Loading...
APPROVED ENG SPEC INSP AGMT - VAULTOV ED CITY OF EDMONDS — ENGINEERING DIVISION SPECIAL INSPECTION AND TESTING AGREEMENT PERMIT # BLD2019-0951 DATE: PROJECT SITE ADDRESS: 23830 Edmonds Way PROJECT NAME: Edmonds Crossing SPECIAL INSPECTION AGENCY Professional Service Industries, Inc. *One form must be completed by each Special Inspection Agency or Inspector. SPECIAL INSPECTIONS REQUIRED-. Special inspections are required for this project, as applicable, in accordance with Title 18 Edmonds Community Development Code (ECDC). When required, the project must be installed/constructed per approved plans and specifications. The owner or the registered design professional in charge- shall employ an independent testing/inspection agency/special inspector to perform required special inspections. The special inspector shall be a qualified person with competence for inspecting the specific type- of construction or operation requiring special inspection. The owner, registered professional, contractor and special inspector/agency shall provide a special inspection report detailing compliance with approved plans and specifications directly to the Engineering Division. WORK REQUIZING SPECIAL INSPECTION: Special inspections will be required for the following categories of work: ; FOR SPECIFIC INFORMATION REGARDING REQUIRED SPECIAL INSPECTIONS SEE THE STATEMENT OF SPECIAL INSPECTION NOTED AS A CONDITION ON THE BUILDING PERMIT AND/OR ON THE APPROVED PLANS. FA Detention Vault — Structural and Drainage BEFORE A PERMIT CAN BE ISSUED: The owner and contractor and special inspector shall complete this agreement and retum'to a Permit Coordinator prior to permit -issuance. APPROVAL OF SPECIAL INSPECTORS.: Each special inspector shall be approved by the E ngineering Division prior to performing any duties or inspections. The credentials of the specific person performing the inspection shall.. be submitted. When applicable, the company performing inspections must be accredited by the American Association of State.Higbway and Transportation Officials (AASHTO) R1 8. PageI of 3 A. Duties and Responsibilities of the Special Inspector . The special inspector shall observe the site work. for conformance with the approved (stamped) plans and specifications. Special inspections are to be performed as needed, to confirm that the work being completed meets specifications and approved plans. 2. REPORT NONCONFORMING ITEMS The special inspector shall bring non-conforixiing items to the immediate attention of the contractor and engineer of record. The special inspector shall provide a report to the Engineering Division notifying of any items not resolved and/or not installed per the approved plans and specifications, Items not constructed per the approved plans and specifications will result in a review of the plans to determine what requirements will be needed for the project to meet the necessary stormwater requirements; such as removal and reconstruction, re -design of the stormwater management system(s), etc. Final approval for the project will not occur until installation of all required improvements is complete and accepted by the Special Inspector and the City. 3. FINAL CONSTRUCTION REPORT The special inspector or inspection agency shall submit a final signed report or Certificate of Compliance to the City stating that all items requiring special inspection and testing were fulfilled and reported. The report sliall also include a statement from the inspector stating to the best of his/her knowledge the project is in conformance with the approved plans, specifications, and approved plan revisions; if any. Items not in conformance, unresolved items or any discrepancies in inspection coverage (i.e., missed inspections, periodic inspection when continuous inspections were required, etc.) shall be specifically addressed in this report. B. Contractor Responsibilities 1. NOTIFY THE SPECIAL INSPECTOR OF ALL REQUIRED SPECIAL INSPECTIONS It is the duty of the, contractor to notify the special inspector when work is ready for special inspection. Note, the, items listed under the statement of special inspection, on the building permit and as noted on the approved plans and specifications are -required to have special inspections. Adequate notice shall be provided by the contractor so that the special inspector has time to become familiar with the project. All work requiring special inspection must be approved prior to concealing or covering said work. 2. PROVIDE ACCESS TO APPROVED PLANS The contractor is responsible for providing the special inspector access to approved plans at the jobsite. 3. RETAIN SPECIAL INSPECTION RECORDS The contractor is responsible to retain at the jobsite all special inspection records submitted by the .special inspector. These records are to be provided to the City Engineering inspector upon request and upon completion of work. C. City.of Edmonds Engineering Division Res116nsibilities L APPROVE SPECIAL INSPECTION The Engineering Division shall approve all Special Inspectors and special inspection. requirements. 2. MONITOR SPECIAL INSPECTIONS AND APPROVE REPORTS Page 2 of 3 Work requiring specie inspection. and perf�, r= xt of special inspectors shall be monitored by the Engineering Division inspector. r ngizlee ring liuspect,r approval mast he obtained prier to placement of concrete or of xer Similar ac.r av ines it a-Wition, to that of the special inspector. 3. FINAL APPROVAL The Engineering Division may provide final inspae;cm on approval after the special inspection report(s) have been submitted and accepred by the City= D.'Owner ReMonsibliffies 1, The proiect owner or the engin "�r or arc hi c :t 'of ecord acting as the owner's agent shall fund special inspection services, E. hagineer or Architect,eL)t i 1. Prepare Statement of Special Insprec-bons, 2. Review the s secial inspection repEons and pr u) pride c,£rrecove action tar work that may not conform to the approved plans. have read and agree to comp y 34-lith the ierms and conditions of this a ree trent. Owner name RNK E suite 1. L (010 se prim se typvv ignatur General Contractor Company/Owner name ignat Date' i �k m Construction, Iwlw (please print ar Special nspector•; ,enr .:y name Profersionaf Sinv°ice Industries, inc. Eric Allen Si nature -��' �� � Date 3131 /202 gin r of Record " _tr;a"mt, rt:Va n type; Date Return the original signed agreement to:. City of EdmondsDevelopment Services Department i "' Avenue North, City flail Second Floor Edmonds, WA 98020 CCEM'D BY CITY OF DMOIN :. 'GtN. ERIN 1 SION; City Official Signature l atc Title - Page 3 of 3