Loading...
DNS BLD2023-0246+ASSESSMENT+2.26.2023_1.01.39_PM+3388701BODINE CONSTRUCTION SERVICES, INC. I Drainage Contractors ♦ Drainage Consultants E-mail: infoaa bodineconstruction.com ,IK Contractor License # BODINC"332BT Website: www.bodineconstruction.com Dave Tietzel Same as Property Address Cell: 206-533-8656 Email: kathydave52-hotmail.com Field Representative Ken Harris Cell: 206-510-5451 6009 212th St. S.W., Lynnwood, WA 98036 Office (425) 778-2557 ♦ Fax (425) 672-2434 Eastside (425) 881-2577 February 21, 2023 Bid #H-0221A23S Property Address "Edmonds Park Townhouses" 610 Daley St., Unit B Edmonds, WA 98020 Assessment: Per site visit and conversation on February 21, 2023 it is evident that: A) A beam supporting the lower deck of unit B on the South side of the building is sagging approximately 11/2 - 2 inches. B) Recommendations have been made by Side Sway to install a new concrete pier an support column to lift and stabilize the deck. Proposal: A) Excavate as necessary in the planting area to a depth of approximately 42 inches. B) Form and pour a new 18" X 18" X 12" concrete footing with a minimum 8" O concrete pier extending to a level approximately 2" above surface grade. Concrete, rebar and dimensions to conform to engineer's drawings. C) Backfill and compact soil around pier. D) Remove soffit and siding as necessary to expose existing sagging beam. E) Lift beam approximately 1 Y2" — 2" using temporary supports and a hydraulic jack. F) Install a new 4X4 pressure -treated support post secured to beam and pier with anchors as specified by Side Sway Engineering. G) Remove temporary supports and reinstall soffit and siding to accommodate new post. H) Install vertical tight -knot cedar wrap with butt joints around treated 4X4 post. 1) Clean up worksite and return as close as possible to original condition upon completion. Special Notes: All painting to be by others and is not included in this proposal. Bid Amount: $7,46510 plus tax. Certification & Warranty: This completed support column installation described above and located at "Edmonds Park Townhouses'; 610 Daley St., Unit B, Edmonds, WA 98020, shall be under warranty for all materials and workmanship provided under this contract for 2 years from date of completion of work. Bodine Construction Services, Inc. will make any necessary corrections to the above noted work in the unlikely event of failure or future settlement. Also note that your warranty is fully transferable and is recorded by the property address. This warranty stays with the home regardless of change of ownership. Page 2 of 2 Bid # H-0221A23S Terms: Upon bid acceptance please return signed copy of bid. A $3,12000 deposit is required to schedule work. All deposits will be considered as a retainer fee and will be applied to the final billing upon successful completion of the above listed job. Invoices are due on completion of job. For any invoices not paid within 5 days of completion of job, a service charge of 1.5% per month will be applied to your past due balance. "Major Credit Cards Accepted *'Please Note: There is a 2.0% processing fee for all CreditlDebit Card Transactions over $1,000". There are no fees for payment under $1,00000 Acceptance Date Sincerely, Accepted By Ken Harris Bodine Construction Services, Inc.