Revision Letter_Graphite I-10-05-2020Pelletier + Schaar, LLC
26911 9811, Drive NW, Suite B
Stanwood, Washington 98292
P 36o-629-5375, f 36o-629-io65
info@pelletierschaar.com
www.pelletierschaar.com
P E L L E T I E R O S C H A A R
Vision Based Architecture
October 5, 2020
Kristin Johns
Senior Permit Coordinator
121 Fifth Avenue N
Edmonds, WA 98020-3145
RE: Permit Number: BLDi9-nn
Project Name: Graphite Arts I
Project Address: aoa Main St, Edmonds, WA 98020
Dear Kristin Johns,
Thank you for your time assisting with this formal revision request on Graphite I. We
are submitting the following proposed revisions:
(i) Added a kiln room in the ceramic studio.
(z) Turned studios 111 & 112 into a dark room.
(3) Removed the GWB from most of the ceilings, leaving it in the bathrooms and a few
studios.
(4) The hanging flowers which had been previously shown attached to the building
have been moved to light poles or flower poles in accordance with Edmonds
standards. Included are the locations of the flower poles on the site plan and the
elevations with the flowers removed from the building.
If you have any questions or comments regarding the responses to this review, please do
not hesitate to call.
Sincerely,
Pelletier + Schaar
David Pelletier
Pelletier + Schaar, LLC • 26911 981h Drive NW, Suite B • Stanwood, WA 98292
p 36o-629-5375, f 36o-629-1095 • info(& pelletierschaar. corn • www.pelletierschaar.com