Loading...
Building PermitType: RESIDENTIAL BLDG Subtype: ACCESSORY STRUCTURE RES I Status: ISSUED Parcel No: 27032400226000 Subdivision: 003976 Fire Sprinklers: Valuation: $116,649.07 Code Edition: 2018 Site Address: 812 CARY RD EDMONDS,WA 98020-2615 Lot: 0 Lot Area: 97,574 Occupancy Type: U No. Stories: 1 Scope of Work: NORTON- DETACHED GARAGE W/ REC ROOM Zoning: RS-12 Construction Type: VB # of Dwelling Units: 0 WA State Contractor L & I #: STROMH1877CM Applied: 1/6/2022 Issued:4/25/2022 Final: Expiration Date: 4/20/2023 Issued by: JOK CONTACTS NAME TYPE NAME ADDRESS PHONE EMAIL APPLICANT HEIDI HELGESON 23020 EDMONDS WAY 113, (206)542-3734 HEIDI@H2DARCHITECTS.COM EDMONDS WA 98020 CONTACT H2D ARCHITECTURE + DESIGN 23020 EDMONDS WAY 113, (206)542-3734 lisak@h2darchitects.com EDMONDS WA 98020 CONTRACTOR STROMME HOMES INC 9623 8TH AVE NE, SEATTLE WA (206)650-7378 strommep@comcast.net 98115 JOHN M & SABINA K 812 CARY RD, EDMONDS WA OWNER NORTON 98020-2615 91111111111111111 DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT # 17BASEFEE FOR MECHANICAL 001.000.322.10.000.00 $50.00 $50.00 4/25/22 R19720 PERMITS CITY TECHNOLOGY FEE CHARGED 001.000.321.99.100.00 $40.00 $40.00 1/7/22 R17149 PER PERMIT EACH VENT OR EXHAUST NOT CONNECTED TO A HEATING OR AC 001.000.322.10.000.00 $30.00 $30.00 4/25/22 R19720 SYTEM ENGINEERING INSPECTION FEE 001.000.341.82.000.00 $440.00 $440.00 4/25/22 R19720 PERMIT FEE - RESIDENTIAL 001.000.322.10.000.00 $1,202.00 $1,202.00 4/25/22 R19720 PLAN REVIEW FEE - RESIDENTIAL 001.000.345.83.000.00 $1,021.70 $1,021.70 1/7/22 R17149 RESIDENTIAL STATE SURCHARGE 001.000.237.150 $6.50 $6.50 4/25/22 R19720 TOTALS: $2,790.20 $2,790.20 7 • • CONDITION TYPE STATUS NOTES Printed: Monday, April 25, 2022 10:47:17 AM 1 of 4 RESIDENTIAL Permit City of • • • PERMIT NUM Edmonds 1 1 • • • • 1 1 �f�c. 1890 &, 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests shall be established by Council and shall be paid upon submittal and are nonrefundable. 3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a ALL BUILDING PERMITS FOR result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only INFORMATION during the hours of 7:OOam to 6:OOpm on weekdays and 10:OOam to 6:OOpm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and potential monetary liability for work performed by unlicensed plumbing contractors. For more information contact L&I Department of Licensing at 1-800-647-0982. CARBON MONOXIDE SYSTEMS FOR CARBON MONOXIDE SYSTEMS NFORMATION It is the owner's responsibility to repair/replace all damage of utilities or frontage DAMAGE TO FRONTAGE FOR improvements in City right of Ways or Easements to City Standards caused by or IMPROVEMENTS INFORMATION occurring during the permitted project. ELECTRICAL PERMIT FOR Obtain Electrical Permit from State Department of Labor and Industries 425-290-1309. NFORMATION ESC REQUIREMENTS FOR MAINTAIN EROSION AND SEDIMENTATION CONTROL PER CITY AND SWMMW STANDARD INFORMATION REQUIREMENTS. Approval of this foundation design is conditional subject to inspection of existing site soil FOR conditions. Retaining walls must be designed and constructed to resist the lateral FOUNDATION BEARING INFORMATION pressure of the retained material. Provisions must be made for the control and drainage of surface water around buildings. Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its FOR officials, employees, and agents from any and all claims for damages of whatever nature, HOLD HARMLESS INFORMATION arising directly or indirectly from the issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. HOSE BIBBS FOR Hose Bibbs are required to have a permanently affixed anti -siphon device installed. NFORMATION INSPECTIONS FOR SCHEDULE REQUIRED INSPECTIONS AS NOTED THROUGH MY BUILDING PERMIT. INFORMATION www.mybuildingpermit.com Installation, use and maintenance of equipment and components shall be per MANUFACTURER SPECS FOR manufacturers specifications, installation instructions, and applicable state codes. INFORMATION Provide manufactures installation instructions on site for Building Inspector. Maximum Height 25 feet. The agent or contractor shall set up the equipment; establish the datum point and the point of average grade. Call for inspections to verify. These MAXIMUM HEIGHT O items must be consistent with the approved plan. If the proposed height of a building is INFORMATION within 12 inches of the maximum height permitted for the zone an elevation survey is required. Printed: Monday, April 25, 2022 10:47:17 AM 2 of 4 0- EDP RESIDENTIAL Permit PERMIT NU City of • • • ' Edmonds WA 91 1 • • • • 1 1 �fic. 189� Final approval on a project or final occupancy approval must be granted by the Building OCCUPANCY FOR Official prior to use or occupancy of the building or structure. Check the job card for all INFORMATION required City inspections including final project approval and final occupancy inspections. REQUIRED SPECIAL FOR INSPECTIONS INFORMATION FOR Owner/Contractor to provide Side Sewer asbuilt at final inspection. See City Handout E71 SEWER ASBUILT INFORMATION for requirements. FOR Heat pumps, AC units and similar equipment greater than 36 inches in height are not SIDE YARD EQUIPMENT INFORMATION allowed within required building setbacks. Sound or noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of FOR 7:00am to 6:00pm on weekdays and 10:00am and 6:00pm on Saturdays, excluding SOUND AND NOISE INFORMATION Sundays and Federal Holidays. At all other times the noise originating from construction sites and activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of FOR 7:00am to 6:00pm on weekdays and 10:00am and 6:00pm on Saturdays, excluding SOUND OR NOISE INFORMATION Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. FOR All utilities shall be located prior to any excavation. New locates shall be called for if at UTILITY LOCATES INFORMATION time of excavation, original locates are no longer identifiable. Installer shall provide the manufacturer installation, operating instructions, and a whole WHOLE HOUSE FAN FOR house ventilation system operation description. A label shall be affixed to the whole INFORMATION house timer control that reads "Whole house ventilation, see operating instructions". INSPECTIONS•• •nline at: https://Inspection.MyBuildingPermit.co COMPLETED SECIID INSPECTION TYPE INSPECTOR RESULT NOTES DATE B-1SETBACKS B-2 FOOTINGS B-2 FOUNDATION WALL B-2 SLAB INSULATION B-3 EXT WALL SHEATHING B-3 MECH ROUGH IN B-3 PLUMB GROUND WK B-3 PLUMB ROUGH IN B-3 ROOF SHEATHING B-3 UNDERFLR FRAMING B-4 DRYWALL FASTENING B-4 FRAMING B-4 HEIGHT VERIFICATION B-5 BLDG SPECIAL INSPECTION B-5 INSULATION ENERGY B-7 BUILDING OTHER INSP Printed: Monday, April 25, 2022 10:47:17 AM 3 of 4 RESIDENTIALBLDGPermit City • • • •121 www.e• • • •• 1 1 BIC X-3 BUILDING FINAL" A-1 BUILDING PRECON A-1 TESC AND MOBILIZE E-3 STRM TIGHTLINE E-4 WATER SERVICE LINE E-9 COMPOST AMEND E-9 PROJECT ASBUILTS X-2 ENGINEERING FINAL Printed: Monday, April 25, 2022 10:47:17 AM 4 of 4