ENG2022-0078 ROW PERMIT�~ o� RIGHT OF WAY EUC PERMIT
o
f
City of Edmonds PERMIT NU M
www.edmo•. i
Description: ZIPLY-TRANSFER ATTACHMENTS AND REMOVE BO POLE
ISSUED: 05/08/2023
Address: 7407 212TH ST SW EDMONDS WA 98026-7635
EXPIRES: 11/08/2023
Permit Type: RIGHT OF WAY EUC Permit Subtype: STANDARD Parcel Number: 00566900400303
CONTACTS
NAME TYPE NAME ADDRESS PHONE
APPLICANT VICTORIA COMER
1800 41ST ST STE N-100, EVERETT WA 98203 (183)051-3661
CONTACT ZIPLY FIBER
1800 41ST ST, EVERETT WA 98203 (140)267-0838
CONTRACTOR PACIFIC CABLE CONSTRUCTION
PO BOX 573, WOOD INVILLE WA 98072 (425)348-7735
OWNER SOUND TOWNHOUSE APARTMENTS
16419 SE 24TH ST, BELLEVUE WA 98008
LLC
FEE INFORMATIO
DESCRIPTION
AMOUNT PAID
CITY TECHNOLOGY FEE CHARGED PER PERMIT $40.00 $40.00
ENGINEERING INSPECTION FEE $220.00 $220.00
ENGINEERING REVIEW FEE - OVER 3 REVIEWS $55.00 $55.00
RIGHT OF WAY STANDARD - EUC PERMIT FEE $330.00 $330.00
REQUIREMENTS
REQUIREMENT TYPE NOTES
TRAFFIC CONTROL
Traffic control and public safety shall be in accordance with City regulations as required by the City
Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification
verifying completion of the required training in their posession.
RESTORATION
Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with
asphalt or City approved material prior to the end of the workday - No Exceptions
WARRANTY The contractor is responsible for workmanship and materials for a period of one year following the final
inspection and acceptance of the work.
INSPECTION SCHEDULING: WWW.MYBUILDING PERMIT.COM
24 HR NOTICE REQUIRED
INDEMNITY
The Applicant has signed an application which states he/she holds the City of Edmonds harmless from injuries, damages or claims of
any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its
departments or employees, including but not limited to the defense of any legal proceedings including defense costs and attorney
fees by reason of granting this permit.
IIIIIIII
RELEASED BY: MAJ DATE: 05/08/2023
Printed: Monday, May 08, 2023 8:39:57 AM 1 of 2
RIGHT PERMIT
PERMIT NUM
City of Edmonds
Edmonds WA 98020 •
www.edmondswa.gov / 425.1 1
CONDITIONS
CONDITION TYPE
NOTES
ALERT RESIDENTS
ALERT AFFECTED RESIDENTS AND OR BUSINESSES PRIOR TO WORK START.
It is the owner's responsibility to repair/replace all damage of utilities or frontage improvements in
DAMAGE TO FRONTAGE
City right of Ways or Easements to City Standards caused by or occurring during the permitted
IMPROVEMENTS
project.
MAINTAIN EROSION AND SEDIMENTATION CONTROL PER CITY AND SWMMW STANDARD
ESC REQUIREMENTS
REQUIREMENTS.
Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to
indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and
agents from any and all claims for damages of whatever nature, arising directly or indirectly from the
HOLD HARMLESS
issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any
requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance
provision.
SCHEDULE REQUIRED INSPECTIONS AS NOTED THROUGH MY BUILDING PERMIT.
INSPECTIONS
www.mybuildingpermit.com
POTHOLING
VERIFY CLEAR BORE CROSSINGS.
RESTORE LANDSCAPE
Restore landscape to like or better conditions
Sound or noise originating from temporary construction sites as a result of construction activity are
exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:00am to 6:00pm on
SOUND AND NOISE
weekdays and 10:00am and 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all
other times the noise originating from construction sites and activities must comply with the noise
limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.
All utilities shall be located prior to any excavation. New locates shall be called for if at time of
UTILITY LOCATES
excavation, original locates are no longer identifiable.
INSPECTIONS
INSPECTION TYPE
DATE
RESULT
NOTES
COMPLETE
A-1 JOB START
E-7 TRAFFIC CTRL
X-2 ENGINEERING FINAL"
Printed: Monday, May 08, 2023 8:39:57 AM 2 of 2
of EpMO
RIGHT OF WAY CONSTRUCTION RECEIVED
PERMIT APPLICATION Feb 28 2022
CITY OF EDMONDS
Complete and submit this Application in accordance with the Submittal DEVELOPMENT SERVICES
4O� S
DEPARTMENT
Requirements outlined in Right -of -Way permit Handout E6�.
If any field is not applicable to your project, write "N/A' instead of leaving blank.
All fields required. Incomplete Applications will be denied.
SECTION A
General •
Project Name 51419-5512485
Site Address or if no site address use Property Address at NW corner of project area: 7407 212TH ST SW
Associated Permits: BLD PLN ENG
Owner and Entity Holding Franchise (if applicable)
Name of Company Ziply Fiber Franchise Ordinance No: WN U-17
Point of Contact Mike HaKahan
Title Engineer
Address 1800 41 St St, Ste N 100
city Everett
State WA
Zip 98203
Phone 425-949-0230
Email mike.hakahan@ziply.com
Contractor and Authorized Agent of Owner (see note below)
Name of company Pacific Cable Construction
Contractor Contacts
Primary Name
During Construction
Danielle Harrera
Agent Name Danielle Herrera
Title
Permit Manager
Title Permit Manager
Mobile
425-348-7735
Address PO BOX 573
Email
danielle@paccab.com
City Woodinville
State WA
Zip 98072
Secondary Name
Phone 425-348-7735
Title
Email danielle@paccab.com
Mobile
City of Edmonds Business License No: PACI FCC954PJ
Email
State License No: 3636CON 1096
Of
Contractor verifies it is currently bonded
Contractor verifies it currently has general liability insurance
NOTE: ECDC 18.6o. o2o requires that the Application be signed by a licensed and bonded contractor unless otherwise approved by the city
engineer.
❑ Multifamily residential ❑ Commercial ❑ City project
❑ Single family residential subdivision ❑ Single family -other ❑ Industrial
❑ Demo and rebuild or from vacant land?
❑ Other, please specify:
❑ Utility Franchise Work associated with development (check one of the above boxes as welt
❑ Traffic Control Only (no associated development)
❑ Utility Franchise Work (no associated development)
City of Edmonds ROW construction permit Application --Page 1 of 3 Updated 3/25/2021
Include an overall narrative description of the proposed work. Be specific and detailed:
Describe infrastructure to be impacted, such as, poles, wires, conduit, utility mains, etc.
Include whether this is construction, maintenance, or repair.
Include description of proposed construction methods, (e.g., bores, trenches, overhead wires proposed, depth for
underground utilities, etc.)
Telecommunications and broadband provider Ziply Fiber to Fli••n.Cirr�•�ir, Anchor, Down Guy, and Overhead guy
Transfer attachments, and remove old pole.
ZIPLY SHALL NOT PLACE ANY NEW POLES
RIGHT-OF-WAY
CLOSURE
AREA
TOTAL
DURATION
(Number of Months)
Sidewalk 72 hours +
LF
I x
LF
SF
Alley 72 hours +
LF
Ix
I LF
SF
Parking 72 hours +
LF
Ix
I LF
SF
SECTION B - If you are not a utility company performing work in the City ROW, skip to SECTION C.
1. The work in the right of way is on or for the following type of facilities:
VZtelecommunications ❑ cable ❑ power ❑ gas
❑ water ❑ sewer ❑ storm
Details of Work to be Completed
1. Does the utility owner have existing overhead infrastructure in the area of work?
Yes
No
2. Will any equipment be added underground or above ground (e.. pedestals, vaults, etc.)?
If yes, describe: Guy Pole
3.
Does the proposed work connect a lot or commercial development with utilities that serve more
than one lot or commercial development?
X
4.
Does the work involve rebuilding or relocating an existing aboveground utility system which
connects a lot or commercial development to an existing underground common utility stem?
X
5.
Does the work involve proposed additions to an aboveground utility stem? If es:
X
Are the additions for the purpose of serving new commercial development?
X
Are the additions for the purpose of serving a single-family residential subdivision?
Details
of Work to be Completed
Yes
No
6.
Does your project involve rebuilding or replacing utility equipment which currently serves more
than one lot or commercial development?
If yes, answer the following questions related to project area, i.e. the actual area in which the
X
project is proposed:
6a.
Does your project involve wires/cables/lines? If yes:
X
How many are existing? 1 1 1 How many are to be added? 1
City of Edmonds ROW construction permit Application --Page 2 of 3 Updated 3/25/2021
6b.
Does your project involve poles? If yes:
How many poles are existing in the project area?
1
What is the height of the existing poles?
How many poles are to be removed?
Are additional poles to be laced?
How many? What is the height of the additionalpoles? 35'
6c.
Are any poles to be modified/rebuilt/replaced? If yes:
How many? 1 1 1 What is the height of the poles after?
Describe the modification rebuild: 000 To rep ace Bu Pole
SECTION C
Traffic Control and Public Safety. Traffic control and public safety shall be in accordance with City regulations as
required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have
certification verifying completion of the required training in their possession.
Restoration. Restoration shall be in accordance with City codes and Standards. All street cut trench work shall be
patched with asphalt or City approved material prior to the end of the workday -NO EXCEPTIONS.
Insurance. The City may require the owner or contractor to provide proof of insurance acceptable to the City prior to
any permit approval.
Indemnification. The Applicant agrees to defend, indemnify, and hold harmless the City of Edmonds, its officials,
officers, employees, and agents against any injuries, damages, or claims of any kind or description whatsoever,
foreseen or unforeseen, including defense costs and attorney fees, resulting directly or indirectly from any act or
omission of the Applicant, its subcontractors, anyone directly or indirectly employed by them, and anyone for whose
acts or omissions they may be liable, arising out of, related to, or by reason of the granting of this permit; and
specifically including but not limited to all loss by the failure of the Applicant to fully or adequately perform, in any
respect, all authorizations or obligations under the permit. These indemnification requirements shall survive the
expiration, revocation, or termination of any resulting permit approval.
Acceptance of terms, conditions, and requirements. Applicant accepts the terms, conditions, and
requirements set forth in this Application and agrees they apply to any resulting permit and shall comply with them to
the satisfaction of the City Engineer. Applicant further agrees to comply with the conditions listed on the Submittal
Requirements; with all applicable city ordinances, including but not limited to ECDC Title 18; and with all applicable
requirements of state and federal law.
Statement of Applicant. I declare under penalty of perjury under the laws of the State of Washington that: I am a
licensed and bonded contractor; the information provided herein is correct and complete; and I am authorized by
owner to act on its behalf and have authority to bind the owner to this application.
Fees. The Applicant is responsible for all permit fees.
APPLICANT SIGNATURE: � DATE: 2/25/2022
APPLICANT PRINTED NAME: Donavon La eur
APPLICANT TITLE:
NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE
City of Edmonds ROW construction permit Application --Page 3 of 3 Updated 3/25/2021
SAFETY PROJECT
-PUD TO REPLACE
BO POLE
*** REVISION 2***
CHANGES ARE DUE TO
THE CITY OF EDMONDS
NOT ALLOWING US TO
PLACE A GUY STUB
POLE SOUTH OF 'B'
NEW
ANCHOR & -
DOWN GUY
17-
7407 212
50'CL1
St SW
H L L KWAXX15
���
-J HLLKWAXX 15
(50-67)
OH GUY
CONSTRUCTION NOTES * REVISION 2
PLACING
LOC "A"
-PLACE NEW ANCHOR AND GUY
-THIS WILL CREATE A SLACK SPAN FROM "A" TO "B"
**PLEASE NOTE THE SLACK SPAN CREATED FROM "A" TO
"B" WAS NEEDED AS ORIGINAL DESIGN WAS REJECTED BY
THE CITY OF EDMONDS
THIS WILL END UP BEING A LONGER THAN TYPICAL SLACK
SPAN- OK PER ZIPLY EXCHANGE ENGINEER.
LOC "B"
-TRANSFER ATTACHMENTS TO NEW 501CL1 POLE TO BE
PLACE BY PUD TIGHT EAST
-REMOVE OLD POLE
LOC "C"
-PLACE NEW ANCHOR & DOWN GUY
PLACE NEW OH GUY FROM "B" TO "C"
EXTEND STRAND FOR NEW OH GUY FROM "B" TO "C"
* NOT E * OH GUY STRAND FROM "B" TO "C" TO BE
* TIED IN TO EXISTING STRAND AT "B"
MVIT1
/Dc am-9 I r
ZIPLY SHALL NOT PLACE
ANY NEW POLES
J V V
O C
O �
I
I
I CERTIFY THAT THE WORK I COMPLETD ON THIS WORK
ORDER AND AS -BUILT IS IN COMPLIANCE WITH ZIPLY
QUALITY STANDARDS AS IDENTIFIED ON THE IPQIP
CHECKLIST.
(SIGNATURE AND DATE)
TOTAL ALLOTTED HOURS
CONTACT SUPERVISOR IF ADDITIONAL
HOURS ARE REQUIRED TO COMPLETE PROJECT
CAP. X-TIME MAINT
CREW 0 0 0
SPLICING 0 0 0
W.O. DRIVER CONSTRUCTION START
❑ ETHERNET
❑ CIAC
❑ DAMAGE
I& OTHER
IN SERVICE DATE
CONSTRUCTION
I@ FLAGGING ❑ BRUSHING ❑ CONTRACTOR
PERMITS
MUNICIPALITY:EDMONDS
❑ BLANKET
❑ TCP/TRAFFIC
® DETAILED (NOT BLANKET)
❑ NO PERMIT REQUIRED
JOINT POLE
JFN/NJUNS#100088201
❑ NO JPN REQUIRED
POLE JPN JPN
OWNER TO FROM
❑ ❑ ❑ POWER
❑ ❑ ❑ CATV
❑ ❑ ❑ ZIPLY
ACCOUNT CODES
® 2411.001
POLES
❑ 2422.201
UG FIBER
❑ 2421.101
OH COPPER
❑ 2441.001
CONDUIT
❑ 2421.201
OH FIBER
® 34XX.XXX
REMOVAL
❑ 2422.101
UG COPPER
® 64XX.XXX
MAINT.
POINT OF CONTACT
SCHEDULING:
PHONE:
ENGINEER:
PHONE:
FACILITIES:
PHONE:
FIELDED BY:
JOHN WOOD
425-261-1412
RICH EVANS
425-261-6282
JEANETTE CHISHOLM
425-263-4011
OSP CONSTRUCTION
i zy
I yfi ber
P
HLLK BO POLE & GUY STUB PLC
7407 212TH ST SW
PROJECT C.O. AREA: 967
NUMBER: 5512485 EXCH. CODE: 51419
DRAWN DATE: ENGR: RICH EVANS NTY: SNOHOMISH
2/15/2022 PHONE: 425-261-6282 FILE:
SCALE: 1:100 TAX DISTRICT: 3748F DWG 1 OF 1
TWNSHP: T27N RNG: R4E SEC: S20
ATCO COMMUNICATIONS SERVICES, LLC AS THE DESIGNER OF THIS TRAFFIC CONTROL PLAN,
MAKES NO REPRESENTATION AS TO ITS' GENERAL ADEQUACY OR BEING APPROVED FOR IMPLEMENTATION.
APPROVAL MUST RESULT FROM THE TRAFFIC ENGINEER OR OTHER PUBLIC OFFICIAL HAVING STATUTORY
ENFORCEMENT AUTHORITY IN THE JURISDICTION. UTILIZATION AND IMPLEMENTATION OF THIS PLAN
SHALL BE A RESULT OF THE APPROVAL. REF. MUTCD 2009 6A - 01 (10)
21 Oth St SW 21 Oth St SW
C3
-4 CL
Kuzmas Fish Market
F WORK AREA
212th St Sw 212th St SW
{may`
Park 212
f~
s
215th St SW
2131h P1 SW
213th Pf SW
Aldercrest Health
& Rehab Center
Jack in the Box 19
2121h 5t SW
Swickard Toyota 9
SEAWEED Cannabis ��
Edmonds - Dispensary'.._ �`
rvlcGtj'�alds
Ai Ca
VICINITY MAP
Agra 10
99
CarMax
Seattl"
Repo
RESUB
Apr 26 2023
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
JWJFMVME
ATCO COMMUNICATIONS SERVICES. LLC
www.atcotelecom.com
360.563.9000
708 First Street
Snohomish, WA 98290
ziPIy fiber
Everett, WA 98206
Lf)
00
N
�
5
L�
0)
3
a
LO
=
N
a
F
p
U)
v
a
5
W
o
's
U,
F-
00
w
N
Cr.
f-
L0
n
' 1I
W
r2
v /
1 f
LU
U
m
W
Z
U
o
Q
U
z
O
w
2
Q
Z
d
0�
IL
O
_I
J_
LL
DATE:
4.26.2023
REVIEWED BY:
D. LAFLEUR
WSTCS# 013259
DESIGNED BY:
M. LUNA
ATCO CONTACT:
606.369.5721
marcus.luna@atcotelecom.com
SCALE:
SHEET:
NOT TO
01
SCALE
NO: 1 OF 3
LEGEND:
OS
SIGNALIZED INTERSECTION
OCONE
(CANDLESTICK)
TYPE III BARRICADE
WORKTRUCK
WORK ZONE LIMITS
OWE
WARNING SIGN
ARROW BOARD
REQUIRED)
(WHERE
DIRECTION OF TRAFFIC
(NOT PAVEMENT MARKINGS)
FLAGGER
(AS NEEDED)
ATCO COMMUNICATIONS SERVICES, LLC AS THE DESIGNER OF THIS TRAFFIC CONTROL PLAN,
MAKES NO REPRESENTATION AS TO ITS' GENERAL ADEQUACY OR BEING APPROVED FOR IMPLEMENTATION.
APPROVAL MUST RESULT FROM THE TRAFFIC ENGINEER OR OTHER PUBLIC OFFICIAL HAVING STATUTORY
ENFORCEMENT AUTHORITY IN THE JURISDICTION. UTILIZATION AND IMPLEMENTATION OF THIS PLAN
SHALL BE A RESULT OF THE APPROVAL. REF. MUTCD 2009 6A - 01 (10)
SIGN LEGEND:
BIKE > > BIKES
ROAD LANE RIGHT LANE MERGE CENTER LANE
WORK CLOSED CLOSED WITH CLOSED
4
AHEAD AHEAD TRAFFIC AHEAD
AHEAD
W20-1 BIKE CLOSED W20-5R BIKE MERGE W14L W20-5C W1-6R
FLAGGERS WILL HAVE WORK STOP TO
ESCORT PEDESTRIANS THROUGH W❑RKZ❑NE
a
.+i
PROVIDE PEDESTRIAN DETOUR IF
SIDEWALK CLOSED - CROSSING AT
NEAREST DESIGNATED CROSSWALKS
(76TH AND 72ND)
W1
WW
O
PHASE 1
ANY WORK AFFECTING TRANSIT
O- OFACILITIES CONTACT CIC
-
0.
PROVIDE O-
BUS STOP IMPACTS
60 411
1 t
Downstream .I
Taper �V
Applicant shall repair/replace all
damage to utilities or frontage
improvements in City right-of-way
per city standards that is caused or
occurs during the permitted project.
BUFFER AREA
LONGITUDINAL BUFFER SPACE = B
POSTED SPEED (MPH)
25
30
35
40
45
50
55
60
64
70
LENGTH (feet)
155
200
250
305
360
425
495
570
645
730
TRANSPORTABLE ATTENUATOR ROLL AHEAD DEVICE = R
HOST VEHICLE WEIGHT (Ibs)
9,900 TO 22,000
HOST VEHICLE WEIGHT (Ibs)
> 22,000
< 45 MPH
45 - 55 MPH
> 55 MPH
< 45 MPH
45 - 55 MPH
> 55 MPH
100,
123'
172'
74'
100,
150'
212TH ST SW
(3 0 MPH)
OWNER/CONTRACTOR IS RESPONSIBLE FOR
EROSION CONTROL AND DRAINAGE
NOTE:
MON. - FRI. = 7:00am TO 4:00pm
WORK DETAILS:
CYO
Transfer attachments to new 50'
Di CL1 pole to loe place loy PUD tight
east, remove pole
20 Place new Anchor & Down Guy
x SPOTTER NEEDED FOR PEDESTRIAN
TRAFFIC AND DRIVEWAY ACCESS,
ENGINEERING DIVISION
...,7TED
� 03W 15/04/2022
ZIPLY SHALL NOT PLACE
ANY NEW POLES
W20-5R11 W2
BIKE(MERGE), I BIKE(CLOSED
OWNER/CONTRACTOR RESPONSIBLE FOR LOCATING
ALL ON SITE UTILITIES. RELOCATION/REVISION TO ANY
UTILITIES MAY REQUIRE A SEPERATE PERMIT.
CHANNELIZATION DEVICE
SPACING (feet)
MPH TAPER TANGENT
50/70 40 80
35/45 30 1 60
25/30 20 1 40
MINIMUM LANE SHIFT TAPER LENGTH = L/2 (feet)
LANE
POSTED SPEED (MPH)
WIDTH
(feet)
25
F 30
35
40
45
50
55
60
65
70
10
55
75
105
135
225
250
275
300
325
350
11
60
85
115
150
250
275
305
330
370
385
12
65
90
125
160
270
300
330
360
390
420
RESUB
Apr 26 2023
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
SIGN SPACING = X (1)
FREEWAY & EXPRESSWAYS 55 / 70 MPH
1500' ±
RURAL HIGHWAYS 60 / 65 MPH
800' ±
RURAL ROADS 45 / 55 MPH
500' ±
RURAL ROADS & URBAN ARTERIALS 35 / 40 MPH
350' ±
RURAL ROADS & URBAN ARTERIALS 25 / 30 MPH
RESIDENTIAL & BUSINESS DISTRICTS
200' ± (2)
URBAN STREETS 25 MPH OR LESS
100'± (2)
(1) ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS,
AT -GRADE INTERSECTIONS AND DRIVEWAYS
(2) THIS SPACE MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS.
O
ATCO COMMUNICATIONS SERVICES. LLC
www.otcotelecom.com
360.563.9000
708 First Street
Snohomish, WA 98290
ziPylfiber
Everett, WA 98206
Lo
00
N
LLI
L
Q
z _o
N
V
Ln
>
ci
I
r
06
LU
Of
CLO
N
_
LO
ON
N
ICz
z
O
U
U
wCO
CO
LU
LL
LL
m
0
o
Q7)
z
Q
Z
O
CZ w
U
U
z
Of
of
U
�
a-
EL
L
DATE:
4.26.2023
REVIEWED BY: D. LAFLEUR
WSTCS# 013259
DESIGNED BY:
M. LUNA
ATCO CONTACT: 606.369.5721
marcus.luna@atcotelecom.com
SCALE:
1"=50'
SHEET:
22
NO: 2OF3
LEGEND:
OS
SIGNALIZED INTERSECTION
OCONE
(CANDLESTICK)
TYPE III BARRICADE
WORKTRUCK
WORK ZONE LIMITS
OWE
WARNING SIGN
ARROW BOARD
REQUIRED)
(WHERE
DIRECTION OF TRAFFIC
(NOT PAVEMENT MARKINGS)
FLAGGER
(AS NEEDED)
III
I�
4
Q
ATCO COMMUNICATIONS SERVICES, LLC AS THE DESIGNER OF THIS TRAFFIC CONTROL PLAN,
MAKES NO REPRESENTATION AS TO ITS' GENERAL ADEQUACY OR BEING APPROVED FOR IMPLEMENTATION.
APPROVAL MUST RESULT FROM THE TRAFFIC ENGINEER OR OTHER PUBLIC OFFICIAL HAVING STATUTORY
ENFORCEMENT AUTHORITY IN THE JURISDICTION. UTILIZATION AND IMPLEMENTATION OF THIS PLAN
SHALL BE A RESULT OF THE APPROVAL. REF. MUTCD 2009 6A - 01 (10)
SIGN LEGEND:
ROAD SHOULDER
WORK WORK
AHEAD > <
W20-1 W21-5
BUFFER AREA
LONGITUDINAL BUFFER SPACE = B
POSTED SPEED (MPH)
25
30
35
40
45
50
55
60
64
70
LENGTH (feet)
155
200
250
305
360
425
495
570
645
730
TRANSPORTABLE ATTENUATOR ROLL AHEAD DEVICE = R
HOST VEHICLE WEIGHT (Ibs)
9,900 TO 22,000
HOST VEHICLE WEIGHT (Ibs)
> 22,000
< 45 MPH
45 - 55 MPH
> 55 MPH
< 45 MPH
45 - 55 MPH
> 55 MPH
100,
123'
172'
74'
100,
150'
WORK DETAILS:
OPlace new Pole & Anchor, to create
a slack span,
w SPOTTER NEEDED FOR PEDESTRIAN
TRAFFIC AND DRIVEWAY ACCESS,
NOTE:
MON. - FRI. = 7:00am TO 4:00pm
CHANNELIZATION DEVICE
SPACING (feet)
MPH TAPER
TANGENT
50/70 40
1 80
35/45 30
60
25/30 20
40
MINIMUM LANE SHIFT TAPER LENGTH = L/2 (feet)
LANE
POSTED SPEED (MPH)
WIDTH
(feet)
25
730
35
40
45
50
55
60
65
70
10
55
75
105
135
225
250
275
300
325
350
11
60
85
115
150
250
275
305
330
370
385
12
65
90
125
160
270
300
330
360
390
420
PHASE 2
a z
RESUB
Apr 26 2023
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
SIGN SPACING = X (1)
FREEWAY & EXPRESSWAYS 55 / 70 MPH
1500' ±
RURAL HIGHWAYS 60 / 65 MPH
800' ±
RURAL ROADS 45 / 55 MPH
500' ±
RURAL ROADS & URBAN ARTERIALS 35 / 40 MPH
350' ±
RURAL ROADS & URBAN ARTERIALS 25 / 30 MPH
RESIDENTIAL & BUSINESS DISTRICTS
200' ± (2)
URBAN STREETS 25 MPH OR LESS
100'± (2)
(1) ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS,
AT -GRADE INTERSECTIONS AND DRIVEWAYS
(2) THIS SPACE MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS.
J"u __N
ATCO COMMUNICATIONS SERVICES. LLC
www.atcotelecom.com
360.563.9000
708 First Street
Snohomish, WA 98290
ziPylfiber
Everett, WA 98206
Lo
00
N
LLI
L
Q
z _o
N
V
Ln
>
N
r
r
r
0
W
^ Of
IL
C
00
N
ON
N
N
1y
z
O
U
U
w
w
m
0
o
Q
z
U
Q
U
z
O
rj." w
Z
Of
a-
�
CL
ULLI
o
LL
DATE: 4.26.2023
REVIEWED BY: D. LAFLEUR
WSTCS# 013259
DESIGNED BY: M. LUNA
ATCO CONTACT: 606.369.5721
marcus.luna@atcotelecom.com
SCALE: SHEET:
=5F 03
NO: 3OF3