Loading...
Building Permit (3)Type: FIRE ALARM Subtype: FIRE ALARM MODIFICATION I Status: ISSUED Parcel No: 01022606510100 Site Address: 65 PINE ST EDMONDS,WA 98020 Subdivision: 010226, 005362, BLA AFN 200202145001, SP S-98-018 Lot: 0 Fire Sprinklers: Lot Area: Zoning: Valuation: $1,948.00 Occupancy Type: Construction Type: Code Edition: 0 No. Stories: 0 # of Dwelling Units: 0 Scope of Work: POINT EDWARDS 65-FIRE ALARM, NOTIFICATION REPLACEMENT Applied: 5/3/2023 Issued: 5/3/2023 Final: Expiration Date: 4/27/2024 Issued by: BAC I WA State Contractor L & I #: SMITHFS861RS I CONTACTS NAME TYPE NAME ADDRESS PHONE EMAIL APPLICANT LENNIE MUELLER 1106 54TH AVE EAST, FIFE WA (253)248-2051 LMUELLER@SMITHFIRE.COM 98424 CONTACT SMITH FIRE SYSTEMS 1106 54TH AVE EAST, FIFE WA (253)248-2051 Imueller@smithfire.com 98424 CONTRACTOR SMITH FIRE SYSTEMS INC 1106 54TH AVENUE E, TACOMA (253)926-1880 LMUELLER@SMITHFIRE.COM WA 98424 POINT EDWARDS 65 PINE ST, EDMONDS WA OWNER CONDOMINIUMS 198020 •' • DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT # CITY TECHNOLOGY FEE -PER 001.000.321.99.100.00 $45.00 $45.00 5/3/23 R28375 PERMIT FIRE - PERMIT BASE FEE 001.000.322.10.100.00 $100.00 $100.00 5/3/23 R28375 FIRE ALARM MODIFICATION - FEE 001.000.345.83.100.00 $186.00 $186.00 5/3/23 R28375 TOTALS: $331.00 $331.00 IF 17 • R • CONDITION TYPE STATUS ?!!!!!j NOTES Printed: Wednesday, May 03, 2023 3:41:49 PM 1 of 2 FIRE ALARM Permit PERMIT NUM City of • • • 45 www.edmondswa.gov1 1 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests shall be established by Council and shall be paid upon submittal and are nonrefundable. 3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a ALL BUILDING PERMITS FOR result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only INFORMATION during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and potential monetary liability for work performed by unlicensed plumbing contractors. For more information contact L&I Department of Licensing at 1-800-647-0982. FIRE FINAL INSPECTION FOR 1 Request final Fire Department Inspection 425-775-7720. NFORMATION ' •NS - Schedule Online at https:Hinspection.mybuildingpermit.com INSPECTIONTYPE INSPECTOR COMPLETED RESULT NOTES F-1 FIRE ALARM ROUGH -IN X-1 FIRE FINAL" Printed: Wednesday, May 03, 2023 3:41:49 PM 2 of 2