Loading...
Revision Letter_Graphite I-10-05-2020Pelletier + Schaar, LLC 26911 9811, Drive NW, Suite B Stanwood, Washington 98292 P 36o-629-5375, f 36o-629-io65 info@pelletierschaar.com www.pelletierschaar.com P E L L E T I E R O S C H A A R Vision Based Architecture October 5, 2020 Kristin Johns Senior Permit Coordinator 121 Fifth Avenue N Edmonds, WA 98020-3145 RE: Permit Number: BLDi9-nn Project Name: Graphite Arts I Project Address: aoa Main St, Edmonds, WA 98020 Dear Kristin Johns, Thank you for your time assisting with this formal revision request on Graphite I. We are submitting the following proposed revisions: (i) Added a kiln room in the ceramic studio. (z) Turned studios 111 & 112 into a dark room. (3) Removed the GWB from most of the ceilings, leaving it in the bathrooms and a few studios. (4) The hanging flowers which had been previously shown attached to the building have been moved to light poles or flower poles in accordance with Edmonds standards. Included are the locations of the flower poles on the site plan and the elevations with the flowers removed from the building. If you have any questions or comments regarding the responses to this review, please do not hesitate to call. Sincerely, Pelletier + Schaar David Pelletier Pelletier + Schaar, LLC • 26911 981h Drive NW, Suite B • Stanwood, WA 98292 p 36o-629-5375, f 36o-629-1095 • info(& pelletierschaar. corn • www.pelletierschaar.com