BLD2023-0358+Letter+3.23.2023_9.03.50_AM+3438552Seavue Condominium
Seavue Association of Apartment Owners
1130 51' Avenue South #B1
Edmonds WA 98020
Date: March 23, 2023
To: Holm, Unit 101
From: Seavue Association
Jay Grant, President
T: 206.260.0080
M:202.351.9399
E: jay@jaygrant.com
CC: City of Edmonds, Building Official (A copy of this letter must be brought to the Planning Department
in order to obtain a City Permit)
RE: Authorization of Heating Installation — Unit 101
Seavue Association of Apartment Owners "Seavue", hereby authorizes the owner of Unit 101 to submit a
permit to the City of Edmonds and the State of Washington for work to include:
Construction and installation of a heat pump system, to include, with specification and pre -approval
of the location of any components to include a unit outside on the common property and installation
of a compressor, electrical and other requirements internal to the structure for a functional system:
o Any electrical work must be performed by a licensed electrician or if within the contractor's
license and liability insurance, minor work within the scope of their individual's license; any
plumbing shall be performed by a licensed journeyman plumber who is licensed;
o All contractors must have valid Washington State licenses, bonded, insured, including being
insured for commercial multi -story buildings, and a current Edmonds business license;
o No hard surface floor work may be performed until a hard surface form is submitted and
approved by the Seavue board;
o No work outside of the scope of this permission may be performed by any party;
o A copy of the permit must be offered to the Association and posted in applicable areas;
o Contractors must be informed of Seavue Administrative Rules, including times of construction
and abide by the 5t" Avenue entrance door use;
o Obtaining of a permit and any work performed is acceptance of the requirements of this
letter, governing documents, and any code requirements in their entirety.
Any changes to your scope of work after approval of the Seavue Board of Directors and or the City of Edmonds
require immediate notification of the parties. All costs, including any permits, architectural and envelope
requirements, the performance of construction, any damage to the building structure, and any dump
requirements shall be the sole responsibility of the owner. If for some reason Seavue provides any other costs
for some reason at a later time, a separate letter will be issued.
It is the owner's responsibility to ensure Seavue is notified of any inspections that take place by any city, county
or state official so a Seavue representative may be present as a condition of approval.
Such authorization is limited to approval subject to any and all Seavue governing requirements, any codes and
permits requirements by the City of Edmonds, Snohomish County, or the State of Washington.
Regards,