Loading...
Attachment 2 - Project Plans STF2021-0035 (2)SUMMARY OF QUANTITIES DOT_RGG900 12/20/2021 ITEM NO SUB-TOTAL SECTION I-07.2(2)OFSTANDARDSPECS SUB-TOTAL SECTION I-07.2(1)OFSTANDARDSPECS UNITSTD.ITEMNO. TOTAL QUANTITY GROUP 1 GROUP 2 EDMONDS FERRY TERMINAL REIMBURSE FOR THIRD PARTYDAMAGE *** ITEM PREPARATION 1 L.S.MOBILIZATION L.S.0001LUMP SUM LUMP SUM 2 10.00REMOVING CEMENT CONC. CURB L.F.011010.00 10.00 3 320.00REMOVING PLASTIC CROSSWALK LINE S.F.0204320.00 320.00 GRADING 4 3.00PAVEMENT REPAIR EXCAVATION INCL. HAUL S.Y.03323.00 3.00 STORM SEWER 5 1.00CATCH BASIN TYPE 1 EACH30911.00 1.00 6 14.00PLAIN CONC. STORM SEWER PIPE 12 IN. DIAM. L.F.339414.00 14.00 HOT MIX ASPHALT 7 2,750.00CRACK SEALING - LF L.F.57032750.00 2750.00 8 3,980.00PLANING BITUMINOUS PAVEMENT S.Y.57113980.00 3980.00 9 1.00HMA FOR PAVEMENT REPAIR CL. 1/2 IN. PG 58-22TON 57391.00 1.00 10 1,250.00HMA CL. 1/2 IN. PG 58-22TON 57671250.00 1250.00 11 -1.00JOB MIX COMPLIANCE PRICE ADJUSTMENT DOL5830-1.00 -1.00 12 -1.00COMPACTION PRICE ADJUSTMENT DOL5835-1.00 -1.00 13 -1.00ASPHALT COST PRICE ADJUSTMENT DOL5837-1.00 -1.00 EROSION CONTROL AND ROADSIDE PLANTING 14 30.00ESC LEAD DAY 640330.00 30.00 15 L.S.EROSION CONTROL AND WATER POLLUTION PREVENTION L.S.6488LUMP SUM LUMP SUM TRAFFIC 16 10.00CEMENT CONC. TRAFFIC CURB L.F.670110.00 10.00 17 2,410.00PLASTIC LINE L.F.68072410.00 2410.00 18 260.00PLASTIC CROSSWALK LINE S.F.6857260.00 260.00 19 L.S.TRAFFIC SIGNAL SYSTEM TYPE 3 INDUCTION LOOPSL.S.6912LUMP SUM LUMP SUM 20 175.00PORTABLE CHANGEABLE MESSAGE SIGN HR 6993175.00 175.00 21 L.S.PROJECT TEMPORARY TRAFFIC CONTROL L.S.6971LUMP SUM LUMP SUM 22 L.S.TRAFFIC CONTROL SUPERVISOR L.S.6974LUMP SUM LUMP SUM OTHER ITEMS 23 5.00STRUCTURE EXCAVATION CLASS B INCL. HAUL C.Y.70065.00 5.00 24 4.00GRAVEL BACKFILL FOR PIPE ZONE BEDDING C.Y.70174.00 4.00 25 1.00ADJUST JUNCTION BOX EACH70431.00 1.00 26 2,500.00FORCE ACCOUNT POTHOLINGDOL77152500.00 2500.00 27 5.00 REIMBURSEMENT FOR THIRD PARTY DAMAGE DOL77255.00 5.00 28 L.S.SPCC PLAN L.S.7736LUMP SUM LUMP SUM 29 1.00CONNECTION TO DRAINAGE STRUCTURE EACH96051.00 1.00 GROUP LEGEND REVISIONDATE SR 104 EDMONDS FERRY TERMINAL PAVING PRESERVATION CONTRACT NO JOB NUMBER 000000 SHEET OF SHEETS SUMMARY OF QUANTITIES Washington State Department of Transportation FEDERAL AID PROJECT. NO. 3 13 BY 10 SQ1 WA 22X051/1 STATEREGION TAX SCHEDULE FUND PARTICIPANTSSR GROUP NUMBER CONTROL SECTION **STATE 1041 318000 **STATE 1042 318000