REV 4 APPROVED_Stormwater Memo_BLD20190120CECIL ASSOCIATES PLANS RECD - MAY 20, 2020 May 18, 2020 REVISION May 26 2020 Zack Richardson CITY OFEDMONDS Engineering DIVISIOn DEVELOPMENT SERVICES g g DEPARTMENT 121 5ch Avenue N Edmonds, WA 98020 COMPLIES WITH APPLICABLE RE: BLD20190120 — Hyundai Sales & Service CIT Plan Revision: Added Pedestal Parking Stall Dear Zack: The corporate Hyundai has handed down direction to add a pedestal parking stall along the Hyundai frontage. I assume this is a stall that will be elevated approximately 6" higher than the adjacent stals and used to show off a featured vehicle. The plan revision is clouded on sheet C2.00-3 of the Hyundai Building Permit set. It is attached to an architectural plan revision package. This addition creates 751 square feet of new plus replaced impervious surface to track in the flow control, water treatment, and various area swaps we have been tracking throughout the overall project. The latest drainage report with the most accurate stormwater tables was dated September 20, 2019, submitted for the Mazda Service Center project. The previous Hyundai Sales & Service drainage report is now obsolete with regards to the stormwater tables. Therefore, rather than resubmit an entire drainage report for Hyundai, in an attempt to streamline review, I have attached only the redlined updates required for the relevant stormwater tables and exhibits. These pages were copied from the Mazda Service Center drainage report dated September 20, 2019. They now apply to Hyundai, as both projects are being mitigated with the same stormwater facilities. I hope this is clear but if not don't hesitate to request any additional information. Thanks, John C. Farleigh, P.E. Cecil & Associates, LLC CC: Frank Karreman (Architect) Marc Ikegami (Owner) Doug Ikegami (Owner) S. PERMANENT STORMWATER CONTROL 5.1: DESIGN OVERVIEW This project is being constructed in conjunction with the Doug's Lynnwood Mazda project (BLD201 71119). The project will replace the existing automotive service building with a larger service building. Parking improvements for the project will be provided by formalizing existing parking and car inventory storage area. The architectural site plan provides accounting for the parking requirements. The building will be fully sprinkled. Stormwater mitigation for the site will comply with the 2016 City of Edmonds Stormwater Management requirements. The City has adopted the 2014 Stormwater Management Manual for Western Washington with amendments in chapter 18.30 of the municipal code. Flow control will be provided in an underground concrete detention vault. Water quality will be provided by an in - line Linear Modular Wetland Filter installed under a separate permit, the Doug's Lynnwood Mazda project, permit number BLD201 7119. 5.2: FLOW CONTROL Flow control is provided via underground concrete detention vault installed under a separate permit (BLD201 71 1 19), located onsite. The table below shows the new plus replaced impervious areas required to be mitigated under this project and previously permitted areas that are mitigated within the same vault. In addition, the table below includes 25% mitigation for existing un-mitigated hard surfaces, required for minimum requirement #5. The original detention vault sizing calculations made a reasonable assumption for this development. However, they did not accurately aEEuFate capture these final conditions. Therefore, sizing verification calculations have been attached in Appendix B based on the total developed condition. 6,338 sf 875+571 sf = 1,626 sf Area Swap (#1): Approximately 5,58sf of runoff from a com Ion of 76`" Avenue W and an onsite gravel parking area is being collected in lieu o lecting Hwy. 99 sidewalk area. That's 4,712 square feet from 76`" Avenue W and-8- 5 uare feet from the upper inventory parking area. The areas swap is being proposed because the Hwy. 99 frontage is downhill of the detention vault and cannot reasonably drained to the vault via gravity. The area swap provides stormwater mitigation for a similar sized area that was not previously being mitigated and has no imminent plans for improvements that would otherwise trigger stormwater mitigation for this area. Area Swap (#2): The project is proposing an onsite area swap to mitigate new plus replaced impervious areas specifically for the concrete pedestrian walkway located on the north end of the project. The walkway provides a connection from the parking area to the Amenity Shelter. A storm line has been provided to the shelter to collect roof runoff; however, the walkway is difficult to collect without excessive storm lines and cutting & patching of the driveway. The project is naturally collecting runoff from the gravel Inventory Parking Area located on the west -end of the site. The walkway area is approximately 1,647 sf (see table below). Area Swap Exhibits have been attached in Section 7 for reference, see Figure 6 & 7. Collected Area Not Required for Mitigation: As stated above, the site slopes, generally, from the west to the east. The gravel parking area, commonly referred to as the "upper inventory parking area," is draining downhill through the site improvements and will be collected by the new stormwater system and routed through the water treatment facility and flow control facility. A portion of the gravel parking area is required to get collected because it is being re -graded (new plus replaced impervious), or it is being mitigated for MR #5 (25% mitigation of existing hard surfaces), or to support an area swap as described above. CECIL & ASSOCIATES, LLC Mazda Service Center 7 Edmonds, WA The areas being collected that are not targeted for flow control mitigation will be routed through the flow control facility. To account for this, there is a base flow of impervious area assumed in the existing site condition calculations. To clarify, the predeveloped surface assumption for all targeted new plus replaced impervious areas is assumed to be forested and existing impervious surfaces that are routed through the vault not targeted for flow control mitigation are modeled as existing impervious. This increases the allowable release rates incrementally to offset the impervious area assumed on the developed condition to allow it to "flow through" the facility. This is an equivalent downstream result as routing the runoff around the flow control facility, but it is more practical than installing a dedicated stormwater bypass line through the site. The table below summarizes how the upper inventory parking area is being counted. Vpper Inventory Parking Area Summary Gravel Area Collected 0 sf 0.287 ac Mitigation Required for Are p #1 875 sf 0.020 ac Mitiga ' equ' or Area Swap #2 1,647 sf 0.038 ac Area Mitigatad46FFIMR # and Surface) 3,130 sf 0.072 ac Re r Passing Through Flow Contro 6,868 sf 0.158 ac of mpervious Bypassed Through Flow Control Facility Flow control calculations showing existing flow through area of 0.158 acres impervious (from table above) and site conditions broken down by each permit (shown below) are attached in Appendix B. The result is that the 2-year orifice will be enlarged to allow the existing base flow through the flow control facility. Upper Inventory Parking Area Summary Gravel Area Collected 12,520 sf 0,287 ac Mitigation Required for Area Stivap #1 Mitigation Required for Area Stivap #2 1,647 sf 0.038 ac Area Mitigated for MR#5 (25% Hard Surface) 3,130 sf 0.072 ac Remainder Passing Through Flow Control Facility - % of Total Impervious Bypassed Through Flow Control Facility CECIL & ASSOCIATES, LLC Mazda Service Center 8 Edmonds, WA The table below summarizes the areas that the detention vault was designed for and how this project can be mitigated within the volume allowance in the vault. azda Service Center Project Vehicle Inventory Gravel Parking Area 12,682 sf 0.291 ac New Building Roof Area 10,882 sf 0.25 ac Parking & Road Area 9,652 sf 0 22 ac Amenity Area (Concrete Walk & Shelter) 1,647 sf .038 ac Total New + Replaced Impervious Area 34,863 sy 0.800 ac Existing Un-mitigated Hard Surface 12,520 sf 0.287 ac 25% Existing Hard Surface Mitigation 3,1 sf 0.072 ac New + R laced Impervious Plus 25% Hard Surface Mitigation /7,993 sf 0.872 ac Total Pervious Area 3,109 sf 0.071 ac Doug's Lynnwood Mazda (MaNa Sales Building) Project LD20171119) Impervious Byp s Area 162 sf 0.004 ac Total Imper ous Area 42,709 sf 0.980 ac Total P rvious Area 7,946 sf 0.182 ac Hyundai Sales & Service Project (BLD20160 0) T tal pervious Area 10,710 sf 0.246 ac Total rvious Area 1,230 sf 0.028 ac Total Area Mitigated in Detentioptzvault Impervious Bypass rea 162 sf 0.004 ac Total Impervious A a 91,412 sf 2.099 ac Total Pervious Area 12,285 sf 0.282 ac Total Capacity of Detention Vault Impervious Bypass Area 1 4 sf 0.004 ac Total Impervious Area 95,360 sf 2.189 ac Total Pervious Area 12,285 0.282 ac Area Vserved for Future Development Impervious Bypass Area 12 sf 0.0 ac Total Impervious Area 3,948 sf 0.091 ac Total Pervious Area 0 sf 0.000 a SEE NEXT PAGE CECIL & ASSOCIATES, LLC Mazda Service Center 9 Edmonds, WA Mazda Service Center Project Vehicle Inventory Gravel Parking Area 12,682 sf 0.291 ac New Building Roof Area 10,882 sf 0.250 ac Parking & Road Area 9,652 sf B.222 ac Amenity Area (Concrete Walk & Shelter) 1,647 sf B.B39 ac Total New + Replaced Impervious Area 34,863 sf 0.800 ac Existing Lin -mitigated Hard Surface 12,520 sf 0.287 ac 25 Existing Hard Surface Mitigation 3,130 sf 0.072 ac New + Replaced Impervious Plus 25% Hard Surface Mitigation 37,993 sf 0.872 ac Total Pervious Area 3" 09 sf 0.07' �c Doug's Lynnwood Mazda (Mazda Sales Building) Project (BLDZ0171119) Impervious Bypass Area 162 sf 0.004 ac Total I mpervicus Area 42,709 sf 0.980 ac Total Pervious Area 7,946 sf 0.182 ac Hyundai Sales & Service Project (BLD2O16O12O) Total Impervious Area Total Pervious Area 1,23D sf 0.028 C-�c Total Area Mitigated in Detention Vault Impervious Bypass Area 162 1 sf 1 0.004 ac Total I mpervicus Area Total Pervious Area 12,285 1 sf 1 0.282 ac Total Capacity of Detention Vault Impervious Bypass Area 174 sf 0.004 ac Total I mpervicus Area 95,36D sf 2.199 ac Total Pervious Area 12,285 sf 0.282 ac Area Reserved for Future Development Impervious Bypass Area 12 sf 1 0.000 ,�c Total Impervious Area Total Pervious Pervious Area 0 sf I 0.000 ac 5.3: WATER QUALITY The project triggers enhanced water quality for all new and replaced pollution -generating hard surfaces (PGHS). Additionally, the project drains to Lake Ballinger and therefore requires phosphorus treatment per ECDC 18.30.060.B.i. The water quality treatment will be provided by routing all runoff from the parking and driving surfaces to a Modular Wetland System (MWS) - Linear Modular Wetland. The Linear Modular Wetland has received a General Use Level Designation (GULD) from Ecology for Enhanced water quality and Phosphorus treatment. The required water quality flow rate has been calculated using 2012 WWHM. The treatment units will be located upstream of detention, requiring a water quality design flow rate equivalent to the offline 1 5-minute peak flow rate. The Linear Modular Wetland can be provided in multiple sizes. The Linear Modular Wetland provided under separate permit, BLD201 71 1 1 9, has an approved filtration rate of 0.147 cubic feet per second. The table below shows the pollution generating surfaces areas for this project. Total Linear Modular Wetland Filter Sizing Table Doug's Lynnwood Mazda (Mazda Sales Building) Project (BLD20171119) Total Pollution Generating Impervious Area 29,483 sf 0.677 ac Total Pervious Area 7,946 sf 0.182 ac 4,792+751 = 5,543 sf (0.127 ac) Hyundai Sales & Service Project (BLD20190120) Total Pollution Generatine Impervious Area Total Pervious Area 1 1,230 1 sf 1 0.028 1 ac Mazda Service Center Project (BLD2019XXXX) Total Pollution Generatine Impervious Area 23,9811 sf 1 0.551 1 ac Total Pervious Area 3,109 sf 0.071 ac Total Pollution Generating Impervious Area 8,256 Total Pervious Area 12,285 sf 0.282 c Total PGIS Allowance from BLD20171119 66,089 sf 1.517 ac See BLD201 71119 drainage report for water quality calculations. 59,007 sf (1.335 ac) Collected Area Not Required for Mitigation: There is an additional 6,868 square feet (0.158 acres) of runoff routed through this water treatment facility than are required. This area is not included in the table above but still is within allowable size for filtration requirements (58,256 sf + 6,686 sf = 64,942 sf). 5.4: CONVEYANCE REQUIREMENTS This section discusses the criteria that will be used to analyze and design the proposed storm conveyance system. For basic conveyance system design, the ECDC requires the use of the latest edition of the King County Surface Water Design Manual (SWDM), Chapter 4: Conveyance System Analysis and Design. Chapter 4 refers to Core Requirement #4, which is found in Chapter 1.2.4 of the KCSWDM. The relevant portions of this Section prescribe the following: CECIL & ASSOCIATES, LLC Mazda Service Center 10 Edmonds, WA V� HOUSE HOUSE 1,. 31°, 5' CHAT UNK FENCE CROSS c: yyb`' } PL 9.05' S. OF PROP. CO Z w J 3 O� � 26 \ of �; • n \ a0 T CHAINLINK FENCE N 53.65 ASPHALT ,� I y1ti10 / »... 4 s • RR .g4 3 E LOF 0 3' o�`sa '� N89-06-13"W 325.83' 3s..az 101 3ybye y`y z y°"° /.•• I 0 I t 3et.6t 1.56 a1 a ,RND 1-1/2" IRON PIPE "R + I+ 379.97 y19 I o s< ysb AT CORNER. 10-27-05 •'��� 1a �fl T7 qs 3ss.z6 v NOTE: HELD PLAT INfE IS y� .y"#* y j55• yy5 y61 cz N89'O6 2"W NO 1/2" REBAR W/ CAP hH AREA, OVERLAPS SULINE yb 3ss.oa roy �g c, 3 •qwW° WOOD a "GROUP 4 LS N0. 9435" - / / 355.07 a� 3 y '�° ALL CURBS EXTRUDED P \ 0 AT CORNER 5-4-0 4 ya k S RR 5' CHAINUNK FEN UNLESS OTHERWISE NOTED FENCE X� EX CB TYPE 2 48" 354.97 �ti. J87. o . HR .r mc, X • IR $ ,^ y1'''k s'A TOP=354.17 ti5 I 1 1°� +369.6a IlS1'' p,,FP IE=351.78 6"FLEXPIPE SW 1 +'CHAINUNK FENCE IS 045 IE=349.88 30" CMP E � 1`' SHE 1°ti0 -Iv',, 0.3'W 0.2'W OF PROP�. R. + zo N flR c +incic70.te ® 3� ' o 11 6, / +3ss.6i 6 +s1 s`T'pO 3 3 `� ze -s1' , '`A R. -T31. A 0 ti EX CB TYPE 2 48" v2 1)6'" PLAT 0.16' 9,JL 3y" �_��� OF IE 349512 30"CMP NW ` J I VdP�� 0 3sa.os+ 367s9 NLINP r.!'• E OF SUBD. ASP ALT :-�T \ IE=349.01 30"CMP S E.L.R / .. _ ._ -% ,� /_LL ® ' sEauau EX CB TYPE 2 48" / VI¢ H31g9 ,s6 fi i i y91 !/ z _ _ ay1 p N ® • pR ®Fl�, -"' 30"CMP W IE=349.40 = N ® LOCR rw t/z' REaw w/ w • r ..`'... • ]' 30"CMP SE 0 3 Sat` ®. i / 376.13 tippets xo s<ss• 3V � ,6 D R Al coRr'^ 153.96 0 53.a0 � 1,644+751 = 2,395 sf ti �w , , �y - 9/ I / TO PAINT STR/PE \ / AREA SWAP REQUIRED y REQUIRED FOR w/ CAP , \ BLD20171119= 3,943 SF 3 3 "GROUP 4 AT CORNER. N0}Feti - 355.9z / / / /'•` / & HYUNDAI SALES AND s-a-.s 435" 6a � SERVICE PROJECT FOR 3n.- s ASPHALT h o � F 356.a., Cz HWY. 99 FRONTAGE= , 4' CHAINUNK FENCE IS 0.6'S. / / 3 cr I SF I X 0.1'F/OF PROP CORNER 1yy yy / h`N 51 HYUNDAI SALES & / TOTAL AREA SWAP �• y e SERVICE BUILDING PROVIDED=-F�;5&�SF ®®®� ( LD2019012) _- 5 587+751 = 6,338 sf �/ N8n6'13"W 336.59' _ I iEX SSMH TOP=351.81 EX CB TYPE 2 48" / TOP=378.08 IE=373.22 .' I / / Cr (IN N, OUT CTR CHANNEL sti / (IN N, OUT S) 8"RCP E IE=372.22 8"RCP W IE=371.76 / y3ti i EX CB TYPE 2 54" TOP=353.91 N IE=371.96 MAZDA SERVICE }y / 1" / 12"RCP BUILDING 3 s y+ ^� TOP INSIDE CP STA44 TOP OF 12"CMP STANDPIPE=352.61 BOTTOM 0 "CMP30"C STANDPIPE=346.61 IE=346.50 30"CMP W / y / SO IE=346.43 30"CMP N _ v v v v 6 IE=348.45 12"CMP SW 875+751 = 1,626 sf D s v D ® / IE=348.35 12"ADS SE L - �� / 475-SF ASSUMED / FROM GRAVEL AREA X CB TYPE 1 4,712 SF FROM TOP48.259 �� IE=348.25 12"ADS NW 76TH AVE c I 3 CD s i END 1/2" REBAR W/ CAP a.aaanuns icurav a� cAs NO. 9435 u�r vtx ns-eunrruxs:xcw AT CORNER 5- - Fp - wxxrsawatwmcr 6' CHAINLINI' ' /'' i/ /'qf ROP MR 3 i..zs .. ... . ;� � � � � e v .. , EX CB TYPE 1 1}-- • y ��' d e e e TOP=348.49 TN 30.0 /^� '� yu'.,', (. FFFDDD IE=344.74 12"ADS W o N8906'3 ' •• OW bo .32' 1 Cz /� / AREA IS INFEASIBLE TO tl0, mcv TO SHORT PLAT =CH NK FENCE CROSSES 9y T. N. LINE S. mo' MAZDA SALES a 85.1' E. OF PROP COR • 0- N. LONG AS LINE �; 4 '•. . _ COLLECT (COLLECT a ALONG W. LINE RUNOFF FROM 76TH v No a Y 369.8 � BUILDING 6 COLLECT 76TH AVE / (BLD20171119) AVE IN LIEU OF) RUNOFF VIA CATCH+ I '' BASIN Q EX CB TYPE 1 I ^ O 371.6U I1, �6 ASPHALT TOP=347.99 • I IE=345.81 12'RCP W IE=345.81 12'RCP E ECIL GATE � / ~ .+may + N 310� TOPEX C353.40E 1 ���-� .. QrQ Cz TOPEX CB4TYP9 1 U ;SOCIATES� m I "«.«...E 344.36 12"DI 48' IE=350.98 12'RCP E 2ti ( L- I FIGURE 6 AREA SWAP EXHIBIT OFFSITE N89'06'30 W 90.54 -5 --- 5 .09' I EX SSMH r BREAKER BOXY � � TOP=346.94 Mazda Service Center o 1pD/ 3a66a / �a� IE=338.74CTR CHANNEL 0 25 50 I 100 TOP=3 6. DROP N (IN N, OUT S) H O R I Z. 20' EASEMENT FOR INGRESS, - / 7.12.2 019 EGRESS AND UTILITY PER SIP �v2oiy EX SSMH S CQ I e In Fe t RECORDED UNDER AFN �' TOP=346.78 7903130264 45.8 IE=338.57 CTR CHANNEL 3 �^ (IN N, OUT S) V� HOUSE HOUSE 1�. 31°', 5' CHAT UNK FENCE CROSS yyb`' } PL 9.05' S. OF PROP. CO Z w J 3 O� 'm 7' CHAINLINK FENCE N 53.65 ` I ASPHALT ,� I y1ti10 • FlR .ge 3 E LOT 0 3 01b - '� N89"O6'13"W 325.83' 35i.az 101 3sbye y`y z y°g0 /.•• I 0 I 1 3etsl 1.56 L�l 1-1/2" IRON PIPE ,.7.49+ 55. -379.97 I o s< ysbt- -lf'('D CORNER. 10-27-05 3ss.zs v NOTE: HELD PLAT INfE IS yam' .y#* y j55• yy7 yy1 1/�C N89-06 2°W NO 1/2" REBAR W/ CAP h°p AREA, OVERLAPS SULINE hga / / 355.oa 3 OD "GROUP 4 LS N0. 9435" 355�- p WOOD \ ey ALL CURBS EXTRUDED 3 P sy' AT CORNER 5-4-0 RR 5' CHAINUNK FEN avFENCE rn X/ / EX CP NPF 7 4R" UNLESS OTHERWISE NOTED 354.97 \ Q J81. 0 • OR N F X . OR I S y1 TOP h .y0'L� i + 19yry o CHAINUNK FENCE IS 04'S CIE= APPROXIMATELY 1,647 SF b N SHE °ti0 \ 0.2'W OF PROP+355.6t OF AREA IS INFEASIBLE TO I fIR t 70.18 3� 131 ih o a m/ 2a o o� / a i�AR. A 9� 3 _ + / o ® COLLECT WITHOUT -- - - aj ® Z , 368.°5 36799 -�/= ' "^ VE ASP ALT EXCESIVE STORM LINES Ir, �yPL� o t NLINk" ° r ,�T �, E OF SUED. a �� Kati AND PAVEMENT PATCHING I _ ?� ® ® LOd( il0 I/2• RF84t W/ fM � .;•'• •� • � - O 3 / 'mow 4 Ls x0. o+xs' I .s p ASPHAL \ R Ai CaIaER 5-4-05 353.96 \ 353.40 - I PAINT S7R/PE •yyS�y .yyy� s 6 I O PAINT STRIPE MITIGATE EXISTING �y IMPERVIOUS AREA IN LIEU -FouNo 1/2^ REBAR W/ CAP - 311.s2 - OF CONCRETE WALKWAY. I 3 "GROUP 4 . N0. 435" , AREA SWAP OF 1,647 SF. AT CORNERs-a- s , "/ 3 377.64 � 5' sa ASPHALT h F 35s.a., - 4' CHAINLINK FENCE IS 0.6'S. / / X 0.1'YOF PROP CORNER yy Vl 7 + y1 's / / g/ 3 HYUNDAI SALES & SERVICE BUILDING rya J ' ec uei I e i EX CB TYPE 1 I`'' ®®®®®®®� / (BLD20190120) TOP=378.41 IE=374.57 >/ I� N89T)6'13°W 336.59' EX SSMH SO / TOP=351.81 EX CB TYPE 2 48° TOP=378.08 IE=373.22 - Cz (IN N, OUT CTR CHANNEL 8"RCP E 08 IE=.22 vl .y�bti / / / (IN N, OUT S) 8"RCP W IE=371.76 377.70 37 ! / y3ti EX CB TYPE 2 54" 12°RCP S IE=371.96 3 TOP=353.91 3 s 12°RCP N / TOP INSIDE 08=353.44 ya�a TOP OF 12"CMP STANDPIPE=352.61 BOTTOM 12"CMP STANDPIPE=346.61 Z ti SG, �'E' IE=346.50 30"CMP W w N--------- ZQ IE=346.4330"CMPN Q c r E66E / IE=348.45 12"CMP SW I S D I ' Q' / IE=348.35 12"ADS SE �m o L376,01. f vNi •.•. 3 t2 ? / X CB TYPE 1 3 I / TOP 48.259 IE=348.25 rn � 12"ADS NW v o- A.PROXIAIA ICLCLAiION LI"."iNFR V1 t I/NE Pfil AS-&NLr PIAN.S {Apl NCD IlY GIY L1' m.WQW)$ 3 c - aeA END 1/2' REBAR W/ CAP - acaWaxwAsiaArav cAs ac'S NO. 9435 u�r vtx As-eunrruxs rxcw S AT CORNER 5- --FID wxxr salWa tWmcr - " �n 6' CHNNLINN1. ROP CDR ' EX CB TYPE 1 T3).0Z ��� a e v •:. , .: ;, I e e e TOP=348.49 l . �^ = w�f c u•, <_' <. {; FD�� / IE=344.74 12"ADS W 10 o N 6 CHAINLINK FE I Co �bo N8906'30'W ,�6.32' (( 1 / e� AFM°AiMA]E LOCARdl L1'WA2R y1 I\^Da� / I I (J' NF �rc an�mroros�mcv W \11 /I 0.58' SHORT PLAT p�"F 6' CH NK FENCE CROSSES v} / TO N. LINE S. 100' R a I 85.1' E. OF PROP COR. J+, I 4y'fl' N. 300' AS MEAS. ^� MAZDA SALES a I ALONG W. LINE v o Q V 369.61� BUILDING / 416 o I p1 (BLD20171119) 161 N Q v EX CB TYPE 1 I .49 371.60 I1, 36 ASPHALT TOP=347.99 IE-345.81 12'RCP W IE=345.81 12'RCP E ECIL •� .+may ++ GATE �� '� TO CB TYPE 1 U 1I TE v 310� I OPC653.40E 1 �- - «.«..,0«P=346.79 .36 48' it IE=350.98 12'RCP E IE=344.36 12"DI FIGURE 7 - AREA SWAP EXHIBIT ONSITE N89 O6'30W90.54 -- --- �. 5 .09' I EX SSMH r BREAKER BOh ! ss TOP=346.94 Mazda Service Center o 1pD/ 3a66a // ' �a� IE=338.74CTRCHANNEL 0 25 50 I 100 �°i IE=343.89 DROP N (IN N, OUT S) H O R I Z. 20' EASEMENT FOR INGRESS, - / 7.12.2 019 EGRESS AND UTILITY PER SP EX SSMH Scale In Fe t RECORDED UNDER AFIN �' TOP=346.78 7903130264 45.6 IE=338.57 CTR CHANNEL 3 A �" (IN N, OUT S)