APPROVED RESUB1 BLD2022-0403+Structural_Plan+5.3.2022_12.13.36_AM+2842268Floor Joists
NO. DATE BY REVISION
49;
Know what's below.
Call before you dig.
Determina to que esta bajo tierra.
Llama antes de excavar.
Project: Garage Conversion to Bedrooms
L_
2x8 Joist Spaced 16" OC
DRAWN: Mesfin T.
PROJECT NO.:
DESIGN: 4
SCALE: 1" = 20'
CHECKED:
DATE:
DRAWING N0.
MQ;9,07 Meado
SHEET NO.
dale E
-980A
Pressure Treated Curb
Frame in Garage Door oo&nki-p
x�tl7 �k�r �1�� � 1$r' 0.c_ will� 1�
sheiachi-r-ig on Ahe exwrior. EApsling
fiaader l4 remain in 1km cp•snirg.
21' main �
concrete -06d
41
_ 1.12' x 6.5' Sc;rew Anahc?r-5 Ql)
dp .21 a
NO. DATE BY REVISION
• Know what's below.
Call before you dig.
Determina to que esta bajo tierra.
Llama antes de excavar.
R-30 Batt
insulation
between
Joists
DRAWN: I-L-""
DETAII
DESIGN: Mesfin T
CHECKED:
DRAWING NO.
NO..
SCALE: 1 " = 20'
DATE:
2 of 4
SHEET NO.
4 4 OF Mesfin T.
NO. DATE BY REVISION
49;
Know what's below.
Call before you dig.
Determina to que esta bajo tierra.
Llama antes de excavar.
Project: Garage Conversion to Bedrooms
6907 Meadowdale Beach Road
,
Edmonds, WA-98026
DRAWN: Mesfin T.
PROJECT NO.:
DESIGN: Mesfin T.
SCALE: 1" = 20'
CHECKED:
DATE:
DRAWING NO.
CROSS SECTION DETAIL
SHEET NO.
3 of 4
deader @all new
upulInings
Mesfin T.
Project: Garage Conversion to Bedrooms MesfinT.
6907 Meadowdale Beach Road ,
Edmonds, WA-98026
Window Framing Detail
4of4