BLD2023-0540_Letter_5.2.2023_3.00.03_PM_3520247rae-
LIM
ROOFING & CONSTRUCTION
Klim Roofing and Construction Inc.
21828 87th Ave SE Unit D
Woodinville, WA 98072
425-422.8991
chad@klimroofing.com
Proposal by Chad Baker
Bell Street Condos Attn: Karen Biermanski
632 Bell St Email: b4lotharb@comcast.net
Edmonds, WA Phone: (425) 776-2043
Roof
Area of work: Entire Roof Site address: 632 Bell St
Protect customers grounds and landscaping with tarps and plywood as needed
Place disposal container as needed to dump roof debris directly into the dumpster and haul away (driveway)
Remove (1) layer of existing roof shingles
Inspect existing plywood and replace as needed (see page 2)
Install GAF Tiger Paw synthetic underlayment over entire surface
Install 26 gauge baked on pre -painted 1"x3" starter metal flashing on all gutter -to -roof transitions
Install 26 gauge baked on pre -painted 1.5"xl.5" drip edge flashing on all gabled edges
Install (13) new no caulk flashing's on all pipe penetrations and paint to match
Install (2) new metal flapper vents
Install (4) new 13-Vent collar flashings and paint to match
Install new continuous GAF Snow Country ridge vent for attic ventilation
Install new 26 gauge baked on pre -painted roof to wall flashing and step flashing along walls and skylights
Install new 26 gauge baked on pre -painted 'W' valley in all valley's
Install GAF Pro Start starter strip on all starter courses and rake edges
Install GAF Timberline HDZ laminate composition shingle using electro galvanized nails
Install GAF Z-Ridge hip and ridge using electro galvanized nails
Site, roof and gutters to be left clear and clean of all roof related debris
Edmonds, WA
GAF 50 YEAR NON PRO RATED SILVER PLEDGE MATERIAL 8: GAF 10 YEAR WORKMANSHIP WARRANTY
Composition color: initial_
Metal and paint color initial_
10 Year Klim Roofinq Workl
wr
AND LABOR -
Full Re -Roof
Subtotal
$24,282.00
for 30 d:
S. FOR THE
Approve product w/signature
x �, "C; - l�Acr
X
C,
0
o Not Exceed) X
YOUR CITY MAY REQUIRE A PERMIT- NOT INCLUDED IN PRICE
Terms: 0 down and the balance on completion. Above prices consider a discount for cash payment
Price does not include Washington state sales tax.
WORK
ADDMONAL:
Any additional work will be billed on a time and materials basis ($65 per man hours plus materials)
Any bad plywood will be removed and replaced at cost of $85 per sheet
Price based off roof top delivery of materials, ground drop will have added cost
Price based off disposal of roofing debris directly into dumpster from roof, ground drop will have added cost
*Klim Roofing is not responsible for sheetrock or plaster cracks due to roofing operations*
*Due to fluctuation in lumber prices sheathing price is subject to change at time of roof installation*
All material is guaranteed to be as specified. This agreement shall became binding upon acceptance anm consumies me enure .. ........ _, __.
registered mail. This proposal has been priced with the assumption that IOim Roofing can have access to load all malenals directly on the roof and that a dumpster can be set dose to the roof edge. Any deviation from this
agreement will result in charges to the alslomer, unless specified before signing the contract. Klim Roofing shall not be responsible for damage to driveways from dumpsters or loading trucks due to poor construction of concrete or
asphalt. This includes, but is not limited to: erosion, air pockets, or roots growing under the driveway. If the customer wishes, they can pay an additional cost to have all material hard loaded and all debris packed out to a dumpster
on the street. Klim Roofing shall not be responsible for delays due to weather, strikes, fire, acddents, or cause beyond its control. All employees are insured for liability and property damage. Igim Roofing will do its best to avoid
to gutters, but due to the proximity to the roof, the gutters cannot be warranted against damage. The contractor will need access to power. All Payment is due immediately upon completion of work.
Customer signature
Klim Roofing signature X
Payment terms. 0 down and the balance upon completion. Above prices consider a discount for payment with cash or check.