Attachment 2 - Project Plans STF2021-0035 (2)SUMMARY OF QUANTITIES DOT_RGG900
12/20/2021
ITEM NO
SUB-TOTAL
SECTION
I-07.2(2)OFSTANDARDSPECS
SUB-TOTAL
SECTION
I-07.2(1)OFSTANDARDSPECS
UNITSTD.ITEMNO.
TOTAL
QUANTITY
GROUP 1 GROUP 2
EDMONDS
FERRY
TERMINAL
REIMBURSE
FOR
THIRD
PARTYDAMAGE
***
ITEM
PREPARATION
1 L.S.MOBILIZATION L.S.0001LUMP SUM LUMP SUM
2 10.00REMOVING CEMENT CONC. CURB L.F.011010.00 10.00
3 320.00REMOVING PLASTIC CROSSWALK LINE S.F.0204320.00 320.00
GRADING
4 3.00PAVEMENT REPAIR EXCAVATION INCL. HAUL S.Y.03323.00 3.00
STORM SEWER
5 1.00CATCH BASIN TYPE 1 EACH30911.00 1.00
6 14.00PLAIN CONC. STORM SEWER PIPE 12 IN. DIAM. L.F.339414.00 14.00
HOT MIX ASPHALT
7 2,750.00CRACK SEALING - LF L.F.57032750.00 2750.00
8 3,980.00PLANING BITUMINOUS PAVEMENT S.Y.57113980.00 3980.00
9 1.00HMA FOR PAVEMENT REPAIR CL. 1/2 IN. PG 58-22TON 57391.00 1.00
10 1,250.00HMA CL. 1/2 IN. PG 58-22TON 57671250.00 1250.00
11 -1.00JOB MIX COMPLIANCE PRICE ADJUSTMENT DOL5830-1.00 -1.00
12 -1.00COMPACTION PRICE ADJUSTMENT DOL5835-1.00 -1.00
13 -1.00ASPHALT COST PRICE ADJUSTMENT DOL5837-1.00 -1.00
EROSION CONTROL AND ROADSIDE PLANTING
14 30.00ESC LEAD DAY 640330.00 30.00
15 L.S.EROSION CONTROL AND WATER POLLUTION PREVENTION L.S.6488LUMP SUM LUMP SUM
TRAFFIC
16 10.00CEMENT CONC. TRAFFIC CURB L.F.670110.00 10.00
17 2,410.00PLASTIC LINE L.F.68072410.00 2410.00
18 260.00PLASTIC CROSSWALK LINE S.F.6857260.00 260.00
19 L.S.TRAFFIC SIGNAL SYSTEM TYPE 3 INDUCTION LOOPSL.S.6912LUMP SUM LUMP SUM
20 175.00PORTABLE CHANGEABLE MESSAGE SIGN HR 6993175.00 175.00
21 L.S.PROJECT TEMPORARY TRAFFIC CONTROL L.S.6971LUMP SUM LUMP SUM
22 L.S.TRAFFIC CONTROL SUPERVISOR L.S.6974LUMP SUM LUMP SUM
OTHER ITEMS
23 5.00STRUCTURE EXCAVATION CLASS B INCL. HAUL C.Y.70065.00 5.00
24 4.00GRAVEL BACKFILL FOR PIPE ZONE BEDDING C.Y.70174.00 4.00
25 1.00ADJUST JUNCTION BOX EACH70431.00 1.00
26 2,500.00FORCE ACCOUNT POTHOLINGDOL77152500.00 2500.00
27 5.00 REIMBURSEMENT FOR THIRD PARTY DAMAGE DOL77255.00 5.00
28 L.S.SPCC PLAN L.S.7736LUMP SUM LUMP SUM
29 1.00CONNECTION TO DRAINAGE STRUCTURE EACH96051.00 1.00
GROUP
LEGEND
REVISIONDATE
SR 104
EDMONDS FERRY TERMINAL
PAVING PRESERVATION
CONTRACT NO
JOB NUMBER
000000
SHEET
OF
SHEETS
SUMMARY OF QUANTITIES
Washington State
Department of Transportation
FEDERAL AID PROJECT. NO.
3
13
BY
10
SQ1
WA
22X051/1
STATEREGION
TAX SCHEDULE FUND PARTICIPANTSSR GROUP NUMBER CONTROL SECTION **STATE 1041 318000 **STATE 1042 318000