Building Permit (3)Type: PLUMBING Subtype: RESIDENTIAL PLUMBING I Status: ISSUED
Parcel No: 00446600000200
Subdivision: 004466
Fire Sprinklers:
Valuation: $0.00
Code Edition: 0
Site Address: 9825 240TH PL SW EDMONDS,WA 98020-6509
Lot: 0
Lot Area: Zoning:
Occupancy Type: Construction Type:
No. Stories: 0 # of Dwelling Units: 0
Scope of Work: BLESSING- PLUMBING FOR REMODEL BLD2023-0182
WA State Contractor L & I #:
Applied: 5/2/2023
Issued: 5/3/2023
Final:
Expiration Date: 10/30/2023
Issued by: NED
CONTACTS
NAME TYPE
NAME
ADDRESS I
PHONE
EMAIL
APPLICANT
MARIKO BLESSING
9825 240TH PL SW, EDMONDS
(541)554-3271
MBLESSING98020@GMAIL.COM
WA 98020
CONTACT
MARIKO BLESSING
9825 240TH PL SW, EDMONDS
(541)554-3271
mblessing98020@gmail.com
WA 98020
CONTRACTOR
OWNER
MARIKO K & COLIN
M
9825 240TH PL SW, EDMONDS
OWNER
(541)554-3271
BLESSING
WA 98020
FEE INFORMATION
DESCRIPTION
ACCOUNT AMOUNT
PAID
PAID DATE
RECEIPT #
CITY TECHNOLOGY FEE - PER
001.000.321.99.100.00
$45.00
$45.00
5/3/23
R28325
PERMIT
EACH PLUMBING FIXTURE ON ONE
001.000.345.83.000.00
$51.00
$51.00
5/3/23
R28325
TRAP
PLUMBING BASE FEE
001.000.322.10.000.00
$57.00
$57.00
5/3/23
R28325
WATER HEATER - INC EXPANSION
001.000.345.83.000.00
$17.00
$17.00
5/3/23
R28325
TANK
TOTALS: $170.00
$170.00
CONDITIONS
CONDITION TYPE
STATUS
NOTES
Printed: Wednesday, May 03, 2023 10:56:19 AM 1 of 2
PLUMBING Permit
-
City of • • •
•: i 1 142
www.edmondswa.gov -
1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors
in interests, agrees to indemnify defend and hold harmless the City of Edmonds,
Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance
of this permit shall not be deemed to modify, waive or reduce any requirements of any
City ordinance nor limit in any way the City's ability to enforce any ordinance provision.
2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or
other administrative deviation from adopted codes ordinances or policies must be
specifically requested in writing and be called out and identified. Processing fees for such
requests shall be established by Council and shall be paid upon submittal and are
nonrefundable.
3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a
ALL BUILDING PERMITS
FOR
result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only
INFORMATION
during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on
Saturdays, excluding Sundays and Federal Holidays. At all other times the noise
originating from construction sites/activities must comply with the noise limits of
Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.
4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted
by the Building Official prior to use or occupancy of the building or structure. Check the
job card for all required City inspections including final project approval and final
occupancy inspections.
5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW.
Property owners who hire an unlicensed plumber may assume the risks and potential
monetary liability for work performed by unlicensed plumbing contractors. For more
information contact L&I Department of Licensing at 1-800-647-0982.
ELECTRICAL PERMIT
FOR
Obtain Electrical Permit from State Department of Labor and Industries 425-290-1309.
NFORMATION
Installation, use and maintenance of equipment and components shall be per
EQUIPMENT USAGE
FOR
manufacturer's specifications, installation instructions, and applicable state codes.
INFORMATION
Provide manufacture's installation instructions on site for Building Inspector.
FOR
In addition to the required pressure relief valve an approved listed expansion tank shall
EXPANSION TANK
INFORMATION
be installed on all hot water tanks per UPC 608.
INSPECTIONS - Schedule Online at https://inspection.mybuildingpermit.com
INSPECTIONTYPE INSPECTOR COMPLETED RESULT
NOTES
B-3 PLUMB ROUGH IN
X-0 PLUMBING FINAL"
Printed: Wednesday, May 03, 2023 10:56:19 AM 2 of 2