Building PermitType: RESIDENTIAL BLDG Subtype: DECK I Status: ISSUED
Parcel No: 00619400100600
Subdivision: 006194
Fire Sprinklers:
Valuation: $10,212.00
Code Edition: 0
Site Address: 827 FIR ST EDMONDS,WA 98020-3958
Lot: 0
Lot Area:
Occupancy Type:
No. Stories: 0
Scope of Work: BERGEVIN-DECK
Zoning:
Construction Type:
# of Dwelling Units: 0
WA State Contractor L & I #:
Applied: 4/4/2023
Issued:5/12/2023
Final:
Expiration Date: 11/13/2023
Issued by: BAC
NAME TYPE
NAME
ADDRESS
PHONE
EMAIL
APPLICANT
DOUGLAS ALMOND
6300 139TH AVENUE S.E.,
(206)225-0068
DOUG.ALMOND@NUTTYCAD.COM
SNOHOMISH WA 98290
CONTACT
NUTTYCAD DRAFTING
AND
6300 139TH AVENUE S.E.,
(206)225-0068
doug.almond@nuttycad.com
DESIGN
SNOHOMISH WA 98290
CONTRACTOR
FRANK'S PAINTING INC
26101 14TH PL S, DES MOINES
Brionesj884@icloud.com
WA 98198
JULIE RICE & JON DOUG
827 FIR ST, EDMONDS WA
OWNER
juliebergevin@hotmail.com
BERGEVIN
98020-3958
•' M •
DESCRIPTION
7BLDRESALUE
ACCOUNT
AMOUNT
PAID
PAID DATE RECEIPT #
BASED FEE
001.000.345.83.000.00
$301.00
$301.00
5/12/23
R28618
BLD - RES VALUE BASED REVIEW
001.000.345.83.000.00
$243.95
$243.95
4/11/23
R27700
CITY TECHNOLOGY FEE - PER
001.000.321.99.100.00
$45.00
$45.00
4/11/23
R27700
PERMIT
ENG - INSPECTIONS
001.000.345.83.400.00
$126.00
$126.00
5/12/23
R28618
STATE BUILDING CODE SURCHARGE
001.000.237.150
$6.50
$6.50
5/12/23
R28618
RES
TOTALS: $722.45
$722.45
CONDITIONS
CONDITION TYPE
STATUS
NOTES
Printed: Friday, May 12, 2023 3:30:30 PM 1 of 3
'RESIDENTIAL
BLDG PermitCity
• • • • -
EL
98020 1 1 �
www.edmondswa.gov•
1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors
in interests, agrees to indemnify defend and hold harmless the City of Edmonds,
Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance
of this permit shall not be deemed to modify, waive or reduce any requirements of any
City ordinance nor limit in any way the City's ability to enforce any ordinance provision.
2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or
other administrative deviation from adopted codes ordinances or policies must be
specifically requested in writing and be called out and identified. Processing fees for such
requests shall be established by Council and shall be paid upon submittal and are
nonrefundable.
3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a
ALL BUILDING PERMITS
FOR
result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only
INFORMATION
during the hours of 7:OOam to 6:OOpm on weekdays and 10:OOam to 6:OOpm on
Saturdays, excluding Sundays and Federal Holidays. At all other times the noise
originating from construction sites/activities must comply with the noise limits of
Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.
4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted
by the Building Official prior to use or occupancy of the building or structure. Check the
job card for all required City inspections including final project approval and final
occupancy inspections.
5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW.
Property owners who hire an unlicensed plumber may assume the risks and potential
monetary liability for work performed by unlicensed plumbing contractors. For more
information contact L&I Department of Licensing at 1-800-647-0982.
It is the owner's responsibility to repair/replace all damage of utilities or frontage
DAMAGE TO FRONTAGE
FOR
improvements in City right of Ways or Easements to City Standards caused by or
IMPROVEMENTS
INFORMATION
occurring during the permitted project.
ESC REQUIREMENTS
FOR
MAINTAIN EROSION AND SEDIMENTATION CONTROL PER CITY AND SWMMW STANDARD
INFORMATION
REQUIREMENTS.
Approval of this foundation design is conditional subject to inspection of existing site soil
FOR
conditions. Retaining walls must be designed and constructed to resist the lateral
FOUNDATION BEARING
INFORMATION
pressure of the retained material. Provisions must be made for the control and drainage
of surface water around buildings.
INSP PRIOR TO BACKFILL
FOR
Call for all required inspections. All work shall be inspected prior to backfill.
NFORMATION
INSPECTIONS
FOR
SCHEDULE REQUIRED INSPECTIONS AS NOTED THROUGH MY BUILDING PERMIT.
INFORMATION
www.mybuildingpermit.com
Installation, use and maintenance of equipment and components shall be per
MANUFACTURER SPECS
FOR
manufacturers specifications, installation instructions, and applicable state codes.
INFORMATION
Provide manufactures installation instructions on site for Building Inspector.
Sound or noise originating from temporary construction sites as a result of construction
activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of
FOR
7:OOam to 6:OOpm on weekdays and 10:OOam and 6:OOpm on Saturdays, excluding
SOUND AND NOISE
INFORMATION
Sundays and Federal Holidays. At all other times the noise originating from construction
sites and activities must comply with the noise limits of Chapter 5.30, unless a variance
has been granted pursuant to ECC 5.30.120.
Sound or noise originating from temporary construction sites as a result of construction
activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of
FOR
7:OOam to 6:OOpm on weekdays and 10:OOam and 6:OOpm on Saturdays, excluding
SOUND AND NOISE
INFORMATION
Sundays and Federal Holidays. At all other times the noise originating from construction
sites and activities must comply with the noise limits of Chapter 5.30, unless a variance
has been granted pursuant to ECC 5.30.120.
FOR
All utilities shall be located prior to any excavation. New locates shall be called for if at
UTILITY LOCATES
INFORMATION
time of excavation, original locates are no longer identifiable.
Printed: Friday, May 12, 2023 3:30:30 PM 2 of 3
RESIDENTIAL BLDG '-rmit
AveCity of Edmonds PERMIT NUM
•:� i 1 1 �
www.edmondswa.gov
Lw.A&
INSPECTIONS•
INSPECTIONTYPE
•.
INSPECTOR COMPLETED RESULT NOTES
A-1 BUILDING PRECON
B-2 FOOTINGS
B-4 FRAMING
B-7 BUILDING OTHER INSP
X-3 BUILDING FINAL"
B-3 UNDERFLR FRAMING
inspector: this is for the connection of the lateral ties
into the home if necessary.
A-1 TESC AND MOBILIZE
E-3 STRM MGMT FACILITY
E-3 STRM TIGHTLINE
E-9 COMPOST AMEND
X-2 ENGINEERING FINAL
Printed: Friday, May 12, 2023 3:30:30 PM 3 of 3