ENG2023-0197 ROW PERMIToff' EIDM
�~ o�RIGHT OF WAY EUC PERMIT
o
,
EdmondsCity of Edmonds PERMIT NUM
9802011-01
www.edmondswa.gov i
Description: OVWSD - LOWERING AND UPGRADING 3 WATER METERS
ISSUED: 05/03/2023
Address: 7927 228TH ST SW EDMONDS WA 98026-8443
EXPIRES: 11/03/2023
Permit Type: RIGHT OF WAY EUC Permit Subtype: STANDARD Parcel Number: 00527800001500
CONTACTS
NAME TYPE NAME ADDRESS PHONE
APPLICANT
MARTY HENNINGER
8128 228TH ST SW, EDMONDS WA 98026
(425)774-7769
CONTACT
OLYMPIC VIEW WATER AND SEWER
8128 228TH ST SW, EDMONDS WA 98026
(425)774-7769
DISTRICT
CONTRACTOR
OLYMPIC VIEW WATER & SEWER
8128 228TH ST SW, EDMONDS WA 98026
(425)670-1856
DISTRICT
OWNER KROM RYAN L
T 411, SEATTLE WA 98104
kw#
DESCRIPTION
NT PAID
CITY TECHNOLOGY FEE - PER PERMIT $45.00 $45.00
ENG - INSPECTIONS $126.00 $126.00
RIGHT-OF-WAY PERMIT - STANDARD $378.00 $378.00
REQUIREMENTS
REQUIREMENT TYPE NOTES
TRAFFIC CONTROL
Traffic control and public safety shall be in accordance with City regulations as required by the City
Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification
verifying completion of the required training in their posession.
RESTORATION
Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with
asphalt or City approved material prior to the end of the workday - No Exceptions
WARRANTY The contractor is responsible for workmanship and materials for a period of one year following the final
inspection and acceptance of the work.
INSPECTION SCHEDULING: WWW.MYBUILDING PERMIT.COM
24 HR NOTICE REQUIRED
The Applicant has signed an application which states he/she holds the City of Edmonds harmless from injuries, damages or claims of
any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its
departments or employees, including but not limited to the defense of any legal proceedings including defense costs and attorney
fees by reason of granting this permit.
RELEASED BY: MAJ DATE: 05/03/2023
Printed: Wednesday, May 03, 2023 12:45:01 PM 1 of 2
RIGHT PERMIT
PERMIT NUM
City of Edmonds
•
Edmonds WA 98020
www.edmondswa.gov / 425.1 1
CONDITIONS
CONDITION TYPE NOTES
ALERT RESIDENTS
ALERT AFFECTED RESIDENTS AND OR BUSINESSES PRIOR TO WORK START.
It is the owner's responsibility to repair/replace all damage of utilities or frontage improvements in
DAMAGE TO FRONTAGE
City right of Ways or Easements to City Standards caused by or occurring during the permitted
IMPROVEMENTS
project.
MAINTAIN EROSION AND SEDIMENTATION CONTROL PER CITY AND SWMMW STANDARD
ESC REQUIREMENTS
REQUIREMENTS.
Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to
indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and
agents from any and all claims for damages of whatever nature, arising directly or indirectly from the
HOLD HARMLESS
issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any
requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance
provision.
SCHEDULE REQUIRED INSPECTIONS AS NOTED THROUGH MY BUILDING PERMIT.
INSPECTIONS
www.mybuildingpermit.com
POTHOLING
VERIFY CLEAR BORE CROSSINGS.
RESTORE LANDSCAPE
Restore landscape to like or better conditions
Sound or noise originating from temporary construction sites as a result of construction activity are
exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:00am to 6:00pm on
SOUND AND NOISE
weekdays and 10:00am and 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all
other times the noise originating from construction sites and activities must comply with the noise
limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.
All utilities shall be located prior to any excavation. New locates shall be called for if at time of
UTILITY LOCATES
excavation, original locates are no longer identifiable.
INSPECTIONS
INSPECTION TYPE DATE
RESULT
NOTES
COMPLETE
A-1 JOB START
X-2 ENGINEERING FINAL"
Printed: Wednesday, May 03, 2023 12:45:01 PM 2 of 2
RECEIVED
of EUAt�Y APR 11 2023
RIGHT OF WAY CONSTRUCTION
PERMIT APPLICATION CITY OF EDMONDS
DEVELOPMENT
Complete and submit this Application in accordance with the Submittal SERVICES DEPARTMENT
<<vc, 1 990 Requirements outlined in Right-of-WU permit Handout E6S.
If any field is not applicable to your project, write "N/A" instead of leaving blank.
All fields required. Incomplete Applications will be denied.
SECTION A
General •
Project Name w0k.441 G- `L� y��d�, d�tt �o G��M 0� �d.r.w•dg St�r�M. ct�0tirad
Site Address or if no site address use Property Addfess at NW corner of project area: 7,1 Z, •r At 713 01 2Zvi h Sf w
Associated Permits: BLD PLN G
Owner and Entity Holdingapplicable)
Name of Company ` + Franchise Ordinance No:
Point of Contact 4APi,4i
Title Q*4 wAl, r
Address
City StateW06 Zip Z(t
Phone
Email im GLi • Caw"
%J
Contractor and Authorized Agent of Owner (see note below)
Name of Company L i {}
Contractor Contacts During Construction
Primary Name
Agent Name
Title
Title QtcL& ".V
Mobile
Address (2 2Z&" s(,•,/
Email
City State Zip
Secondary Name
Phone 4ZS7
Title
EmailV4ar46A&ovw*Atr-t✓v%
Mobile
City of Edmonds Business License No:
Email
State License No:
Contractor verifies it is currently bonded
Contractor verifies it currently has general liability insurance
NOTE: ECDC 18.6o.020 requires that the Application be signed by a licensed and bonded conh•actor unless otherwise approved by the city
engineer.
Type of Development — Check ALL that apply
❑ Multifamily residential ❑ Commercial ❑ City project
o Single family residential subdivision ❑ Single family -other ❑ Industrial
❑ Demo and rebuild or from vacant land?
❑ Other, please specify:
❑ Utility Franchise Work associated with development (check one of the above boxes as well)
❑ Traffic Control Only (no associated development)
Utility Franchise Work (no associated development)
City of Edmonds ROW construction permit Application --Page 1 of 3 Updated 3/25/2021
Include an overall narrative description of the proposed work. Be specific and detailed:
Describe infrastructure to be impacted, such as, poles, wires, conduit, utility mains, etc.
Include whether this is construction, maintenance, or repair.
Include description of proposed construction methods, (e.g., bores, trenches, overhead wires proposed, depth for
underground utilities, etc.)
RIGHT-OF-WAY
CLOSURE
AREA
TOTAL
DURATION
(Number of Months)
Sidewalk 72 hours +
LF
x
LF
SF
Alley 72 hours +
LF
x
LF
SF
Parking 72 hours +
LF
x
LF
SF
SECTION B -If you are not a utility company performing work in the City ROW, skip to SEC7IONC.
Type of Utility Facilities
1. The work in the right of way is on or for the following type of facilities:
❑ telecommunications ❑ cable ❑ power ❑ gas
)(water ❑ sewer ❑ storm
Details
1.
of Work to be Completed
I Does the utility owner have existing overhead infrastructure in the area of work?
Yes
No
2.
1 Will any equipment be added underground or above ground e.. pedestals, vaults, etc.)?
X
If yes, describe:
3.
Does the proposed work connect a lot or commercial development with utilities that serve more
than one lot or commercial development?
X
4.
Does the work involve rebuilding or relocating an existing aboveground utility system which
connects a lot or commercial development to an existing underground common utility stem?
X
5.
Does the work involve proposed additions to an aboveground utility stem? If es:
Are the additions for the purpose of serving new commercial development?
Are the additions for the ui)ose of serving a single-family residential subdivision?
6. Does your project involve rebuilding or replacing utility equipment which currently serves more
than one lot or commercial development? X
If yes, answer the following questions related to project area, i.e. the actual area in which the
project is proposed:
6a. Does your project involve wires/cables/lines? If yes: gu,
How many are existing? I alA How many are to be added?
City of Edmonds ROW construction permit Application --Page 2 of 3 Updated 3/25/2021
6b.
I Does your project involve poles? If yes:
X
How many poles are existing in the project area?
What is the height of the existing poles?
How many poles are to be removed?
Are additional oles to be laced?
How many? I What is the height of the additionalpoles?
6c.
Are any poles to be modified/rebuilt/replaced? If yes:
X
How many? I I What is the height of the poles after?
Describe the modification rebuild:
SECTION C
Traffic Control and Public Safety. Traffic control and public safety shall be in accordance with City regulations as
required by the City Engineer. Every flagger must be trained as required by WAC 296-155-3o5 and must have
certification verifying completion of the required training in their possession.
Restoration. Restoration shall be in accordance with City codes and Standards. All street cut trench work shall be
patched with asphalt or City approved material prior to the end of the workday -NO EXCEPTIONS.
Insurance. The City may require the owner or contractor to provide proof of insurance acceptable to the City prior to
any permit approval.
Indemnification. The Applicant agrees to defend, indemnify, and hold harmless the City of Edmonds, its officials,
officers, employees, and agents against any injuries, damages, or claims of any kind or description whatsoever,
foreseen or unforeseen, including defense costs and attorney fees, resulting directly or indirectly from any act or
omission of the Applicant, its subcontractors, anyone directly or indirectly employed by them, and anyone for whose
acts or omissions they may be liable, arising out of, related to, or by reason of the granting of this permit; and
specifically including but not limited to all loss by the failure of the Applicant to fully or adequately perform, in any
respect, all authorizations or obligations under the permit. These indemnification requirements shall survive the
expiration, revocation, or termination of any resulting permit approval.
Acceptance of terms, conditions, and requirements. Applicant accepts the terms, conditions, and
requirements set forth in this Application and agrees they apply to any resulting permit and shall comply with them to
the satisfaction of the City Engineer. Applicant further agrees to comply with the conditions listed on the Submittal
Requirements; with all applicable city ordinances, including but not limited to ECDC Title 18; and with all applicable
requirements of state and federal law.
Statement of Applicant. I declare under penalty of perjury under the laws of the State of Washington that: I am a
licensed and bonded contractor; the information provided herein is correct and complete; and I am authorized by
owner to act on its behalf and have authority to bind the owner to this application.
Fees. The Applicant is responsible for all permit fees.
APPLICANT SIGNATURE: DATE:
APPLICANT PRINTED NAME: r►�
APPLICANTTITLE: Le&A ' er
NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE
City of Edmonds ROW construction permit Application --Page 3 of 3 Updated 3/25/2021
ZJVA-23
—."--N6l=ZL00
1c,
'-Z
1,C3
13�/Aj
UJUVYJ
A.
'�cpV eey :w:
(Z
Male
0163a'
806,?9
Oz-C3
rn
8z 23
VZ-23
IA Vdd S 0 a 611 09 L-23 improvements in City right-of-way APPF
-61, L-231 per city standards that is caused or
I occurs during the permitted project. zi
211M, HIG Z2119 8all
N3dO
Z C
C'0 /-CA —C3
r. I-VA-23 6 CA —23
3
ZA—C3
IQ
7
— 77' M 17"5 226[ 0z L—z---v oz
— --1 ) � L - - L� �. -�� -
. .. ..... tZ C3
0 fA-- M z
lie 73702 orz 1
-J-626 L.
29 73 e --t�+�
Azb-ce -r� 2ZA—�
23 OWNER/CONTF
00 zola
CDC EROSION
HLLOC c3 1 1111 s Ls
LL
Ml, p r, z hL ?Z?
2,,,, 77P 6061, 1909 OWNERA
I ALL ON Sl'
%.VAT-, 'YVILNHD I V 1 I UTILF
8160a C,? 7 'LElVnbN0D
M
J
F—
r[ z ME: =-4
1106Z 0162'
cz�� g8 MIT
80
,1 '4
JL C,
Ul
-9 -0609
E060e
IUJ
o�Gj 2 2'82 2 a ,LZ
, 083'a /(2N
8a,88'a, lawn0f-D
k, '90 L
I =
9180a I 0 J=
L-23 6018 a "g2
HJUnHD
EU7 0) OEIR 61a8
ANVi
Z. L [Z—Z (13t11321) M31A
oW 97
9061,
I I I Q U + N2
9aall Z-C3 tICF U66 I 1- I I I N I
Oa6l, IN KNP"N 0808 9018
M0000000000 8018 0008
COOOOO
NNW]
N)COO)c co
4�mo) "n NNW]
"D 9Z-6 L 2
OL-
177 � �77-
10142 . ..... . . ........ . . k7--3!N-07
LCA-Z3 la"J IlA.-Z3-.,. 19�
91A-Z3
A k Z HOIHT 7a,,e Ad,
M 10
4 lo"e
"Jo 99 — z0oz
M
14 la"e
rri ZLA-ZI
9-Z3
6181, H I ON
VUl 9 LA-Z3 M
to
801ala, :051)
1061, .9161, 1 la6l, 12'61, K)
(_ - -1 __ _ _ I I 1 6008 1 <1
Si
08 "zI I 9118 i '1
1N3H1\cJVd34 S301A2J3S VC
1N3AdO�3A34
SONOAGE] 301110
CZOZ NdV
a3A1303N NZZJL Q88 VDa9 N ZDa N
MINIMUM LANE CLOSURE TAPER LENGTH = L (feet)
LANE
WIDTH
0"0
Posted Speed (mph)
25
30
35
40
45
50
55
60
65
70
70
105
150
105
270
450
500�660)
550
11
"1
165
225
295
495
550605
660
-
-
12
125
180
245
320
540
600
720
780
840
MINIMUM SHOULDER TAPER LENGTH = L/3 (feet)
SHOULDER
Posted Speed (mph)
WIDTH
(feel)
25
30
35
40
45
50
55
60
65
70
8'
40
1 40
1 60
90
120
130
150
160
170
190
1D
40
60
1 90
90
150
170
190
200
220
240
USE A MINIMUM 3 DEVICES TAPER FOR SHOULDER LESS THEN B.
®®® N p
U
IRECEIVED6AHEAD
APR 11 2023
CITY OF EDMONDS W281
DEVELOPMENT
ERVICES DEPARTMENT
LEGEND (c\
DI TEMPORARY SIGN LOCATION
® TRAFFIC SAFETY DRUM
�D SEQUENTIAL ARROW SIGN
®° TRANSPORTABLE ATTENUATOR
PCMS PORTABLE CHANGEABLE MESSAGE SIGN
SIGN SPACING = X (1)
FREEWAYS 8 EXPRESSWAYS 55 170 MPH
150C±
RURAL HIGHWAYS 60 165 MPH
80Cz
RURAL ROADS 45 155 MPH
50Vt
RURAL ROADS & URBAN ARTERIALS 35 140 MPH
35011.
RURAL ROADS 6 URBAN ARTERIALS 25 /30 MPH
RESIDENTIAL 8. BUSINESS DISTRICTS
2O0z (2)
URBAN STREETS 25 MPH OR LESS
100'2 (2)
(1)ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE
RAMPS, AT -GRADE INTERSECTIONS AND DRIVEWAYS.
(2) THIS SPACING MAY BE REDUCED IN URBAN AREAS TO FIT
ROADWAY CONDITIONS.
CHANNELIZATION DEVICE
SPACING feet
MPH
TAPER
TANGENT
5L/70
40
80
35/45
30
60
25/30
2(
40
® ® ® ¢ WORK AREA
p p
Y Y U3 SEE
NOTE 4
R R 100' 2
\,�
Yw
aa-
W4.2(L)
GHTCLOSED
LANE
AHEAD W
AHEAD 48-
W20.5R
BUFFER DATA
LONGITUDINAL BUFFER SPACE = B
SPEED (MPH)
25
30
35
40
45
50
55
1 60
65
70
LENGTH (feet)
155
200
250
305
360
425
495
570
645
730
TRANSPORTABLE ATTENUATOR ROLL AHEAD DISTANCE = R
HOST VEHICLE WEIGHT
9,900 TO 22.000 IDs.
HOST VEHICLE WEIGHT
> 22.000 IDs.
< 45 MPH
45.55 MPH
> 55 MPH
< 45 MPH
4555 MPH
> 55 MPH
100'
1 123'
17Z
74'
109
15-
SINGLE -LANE CLOSURE FOR TL--')D LANE ROADWAYS
NOT TO SCALE
PCMS
1 z
RIGHT 7 MILE
LANE AHEAD
CLOSURE
2.0 SEC 20 SEC
ADVANCE OF LANE CLOSLOCATE IIURE SIGNING.
ENGINEERING DIVISION
APPROVED AS NOTED
jell tVl j . Wz 04/28/2023
vv
NOTES
1. SEE SPECIAL PROVISIONS FOR WORK HOUR RESTRICTIONS.
2. EXTEND DEVICE TAPER AT U3 ACROSS SHOULDER.
3. DEVICES SHALL NOT ENCROACH INTO THE ADJACENT LANE.
4. USE TRANSVERSE DEVICES IN CLOSED LANE EVERY 1000'(FT)
(RECOMMENDED).
5. DEVICE SPACING FOR THE DOWNSTREAM TAPER SHALL BE
20'(FT).
6. ALL SIGNS ARE BLACK ON ORANGE.
FILE NAME S:W-1 n R Pd. S14SOndardal2-Plan Shaet Ll6n 101-PSL Work In P reselFem\Tc1-rG1r u re pool U�.a n -
TIME 8:13:31 AM 11" FED.AID PROJ.NO. �� Rr
DATE 113=8 M AS -" TC3aa
PLOTTED BY Ildderc
DESIGNED BY '°' """°Oi Washington State
ENTERED BY
CHECKED BY �o....°* �.. »o. Department of Transportation °r
PROJ. ENGR o.,< TRAFFIC CONTROL PLAN .a,a
REGIONAL ADM. REVISION DATE BY
RECEIVED
APR 11 2023
OLl�MPIC VIEW WATER & SEWER DISTRICT' CITYDEVOELOEDMONDS
PM NT
EDMONDS BLANKET PERMIT BEGINNING SERVICES DEPARTMENT
NOTIFICATION
Site Address: 7927, 7921, & 7819 228th St SW
Scope of Work: Replace and lower water services due to Edmonds storm project
Asphalt or Concrete Cut: No Start date: ASAP
Olympic View Water & Sewer District
8128 228th ST SW
Edmonds WA. 98026
Phone Number 425 774 7769
Fax Number 425 670 1856
Contact: Marty Henninger
E-mail: marty@ovwater.com
Olympic View Water & Sewer District
8128 228th ST SW
Edmonds WA. 98026
Phone Number 425 774 7769
Fax Number 425 670 1856
Contact: Bob Danson
E-mail: Bobd@ovwater.com
. Traffic control shall be in accordance with the MUTCD.
. All flaggers shall be trained and certified as required by WAC 296-155-305.
• Restoration shall be in accordance with City of Edmonds standards.
• All asphalt or concrete cut surfaces shall be patched with City of Edmonds
approved materials prior to the end of the day.
O:ISHAREIPERMITS RIGHT OF WAMEdmonds