquefaction; and 4) ground
motion.
The nearest known fault zone is the South Whidbey Island fault that is located several miles north
of the property. No surficial faulting has been noted anywhere near this area and the potential for
surficial ground rupture during the lifespan of the residences is considered to be low.
Due to the lack of significant slopes near the site the potential for seismically induced landslides
is considered to be very low.
The underlying glacial till soils are not subject to liquefaction.
Based on the encountered site conditions, seismic design criteria should follow 2015 International
Building Code recommendations for Site Class C soils.
Gary A. Flowers, PLLC.
5205 23" Avenue W Everett, Washington 98203 206-819-4304
2
Rnk Eastside, LLC Property Geotechnical Services Report
23830 Edmonds Way, Edmonds Washington
CONCLUSIONS AND RECOMMENDATIONS
Based on the results of our site reconnaissance, subsurface investigation and literature review it is
our opinion that the site is suitable for the planned development. Planned finish floor elevation
for the new structures will be 399.5 which will require removal of much of the encountered fill
soils on the upper portion of the site. In areas where the existing fill is not fully removed it will
be necessary to further excavate to extend the foundations to suitable bearing soils. It should also
be noted that loose recessional outwash sediments were observed underlying the fill soil. These
loose soils are also not suitable for foundation support and must either be recompacted to a medium
dense or better condition or removed down to the underlying glacial till sediments.
Grading of the site will expose loose fill soil or loose native sediments along the south property
line. In order to not adversely impact the adjacent properties to the south it may be necessary to
provide temporary shoring to support the slope until the buildings are constructed and the
foundation walls fully backfilled. We anticipate that ecology blocks or Ultrablocks can be used
for this purpose, but sloughing soils could mandate other shoring methods as well.
Excavation along the south property line will also likely impact a large evergreen tree that is
located very near the south property line. An arborist should be consulted to determine whether
or not this tree will be considered a hazard tree or how the excavation can proceed without
damaging the tree.
The observed fill soils are generally granular in nature and where organics are not present can
generally be re -used as structural or nonstructural fill around the site.
Excavation safety is incumbent on the contractor as they are on site on a continual basis. However,
for planning purposes we do not recommend that temporary excavations in the loose fill or loose
native sediments should be planned any steeper than 1H:1V. Even at this inclination some
sloughing could occur and the slopes should be protected from storm water.
Foundations
Based on our field explorations suitable bearing soils will be encountered at a relatively shallow
depth after the site is final graded. The foundation should be designed for an allowable soil bearing
of 2,000 psf. An increase of one-third will be appropriate for short term wind or seismic loading
conditions. The planned wall along the west property line will be constructed atop fill soils utilized
for detention vault wall backfill. The backfill must be placed and compacted as structural fill.
Lateral resistance will be provided be soil pressure against the footings and foundation walls and/or
by friction between building elements and the soil. We recommend a passive resistance value of
200 pcf and a soil friction value of 0.30 for this site. These values are allowable and have a
minimum factor of safety of 1.5.
Gary A. Flowers, PLLC.
5205 23rd Avenue W Everett, Washington 98203 206-819-4304
Rnk Eastside, LLC Property Geotechnical Services Report
23830 Edmonds Way, Edmonds Washington
Bearing soils will be easily disturbed and must be protected from disturbance during grading. No
footing should be placed on existing fill soil. Any loose native soil that is naturally loose or has
been disturbed during grading operations must either be removed or suitably recompacted to a
medium dense or better and unyielding condition. Overexcavation or re -compaction of the soils
must extend outward from the footing line a distance equal to the depth of excavation on each side
of the footing. In other words, if a 2-foot overexcavation is required to reach suitable bearing, and
the excavation will be backfilled with structural fill to footing subgrade elevation, or can be
recompacted to a suitable density, the overexcavated trench or area of re -compaction must extend
2 feet outward from each side of the footing. Due to the variability of the onsite soils and depth to
bearing soils all footing subgrade soils must be approved by a representative of this office prior to
concrete placement.
Floor Support Recommendations
The observed native sediments, or granular fills soils, will provide suitable support for
slab -on -grade floors provided that they are re -compacted to a medium dense or better and
unyielding condition. Compaction should be attained with a hoe-pac, walk behind vibratory
compactor, jumping jack or large sled compactor. Small sled compactors used for surficial
leveling and compaction are not suitable for this purpose. Suitable compaction should be verified
by the geotechnical professional prior to concrete placement. If any unsuitable soils are observed
during excavation and/or compaction they should be removed and replaced with appropriate
structural fill material.
Following compaction and approval of the slab bearing soils, a capillary break layer consisting of
a minimum of 4 inches of washed pea gravel, washed crushed rock or clean, coarse grained,
granular soils and a heavy duty (minimum 10 mil), polyethylene plastic vapor barrier should be
provided under any floor slabs where moisture intrusion is a concern. If the vapor barrier becomes
compromised in any way during construction it should be replaced or an additional layer added.
Penetrations through the vapor barrier should be wrapped and taped. All seams should be
overlapped a minimum of 2 feet.
Retaining Walls
Foundation or basement retaining walls that are free to rotate at least .001 percent of their height
should be designed for an active equivalent fluid pressure of 35 pcf. Wall that are not free to rotate
should be designed for an at rest pressure of 50 pcf equivalent fluid pressure. These pressures are
for a condition of level backflll and suitable wall drainage to eliminate hydrostatic pressure.
Drainage
Storm water from impermeable surfaces should be collected and discharged into a city approved
storm water drainage system. Footing drains should be installed around the exterior footings with
discharge to a catch basin and ultimately into the storm drain system. The footing drains should
Gary A. Flowers, PLLC.
5205 23rd Avenue W Everett, Washington 98203 206-819-4304
4
Rnk Eastside, LLC Property Geotechnical Services Report
23830 Edmonds Way, Edmonds Washington
consist of 4-inch diameter, perforated pvc pipe, bedded in washed drain rock and covered entirely
with washed drain rock that is wrapped in geotextile filter cloth. The drains should be placed at
the bottom of the footings and sloped to gravity drain to the catch basin. Appropriate cleanouts
should be installed to allow for periodic maintenance of the drainpipes.
Foundation walls taller than 3 feet should be provided a wall drain to reduce the potential for
hydrostatic pressure buildup against the wall. The wall drain should consist of either a minimum
of 12 inches of washed drain rock, wall backfill containing less than 3% fines or a geotextile
drainage mat such as MiraDrain or DeltaDrain. The wall drains must hydraulically connect to the
footing drain system. All drainage material should extend to within 18 inches of ground surface
before being capped in order to prevent surface water from entering the wall drain.
Infiltration of Storm Water
We understand that infiltration of storm water may be considered for the project. We further
understand that an infiltration facility, if feasible, would be located on the western portion of the
site. During our subsurface exploration we encountered very dense glacial till soils at shallow
depth on the western portion of the site and in the northeast corner of the site and they most likely
underlie the entire site. The presence of shallow glacial till soils means that infiltration is not a
feasible alternative for the site.
Erosion Control
Suitable best management practice (BMP) erosion control measures should be implemented for
the project. The site will be graded nearly level which will aid in reducing the amount of potential
sediment laden runoff from the parcel. A silt fence should be installed as per city of Edmonds
requirements along the lower portions of the site. Soil stockpiles should be covered with plastic
sheeting to contain in -situ moisture and prevent storm water runoff. Areas of disturbance should
be limited to necessary construction areas. A rocked construction should be provided in order to
reduce sediment impacts to the adjacent streets. The exposed soils should be covered with
geotextile filter fabric prior to rock placement. The construction entrance will likely require
maintenance and additional rock depending upon local weather conditions.
Detention Vault
A large detention vault is planned for the western portion of the site. Bottom elevation of the vault
floor is planned at 385 feet, Footing excavation will be on the order of 1 foot deeper for a total
excavation to approximate elevation 384 feet. Ground surface elevation ranges from 396 to 398
feet in this area. This will require an excavation on the order of 14 feet deep. The excavation will
be located approximately 5 feet from the west property line.
Our subsurface excavation in this area only extended to approximate elevation 391 feet due to
utilizing smaller limited access equipment to access the site. Dense glacially consolidated soils
Gary A. Flowers, PLLC.
5205 23rd Avenue W Everett, Washington 98203 206-819-4304
5
Rnk Eastside, LLC Property Geotechnical Services Report
23830 Edmonds Way, Edmonds Washington
were observed in exploration pit EP-1. These sediments are typically capable of standing in
temporary vertical excavations when ground water is not present. For planning purposes it is likely
that an 8 foot or taller vertical cut can be established and then slope to the property line. However,
it will be necessary to obtain additional subsurface information in order to verify subsurface soil
and ground water conditions. We recommend that, at the time of demolition, when larger
equipment will be on site, that several additional exploration pits be excavated at least to elevation
384 feet. If soils or ground water conditions are encountered at that time that are not suitable for
the required vertical excavation, it will be necessary to provide temporary shoring to support the
cut face. A design for a soldier pile wall would then be required.
Temporary Shoring — South Property Line
The required cut slopes along the south property line will encounter loose fill and/or native soils
that will require temporary shoring unless a temporary construction easement is obtained from the
adjacent property owner(s). We strongly recommend trying to obtain the temporary construction
easement as the loose nature of the soils in this area are problematic. Also, the large evergreen
tree along the south property line as discussed above will likely have multiple large roots that must
be cut to make room for the block wall.
The cut in this area will only be about 5 feet tall. Should temporary shoring be necessary, it is our
opinion that either ecology blocks or Ultrablocks may be utilized for the temporary shoring. The
face of the cut should be as far away from the property line as is feasible to allow space for the
blocks and workers who will be forming the footings and foundation walls. The face of the cut
slope should be continually densified with the bucket of the trackhoe as the excavation proceeds.
The blocks should be installed with a small batter on the order of 5 degrees. The larger Ultrablocks
(2.5'x2.5' x5') could support the cut with only 2 blocks while ecology blocks (2'x2'x6')will
require 3 blocks. The bottom block must be embedded a minimum of 6 inches into bearing soils.
The blocks must be staggered such that each block sits atop the two lower blocks. A minimum 4-
inch-thick, crushed rock leveling pad must be placed and graded prior to block placement to
establish level and batter. Any annular space behind the blocks must be immediately filled with
pea gravel, sand or crushed rock in order to provide continuous contact between the back of the
blocks and the excavation cut surface. The excavation should not be cut until the blocks are on site
and available for use. The excavation should be staged such that no more than 10 feet is open at a
time without being shored. A representative of this firm should monitor the excavation and wall
building activities and periodically monitor the wall until such time as the permanent building
walls are constructed and backfilled.
This temporary shoring wall will be sacrificial and remain in place after the building walls are
constructed and backfilled.
During initial grading operations several exploratory excavations should be made near the south
property line to further evaluate whether or not the loose soils will stand temporarily while the
Gary A. Flowers, PLLC.
5205 23rd Avenue W Everett, Washington 98203 206-819-4304
0
Rnk Eastside, LLC Property Geotechnical Services Report
23830 Edmonds Way, Edmonds Washington
temporary shoring is installed. Should the caving be excessive, and if no temporary construction
easement can be attained, it may be necessary to redesign the temporary shoring system to avoid
adversely impacting the adjacent property. Alternative methodology would likely involve some
type of pile supported temporary wall.
SUMMARY
The conclusions and recommendations presented in this report are based on our interpretation and
evaluation of soil conditions on this site based on visual observation, literature research and
subsurface exploration. If changed conditions are observed during construction, we should be
immediately contacted to further evaluate the changes and make suitable recommendations.
Our findings and recommendations provided in this report were prepared in accordance with
generally accepted principles of engineering geology and geotechnical engineering as practiced in
the Puget Sound area at the time this report was submitted. We make no other warranty, either
express or implied.
Thank you for the opportunity to be of service. Should you have any questions please do not
hesitate to contact our office.
Respectfully submitted,
�eoE Wash;'
y� �I
prr�ring Gedopfq �.
'�P 105fi �'•`'
qs�d Geo�o
Gary A. Flowers
Gary A. Flowers, P.G., P.E.G.
Principal Engineering Geologist
Attachments: Exploration Pit Logs
Site & Exploration Plan
Robert M. Pride, P.E.
Geotechnical Engineer
Gary A. Flowers, PLLC.
5205 23" Avenue W Everett, Washington 98203
206-819-4304
7
Rnk Eastside, LLC Property Geotechnical Services Report
23830 Edmonds Way, Edmonds Washington
EXPLORATION PIT LOGS
23830 Edmonds Way
Edmonds, WA
EP-1 Approximate elevation 396 feet.
0.0' — 0.3' Forest duff and highly organic topsoil
0.3' — 2.3' Dense, moist, brownish -gray, silty SAND with occasional gravel — highly
oxidized (weathered glacial till)
2.3' — 5.0' Very dense, moist, gray, silty SAND with gravel (unweathered glacial till)
Bottom of pit at 5.0 feet on 10/8/2018. No ground water. No caving.
EP-2 Approximate elevation 403 feet.
0.0' — 3.5' Loose, moist, gray and brown, silty SAND with large gravel to 4" diameter — 2
old drainpipes with large diameter drain rock on NW side of pit (fill)
3.5' — 4.5' Dense, moist, gray, silty SAND with gravel (glacial till)
Bottom of pit at 4.5 feet on 10/8/2018. No ground water. No caving.
EP-3 Approximate elevation 403 feet.
0.0' — 0.3' Grass sod and organic topsoil
0.3' — 5.0' Very loose, dry, brown, silty SAND with gravel and probable ash (fill)
5.0'— 7.0' Loose, moist, brown, silty SAND (fill or recessional outwash)
Bottom of pit at 7.0 feet on 10/8/2018. No ground water. Moderate caving
throughout pit. Surrounding ground loose and very spongy with many fine
organics to a depth of 3 feet.
EP-4 Approximate elevation 403 feet.
0.0' 2.0' Very loose, dry, brown, silty SAND with occasional gravel (fill)
2.0' — 3.0' Loose, dry, brown, gravelly SAND with silt (recessional outwash)
Bottom of pit at 3 feet on 10/8/2018. No ground water. Moderate caving.
Gary A. Flowers, PLLC.
5205 23" Avenue W Everett, Washington 98203
206-819-4304
Rnk Eastside, LLC Property Geotechnical Services Report
23830 Edmonds Way, Edmonds Washington
EP-5 Approximate elevation 402 feet.
Off— 3.0' Very loose, dry, brown, silty SAND with occasional gravel and ash (fill)
3.0' — 6.0' Loose, dry, brown, fine to medium SAND with gravel, trace silt (recessional
outwash)
Bottom of pit at 6 feet on 10/8/2018. No ground water. Moderate caving.
Gary A. Flowers, PLLC.
5205 23" Avenue W Everett, Washington 98203 206-819-4304
9
THE NW 1/4 OF THE SW 1/4 OF SEC. 31, T 27 N., R 4E.
U
Z
>,
m
J
Q
co
i
0
N
N
N
a
�\ ��
\ \
`\ I
`\ I
\ \
\ \ �\ � T\
-� \
\\ ���� � sc TRH
\ \ �'
\\ I 3
/ \ \ �� ti�
\ �/\
\\ \ I \ \ I �� >>'\\ SO
\ \ � � ,\ \ � \ TS�NO
/ \ ,,,°� � � � \ I \
/ \ O \ \'�`� \ O
\ � � \ \ a \�
\ \ \ � \
\ �, \
\
\ \
C T � \ " �� I
/ \ /
RIM 393.64 ��\ ��� \ �����` � � \
\ \ �� \ \ \
IE(14") 389.31 SE —NW �`, I,TE ���EX t�0 TION ��AN \� �`, �
IE(8") 389.91 SW I
��
/ `� V �s `�� AJ `�
/ / I `,� \ ��� `:�\ RIM 395.1\ \ `, �
`�\ \\ S\ `�\ IE(M\ 388.1\\� � \ �` �
I
`� � ��
�� `
I I � S� �� \
�� \
I5.5' \ `� � \
z
O
w
oc
�
m
m
�
m�
m
�
a�
�
�
G1 N
�
�� �
�_
'y
�=
m
c �
LX
aX
Z
p Z
a
p�
a
U�
Q�
�I0
0
n
.0
N
d
0
ofZ
d
�
T
�
�
N
� N
Z
� O
C>
N
N
o
+S I
y
�
0
n
o
�x
�
> tea`
/ I � \ � �
� `��
�� \ `,
�� O
\--Z--�,� \ �,\ � ,� \
/ \ ���,
\ o
�- � A,
\ ,� ��. ,, � � I `,
�` '1 � �� � � � o. o
/ �� ; ;T � \
/ A /'�� S.F.R. �,�� � \ �,�,`� v � V � \ `� I
/'%1 1952 I�r �� �\ \ S � � \ �
f \ � � 3 a
1 I �;
;L'1/ ( � �
/ �\ I �\/ �� ,�\i� \� \ A � � �A � \ s� V \ \ w U '� �
EP-1 � "' \�
/ / \ � � � \ �q \ ------------ ---- \
/ --- � �
;,� ;
�.
\ ;''� BUILDING �����'�;�� \ / � ��
3 �
�� �� � r
\ _________ o ___
} � — � _ — ____, 10
6 " �o° \ E P-3 � � �
// 6' WOOD FENC
� FENCE CRN. ' 9.5' \N89'\'S2"E \ 6 �, 255.96' �\
3.5' W, 0.6' N -� � ,— � -� � \ � \
� \
— — \
o
I boo o`� \� o� \ I
I Legend EP-1 Approximate L�Ocation of Exploration Pity �
I
Reference: SDA Associates, Sheet 1.2 Existing Conditions
Gary A Flowers, PLLC
Geologic and Geotechnical Consulti g
Project No. 18-019
� SITE
I 16,957 sq.ft.±
0.38 Acr±
I
20' 0 20' 40'
1 "= 20'
Scale Feet
APPROVED FOR CONSTRUCTION
CITY OF EDMONDS
DATE:
.�
C
a�
U
z
Y
� W
O Z
oc
� w rn
Y � M
Z Z a0
W �
z Q
� _ �
o ° z_
U M �
� � w
� N � i
H
Z
W
H
Q
Q
0
Z
O
0
w
�_
Z
0
c�
Z
W
C1.2
R:\Projects\410 (LZG Construction)\002-18 (Edmonds Apt)\Dwg\sheets\EW-ex01.dwg 36x24
Know what's be�OW.
C111 before you dig.
I�
CITY ENGINEERING DIVISION