Loading...
Building PermitType: RESIDENTIAL BLDG Subtype: DECK I Status: ISSUED Parcel No: 00619400100600 Subdivision: 006194 Fire Sprinklers: Valuation: $10,212.00 Code Edition: 0 Site Address: 827 FIR ST EDMONDS,WA 98020-3958 Lot: 0 Lot Area: Occupancy Type: No. Stories: 0 Scope of Work: BERGEVIN-DECK Zoning: Construction Type: # of Dwelling Units: 0 WA State Contractor L & I #: Applied: 4/4/2023 Issued:5/12/2023 Final: Expiration Date: 11/13/2023 Issued by: BAC NAME TYPE NAME ADDRESS PHONE EMAIL APPLICANT DOUGLAS ALMOND 6300 139TH AVENUE S.E., (206)225-0068 DOUG.ALMOND@NUTTYCAD.COM SNOHOMISH WA 98290 CONTACT NUTTYCAD DRAFTING AND 6300 139TH AVENUE S.E., (206)225-0068 doug.almond@nuttycad.com DESIGN SNOHOMISH WA 98290 CONTRACTOR FRANK'S PAINTING INC 26101 14TH PL S, DES MOINES Brionesj884@icloud.com WA 98198 JULIE RICE & JON DOUG 827 FIR ST, EDMONDS WA OWNER juliebergevin@hotmail.com BERGEVIN 98020-3958 •' M • DESCRIPTION 7BLDRESALUE ACCOUNT AMOUNT PAID PAID DATE RECEIPT # BASED FEE 001.000.345.83.000.00 $301.00 $301.00 5/12/23 R28618 BLD - RES VALUE BASED REVIEW 001.000.345.83.000.00 $243.95 $243.95 4/11/23 R27700 CITY TECHNOLOGY FEE - PER 001.000.321.99.100.00 $45.00 $45.00 4/11/23 R27700 PERMIT ENG - INSPECTIONS 001.000.345.83.400.00 $126.00 $126.00 5/12/23 R28618 STATE BUILDING CODE SURCHARGE 001.000.237.150 $6.50 $6.50 5/12/23 R28618 RES TOTALS: $722.45 $722.45 CONDITIONS CONDITION TYPE STATUS NOTES Printed: Friday, May 12, 2023 3:30:30 PM 1 of 3 'RESIDENTIAL BLDG PermitCity • • • • - EL 98020 1 1 � www.edmondswa.gov• 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests shall be established by Council and shall be paid upon submittal and are nonrefundable. 3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a ALL BUILDING PERMITS FOR result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only INFORMATION during the hours of 7:OOam to 6:OOpm on weekdays and 10:OOam to 6:OOpm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and potential monetary liability for work performed by unlicensed plumbing contractors. For more information contact L&I Department of Licensing at 1-800-647-0982. It is the owner's responsibility to repair/replace all damage of utilities or frontage DAMAGE TO FRONTAGE FOR improvements in City right of Ways or Easements to City Standards caused by or IMPROVEMENTS INFORMATION occurring during the permitted project. ESC REQUIREMENTS FOR MAINTAIN EROSION AND SEDIMENTATION CONTROL PER CITY AND SWMMW STANDARD INFORMATION REQUIREMENTS. Approval of this foundation design is conditional subject to inspection of existing site soil FOR conditions. Retaining walls must be designed and constructed to resist the lateral FOUNDATION BEARING INFORMATION pressure of the retained material. Provisions must be made for the control and drainage of surface water around buildings. INSP PRIOR TO BACKFILL FOR Call for all required inspections. All work shall be inspected prior to backfill. NFORMATION INSPECTIONS FOR SCHEDULE REQUIRED INSPECTIONS AS NOTED THROUGH MY BUILDING PERMIT. INFORMATION www.mybuildingpermit.com Installation, use and maintenance of equipment and components shall be per MANUFACTURER SPECS FOR manufacturers specifications, installation instructions, and applicable state codes. INFORMATION Provide manufactures installation instructions on site for Building Inspector. Sound or noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of FOR 7:OOam to 6:OOpm on weekdays and 10:OOam and 6:OOpm on Saturdays, excluding SOUND AND NOISE INFORMATION Sundays and Federal Holidays. At all other times the noise originating from construction sites and activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. Sound or noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of FOR 7:OOam to 6:OOpm on weekdays and 10:OOam and 6:OOpm on Saturdays, excluding SOUND AND NOISE INFORMATION Sundays and Federal Holidays. At all other times the noise originating from construction sites and activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. FOR All utilities shall be located prior to any excavation. New locates shall be called for if at UTILITY LOCATES INFORMATION time of excavation, original locates are no longer identifiable. Printed: Friday, May 12, 2023 3:30:30 PM 2 of 3 RESIDENTIAL BLDG '-rmit AveCity of Edmonds PERMIT NUM •:� i 1 1 � www.edmondswa.gov Lw.A& INSPECTIONS• INSPECTIONTYPE •. INSPECTOR COMPLETED RESULT NOTES A-1 BUILDING PRECON B-2 FOOTINGS B-4 FRAMING B-7 BUILDING OTHER INSP X-3 BUILDING FINAL" B-3 UNDERFLR FRAMING inspector: this is for the connection of the lateral ties into the home if necessary. A-1 TESC AND MOBILIZE E-3 STRM MGMT FACILITY E-3 STRM TIGHTLINE E-9 COMPOST AMEND X-2 ENGINEERING FINAL Printed: Friday, May 12, 2023 3:30:30 PM 3 of 3