Loading...
APPROVED BLD SUPP STRUC CALCS BLD2019-095113228 NE 20th St, Suite 100, Bellevue, WA 98005 Phone (425) 614-0949 Fax (425) 614-0950 STRUCTURAL CALCULATIONS FOR: Edmonds Apartment Building - Supplemental Submittal for Comment Response 23830 Edmonds Way, Edmonds, WA 98026 Client: Hayes Wilson Lund Architects, LLC 385 101 st AVE SE Bellevue, WA 98004 By Bill Armour, S.E., SECB Mitchell Beck, P.E. PLAN REVIEW ACCEPTANCE FOR COMPLIANCE WITH THE APPLICABLE CONSTRUCTION CODES IDENTIFIED BELOW. ® BUILDING ® STRUCTURAL ® MECHANICAL ® PLUMBING ELECTRICAL ® ENERGY ® ACCESSIBILITY FIRE PLAN REVIEW ACCEPTANCE OF DOCUMENTS DOES NOT AUTHORIZE CONSTRUCTION TO PROCEED IN VIOLATION OF ANY FEDERAL, STATE,ORLOCAL REGULATIONS. BY: /y�-Y4' DATE:07/29/2020 WEST COAS CODE CONSULTANTS, INC. AUE No. 18456 Rev. 1 Date 10/25/2019 Design Criteria Code Summary Building Code: 2015 International Building Code Supplemental Code: 2010 ASCE 7 Risk Category: II Standard -Occupancy Building Seismic Loading: Ss: 1.3957 Sas: 0.9305 Ie: 1.00 Site Class: D S1: 0.5514 Sal: 0.5514 R: 6.50 Seismic Design Category: D Cs: 0.1431 Wind Loading: Vas: 110 mph Exposure Category: B Risk Category: II Kzt: 1.00 Design Loads Dead Loads: (Floor Structure: 9-1/2" 1-joists @ 16" O.C. 1.9 psf 3/4" Sheathing 2.8 psf 1/2" GWB 2.2 psf 3/4" gyperete 6.5 psf Carpete + Pad 2.0 psf M&E 1.0 psf Misc 1.6 psf Cement Board at Walkways 5.6 psf Total Interior Floor 18 psf Total Exterior Floor 24 psf Roof: Gangnail Trusses @ 24" O.C. 2.5 psf 5/8" Sheathing 1.8 psf 1/2" GWB 2.2 psf Roofing 3.0 psf Insullation 1.0 psf MEP 2.0 psf Misc. 2.5 psf Total 15.0 psf Live Load: Roof. 20.0 psf Snow: 25.0 psf Terrace: 100.0 psf Floor: 40.0 psf Walkway: 100.0 psf Storage: 125.0 psf Decks: 60.0 psf Soil Properties: Allowable Vertical Bearing = 2000.0 psf Deflection Criteria Stair: Floor Roof Walls Live Load: L/ 480 Live Load: L/ 480 Live Load: L/ 240 Flexible Finishes: L/ 180 Total Load: L/ 360 Total Load: L/ 240 Total Load: L/ 180 Brittle Finishes: L/ 360 Supporting Glass: L/ 240 13228 NE 20th St, Suite 100, Bellevue, WA 98005 1 (425) 614-0949 Project: Edmonds Apartment Building - Supplemental Submittal for Comment Re Pg. No: DC 1 Address: 23830 Edmonds Way, Edmonds, WA Date: 10/25/19 Client: Hayes Wilson Lund Architects, LLC Job No.: 18456 Shear Wall Analysis Shearwall Delta 9 7.89 8.75 8.75 ft ft ft Vertical Loads: Roof DL: 2nd Floor DL: 3rd Floor DL: Wall DL: T1 T1 T2 T2 Ld 10.58 ft 15 psf 18 psf 18 psf 10 Dsf 3rd Floor Wall - Local Overturn MOT: 9.705 k-ft Wall Wt: 0.835 k Roof Weight: 0.159 k MR: 5.255 k-ft Uplift: 0.65 k @ Tl Roof Fr: 1.23 k v = 116.3 plf Shearwall Designation: 1 3rd Flr 0.88 k Total F3: 2.11 k v = 199.4 plf Shearwall Designation: 1 2nd Flr 0.38 k Total F2: 2.49 k v = 235.3 plf Shearwall Designation: 1 Foundation MOT: 49.95 k-ft Wall Wt: 2.686 k Wall Trib: 25.39 ft 2nd Flr Wt: 0.5 k 2nd Flr Trib: 2.625 ft 3rd Flr Wt: 0.5 k 3rd Flr Trib: 2.625 ft Roof Weight: 2.341 k Roof Trib: 14.75 ft MR: 31.88 k-ft Uplift: 3.067 k Wall Trib: 7.89 ft Roof Trib.: 1 ft 2nd Floor Wall - Local Overtu MOT: 28.17 k-ft Wall Wt: 1.761 k Roof Weight: 2.341 k 3rd Flr Wt: 0.5 k MR: 21.7 k-ft Uplift: 1.51 k @ T2 Wall Trib: 16.64 ft Roof Trib.: 14.75 ft 3rd Flr Trib: 2.625 ft 13228 NE 20th St, Suite 100, Bellevue, WA 98005 1 (425) 614-0949 r ect:Edmonds Apartment Building Pg. No: Shear Wall 1 ress: 23820 Edmonds Way Edmonds, WA 98026 Date: 10/23/19 nt: Hayes Wilson Lund Architects, LLC Job No.: 18456 7.89 8.75 8.75 ft ft ft Ah T1 T1 T2 T2 t 10.58 ft Roof Fr: 1.1 k v = 104 plf Shearwall Designation: 1 3rd Flr 0.79 k Total F3: 1.89 k v = 178.6 plf Shearwall Designation: 1 2nd Flr 0.34 k Total F2: 2.23 k v = 210.8 plf Shearwall Designation: 1 Foundation MOT: 44.73 k-ft Wall Wt: 2.686 k 2nd Flr Wt: 0.5 k 3rd Flr Wt: 0.5 k Roof Weight: 2.341 k MR: 31.88 k-ft 2.55 k Floor Wall - Local Wall Trib: 25.39 ft 2nd Flr Trib: 2.625 ft 3rd Flr Trib: 2.625 ft Roof Trib: 14.75 ft MOT: 25.22 k-ft Wall Wt: 1.761 k Roof Weight: 2.341 k 3rd Flr Wt: 0.5 k MR: 21.7 k-ft Uplift: 1.21 k @ T2 Wall Trib: 16.64 ft Roof Trib.: 14.75 ft 3rd Flr Trib: 2.625 ft 3228 NE 20th St, Suite 100, Bellevue, WA 98005 1 (425) 614-0949 'roject: Edmonds Apartment Building Pg. No: Shear Wall 2 kddress: 23820 Edmonds Way Edmonds, WA 98026 Date: 10/23/19 ,ient: Hayes Wilson Lund Architects, LLC Job No.: 18456 7.89 8.75 8.75 ft ft ft Ah T1 T1 T2 T2 t 11.5 ft Roof Fr: 1.81 k v = 157.4 plf Shearwall Designation: 1 3rd Flr 1.3 k Total F3: 3.11 k v = 270.4 plf Shearwall Designation: 1 2nd Flr 0.56 k Total F2: 3.67 k v = 319.1 plf Shearwall Designation: 2 Foundation MOT: 73.61 k-ft Wall Wt: 2.92 k 2nd Flr Wt: 0.983 k 3rd Flr Wt: 0.983 k Roof Weight: 0.173 k MR: 29.09 k-ft 5.14 k Floor Wall - Local Wall Trib: 25.39 ft 2nd Flr Trib: 4.75 ft 3rd Flr Trib: 4.75 ft Roof Trib: 1 ft MOT: 41.49 k-ft Wall Wt: 1.914 k Roof Weight: 0.173 k 3rd Flr Wt: 0.983 k MR: 12 k-ft Uplift: 3.14 k @ T2 Wall Trib: 16.64 ft Roof Trib.: 1 ft 3rd Flr Trib: 4.75 ft 3228 NE 20th St, Suite 100, Bellevue, WA 98005 1 (425) 614-0949 'roject: Edmonds Apartment Building Pg. No: Shear Wall 3 kddress: 23820 Edmonds Way Edmonds, WA 98026 Date: 10/23/19 ,ient: Hayes Wilson Lund Architects, LLC Job No.: 18456 7.89 8.75 8.75 ft ft ft Ah T1 T1 T2 T2 t 9.42 ft Roof Fr: 0.51 k v = 54.14 plf Shearwall Designation: 1 3rd Flr 0.54 k Total F3: 1.05 k v= 111.5 plf Shearwall Designation: 1 2nd Flr 0.27 k Total F2: 1.32 k v = 140.1 plf Shearwall Designation: 1 Foundation MOT: 24.76 k-ft Wall Wt: 2.392 k 2nd Flr Wt: 0.805 k 3rd Flr Wt: 0.805 k Roof Weight: 1.413 k MR: 25.51 k-ft 1.06 k Floor Wall - Local Wall Trib: 25.39 ft 2nd Flr Trib: 4.75 ft 3rd Flr Trib: 4.75 ft Roof Trib: 10 ft MOT: 13.21 k-ft Wall Wt: 1.567 k Roof Weight: 1.413 k 3rd Flr Wt: 0.805 k MR: 14.04 k-ft Uplift: 0.54 k @ T2 Wall Trib: 16.64 ft Roof Trib.: 10 ft 3rd Flr Trib: 4.75 ft 3228 NE 20th St, Suite 100, Bellevue, WA 98005 1 (425) 614-0949 'roject: Edmonds Apartment Building Pg. No: Shear Wall 4 kddress: 23820 Edmonds Way Edmonds, WA 98026 Date: 10/23/19 ,ient: Hayes Wilson Lund Architects, LLC Job No.: 18456 (Worst Case) Uplift: Loc. On Ftg Simpson Holdown to Use: Holdown Capacity: Check Shearwall Delta 9 3066.9 lb Corner Simpson STHD14 3695 lb OK Shearwall Delta 10 2547.0 lb Corner Simpson STHD14 3695 lb OK Shearwall Delta 11 5139.9 lb Corner Simpson HDU5 5645 lb OK Shearwall Delta 12 1056.8 lb Corner Simpson STHD14 3695 lb OK *Note: All Strap Capacities based on 6" Thick Stemwall Case) Uplift: Simpson Strap to Use: Strap Capacity: Check Shearwall Delta 9 1507.3 lb Simpson MSTC28 1540 lb OK Shearwall Delta 10 1213.7 lb Simpson MSTC28 1540 lb OK Shearwall Delta 11 3139.3 lb Simpson MSTC52 4620 lb OK Shearwall Delta 12 1030.0 lb Simpson MSTC28 1540 lb OK Shearwall Delta 9 Shearwall Delta 10 Shearwall Delta 11 Shearwall Delta 12 Uplift: 651.8 lb 0.0 lb 966.2 lb 0.0 lb Case) Simpson Strap to Use: Simpson MSTC28 No Strap Needed Simpson MSTC28 No Strap Needed *Note: All based on max 16" clear Strap Capacity: Check 1540 lb OK N/A lb OK 1540 lb OK N/A lb OK *Note: All based on max 16" clear 3228 NE 20th St, Suite 100, Bellevue, WA 98005 1 (425) 614-0949 'roject: Edmonds Apartment Building Pg. No: Shear Wall c iddress: 23820 Edmonds Way Edmonds, WA 98026 Date: 10/23/19 'lient: Hayes Wilson Lund Architects, LLC Job No.: 18456 Shear Wall Footing Analysis Shear Wall: Shearwall Delta 9 / 10 Loadine Summa OTM = 49.95 k-ft Pwall = 6.027 k Pleft = 0 k Pright = 0 k Footing Geometry a= 2 ft b = 10.58 ft c= 2 ft Depth = 1 ft Width = 2.5 ft Check Overturning and Bearing Pressure Overturning Moment = 49.95 k-ft Resisting Moment = 101.7 k-ft Factor of Safety = 2.035 > 1.5 OK Pressure under left end = 0.059 ksf Pressure under right end = 0.467 ksf Allowable Bearing Pressure = 2.66 ksf OK Stemwall at Shear Wall Width = 6 in Height = 12 in Length = 14.58 ft Weight = 1.0935 k u Soil Above Footin fA OTM Pleft Pright Pwall Concrete Footing a b c Width = 24 in Height = 6 in Length = 14.58 ft Weight = 1.604 k Design Cont. Footine Reinforcement Cont. Reinf. Top+Bot. Bar Size 5 As,min req'd = 1.188 inA2 # of Bars in Top Layer = 3 # of Bars in Bot. Layer = 2 Slab on Grade Weight Width = 24 in Thickness: 4 in Length = 14.58 ft Weight = 1.409 k 13228 NE 20th St, Suite 100, Bellevue, WA 98005 1 (425) 614-0949 r ect:Edmonds Apartment Building Pg. No: SW Footing 1 ress: 23820 Edmonds Way Date: 18456 nt: Hayes Wilson Lund Architects, LLC Job No.: 10/23/2019 Shear Wall Footing Analysis Shear Wall: Shearwall Delta 11 Loading Summary OTM = 73.61 k-ft Pwall = 5.059 k Pleft = 1.8 k Pright = 1.238 k Footing Geometry a= 1 ft b = 11.58 ft c= 1 ft Depth = 1 ft Width = 3 ft Check Overturning and Bearing Pressure Overturning Moment = 73.61 k-ft Resisting Moment = 123 k-ft Factor of Safety = 1.67 > 1.45 OK Pressure under left end = 0 ksf Pressure under right end = 0.80 ksf Allowable Bearing Pressure = 2.66 ksf OK Stemwall at Shear Wall Width = 6 in Height = 12 in Length = 13.58 ft Weight = 1.019 k Footing & Stem at Left End Stem Width = 6 in Stem Height = 12 in Length = 4 ft Weight = 0.3 k Soil Above Footin fA OTM Pleft Pright Pwall Concrete Footing a b c Width = 30 in Height = 6 in Length = 13.58 ft Weight = 1.867 k Ftg Width = 30 in Thickness = 12 in Length = 4 ft Weight = 1.5 k Design Cont. Footine Reinforcement Cont. Reinf. Top+Bot. Bar Size 5 As,min req'd = 1.426 inA2 # of Bars in Top Layer = 4 # of Bars in Bot. Layer = 3 Slab on Grade Weight Width = 24 in Thickness: 4 in Length = 13.58 ft Weight = 1.313 k Footing & Stem at Left End Stem Width = 6 in Ftg Width = 30 in Stem Height = 12 in Thickness = 12 in Length = 4 ft Length = 2.5 ft Weight = 0.3 k Weight = 0.938 k 13228 NE 20th St, Suite 100, Bellevue, WA 98005 1 (425) 614-0949 r ect:Edmonds Apartment Building Pg. No: SW Footing 2 ress: 23820 Edmonds Way Date: 18456 nt: Hayes Wilson Lund Architects, LLC Job No.: 10/23/2019 Shear Wall Footing Analysis Shear Wall: Shearwall Delta 12 Loadine Summa OTM = 24.76 k-ft Pwall = 5.416 k Pleft = 0 k Pright = 0 k Footing Geometry a= 2 ft b = 9.42 ft c= 2 ft Depth = 1 ft Width = 2.5 ft Check Overturning and Bearing Pressure Overturning Moment = 24.76 k-ft Resisting Moment = 86.07 k-ft Factor of Safety = 3.476 > 1.5 OK Pressure under left end = 0.279 ksf Pressure under right end = 0.259 ksf Allowable Bearing Pressure = 2.66 ksf OK Stemwall at Shear Wall Width = 8 in Height = 12 in Length = 13.42 ft Weight = 1.342 k Footing & Stem at Left End Stem Width = 6 in Stem Height = 12 in Length = 1.25 ft Weight= 0.0938 k Soil Above Footin fA OTM Pleft Pright Pwall Concrete Footing a b c Width = 22 in Height = 6 in Length = 13.42 ft Weight = 1.353 k Ftg Width = 30 in Thickness = 12 in Length = 1.25 ft Weight = 0.469 k Design Cont. Footine Reinforcement Cont. Reinf. Top+Bot. Bar Size 4 As,min req'd = 1.188 inA2 # of Bars in Top Layer = 3 # of Bars in Bot. Layer = 2 Slab on Grade Weight Width = 24 in Thickness: 4 in Length = 13.42 ft Weight = 1.297 k Footing & Stem at Left End Stem Width = 6 in Ftg Width = 30 in Stem Height = 12 in Thickness = 12 in Length = 1.25 ft Length = 1.25 ft Weight = 0.094 k Weight = 0.469 k 13228 NE 20th St, Suite 100, Bellevue, WA 98005 1 (425) 614-0949 r ect:Edmonds Apartment Building Pg. No: SW Footing 3 ress: 23820 Edmonds Way Date: 18456 nt: Hayes Wilson Lund Architects, LLC Job No.: 10/23/2019